BUILDING A GATEWAY

TO PERTHThe Gateway WA Perth Airport and Freight Access Project seeks to give the capital city new levels of safety and efficiency

Written by: Sasha Orman | Produced by: Vince Kielty

Page 3: Gateway WA Company Profile

3

BUILDING A GATEWAY

TO PERTHThe Gateway WA Perth Airport and Freight Access Project seeks to give the capital city new levels of safety and efficiency

Written by: Sasha Orman | Produced by: Vince Kielty

Page 4: Gateway WA Company Profile

Western Australia, which allocated work to more than 600 local subcontractors and suppliers.”

The extensive scope of the $1 billion Gateway WA project includes vital upgrades to 7km of Tonkin Highway, 3km of Leach Highway and major interchanges in the area, including the ‘Grand

W ith significant global industry and tourism connections, and as

Western Australia’s capital, Perth is often our country’s primary entry point for visitors and trade partners—and first impressions are always important.

To alleviate Perth’s rising airport and industrial traffic, while ensuring that the city is always putting its best foot forward, Main Roads Western Australia assembled an Alliance of five industry leaders—CPB Contractors, Georgiou, GHD, AECOM, and BG&E—to take on the most ambitious road infrastructure project in Western Australia’s history.

“The Gateway WA Perth Airport and Freight Access Project is an iconic infrastructure project for Western Australia, providing a much needed upgrade to one of the State’s most important transport hubs,” says Ilario Spagnolo, Senior Project Director. “A road project of this size and scale had never been carried out in the state before. It was delivered by an Alliance of industry contractors, including Main Roads

4

GATEWAY WA

Tonkin Highway / Roe Highway interchange in operation

Page 5: Gateway WA Company Profile

C O N S T R U C T I O N

w w w. gatewaywa.com.au 5

Gateway’ at the Tonkin Highway/Leach Highway interchange, and approximately 21km of continuous grade separated shared path and local connections for pedestrians and cyclists. In addition to these technical upgrades, the project is also creating more pleasant travels through such innovative aesthetic

urban design upgrades as 7km of noise/screen walls and more than one million plants.

Such an ambitious project often faces the risk of going over budget and past schedule. But through diligence and careful planning, Gateway WA is on track for completion at the end of March

GATEWAY WA

Tonkin Highway / Roe Highway interchange in operation

Page 6: Gateway WA Company Profile

Gateway WA Quarterly Alliance Directors Award January – March 2015for the high standard of work delivered on the project

“At Westforce we strive to constantly improve and deliver in the most cost effective and safety conscious manner for each

and every client on each and every project.”

Westforce is a multi disciplined construction company focusing on major construction, infrastructure and resource projects across Australian metropolitan and remote areas.

TThe Westforce Group has both a “Construction” and a labour and plant “Hire” division. This allows Westforce to offer clients anything from a design and construct lump sum projects to a once off trade and plant placement.

27 Moojebing StreetBayswaterWA 6053

T: (08) 9279 1900F: (08) 9279 1422E: [email protected] www.westforce.com.au

Page 7: Gateway WA Company Profile

C O N S T R U C T I O N

w w w. gatewaywa.com.au 7

2016, under budget and nearly a year ahead of schedule.

SAFETY ON THE GATEWAY“The vision of the Gateway WA project was a safe and efficient transport network that provides an iconic gateway to Western Australia and the project’s mission was to safely deliver sustainable landmark infrastructure around Perth Airport and the Kewdale and Forrestfield freight precincts,” states Spagnolo. “Safety has always been at the forefront of what we have done and

what we have delivered.” When a complex project

with multiple high risk-posing components is at hand, a commitment to safety cannot simply be lip service. For the Gateway WA Alliance, safety is fully engrained in the workplace culture. The project has entailed what Spagnolo describes as a “hierarchy of control” including engineering, isolation, substitution and elimination to promote a high standard of safety that ultimately achieved concrete results.

Gateway WA Quarterly Alliance Directors Award January – March 2015for the high standard of work delivered on the project

“At Westforce we strive to constantly improve and deliver in the most cost effective and safety conscious manner for each

and every client on each and every project.”

Westforce is a multi disciplined construction company focusing on major construction, infrastructure and resource projects across Australian metropolitan and remote areas.

TThe Westforce Group has both a “Construction” and a labour and plant “Hire” division. This allows Westforce to offer clients anything from a design and construct lump sum projects to a once off trade and plant placement.

27 Moojebing StreetBayswaterWA 6053

T: (08) 9279 1900F: (08) 9279 1422E: [email protected] www.westforce.com.au

Employees: 70 -120 Established: 2006 Industry: Civil Construction

Services: Specialists in all aspects of the civil construction industry from earthworks to finished concrete & mechanical. Providers of skilled labour crews and plant hire.

Ongoing Projects: Roy Hill Chlorides Washing Facility, Beenyup Waste Water Treatment Plant, Australian Defence Facility Upgrade, Boral Crushing Facility, PTA Claisebrook Retaining Noise Walls, BHP Yandi Upgrade.

Management: Mike Murrey - Managing Director; John Smith - Commercial Director; Phil Clarke - Operations Director; Paddy Kearns, Resources Director

Website: www.westforce.com.au

SUPPLIER PROFILEWEST FORCE CONSTRUCTION

Page 8: Gateway WA Company Profile

Telephone: (08) 9279 [email protected]

· W-Beam and Thrie-Beam Guardrail· Wire Rope Safety Barriers (WRSB)· Steel Protection Screen· Steel Security Bollards· Bridge Barriers

· Top Rail Barriers· Concrete Barriers· Temporary Barriers· Crash Cushions· End Treatments

Safety Barriers WA (SBWA) supplies and installs a wide variety of safety barriers for roads, bridges, car parks, temporary work sites and mine sites including:

www.safetybarriers.com.au

Page 9: Gateway WA Company Profile

C O N S T R U C T I O N

w w w. gatewaywa.com.au 9

“Gateway WA’s commitment to providing a robust safety culture resulted in the project achieving more than 4 million Lost Time Injury free hours,” says Spagnolo. “The team focused on the critical aspects of safety across all stages of design and construction, as well as frontline leadership.” That record has not gone unnoticed by the Alliance’s peers—the project took the ‘Best Workplace Safety and Health Management System’ award at the 2015 Western Australian Work Safety Awards.

AN INNOVATIVE APPROACHGateway WA has employed many instances of innovation and creative thinking to meet the unique challenges of the project, while increasing safety and efficiency for drivers at every turn.

“The introduction of the first, single-point urban interchange to the State, at Leach Highway/Abernethy Road, was innovative for Western Australia, and the introduction of the first-ever tennis ball design configuration, as part of the Roe Highway/Berkshire

Safety Barriers WA has over 30 years of experience in the Civil Construction industry supporting small and large Road Building projects all over Western Australia. Safety Barriers WA supply and install Guardrail, Wire Rope Safety Barriers, Bridge Barriers and Crash Cushion systems throughout Western Australia’s public roads, mine sites and commercial properties. Safety Barriers WA have successfully completed the largest ever Road Barrier package in Western Australia on the iconic Gateway WA project with over 45,000 metres of Road Barriers, Crash Cushions, End Treatments and Top Rails. Our work crews have a long standing reputation for their professional and safe attitude on-site and are often commended by our clients. Why compromise on Safety – Insist on Safety Barriers WA for your next project.

Website: www.safetybarries.com.au

SUPPLIER PROFILESAFETY BARRIERS WA

Page 10: Gateway WA Company Profile

improved road safety outcome for road users, while also moving traffic through the junction in an efficient manner.”

That same creative thinking helped Gateway WA stay ahead of schedule and keep workers safe, without adding undue disruptions to Perth’s already busy functioning highway system.

“Gateway WA was dealing with one of the State’s busiest transport hubs and had to keep freight and passengers moving during

Road interchange, was a first for Australia,” explains Spagnolo. “The innovative design at Roe Highway/Berkshire Road was prompted as a Safe Systems initiative and it can generally be described as being similar to a roundabout under signal control but with right-turn traffic movements from Berkshire Road moving through the roundabout to and from the ramps. This type of design means the risk of 90 degree collisions between vehicles is significantly reduced, leading to an

1 0

"Over the fourteen months of the Gateway project 55,000 cubic metres of C-Wise composted products were delivered to the project, which

equates to more than 1,000 semi trailer loads."

Do you struggle to increase tree survival rates?Do you have soil erosion issues?Do you want to increase your water efficiency?Do you want to achieve a superior aesthetic for your landscape design?Let C-Wise design a solution for your needs.

P (08) 9581 9582 F (08) 9581 9585 E [email protected] W cwise.com.auPO Box 2040, Mandurah WA 6210

A PARTNER YOU CAN RELY ON FOR LARGE SCALE PROJECTS

Page 11: Gateway WA Company Profile

C O N S T R U C T I O N

w w w. gatewaywa.com.au 1 1Roe Highway / Berkshire Road interchange at night time

“The innovative design at Roe Highway / Berkshire Road was prompted as a

Safe Systems initiative and it can generally be described as being similar to

a roundabout under signal control but with right-turn traffic movements from

Berkshire Road moving through the roundabout to and from the ramps.”

– Ilario Spagnolo, Senior Project Director

Page 12: Gateway WA Company Profile

GATEWAY WA

construction,” notes Spagnolo. “The Alliance worked closely with Main Roads Western Australia to deliver higher standards and implement traffic management not widely used before in Western Australia.” This included the use of truck mounted attenuators and the introduction of full road closures and contra flows, which increased worker safety.

A SUSTAINABLE OPTIONIn addition to safety, the Gateway WA project has also paid special

attention to sustainability, especially where the management of its 5.9 million tonnes of bulk materials and subsequent waste was concerned.

“The Alliance model on the Gateway WA project fostered fresh ideas for sustainability,” says Spagnolo. “The team looked at a wide range of perceived environmental risks that could potentially arise from construction. From there, a waste management strategy was put in place that set clear targets and goals for

1 2

Leach Highway

Page 13: Gateway WA Company Profile

GATEWAY WA C O N S T R U C T I O N

w w w. gatewaywa.com.au 1 3

waste reduction from the outset. By defining what the project’s objectives were from the outset, it led to a shared vision of what waste minimisation would be on the project.”

The Gateway WA project utilised several methods of waste minimisation, such as using recycled materials like quarry crusher dust and construction and demolition waste (C&DW) as fill. The project also created an onsite licensed facility to treat acid

Shared path along Tonkin Highway

Number of employees at peak construction

1,000

Page 14: Gateway WA Company Profile

AN UNRIVALED IMPRESSION“From the outset, it was important to create a gateway to Perth, with an entry statement rivaling other cities in the world,” says Spagnolo. “Perth is often the first impression of Australia to international visitors, so we wanted to create something that was unique to the State and to

sulphate soil and degraded soil material, ensuring that its topsoil waste can be reused in other projects down the line instead of being sent to landfill.

“The sustainable reuse of degraded and other unsuitable soil has many benefits, particularly from an environmental perspective,” says Spagnolo. “As well as reducing the project’s impact of sending materials to landfill, it decreased Gateway WA’s reliance on imported fill brought in for the project. This, in turn, meant less vehicle haulage and traffic congestion, which is environmentally and socially beneficial.”

Gateway WA was also recognized for these efforts, chosen as the Business Category winner at the Waste Authority’s 2015 Infinity Awards for its commitment to waste minimisation on the project. The project has also garnered a prestigious certification of excellence for design by the Infrastructure Sustainability Council of Australia in 2014—one of only two road projects in Australia to earn that designation.

1 4

GATEWAY WA

Tonkin Highway / Horrie Miller Drive / Kewdale Road interchange at night time

Page 15: Gateway WA Company Profile

C O N S T R U C T I O N

w w w. gatewaywa.com.au 1 5

the country—to express the dynamic, creative and rapidly evolving character of Western Australia.”

From its cutting-edge engineering to striking urban design, the Gateway WA project is helping Perth make its mark on the world. As Spagnolo adds, “The Gateway is something that the people of our State can be proud of for years to come.”

Company Information

P R O J E C T N A M E

Gateway WA Perth

Airport and Freight

Access Project

I N D U S T RY

Infrastructure

H E A D Q U A RT E R S

Forrestfield, WA

F O U N D E D

2013

E M P L O Y E E S

1,000 at peak

construction

P R O J E C T B U D G E T

$1 billion

GATEWAY WA

Tonkin Highway / Horrie Miller Drive / Kewdale Road interchange at night time

Page 16: Gateway WA Company Profile