[1] GARFIELD POOL PROJECT PUBLIC ART PROJECT OUTLINE BACKGROUND (CAPITAL IMPROVEMENT PROJECT OVERVIEW) Garfield Square is located at Harrison and 26th Streets. The park is approximately 169,000 square feet, has a pool building and adjacent club house, sport courts, synthetic fields for soccer, children’s play area, picnic area, landscaping, and related amenities. The capital improvement project will include the renovation of the pool, pool building, and reconfiguration of park indoor facilities, improved park accessibility, and related amenities. ART OPPORTUNITY There are several opportunities for an artwork at the site, and the exact location will be determined as the architectural design progresses: A two-dimensional artwork to be integrated into the North facing wall of the pool building’s interior.

GARFIELD POOL PROJECT PUBLIC ART PROJECT …presentation to the community on January 19, 2017. A community representative will serve on the Garfield Pool Public Art Project Selection

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GARFIELD POOL PROJECT PUBLIC ART PROJECT …presentation to the community on January 19, 2017. A community representative will serve on the Garfield Pool Public Art Project Selection

[1]

GARFIELD POOL PROJECT

PUBLIC ART PROJECT OUTLINE

BACKGROUND (CAPITAL IMPROVEMENT PROJECT OVERVIEW)

Garfield Square is located at Harrison and 26th Streets. The park is approximately 169,000 square

feet, has a pool building and adjacent club house, sport courts, synthetic fields for soccer, children’s

play area, picnic area, landscaping, and related amenities. The capital improvement project will

include the renovation of the pool, pool building, and reconfiguration of park indoor facilities,

improved park accessibility, and related amenities.

ART OPPORTUNITY

There are several opportunities for an artwork at the site, and the exact location will be determined

as the architectural design progresses:

A two-dimensional artwork to be integrated into the North facing wall of the pool building’s

interior.

Page 2: GARFIELD POOL PROJECT PUBLIC ART PROJECT …presentation to the community on January 19, 2017. A community representative will serve on the Garfield Pool Public Art Project Selection

[2]

A two-dimensional artwork to be integrated into the West facing glass wall of the pool building

that spans the length of the building and separates the pool’s interior with the outside courtyard.

An artistic fence treatment adjacent to the courtyard is another possible option.

Page 3: GARFIELD POOL PROJECT PUBLIC ART PROJECT …presentation to the community on January 19, 2017. A community representative will serve on the Garfield Pool Public Art Project Selection

[3]

A standalone sculpture in a landscaped area.

As the plans for the site develop, the exact approach and location will be determined.

PROJECT GOAL

The goal of the project is to create a signature artwork for the renovated Garfield Pool that will

inspire and engage the pool’s users and enhance their connection to recreation and to the

neighborhood.

PROJECT BUDGET

Admin Fee $32,000

Selection, signage and documentation $6,700

Artwork (design, fabrication,

installation) $94,100

Contingency $11,200

Conservation $16,000

Total $160,000

ARTIST RECRUITMENT APPROACH AND ELIGIBILITY

Arts Commission staff will select a short list of artists from the 2017/18 Prequalified Artist Pool.

Page 4: GARFIELD POOL PROJECT PUBLIC ART PROJECT …presentation to the community on January 19, 2017. A community representative will serve on the Garfield Pool Public Art Project Selection

[4]

ARTIST SELECTION PROCESS

The list of qualified artists will be presented to the Garfield Pool Public Art Project Selection Panel

consisting of a representative of the Client Agency, a member of the design team, two arts

professionals, an Arts Commissioner, and one community member. The panel will identify three

finalists who will be invited to develop conceptual site specific proposals after attending an

orientation session with the project team and key stakeholders. These finalists will be paid an

honorarium of $1,000 for the development of a proposal.

The Garfield Pool Public Art Project Selection Panel will reconvene to consider the finalists’ proposals

in an interview format and will select one artist and an alternate for the project for recommendation

to the Art Commission.

COMMUNITY INVOLVEMENT

SFAC staff presented an overview of the public art project in conjunction with the CIP

presentation to the community on January 19, 2017.

A community representative will serve on the Garfield Pool Public Art Project Selection Panel

and will participate in the Artist Orientation

The finalists proposals will be on display for public comment at the project site and on the

SFAC website for two weeks prior to the final selection panel meeting

All selection panels, Visual Arts Committee (VAC) and Commission meetings are open to the

public.

TIMELINE (Subject to change)

Project Outline Approval (VAC) April 19, 2017

First Project Artist Selection Panel May 2017

Artist Finalist Orientation May 2017

Finalist Proposals Due June 2017

Final Project Artist Selection Panel July 2017

VAC Approval July 19, 2017

Arts Commission Approval August 7, 2017

Artist Under Contract August 2017

FURTHER INFORMATION

Contact Zoe Taleporos, Public Art Project Manager at (415)252-2243 or by email at

[email protected].

Page 5: GARFIELD POOL PROJECT PUBLIC ART PROJECT …presentation to the community on January 19, 2017. A community representative will serve on the Garfield Pool Public Art Project Selection

Capital & Planning

Project Manager

Toks Ajike

Recreation & Park Department

SFAC Project Manager

Zoe Taleporos

Design Team

TEF Design/Paulett Taggart Architects

Joint Venture

SF Public Works Landscape Architecture

1

GARFIELD POOL & CLUBHOUSE RENOVATIONSF REC & PARK

Garfield Pool Renovation | Civic Design Review #1 | 02/13/2017

CIVIC DESIGN REVIEW #1FEBRUARY 13, 2017

Page 6: GARFIELD POOL PROJECT PUBLIC ART PROJECT …presentation to the community on January 19, 2017. A community representative will serve on the Garfield Pool Public Art Project Selection

Capital & Planning

2AERIAL VIEW OF SITEGarfield Pool Renovation | Civic Design Review #1 | 02/13/2017

Page 7: GARFIELD POOL PROJECT PUBLIC ART PROJECT …presentation to the community on January 19, 2017. A community representative will serve on the Garfield Pool Public Art Project Selection

Capital & Planning

3

NATATORIUM

T R E A T A V E N U E

26

thS T

R E

ET

25

thS T

R E

ET

EXISTING SITE PLAN

H A R R I S O N S T R E E T

CLUB HOUSE

SOCCER FIELD

PLAY AREA

LAWN

COURT

LAWN

Garfield Pool Renovation | Civic Design Review #1 | 02/13/2017

Page 8: GARFIELD POOL PROJECT PUBLIC ART PROJECT …presentation to the community on January 19, 2017. A community representative will serve on the Garfield Pool Public Art Project Selection

Capital & Planning

15PROPOSED SITE PLAN

H A R R I S O N S T R E E T

T R E A T A V E N U E

26

thS T

R E

ET

25

thS T

R E

ET

(N) CLUB HOUSE (N) LOBBY

(E) NATATORIUM

Garfield Pool Renovation | Civic Design Review #1 | 02/13/2017

Page 9: GARFIELD POOL PROJECT PUBLIC ART PROJECT …presentation to the community on January 19, 2017. A community representative will serve on the Garfield Pool Public Art Project Selection

Capital & Planning

16PROPOSED FLOOR PLAN

Garfield Pool Renovation | Civic Design Review #1 | 02/13/2017

Page 10: GARFIELD POOL PROJECT PUBLIC ART PROJECT …presentation to the community on January 19, 2017. A community representative will serve on the Garfield Pool Public Art Project Selection
Page 11: GARFIELD POOL PROJECT PUBLIC ART PROJECT …presentation to the community on January 19, 2017. A community representative will serve on the Garfield Pool Public Art Project Selection

Garfield Square Pool Renovation | 08.12.162

Building Plan: Option 1

5 20 40100

LOBBY390 SF

WETSTORAGE70 SF

STAFF RM130 SF

M(48')

RECEPTION/OFFICE170 SF

STAFFOFFICE178 SF

STAFFRESTRM85 SF

W(48')

JANCL

AREAWAY147 SF

JANCL

DRY STORAGE150 SF

86'-0"

32'-0

"

GM45 SF

49'-0"

STEPS

TRASHROOM200 SF

LOCKERSSEAT

SEAT

75 SF

PVTMTGRM

49'-0"

12'-3

"

TOOLROOM140 SF

Building PlanOption 1(Enclosed Hallway & Lobby)

Option 1 includes:1) Interior Entry Lobby and Hall 22) Natatorium Ventilation: Dehumidification system

Courtyard Scheme 1: BBQ with Splashpad11.15.16

Page 12: GARFIELD POOL PROJECT PUBLIC ART PROJECT …presentation to the community on January 19, 2017. A community representative will serve on the Garfield Pool Public Art Project Selection
Page 13: GARFIELD POOL PROJECT PUBLIC ART PROJECT …presentation to the community on January 19, 2017. A community representative will serve on the Garfield Pool Public Art Project Selection
Page 14: GARFIELD POOL PROJECT PUBLIC ART PROJECT …presentation to the community on January 19, 2017. A community representative will serve on the Garfield Pool Public Art Project Selection