Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
International Atomic Energy Agency
GENERAL CONFERENCE
GC(XXII)/6l2/Mod.l 3 December 1979
GENERAL Distr.
Original: ENGLISH
Twenty-third regular session
Item 9 of the provisional agenda (GC(XXIII)/609)
THE AGENCY'S BUDGET FOR 1980
Modifications
1. At the beginning of November the Director General circulated a note-^ to
inform the General Conference of his intention to consult the Board of Governors
about ways of overcoming the difficulties confronting the Agency an a result of
the fluctuations in currency exchange rates that have occurred since the
estimates in the Agency's budget for 1980-/ wore prepared.
2. When the Board came to consider the matter on 30 November, it was informed
by the Director General that the United Nations operational rate of exchange of
the Austrian schilling to the United States dollar, which stood at 14.00
schillings to the dollar in June, when the Board reviewed the budget estimates
for 1980, had been fixed at 12.90 schillings to the dollar with effect from
1 November. Just as the change in the rate from 15.05 to 14.00 schillings had
necessitated a provision in the estimates of $4 080 000, as the Board has
explained in the introduction to the estimates^ , so this further reduction in
the value of the dollar will make it necessary to increase the budget estimates
by $4 987 000 in order fully to finance the programme of activities which the
Board has decided is to be carried out under next year's Regular Budget.
3. The Board, for its part, has considered how the $4 987 000 could be raised
with the least inconvenience to Members. It recommends that this amount bo
financed as follows: $500 000 from the cash surplus in respect of 1978,
$500 000 from miscellaneous income for 1979, and $3 987 000 from contributions
by Member States on the basis of the scale of assessment to be fixed by the
General Conference.
1 / GC(XXIII)/615.
2 / GC(XXIII)/612.
3/ Ibid *, para. 16.
79-9725
ac(mn)/6i2/Mod.i page 2
4 , The Board accordingly informs the Conference tha t document QC(XXXII)/6l2
containing the "budget estimates for 198G i s modified as follows*
(a) The text of paragraphs 15 through 19 of the Introduction i s replaced
by the materiel attached hereto;
(b) Tables 1, 3, 4 and 5 are replaced by the material attached hereto |
(o) Part T "Adjustment of programme cost estimates'* and Table T.l are
replaced by the material attached hereto; and
(d) Annex VII, draft resolution A, REGULAR HJDOBT APPROPRIATIONS SOR 1980,
i s replaced in i t s en t i r e ty by the material attached hereto .
GC(XXIII)/6l2/Mod.l pege 3
TEE REGULAR BuBOS? K)R 1980
Is). fha t o t a l of ihe Regular Budget e s t i atos for 1980 i s ' X> 643 O0O„
16, fhe programme cost estimates are baaed on as exchange ra t e of 15*05 Austrian
sch i l l ings t o the United States dollar} they oeait therefore, b«» compared d i r e c t l y
with the adjusted programme cost estimates for 1979* which are also based on tha t
r a t e . Because of the substant ia l decline in the do l la r / scb i l l i r .g exchange ra te
during recent months, however, an amount of 19 O67 000 has been included under
appropri&tic.?? Section 10 of the Regular Budget ~ A&juste.ont of progress® cost
estimates - In order to compensate for an estimated average ra t e of exchange of
12,90 sch i l l ings t o the do l l a r throughout 198O.
1?, The progreame budget and the t o t a l Regular Budget aro set for th i n Table 3*
The program© budget r e f l ec t s the Agency's programme and supporting administra
t i v e a c t i v i t i e s including the cost of work for o the rs . The programme budget for
198O was prepared on the bas i s t ha t a l l programmes vri.ll be charged with costs
exclusive of Value Added Tax in respect of 1 ><$al services rendered and goods
received. This change i s in conformity with the p rac t i ce of -She United nat ions
and i t s organisat ions . As a r e s u l t , the refund of Value Added fax « i l l be
recorded outside the budget accounts and has been deleted from Table 5»
^Summary of income", in respect of 1980 and subsequent yea r s . The Regular
Bedget i s the amount being requested for appropriation; i t i s the t o t a l of the
programme budget lus the amount necessax. t o compensate fo currency
f luc tua t ions . "Phas year , as raoxcated above, the amount necessary t o compensate
for currency f luctuat ions i s §9 06? 000 as the 1979 Regular Budget i s based on
an exchange ra t e of 15.05 sch i l l ings t o t he do l l a r while the 198O Regular
Budget i s based on an estimated average ra te of 12.90 sch i l l ings to the d o l l a r .
16. The programme cost est imates for 1980 are d i r e c t l y comparable Kith the
adjusted programme cost estimates for 1979* ®fce increase from the 1979 *° the
1980 bv.dgst level i s $6 399 000 or 9«8£ (see fable 3)« She 9»8# i s made up as
follows* 6.9$ for p r i ce increases a t t r i bu tab le t o in f l a t ion ; 2.9$ for a net
programme increase . The ne t programme increase i s made up as follows:
prograHBse growth of 1.1$ (2.3$ programme growth under "Safeguards" p a r t i a l l y
0C(ni l ) /6 l2/Mod s l page 4
offset hy a !»*$ reduction for a i l other program® ac t iv i t i e s ) s a programs©
inoreaae of 1.4$ wader MCogst of work for others'*? sad 0*4$ in wspeet of the
AgenoyfB Pezraaaent Headquarters (aa increase of 6«4$ "or & f a l l y e a r ' s operation
and aaintwtence p a r t l y offset 'by a 2.5$ prograsne reduction undor "General
services" and & 3»5$ reduction under t r a n s f e r of the Agency to i t s Permanent
Headquarters**),
19» The Boardf recognising tha t the progress of the construction of the
Pemaneni He®dquftrt©rs a&d the related date® when cer ta in equipment had to he
in s t a l l ed were further delayed* and in the i n t e r e s t of effective f inancial
Banagenent ooatrol over the changed conditions* ©ndorsed under the ex is t ing
conditions end as m exception the carry formrd of any unused balaaoee
remaining tinder the appropriation Section of the Begular Badget for the Agency*a
i r snafer to i t e Peraanent Headquarters with respect to "balances a t the end of
1979* Th® action by the Beard does not increase the funds avai lable for t h i s
purpose over the aaouata already appropriated* The balances remaining at the
end of 1979 would he available se l s ly for the purposes of meeting costs d i r ec t ly
associated with the Agency6® t rans fe r @ad? in addition,, such balances would not
he available for u@e af te r 1983, Ho provision for the t ransfe r of the Agency
to i t a Permanent Headquarter® i s contained in the Regular Budget for I960*
QC(XXHI)/612/fco4a page 5
REGULAR AND OPERATIONAL BUDGETS 1980
Table 1
Operational Budget Programme Kaguiar
Budgat
3 101 000
3 445 000 5 180 000 193 000
3 45B 000 2 887 000 5 409 000 901 000 915 000
13 396 000
3 92 S 000
3 ZS4 000 1 331 000 6 836 000 10 589 000
1 708 000
Operating Fund t
-
-
1 235 000 135 000
-
-
-
-
Operating Fund I!
If 050 000
_
-
-
-
-
.
Total
A. Technical asalst&nce and training
B. Nuclear power and reactors C. Nuclear safety and environmental protection D. Nuclear explosions tor peaceful purposes
E Food and agriculture F Life sciences G. Physical sciences i. International Centre for Theoretical Physic* J. International Laboratory of Marine Radioactivity
K. Safeguards
L information and technical cervictis
M, Policy-making organs N. Executive management and technical programme plannlni? O. Administration P. General services
K.. Cost of work for others
T. Adjustment of programme cost estimates
TOTAL
Source of funda-.
Assessment on Member States Voluntary contributions Sxtrabudgtjtary resources Income from work for
others Other miscellaneous income Transfer of cash surplus
TOTAL
74 S20 000
1 708 000 3 013 0O0 I 000 000
1 370 000 10 300 000
550 000
14 247 000
3 445 000 5 180 000
19S 000
3 458 000 2 887 000 5 409 000 2 136 000 t OSO 000
19 386 000
3 925 000
2 284 000 1 391 000 3 888 000
10 399 000
1 708 000
3 087 000
80 S43 000
•
1 370 000
-
11 050 000
9 067 000
S3 083 000
74 820 000 11 670 000
1 708 000 3 385 000 1 000 000
SO 643 000 1 370 000 11 050 000 93 083 000
THE REGULAR BUDGET
By programme
Table 3
w a - o
m i
A.
8 . C.
0.
E
F. G. I.
S.
K. L 88.
s.
o. p
Technical assistance and training (Regular Budget) Maclear power and reactors Nuclear safety and environmental protection Nuclear explosions for peaceful purposes Food and agriculture l i t e sciences Physical sciences International Centre for Theoretical Physics
Regular Budget Operating Fund I
Sub-total
Sntertmticinal Laboratory of Maries Radioactivity
Regnl&r Budget Operating Fund 1
Sobwtotal
Safeguards Information m»d technical services Policy-making organs &eeutiv«- management And technical programme planning Administration General services
Permanent Headquarters operating costs
S'jb- total
S979 Adjusts^
badge*
»
2 857 000 3 680 00©
4 838 ©00
226 000
3 343 000 S 492 900 6 181 000
710 930 1 165 000
I 578 000
698 000 120 000
618 006
IS T95 060 4 e n 099
2 240 003
S 389 COS S 430 000 5 21T 003
2 120 000
7 33? 00S
Prte»
*
221 GOO 163 080
380 000
13 700
279 (KM) 382 Mfl -«« 000
37 00$ 135 000
222 000
178 700 30 040
zmiw S 132 000
142 200
150000
92 008 SSI 090 485 80S
230 000
693 009
%
7,7 4,4
?,S
8,1
e,3 7 ,4 8,1
12,3* 11,6
11,8
25,7 25 ,0
23,8
8,7 3 , 5
6,7
7 , 0 5,5 8 ,3
9 ,9
9 , 5
FragrantuM increase
$
119 000 (378 000}
(38 000)
{44 700}
{154 000} 10 000
(190 000}
104 000 (65 000)
S9 008
*D 30® US 000)
2$ 300
1 469 000 (234 200)
UOfi ooo)
(10 000) 105 000
(1 803 000)
4 170 000
2 587 000
%
4,2 (10,3)
(0,8)
(19,8)
(4,9) 0,4
(3,7)
14,« (3,6)
3 ,1
5,8 «2 ,5>
3,1
8,8 (5,8)
(4,7)
(0,7) 1,6
(30,7)
198,7
35,0
TaM efa*a*«
»
340 000 (215 000)
342 000
(31 000)
115 000 1S5 000 223 000
131 000 70 000
261 008
219 000 15 000
234 090
2 601 000 (92 000)
4*006
82 000 458 000
(I 118 000)
4 380 000
3 252 000
%
11,9 (5,9)
?4
(13 .7 )
3,4 7,8 4,4
2S,8 8 ,0
13,9
31 ,8 12 f5
29,7
15,5 (2,3>
t,0
6,3 7,1
(21,4)
206,8
44,5
I860 EfctbMte
*
3 197 000 3 445 COO
5 180 000
1SS 000
3 453 000 2 687 000 5 409 000
SOI 030 1 23$ SCO
2 13S000
915 008 235 300
1 050 000
19 396 000 3 925 000
3 204 000
1 391 000 5 888 000 4 099 000
6 500 000
10 599 000
1981 Prsttm&ssnry
9
3 520 000 4 231 000
5 774 000
251 000
4 020 000 3 147 ©08 6 215 COS
940 000 1 450 000
2 396 000
1 040 000 150 000
1 130 000
22 932 800 4 520 000
2 442 030
1 438 000 7 724 COS 4 328 000
S 500 000
10 828 000
E. Coat of work for o thers
3. Traaafer of Use Agency ta i ts Peroaaaeot Heaxdijuajtsra
Sub-total; Regular Budget Oj>erating Fund I
T. Adjustment cf p r o g r a m m e cost e s t i m a t e s
TOTAL: Regular Budget and Operating Fuad I
Source of funds
Begul&r Budgat; Profjrasutoe budget Adjustment of p r o g r a m m e coal e s t i m a t e s
TataS Regular Budget
Ojitratinf Fuad I
Regular Budget L e « : MisceUaoeotur income
Income from work for others
Other
T r a n s f e r of c a s h s u r p l u s
Aasesament an Member State*
z sse o«&
65 177 020 i 223 OfrQ
66 4S3 CSO
6S 462 000
is ess
4 500 300 IS5 000
4 685 600
9 067 000
13 732 600
t,7
6,9 12,9
7,0
20,7
m$tm
(2 2S8 000J
1 838 400
(§aeaa>
x ais 400
1 818 400
117,3
(100,0)
2,9 16,2)
2,7
2,7
(2 266 oee)
S 399 060 « 3 W
S 484 030
8 067 Odd
15 551 003
{ioore|
95S
9,7
23„4
i imsm
7i 57S 000 .
1 370 000
72 S4S 000
9 067 000
82 013 000
1 070 090
so ess oao i goo oca
82 586 000
10 2S0 000
92 356 0*}3
SS 177 000 4 500 600
9 067 000
8,9 1 898 400 2,9 S 399 0&J S t8
9 067 000
71 576 000
9 067 000
80 933 C00
10 260 000
65 177 000
1 385 000
€6 462 000
65 177 009
'730 000 2 875 000
-
13 567 600
issooa
13 732 600
13 5S7 600
13 000
--
20,8
12,8
20,7
20,8
».' --
i 898 400
(SOOCOjf
1 818 400
I 898 400
": 915 00ft
140 000
1 000 000
2,9
SS,2>
2,7
2,9
117,3
4,9
-
15 468 000
85 600
15 551 000
15 466 000
328 068
140 CO©
i ooo ooe
' 23,7
e,«
23,4
23,7
119,0 4,9
-
80 643 000
I 37Q0QQ
82 013 Q00
80 S43 000
1 708 000
3 015 000
1 060 000
91 256 000
1 600 000
92 856 000
91 256 000
1 970 000
3 075 000
-
61 522 000 13 554 600 22,0 (156 600} ( 0 , 2 ) 13 398 000 21,3 74 920 000 86 211 000
O C2
IB M
o
00 ( m n ; page 3
THE REGULAR BUDGET
By item of expenditure
Table 4
Item of expenditure 1978
Actual ^ligations
1978 Adjust ad
budget
Increase ttHdecresae) from 1979
Price Programme Total
1930 Estimate)
1881 Preliminary
estimate
Salaries and wages
Established posts Consultant * Overtime Temporary *#»istanc«
Sub-total
Common staff coats
Travel
Conferences, symposia, seminars
Technical committees, advisory groups
Representation' and hospitality
Scientific and technical contracts
Scientific supplies and equipment
Common services , supplies and equipment
Permanent Headquarters operating coats
Other items of expenditure
Transfer of costs:
Linguistic services Printing and publishing
services
Cost of work for others
Adjustment of programme cost estimates
TOTAL: Regular Budget end Operating Fund I
2fl 535 803 34 000 000 2 882 000 503 000 3 167 000 37 187 000 41244 000 582 819 772 300 31800 (87 000) (35 200) 717 100 822 300 198 239 174 000 8 800 (12 300) (3 500) 170 500 213 500
1 0 1 3 036 1 1 3 4 1 0 0 144500 (388600) (242100) 892000 1 4 4 0 2 0 0
31 328 897 38 080 400
8 409 035 9 914 800
1 209 252 1 388 200
1 025 972 1 128 000
t 032 241 1 395 500
107 081
2 847 100 19 100 2 888 200 38 948 800 43 72N 000
1120 800 151800 1272 800 10 787 400 11957 900
110 800 317 500 428 300 1 818 500 2 508 200
73 400 (27 400) 48 000 1 174 000 1 753 500
102 800 (403 800) (301 000) 1 284 500 1 949 100
108 800 4 300 (4 800) (500) 108 100 133 800
1 838 347 2 330 900
747 225 ! 387 500
7 296 758 10 517 600
2 120 00(3
484 956 618 500
(527 359) (962 000)
(82 089) (148 000)
780 000
90 100 (75 500) 14 800 2 345 500 3 257 000
137 800 3 700 141300 1528 800 1 7fi8 300
50 800 (3 383 400) (? 333 500) 7 185 100 3 013 000
210 000 4 170 000 4 380 000 8 500 000 6 500 000
27 700 (197 700) (570 000) '448 500 552 000
(117 700) 282 700 J 45 000 (817 000) (1398 000)
(5 000) 71 000 68 000 (80 000) (05 000)
13 000 915 000 928 000 1708 000 1970 000
9 087 000 S 067 OW -1 0 ". 000 10 260 0',
52 886 284 88 462 000 13 732 800 1 818 400 15 851 000 l V.'i3 t'i1 92 85'/ 000
Source of funds:
Regular Budget
Operating Fund I
TOTAL
51 38« 386 85 177 000
1 299 896 1 285 000
13 567 600 1888 4(50 15 468 000 Si '43 000 i,;i2H00O
185 000 (80 000) 85 000 i ' 0 000 1 «CS nn1
52 688 284 68 462 000 13 732 600 1818 400 15 351000 62 ' ,3 000 92 858 000
ac(XXIII)/6l2/Mod.l pags 9
Summary of income
Table 5
Item 1878 Actual
197S Adjusted
budget
incraase or
(decrease) over 1979
1980 Estimate
1381 Preliminary
estimate
Assessed contribution* on Member States
Transfer of cash surplus
Miscellaneous income
(a) Income from work for others
Data processing services Printing services Medical services Library services
Sub-total
(b) Attributable to specific programmes Publications of the Agency IN1S publications including
microfiches C1NDA publications Advertising Laboratory income Sale of surplus property Amounts recoverable
under safeguards agreements from non-member States
UNDP programme support cost
S1DA programme support coat
Other programme support costs
Sub-total
(c) Not attributable to specific programmes
Investment and interest income Refund from the United Nations
Joint Staff Pension Fund Refund of Value Added
t a x Other: Gain on
exchange Other
Sub-total
Total miscellaneous Income
49 793 063 81 522 000 13 398 000
1 000 000
74 920 000
I 000 000
38 2 11 000
508 380 112 281 180 947
-
S01 808
531 161
283 345 14 004 30 221 44 119 21 590
53b 000 123 000 120 000
-
780 000
545 000
275 000 15 000 20 000 20 000 30 000
89 000 175 000 130 000 335 000
92B 000
35 000
40 000 15 000 10 000 80 000 (30 000)
623 000 300 000 230 000 535 000
1 708 000
800 000
315 000 30 000 30 000 100 000 20 000
763 000 320 000 290 000 595 000
1 970 000
620 000
355 000 20 000 30 000 110 000 20 000
93 735
853 184
22 219
2 941
1 888 609
1 231 025
!94 480
725 S12
236 241 232 587
80 000
400 000
30 000
1 415 000
706 000
79 000
550 000
130 000
30 000
410 000
20 000
630 000
55 000
5 000
(550 000)
90 000
810 000
50 000
2 045 000
760 000
SO 000
130 000
90 000
810 000
50 000
2 105 000
7S0 000
80 000
130 000
2 820 245
5 318 862
! 460 000
3 655 000
{490 000)
1 088 000
970 000
4 7 23 000
970 000
5 045 000
TOTAL 51111725 85 177 000 15 486 000 80 04:5 000 81256 000
0 C ( m i I ) / 6 l 2 / l i o c M psge 10
C 0 S T E S"T I M A _f'EJS*
? a b i e T.X
Item nf expenditure
Adjustment af pragrsrainn tout estimates
TOTAL,
19"J« Actual
obligations
-
1979 Adjusted
budget
-
increase or (riecrtraael from 1879
Price Programme Total
0 087 000 - 8 037 000
9 087 000 - 9 06T 000
1980 Estimate
9 oen ooo ,
3 067 000
1981 Preliminary
estimate
10 280 000
10 260 000
CHANGES IK COOTS
T » l . The cost e s t ima te s i n t h e e a r l i e r pa r t of t h i s programme budget a r e ba ted on
an exchange r a t e of 15.05 Aus t r i an s c h i l l i n g s t o t h e Unit ad S t a t e s d o l l a r .
However, in t h e l i g h t of cur ren t u n c e r t a i n t y about t h e exchange r a t e and with a
view t o avoiding' a supplementary budgetary app rop r i a t i on* an amount of $9 067 000
i e provided under t h i s head ing . The amount w i l l cover expendi tu re i n c r e a s e s
c a l c u l a t e d on t h e basics of an exchange r a t e of 12*90 s c h i l l i n g s t o t h e d o l l a r .
T*2. AB provided i n paragraph 3 of d r a f t r e s o l u t i o n A, Regular Budget a p p r o p r i a
t i o n s for I98O5 conta ined i n Annex VII f funds a p p r o p r i a t e d for t h e adjustment
of programme cost e s t ima te s s h a l l be UBed on ly with t h e p r i o r approval of t h e
Board of Governors*
oc (xxm )/6is?/taod»i page 11
1 I I S I VII
Aa RE8UUUI anXHBP APPROPRIJffilOKS FOR IgflO
'The General Conference*
A c c e ^ t i ^ the r-ecoffiwendaiiohs of the Board of Govs sixers r e l a t ing . 1 ^
to . the Regular Budget of the Agency for 198©*"'' t
! • Appropriates an s^otuit of 180 643 ©00 for the Re^uliW Budget espensea
of the Agency in 1980 as follows;
Section United Statue d o l i n g
1* Technical assistance and' t ra in ing 3 197 000 p/
2, Technical operational 12 T45 000 3* Research and isotopes^ _ 11 554 000
4* Operational facilities^ 1 816 000
5* Safeguards 19 396 000
6e Policy-making organs 2 284 000
?» Sreoutive ffianagosaent and
administration* 8 27? 000
8e General services 10 599 000
9® ' Cost of work for others 1 708 000
10a. Adjustment of programme cost estimates 9 ®6? 000
TOTAL 00 643 000
2a J&SlJgg. *ha* tlie foregoing appropriation shall "be financed as follows*
(a) Si ?08 000 from incosae from work for others;
(b) S3 015 000 frm other miscellaneous income|
(c) $500 000 from the cash surplus in respect of 1978?
(d) $500 000 fro© miscellaneous income for 1979 in sxcess of that
already taken into account in the Regular Budget; and
(e) $74 920 000 from contributions toy Member States on the "basis of
the scale of assessment fixed toy the General Conference in
Resolution GC(JQan)/BBS/«««»i
OC(XXIII)/612/«od.1 page 12
3* Decides further that in respect of sub-paragraphs 2(e) and 2(d) above
such further amountB as may become available under either sub-paragraph may
be used as do not produce a total of more than $1 000 000$
4* Decides further that the funds appropriated for Section 10 in para
graph 1 above shall be used only with the prior approval of the Board of
Governors} and
5* Authorises the Director Generals
(a) To incur expenditures additional to those for which provision
is made in the Regular Budget for 1980, provided that the
relevant emoluments of any staff involved and ail other coats
are entirely financed from revenues arising out of sales* work
performed for Member States or international organisations,
research grants, special contributions or other sources
extraneous to the Regular and Operational Budgets for 198Q| and
(b) With the prior approval of the Board of Governors, to make
transfers between any of the Sections listed in paragraph 1
above*
1/ See document ac(XUIl)/6l2/Hod. 1, Table 5.
2/ For the financing of Suclaar power and reactors, luclear safety and environmental protection^ Information and technical services and Huclear explosions for peaceful purposes*
%/ For the financing of Pood and agriculture^ Life sciences and Physical sciences,
dj For the financing of the International Centre for Theoretical Physics (in part) and the International Laboratory of Marine Radioactivity (in part).
%/ For the financing of Executive management and technical programme planning and Administration*