Upload
danang-wibisana
View
72
Download
3
Tags:
Embed Size (px)
Citation preview
This certificate is awarded to
August 20, 2009SLAMET NGABIANTO
DateSignature
DANANG WIBISANAAS PROJECT / SITE ENGINEER
in recognition of valuable contributions
4’’ Subsea Pipeline from LWA-LP Platform at Malaka Strait
Contract No. OPS/MS/2009/003 with NO LOSS TIME ACCIDENT
Period : February - July 2009
Certificate of Appreciation