Any deviation from these drawings must be communicated in writing toand reviewed by your local GE Healthcare Installation Project Managerprior to making changes.
Make arrangements for any rigging, special handling, or facilitymodifications that must be made to deliver the equipment to theinstallation site. If desired, your local GE Healthcare Installation ProjectManager can supply a reference list of rigging contractors.
New construction requires the following; 1. Secure area for equipment,
analysis, 4. Restrooms.
Provide for refuse removal and disposal (e.g. crates, cartons, packing)
2. Power for drills and other test equipment, 3. Capability for image
Contact a radiation physicist or consultant to specify radiationcontainment requirements.
Women's HealthSite Planning
Isthisitem
ready?
Willitembe
ready?
1
2
3
4
5
6
7
8
9
10
Item#
Allwallsprimed(finalcoat notneededon Day1),andcounter
topsthat willsupportequipmentmustbe installed.No dust-
producingcabinetryworkin installationareas.
Mechanicalsupplierhasbeen providedwitha setof
equipmentinstallationdrawingsforreference.For California,
permittedconstructiondrawingsorPMI-specifiedinstallation
drawingsarerequired.
Predict
(Pre-ship)
Equipmentinstallationdrawingsmustmatchactual roomsize
andmustmeet clearancerequirements. Deviationsthatmeet
installationrequirementsmaybe red-lined,ifred-liningis
allowedbylocalcode. Seismicrequirementsareidentifiedon
constructiondrawings.
Deliveryrouteto installationorstoragearea meets
requirementsand hasbeendiscussedand scheduledwiththe
customer.Ensurefloorprotection isdiscussed,requirements
identified,andwillbe availableattime ofdeliveryand
installation.
Roomsthatwillcontain equipment,includingstorageareas,
aredustfree. Roomsecuritytopreventunauthorizedaccess
andtheft hasbeendiscussedwith customer.Thecustomeris
awareofthese securityissues,implicationsand responsibility.
InroomHVAC ductworkandunits (inroom)mustbe
mechanicallyinstalledand dustfree. Installationrooms
appearto meetenvironmentalconditions(seeFurther
Definitions)and observedissueshavebeencommunicatedto
thecustomer. Ifbeingstored, storageareamustmeet PIM
storagecriteria.
Storage:
Isitemready?
IssuedDate:7/9/07Rev11
Conduit/electricalcableducting/dividers/ accessflooring
installed,withtheexceptionof surface-mountedfloorducting.
Wiringtothe maindisconnectpanelis installedandcompliant
withequipmentinstallationdrawingsor pre-installation
manual.
Ceilinggridisinstalled,Unistrutis locatedperthe installation
drawings,andpermanentlighting isinstalledand operational.
Floorisclean andpreparedfor finalfloorcovering. Customerhasverifiedfloorlevelingmeetstheequipmentinstallation
drawingsandPIM specsandno visibledefectsareobserved.
Gantryandtable baseplateareinstalledprior todelivery(ifapplicable)
Accesstoa workingphoneat thefacilityfor emergencyuse,
includingMRmagnetdelivery.
MI Supplier:
Lead Installer:
Phone Number:
InspectionDate
Thecustomer isresponsible forproper sitepreparation andsite readinessregardless ofany GEHCinspections/assessments.
GEHCMinimumRequirements
Comments
If"N",pleaseenterin commentsoraction
planVerify
(Delivery):
Isitemready?
Validate
(MechInstall):
Isitemready?
Customer:
GE Healthcare Site Readiness Checklist
Helper:
GEHCGlobalOrder#:
GEHCOn-site Representative:
Nameof customerreviewedwith:
GEHCPMI :
TargetSitePrepCompletionDate:
GE HealthcareCustomer Site Readiness
RequirementsDrawing Index
A mandatory component of this drawing set is the GE HealthcarePreinstallation manual. Failure to reference the preinstallationmanual will result in incomplete documentation required forsite design and preparation.
Preinstallation documents for GE Healthcare products can beaccessed on the web at:
http://www.gehealthcare.com/company/docs/siteplanning.html
These sheets are a document set and should not be separated.Electrical information and references are contained on all sheets.
GE Equipment DeliveryRequirements
Items 1 through 8 on the GE Healthcare Site Readiness Checklist are REQUIRED to facilitate equipmentdelivery to the installation site. Equipment will not be delivered if these requirements are not satisfied.
* REQUIRED REFERENCE *
Preinstallation Manual
These equipment installation drawings indicate the placement andinterconnection of the listed equipment components. These drawings are
not construction or site preparation drawings. Customer remains ultimatelyresponsible for preparing the site to accommodate the installation andoperation of such equipment in compliance with GE Healthcare's writtenspecifications and all applicable federal, state, and/or local requirements.
8/13/2019 GEHC Site Planning Final Drawing Diamond System PDF
2/6
8/13/2019 GEHC Site Planning Final Drawing Diamond System PDF
3/6
8/13/2019 GEHC Site Planning Final Drawing Diamond System PDF
4/6
8/13/2019 GEHC Site Planning Final Drawing Diamond System PDF
5/6
8/13/2019 GEHC Site Planning Final Drawing Diamond System PDF
6/6