GCRTA Euclid Corridor GCRTA Euclid Corridor Transportation Project (ECTP)Transportation Project (ECTP)
GCRTA Euclid Corridor GCRTA Euclid Corridor Transportation Project (ECTP)Transportation Project (ECTP)
Bus Rapid Transit (BRT)Bus Rapid Transit (BRT)Safety & Security CertificationSafety & Security Certification
22
Outline of TopicsOutline of Topics ECTP BRT Certification ScopeECTP BRT Certification Scope Unique Issues Associated with ECTP Unique Issues Associated with ECTP
BRT CertificationBRT Certification Certification SuccessesCertification Successes Future Hurdles for BRT CertificationFuture Hurdles for BRT Certification Safety and Security Certification Tasks, Safety and Security Certification Tasks,
Project Life Cycle.Project Life Cycle.
33
ECTP BRT Certification ScopeECTP BRT Certification Scope ECTP BRT - 9.4 milesECTP BRT - 9.4 miles
• Downtown Transit Zone - 2.3 milesDowntown Transit Zone - 2.3 miles• Euclid Ave BRT - 7.1 milesEuclid Ave BRT - 7.1 miles
Modification to existing Modification to existing maintenance facilitiesmaintenance facilities
Stations/bus stopsStations/bus stops• 5 median consolidated left 5 median consolidated left
side discharge stationsside discharge stations• 26 median right side 26 median right side
discharge stationsdischarge stations• 29 curb side stops29 curb side stops
21 Rapid Transit Vehicles (RTVs).21 Rapid Transit Vehicles (RTVs).
44
Unique Issues Associated w/ CertificationUnique Issues Associated w/ Certification
Modifications to Central Bus Maintenance Facility Modifications to Central Bus Maintenance Facility & Hayden Garage& Hayden Garage• RTV maneuverability restrictionsRTV maneuverability restrictions• Lifts: adjustable 3-post lift & parallelogram lift Lifts: adjustable 3-post lift & parallelogram lift • Fall protectionFall protection• Gas detection system Gas detection system
relationship w/ the new relationship w/ the new interior doorinterior door
• Wash rack. Wash rack.
55
# of intersections w/ protected left hand turn lanes# of intersections w/ protected left hand turn lanes Contra-flowContra-flow Lack of lane separations (pavement cut rumble Lack of lane separations (pavement cut rumble
strips only).strips only).
Left-Turn Only Lane
Westbound Only LaneEastbound
Bus Only Lane
Westbound Bus Only Lane
Unique Issues Associated w/ CertificationUnique Issues Associated w/ Certification(Cont’d)(Cont’d)
66
15” high median stations15” high median stations• Pedestrian crossings & Jay-walking issuesPedestrian crossings & Jay-walking issues• Potential head strikes from the mirrors of approaching Potential head strikes from the mirrors of approaching
busesbuses• Integrating existing fleetIntegrating existing fleet
Docking arm system Docking arm system designdesign
Wheel studs striking Wheel studs striking the median platform.the median platform.
Platform edge Platform edge durability.durability.
Unique Issues Associated w/ CertificationUnique Issues Associated w/ Certification(Cont’d)(Cont’d)
77
Unique Issues Associated w/ CertificationUnique Issues Associated w/ Certification(Cont’d)(Cont’d)
Rapid Transit Vehicle (RTV)Rapid Transit Vehicle (RTV)• 60 ft articulated bus60 ft articulated bus• 3-right side & 2-left side doors3-right side & 2-left side doors• Hybrid-driveHybrid-drive• New bus liftsNew bus lifts• New bridge platesNew bridge plates• Mechanical Precision Mechanical Precision
Docking (MPD)Docking (MPD)• Operator & mechanic training.Operator & mechanic training.
88
Unique Issues Associated w/ CertificationUnique Issues Associated w/ Certification(Cont’d)(Cont’d)
Rapid Transit Vehicle (RTV) (Cont’d)Rapid Transit Vehicle (RTV) (Cont’d)• Vapor door system – sensitive edgeVapor door system – sensitive edge• 22 RTV retrofits – work in progress, some impact 22 RTV retrofits – work in progress, some impact
to certification time-lineto certification time-line• 170 verifiable items per RTV (certifiable items) 170 verifiable items per RTV (certifiable items)
3570 total verifiable items for the fleet of 21 RTVs.3570 total verifiable items for the fleet of 21 RTVs.
99
Unique Issues Associated w/ CertificationUnique Issues Associated w/ Certification(Cont’d)(Cont’d)
Requirements to issue interim operations Requirements to issue interim operations permit/certificate for multiple operating segments permit/certificate for multiple operating segments • Downtown Transit Zone, 3 permits issuedDowntown Transit Zone, 3 permits issued
• ““Open roadway segments, E. 17th to E. 55Open roadway segments, E. 17th to E. 55 thth” and” and
E. 55E. 55thth to E. 86 to E. 86thth”” Without project communication systemsWithout project communication systems Without docking arm system on Without docking arm system on
existing bus fleet existing bus fleet
• Initial operable segment with RTV and Initial operable segment with RTV and complete system, Oct 08.complete system, Oct 08.
1010
Certification SuccessesCertification Successes
An active safety and security certification review An active safety and security certification review committee (SSCRC)committee (SSCRC)
Threat and Vulnerability Assessment (TVA)Threat and Vulnerability Assessment (TVA) Station roof modificationsStation roof modifications Bollards at station rampsBollards at station ramps Safety analysis on the MPDSafety analysis on the MPD Lock out knife switch for RTVsLock out knife switch for RTVs Certification tasks inclusion in Certification tasks inclusion in
project master schedule.project master schedule.
1111
Certification Successes Certification Successes (Cont’d)(Cont’d)
Preliminary hazards analysis (PHAs) tracked Preliminary hazards analysis (PHAs) tracked throughout project, critical hazards addressedthroughout project, critical hazards addressed
Implementation of interim operations permitsImplementation of interim operations permits 100 % certification to date 100 % certification to date
• CO1, Transit Zone, North of Euclid AveCO1, Transit Zone, North of Euclid Ave• CO6, Bus maintenance facilities modificationCO6, Bus maintenance facilities modification• CO3, Innerbelt to E. 79th StCO3, Innerbelt to E. 79th St
Operational planning within the agencyOperational planning within the agency Emergency incident table top exerciseEmergency incident table top exercise An active Fire-Life Safety Committee.An active Fire-Life Safety Committee.
1212
Future Hurdles for BRT CertificationFuture Hurdles for BRT Certification
Certification efforts need to start at the right time Certification efforts need to start at the right time during the project life cycle, during the project life cycle, “Planning and PE Phase”“Planning and PE Phase”
Outdated FTA certification Outdated FTA certification handbookhandbook
BRT certification not BRT certification not addressed in FTA’s handbookaddressed in FTA’s handbook
Education of PMOCs to the Education of PMOCs to the basic certification process. basic certification process.
Handbook for Transit Safety & Security Certification
1313
Future Hurdles for BRT CertificationFuture Hurdles for BRT Certification(Cont’d)(Cont’d)
Bus Start-up Operations not as constrained as Bus Start-up Operations not as constrained as Fixed Guideway Start-upFixed Guideway Start-up
Bus Start-up Zones overlap limits of contracts Bus Start-up Zones overlap limits of contracts requiring interim permits/certificatesrequiring interim permits/certificates
1414
Construction Preliminary Engineering
(PE)Conceptual to 30% Design
Final Design
30%/60%/90% Design
Planning Phase
• Metropolitan Planning Organization (MPO)
• Long Range Metropolitan Transportation Plan, 20 Yr Vision. • Locally Preferred Alternative (LPA)
Local & State Transit Improvement Plan (STIP)
3 Year Plans Prioritized List of Projects
for Funding
• Testing • Start-up• Pre-Revenue Service
3 Years 1-2 Years 1-2 Years 2-3 Years < 1 Year20 Years
Revenue Service
Step 4: PerformPerform construction specificationconstruction specification conformance.conformance.
Includes Vehicle (Bus/Rail)Includes Vehicle (Bus/Rail)Specification ConformanceSpecification ConformanceProcess.Process.
Step 5: Identify additional safety and security test requirements
Step 6: Monitor testing & validation.
Step 7: Verify integrated tests.
Step 8: Track “Open Items”
Step 9: Verify operational readiness.
Step 10: Conduct final readinessdetermination / Issue Safety & Security Certification.
Agency Decision on Agency Decision on Certification Method:Certification Method: + Self Certification+ Self Certification + Certification Consultant + Certification Consultant 33rdrd Party Party + Designer of Record+ Designer of Record + Construction Contractor+ Construction Contractor + Or any combination of + Or any combination of the above.the above.
• PMP Review• SSMP Review + Basic Certification Methodology
• SSC Training • TVA• PHAs• SSC Plan• SSCRC• FLSSC• S&S Design Review• Data Base for PHAs, SCILs & NCRs
• S&S Design Review• Value Engineering (VE)• Track “Open Items” PHAs, SCILs, & NCRs
• Convert un-resolved PHAs to OHAs• SSPP Update• SSP Update• Track “Open Items” PHAs, SCILs, & NCRs• Review Construction & Vehicle Procurement Change Orders
• Verify Operational CILs• Emergency Exercises/Training • Interim Operations Permits• S&S Operational Hazard Checklists & Inspections• Pre-revenue Service Operations Testing• Final Verification Report• Project Close out
Step 1: Identify certifiable elements
Step 2: Provide Input to thedevelopment of the safety & securitydesign criteria
Step 3: Develop and complete designcriteria conformance checklists
Includes Vehicle Procurement Includes Vehicle Procurement (Bus/Rail)(Bus/Rail)
Certification Methodology StepsCertification Methodology Steps
FTA &FHWA
Funding
FTAReview &Approval
FTAReview &Approval
Full Funding Grant Agreement (FFGA)
Approval
Related Certification Activities and TasksRelated Certification Activities and Tasks
SSC Tasks, Project Life CycleSSC Tasks, Project Life Cycle
1515
SummarySummary ECTP BRT Certification ScopeECTP BRT Certification Scope Unique Issues Associated with ECTP Unique Issues Associated with ECTP
BRT CertificationBRT Certification Certification SuccessesCertification Successes Future Hurdles for BRT CertificationFuture Hurdles for BRT Certification Safety and Security Certification Tasks, Safety and Security Certification Tasks,
Project Life Cycle.Project Life Cycle.
Thank You for Your Attention!Thank You for Your Attention! Thank You for Your Attention!Thank You for Your Attention!
Bus Rapid Transit (BRT)Bus Rapid Transit (BRT)Safety & Security CertificationSafety & Security Certification