1Garrett Moore, P.E.Chief EngineerFebruary 2016

Program Update

Page 2: Garrett VTCA presentation2016 › wp-content › uploads › 2016 › 01 › Presentation… · Microsoft PowerPoint - Garrett_VTCA_presentation2016.pptx Author: wendy.jenkins Created

CONTRACT ADVERTISEMENTS (in Millions)

2

CY Eng. DB DBB Locality Total

2013 $266 $648 $1,483 $256 $2,653

2014 $212 $568 $971 $241 $1,992

2015 $305 $345 $1,175 $280 $2,105

2016 $150 $300 $1,000 $400 *$1,850

* $308M advertised as of January 2016

Page 3: Garrett VTCA presentation2016 › wp-content › uploads › 2016 › 01 › Presentation… · Microsoft PowerPoint - Garrett_VTCA_presentation2016.pptx Author: wendy.jenkins Created

HB2: New Prioritization Process

3

Scoring Summary• 321 applications submitted• 34 applications screened out• 287 applications scored

$7.0 billion HB2 request$1.7 billion available

What’s Next?• Feb. CTB: Review projects• March & April: Board

revisions• April & May: Public hearings• May CTB: Revised funding

scenario developed • June CTB: Adopt 6-Year

Program

Page 4: Garrett VTCA presentation2016 › wp-content › uploads › 2016 › 01 › Presentation… · Microsoft PowerPoint - Garrett_VTCA_presentation2016.pptx Author: wendy.jenkins Created

4

Pavement & Bridge Maintenance Operations

CY 2016 Advertisements

� Pavement $500M� Bridge Maintenance $200M� Additional Funds for FAST (new federal legislation)

2017 2018 2019

Maintenance $88M $77M $74M

State of Good Repair

$155M $94M $74M

Formula HB2 $190M $115M $90M

Page 5: Garrett VTCA presentation2016 › wp-content › uploads › 2016 › 01 › Presentation… · Microsoft PowerPoint - Garrett_VTCA_presentation2016.pptx Author: wendy.jenkins Created

Potential Design-Build Projects – $500M*

• Route 220 Corridor Safety Improvements, Salem District, UPC 105543 & 105544 - $85M

• I-64 Peninsula Widening Segment III, Hampton Roads District, UPC 106689 - $290M

• Bridge Replacement: I-81 over Reed Creek and Rte. 697 (Formato Lane), Bristol District, UPC 104936 - $21M

• Bridge Replacement: I-81 over Rte. 686 (Mulberry Lane), Bristol District, UPC 107117 - $14M

• I-64 Widening from I-295 to Exit 205, Richmond District, UPC 107458 - $54M

• I-95 Improvements to Exit 130, Fredericksburg District - $20M

• I-95 over Route 608 Bridge Rehabilitation, Richmond District -$13M

*It is anticipated that the projects listed above will be advertised using the Design-Build project delivery method. The list is subject to change.

5

Page 6: Garrett VTCA presentation2016 › wp-content › uploads › 2016 › 01 › Presentation… · Microsoft PowerPoint - Garrett_VTCA_presentation2016.pptx Author: wendy.jenkins Created

New Design-Build Legislation: Alternative Technical Concepts

• VDOT and industry partnered to propose an amendment to Virginia Code §§§§33.2-209 to allow Alternative Technical Concepts (ATC) for design-build projects.

• The ATC process will allow VDOT and contractors to fully utilize the benefits of design-build in a competitive bidding environment while protecting the innovative ideas proposed by the design-build team.

• As a result, HB 501 and SB 465 companion bills were introduced in the General Assembly.

6

Page 7: Garrett VTCA presentation2016 › wp-content › uploads › 2016 › 01 › Presentation… · Microsoft PowerPoint - Garrett_VTCA_presentation2016.pptx Author: wendy.jenkins Created

Virginia Highway Deaths & Serious Injuries2005 - 2015

7

946

1,026

740775

700

759

600650700750800850900950

10001050

Deaths

Deaths

*Results are preliminary

Page 8: Garrett VTCA presentation2016 › wp-content › uploads › 2016 › 01 › Presentation… · Microsoft PowerPoint - Garrett_VTCA_presentation2016.pptx Author: wendy.jenkins Created

VDOT Needs Interim Contracts to Ensure Continuity of Operations

SERCO TOC Contract

• Ends May 1, 2016

“Bridge” Contracts

• Emergency procurements for TOC, SSP, ITS Maintenance, and PM&G

Replacement Procurements

• Competitive procurements for TOC/SSP, ITS Maintenance, and Program Management & Governance (PM&G)

• Non-competitive procurement for ATMS

• Re-advertise beginning April 2016

8

Operations

Page 9: Garrett VTCA presentation2016 › wp-content › uploads › 2016 › 01 › Presentation… · Microsoft PowerPoint - Garrett_VTCA_presentation2016.pptx Author: wendy.jenkins Created

Upcoming Engineering Business Opportunities

� Richmond District CEI for bus rapid transit (project specific)

� NOVA rolling road design services (project specific)

� Structure and Bridge region 3 inspection of support structures (term)

� NOVA general engineering consultants

� Structure and bridge statewide engineering services (term)

� NOVA permit & street acceptance inspection services (term)

� Operations Divisions ITS for eastern regional operations

� Structure and Bridge statewide design services (term)

� Construction Division support services/risk assessments (term)

� Structure and Bridge Fredericksburg District bridge safety inspection (term)

9

Page 10: Garrett VTCA presentation2016 › wp-content › uploads › 2016 › 01 › Presentation… · Microsoft PowerPoint - Garrett_VTCA_presentation2016.pptx Author: wendy.jenkins Created

Questions?

Discussion!

10