3. PRIMESTAR / GE SOLAR Start-up Thin film CdTe Solar Module Manufacturer (residential & power plants)
100 solar modules / day @ $95 ea. Low Volume / Low Mix
70K Sq. ft. facility in Arvada, Co. Pilot Line Process & Automation for proof of principles for factory expansion. Roles:
Technical Program Manager Factory Development Special Projects
EQUIPMENT LAYOUT
MATERIAL FLOW
GlassTCOZTOCdS
CdTeCdTe
Pin
hole
sC
u-A
ceta
teN
PR
P1
NPR
P1
Cu-Acetate dip
Graphite
P2
Laser Scribe Pattern #3
Laser Beam
Updated: 1/11/2008 PrimeStar Solar Confidential
P2
Metal (Ni and Al)
P3
LASER SCRIBER
LASER SCRIBER
LASER SCRIBER (BEAM SHAPING WITH TOP HAT PROFILE)
PrimeStar Solar Confidential 8
NPC 25MW Lamination Line Layout
PrimeStar Solar Confidential 9
NPC 25MW Lamination Line
PrimeStar Solar Confidential 10
NPC 25MW Lamination Line
PrimeStar Solar Confidential 11
NPC 25MW Lamination Line
PrimeStar Solar Confidential 12
NPC 25MW Lamination Line
PrimeStar Solar Confidential 13
NPC 25MW Lamination Line
PrimeStar Solar Confidential 14
NPC 25MW Lamination Line
PrimeStar Solar Confidential 15
NPC 25MW Lamination Line
PrimeStar Solar Confidential 16
NPC 25MW Lamination Line
PrimeStar Solar Confidential 17
NPC 25MW Lamination Line
18
Systems Pyramid
Field Devices
Data Historian
Manufacturing Execution System
Process Control
PLC/DCS:HMI Graphics Process OperationsSequencingBatch/Recipe Control
Control and Process Level
Process Information Management
Real-Time Procedure
Control
Manufacturing Resource Planning/ Enterprise Resource PlanningCentral
IT System
Manually OperatedEquipment
MES:Product Tracking & GenealogyProcess ManagementDispatching Production UnitsPerformance AnalysisLabor ManagementMaintenance ManagementOperations/Detailed SchedulingDocument ControlMaterials Management and Warehouse ControlQuality Control/LIMS
MRP/ERP:FinancialsProduction PlanningQuality ManagementInventory ManagementSales Order Management
PIMS: Data collection and archiving AnalysisMetrics
Smart Field Instrumentation
19
ANSI/S-95 Reference Model
Level 4
Level 1
Level 2
Level 3
I/O, Devices, Sensors
ERP, APO, Logistics Systems
MES, LIMS, WMS, CMM Systems,Enterprise Historian
PLC, DCS, Packaged Systems
HMI, SCADA, Batch Systems
Business Information Network
Operations Information Network
Automation Network
Device Networks
IT V
isib
ility
20
MES Key Components/Interfaces
ERP System
Production Control/
Scheduling
Quality Management
Plant Maintenance
Inventory Management
Raw Materials Receiving, Material
Usage, WIP Receipts, FG Receipts
Production Orders, Control Recipes,
Confirmations
Raw Materials, WIP and FG
Specifications, Test Results,
Notifications, Calibrations,
Repairs, Overhauls
Batch Control DCS/ProcessControl
OEM Control System (PLC,
etc)
Plant Floor Relational Database(s)
Enterprise HistorianDat
a Vi
sual
izat
ion/
Ana
lysi
s To
ols
Rep
ortin
g To
ols
Order Management
Sales Orders, Completed
Loads, Adjustments
Warehouse Management
System