Ref: ECN/2014-15/CR-25 Date 14.12.2015
To
The Security Officer,
PTPP (Parichha)
JHANSI DIST,
UTTAR PRADESH.
Sub : Permission to take the test equipments inside the plant –reg.
Sir,
In connection with the Energy Audit Study at PTPP Parichha,JHANSI. We require to take the following equipments
inside the plant for measuring purpose..,
List of instruments as follows:
S.NO NAME OF THE INSTRUMENT SERIAL.NO OF INSTRUMENT MAKE Quantity
1 Power Analyzer with kit IES 61010 CAT III Krykard ALM10 1
2Energy Meter 964024 Kusam-meco 2745 1
5 LUX Meter KM-LUX-99 Kusam-Meco 1
(Note- Kit = Chargers, Wires, Clamps, Paste gel, Tape, Pile, Tubes, Transducers, etc)
Permission may kindly be accorded for taking these equipments inside the plant on “RETURNABLE BASIS “
Thanking You,
Yours faithfully
(K M. Kiran Raju)
7/25/2019 Gate Pass and Intruments Letter Ref
http://slidepdf.com/reader/full/gate-pass-and-intruments-letter-ref 2/2
Ref : KSPL/W/0023/14-15 Date 14.12.2015
To
The Security Officer,
PTPP (Parichha)
JHANSI DIST,
UTTAR PRADESH.
Sub : Permission to Energy Audit officials List inside the plant – reg.
Ref : Energy audit of PTPP, Parichha, JHANSI.Sir,
In connection with the Energy audit of PTPP, Parichha, JHANSI. the following
officials are required to work inside the plant.
Sl.no Name Age
1. KM. Kiran Raju 28
2. M. Vinod Babu 28
It is requested to issue temporary gate pass on all working days both day and nightand holidays from 14.12.2015 to 18.12.2015
Thanking You,
Yours faithfully
(K M. Kiran Raju)