  • 8/13/2019 GEHC Site Planning Final Drawing Diamond System PDF

    1/6

    Any deviation from these drawings must be communicated in writing toand reviewed by your local GE Healthcare Installation Project Managerprior to making changes.

    Make arrangements for any rigging, special handling, or facilitymodifications that must be made to deliver the equipment to theinstallation site. If desired, your local GE Healthcare Installation ProjectManager can supply a reference list of rigging contractors.

    New construction requires the following; 1. Secure area for equipment,

    analysis, 4. Restrooms.

    Provide for refuse removal and disposal (e.g. crates, cartons, packing)

    2. Power for drills and other test equipment, 3. Capability for image

    Contact a radiation physicist or consultant to specify radiationcontainment requirements.

    Women's HealthSite Planning

    Isthisitem

    ready?

    Willitembe

    ready?

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    Item#

    Allwallsprimed(finalcoat notneededon Day1),andcounter

    topsthat willsupportequipmentmustbe installed.No dust-

    producingcabinetryworkin installationareas.

    Mechanicalsupplierhasbeen providedwitha setof

    equipmentinstallationdrawingsforreference.For California,

    permittedconstructiondrawingsorPMI-specifiedinstallation

    drawingsarerequired.

    Predict

    (Pre-ship)

    Equipmentinstallationdrawingsmustmatchactual roomsize

    andmustmeet clearancerequirements. Deviationsthatmeet

    installationrequirementsmaybe red-lined,ifred-liningis

    allowedbylocalcode. Seismicrequirementsareidentifiedon

    constructiondrawings.

    Deliveryrouteto installationorstoragearea meets

    requirementsand hasbeendiscussedand scheduledwiththe

    customer.Ensurefloorprotection isdiscussed,requirements

    identified,andwillbe availableattime ofdeliveryand

    installation.

    Roomsthatwillcontain equipment,includingstorageareas,

    aredustfree. Roomsecuritytopreventunauthorizedaccess

    andtheft hasbeendiscussedwith customer.Thecustomeris

    awareofthese securityissues,implicationsand responsibility.

    InroomHVAC ductworkandunits (inroom)mustbe

    mechanicallyinstalledand dustfree. Installationrooms

    appearto meetenvironmentalconditions(seeFurther

    Definitions)and observedissueshavebeencommunicatedto

    thecustomer. Ifbeingstored, storageareamustmeet PIM

    storagecriteria.

    Storage:

    Isitemready?

    IssuedDate:7/9/07Rev11

    Conduit/electricalcableducting/dividers/ accessflooring

    installed,withtheexceptionof surface-mountedfloorducting.

    Wiringtothe maindisconnectpanelis installedandcompliant

    withequipmentinstallationdrawingsor pre-installation

    manual.

    Ceilinggridisinstalled,Unistrutis locatedperthe installation

    drawings,andpermanentlighting isinstalledand operational.

    Floorisclean andpreparedfor finalfloorcovering. Customerhasverifiedfloorlevelingmeetstheequipmentinstallation

    drawingsandPIM specsandno visibledefectsareobserved.

    Gantryandtable baseplateareinstalledprior todelivery(ifapplicable)

    Accesstoa workingphoneat thefacilityfor emergencyuse,

    includingMRmagnetdelivery.

    MI Supplier:

    Lead Installer:

    Phone Number:

    InspectionDate

    Thecustomer isresponsible forproper sitepreparation andsite readinessregardless ofany GEHCinspections/assessments.

    GEHCMinimumRequirements

    Comments

    If"N",pleaseenterin commentsoraction

    planVerify

    (Delivery):

    Isitemready?

    Validate

    (MechInstall):

    Isitemready?

    Customer:

    GE Healthcare Site Readiness Checklist

    Helper:

    GEHCGlobalOrder#:

    GEHCOn-site Representative:

    Nameof customerreviewedwith:

    GEHCPMI :

    TargetSitePrepCompletionDate:

    GE HealthcareCustomer Site Readiness

    RequirementsDrawing Index

    A mandatory component of this drawing set is the GE HealthcarePreinstallation manual. Failure to reference the preinstallationmanual will result in incomplete documentation required forsite design and preparation.

    Preinstallation documents for GE Healthcare products can beaccessed on the web at:

    http://www.gehealthcare.com/company/docs/siteplanning.html

    These sheets are a document set and should not be separated.Electrical information and references are contained on all sheets.

    GE Equipment DeliveryRequirements

    Items 1 through 8 on the GE Healthcare Site Readiness Checklist are REQUIRED to facilitate equipmentdelivery to the installation site. Equipment will not be delivered if these requirements are not satisfied.

    * REQUIRED REFERENCE *

    Preinstallation Manual

    These equipment installation drawings indicate the placement andinterconnection of the listed equipment components. These drawings are

    not construction or site preparation drawings. Customer remains ultimatelyresponsible for preparing the site to accommodate the installation andoperation of such equipment in compliance with GE Healthcare's writtenspecifications and all applicable federal, state, and/or local requirements.

  • 8/13/2019 GEHC Site Planning Final Drawing Diamond System PDF

    2/6

  • 8/13/2019 GEHC Site Planning Final Drawing Diamond System PDF

    3/6

  • 8/13/2019 GEHC Site Planning Final Drawing Diamond System PDF

    4/6

  • 8/13/2019 GEHC Site Planning Final Drawing Diamond System PDF

    5/6

  • 8/13/2019 GEHC Site Planning Final Drawing Diamond System PDF

    6/6