Tasks Start Date Duration (Days) End Date Design of Systems 11/17/15 134 3/30/16 Acquisations of materials 04/04/16 33 5/7/16 Fabrication 04/30/16 28 5/28/16 Testing 05/15/16 44 6/28/16 Pump Selection 06/28/16 14 7/12/16 Assembly 07/13/16 21 8/3/16 Data Collection 07/21/16 44 9/3/16 Data Analysis 09/04/16 21 9/25/16 Conclusion 09/26/16 21 10/17/16

Gantt Chart (1)

Embed Size (px)

Citation preview

Page 1: Gantt Chart (1)

Tasks Start Date Duration (Days) End DateDesign of Systems 11/17/15 134 3/30/16Acquisations of materials 04/04/16 33 5/7/16Fabrication 04/30/16 28 5/28/16Testing 05/15/16 44 6/28/16Pump Selection 06/28/16 14 7/12/16Assembly 07/13/16 21 8/3/16Data Collection 07/21/16 44 9/3/16Data Analysis 09/04/16 21 9/25/16Conclusion 09/26/16 21 10/17/16