Ganganagar New (Autosaved)

Embed Size (px)

Citation preview

  • 8/12/2019 Ganganagar New (Autosaved)

    1/14

    Site NameBADU

    Site ID WB_NTP_kolk_009

    Circle KOLKATA

    S.No BTS Elements

    1 Accurate antenna height (in mtrs)

    2 Accurate Tower height from Ground(in mtrs)

    3 Antenna azimuth (all SIX sectors)

    4 Antenna M-Tilt

    5 Antenna E-Tilt

    6 Sector swapping verified & Rectified (Y/N)

    7 Any obstruction in front of Antenna (Y/N)

    8 Tower type

    9 Building height

    10 Check all Sector RRU Grounding after removing paint from tower body

    11 Weather proofing check for all sectors12 Checking proper RF jumper cable connection

    13 Checking proper Optical f iber cable routing

    14 Checking proper Optical fiber cable (Indoor) routing

    15 No of optical fibers per sector

    16 Type of connector used in joining optical fibers (if more than one fiber used)

    17 Checking proper DBS E1 cable routing and croning

    18 Check proper Power Cables routing

    19 Check proper E1 croning /punching

    20 SFP type in 1st sector

    21 SFP type in 2nd sector

    22 SFP type in 3rd sector

    23 Fiber type in 1st sector24 Fiber type in 2nd sector

    25 Fiber type in 3rd sector

    26 EVDO card availibility

    27 Sealing of cable entry boot done

    28 Verification of earthing and grounding resistance

    29 Lightening protection of Antenna pole

    30 Cabinet/Frame BBU grounded properly

    31 Weather proofing of GPS antenna

    32Checking & cleaning of BBU Fan unit and Heat exchanger fans working

    properly

    33 Air inlet should cleaned properly. (For outdoor BTS )

    32 Optical Fiber

    33 Power Cable

    34 DBS E1 Cable

    35 BTS E1

    36 BBU Power Cable

    37 DCDU Power Cable at SMPS MCB end

    38 GPS

    Labelling

  • 8/12/2019 Ganganagar New (Autosaved)

    2/14

    S.No Item

    2

    SSTL Audit

    4

    1

    3

  • 8/12/2019 Ganganagar New (Autosaved)

    3/14

    BTS Site Address: Thakur Pukur Road(s), Mouza- Kathore, Badu, PS-

    Barasat, Dist- 24Pgs(N)

    Date:8/5/14

    Compliance Remarks

    28/28/28 To be reported 1st time only.

    40M To be reported 1st time only.

    60/ 160/ 300 Quarterly

    0,0,0 Quarterly

    2,2,3 Quarterly

    Y Quarterly

    no Quarterly

    RTP To be reported 1st time only.

    G+2 To be reported 1st time only.

    OK Quarterly

    OK Quarterlychecked and tightened Quarterly

    OK Quarterly

    OK Quarterly

    1 To be reported 1st time only.

    NA To be reported 1st time only.

    NA SITE IN IP SITE IN IP

    OK Quarterly

    NA SITE IN IP

    multi mode To be reported 1st time only.

    multi mode To be reported 1st time only.

    multi mode To be reported 1st time only.

    multi mode To be reported 1st time only.multi mode To be reported 1st time only.

    multi mode To be reported 1st time only.

    1 To be reported 1st time only.

    OK Quarterly

    OK Quarterly

    OK Quarterly

    OK Quarterly

    OK Quarterly

    checked and cleaned Quarterly

    checked and cleaned Quarterly

    OK Quarterly

    OK Quarterly

    OK Quarterly

    OK Quarterly

    OK Quarterly

    OK Quarterly

    OK Quarterly

    etails:

    IP-VIOM

  • 8/12/2019 Ganganagar New (Autosaved)

    4/14

    Date Closed Name / Signature of closing authority

    emarks

  • 8/12/2019 Ganganagar New (Autosaved)

    5/14

    KOLKATA

    LINK NAME:

    1 Site Name

    2 Site ID

    3 System Configuration (PDH/SDH)

    4 Link Capacity

    5 MW Channel Used

    6 Antenna Size (Mtr.)

    7 Supporting Rod (ant size>1.2 m)

    8 Accurate Antenna height (in mtrs)

    9 Polarization (Horizontal/vertical)

    10 Cleaning of IDU

    11 IDU TYPE

    12 Earthing

    13IDU power tapping (critical/Non

    critical) FROM DCDU FROM DCDU

    14 Dual / critical power connected incase of aggregation node/ring

    node/serving more than 4 sites.

    NA NA

    15 ODU type (LP/SP/UBR)

    16 ODU type (HI/LO/UBR)

    17Earthing (to be done on tower body

    after removing paint)

    18 Tx Frequency(MHz.)

    19 Rx Frequency(MHz.)

    20 Tx Power(dbm)

    21TX PWR planned as per Link Budget

    (dbm)

    22 Current RSL (dbm)

    IDU

    ODU

    Commissioning

    -38.7 -36.4

    18050.625 19060.625

    19060.625 18050.625

    10 10

    XMC

    LO HI

    DONE DONE

    cleaned

    HORIZONTAL HORIZONT

    10 10

    XMC

    Link Site B-

    WB_NTP_kolk_088 WB_NTP_Kolk

    0.3 0.6

    Ganganagar to Madhyamgram BT College

    Antenna Details

    PREVENTIVE MAINTENANCE REPORT OF MICROWAVE LIN

    SDH SDH

    128QAM_14M 128QAM_14

    Ganganagar Madhyamgram BT

    Circle:

    1. Path Details Link Site A-B

    na

    24M 22M

    IP IP

    cleaned

    OK OK

    na

  • 8/12/2019 Ganganagar New (Autosaved)

    6/14

    23 RSL ACCRD TO Link Budget(dbm)

    24 SNR

    25 MODULATION

    26 NE IP

    27 NE GATEWAY

    28 Date time adjustment done

    29 BER in Link

    30 Alarms if any in link

    31 Power Control (ATPC/MTPC)

    32 IF Cable Wiring/Routing

    33 IF Cable Connection

    34Weather proofing (to be done in

    case of no weather proffing)

    35 PCM(E1)/Fiber Cable Connection

    36 MCB Rating( 32 / 16 Amps)

    37 FRAME GROUNDING

    38LAN cable connected in case of

    more than one hops

    39Separate DDF for separate IDUs(Yes

    / No)

    40 DDF type (Wrappnig/Krone)

    41( 4/8/16 )E1s terminated in DDF

    (both PCM cable present)

    42 No E1 should be hand twisted

    43 Soft labelling of NE w.r.t site name

    44 IF Cable

    45 Power Cable

    46 IDU47 PCM Cable

    48 Antenna

    49 ODU

    50 DDF

    51 Each and every E1

    52 AGG NODE NAME(WORKING)

    53 AGG NODE NAME(PROTECTION)

    S.No Item Date ClosedName / Signature of closing

    authority

    connected

    ok

    Need to specify MCB rating

    OK

    ok

    For Sites having Ethernet Aggregation Node

    no

    MTPC

    16 E1 terminated in DDF

    No E1 hand twisted

    done

    donedone

    OK

    done

    done

    done

    Proper labeling to be done . No permanent

    marker should be used.

    separate DDF present

    Installation Details

    Labelling Details

    Krone

    1

    10.86.160.5

    10.86.160.22

    newly done and OK

    done

    done

    Need to check the redundancy in the

    Maintainance window.

    done

    no

    -39.43 -39.43

    128QAM_14M 128QAM_14

    3

    SSTL Audit Remarks

    2

  • 8/12/2019 Ganganagar New (Autosaved)

    7/14

    4

  • 8/12/2019 Ganganagar New (Autosaved)

    8/14

    Remarks

    To be reported 1st time only.

    Quarterly

    To be reported 1st time only.

    To be reported 1st time only.

    Quarterly

    To be reported 1st time only.

    Quarterly

    Quarterly

    Quarterly

    To be reported 1st time only.

    To be reported 1st time only.

    Required

    Wherever NMS visiblity is not there , take

    screenshot at the sites.

    L

    A

    _079

    Date:

    (per link)

    M

    College

    To be reported 1st time only.

    29/4/2014

  • 8/12/2019 Ganganagar New (Autosaved)

    9/14

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    QuarterlyQuarterly

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    M

  • 8/12/2019 Ganganagar New (Autosaved)

    10/14

  • 8/12/2019 Ganganagar New (Autosaved)

    11/14

    MTS Site ID

    IP Name

    Sr No. Alarm Description OK/NOT OK

    1 AC MAINS FAIL

    2 BATTERY DISCHARGE

    3 LOAD ON DG4 HRT

    5 RECTIFIER FAIL

    6 DG FAIL TO START

    7 DG FAIL TO STOP

    8 LFL

    9 DOOR OPEN

    10 LLOP

    11 LOAD ON MAINS

    12 SYSTEM ON BATTERY

    13 BTS Power cable MCB rating (should be ( 32 A / 63A)

    14 Power to BTS: DC input power to BTS must be checked should be between (-48V ~ -53V)

    15Battery bank is installed properly or not and installed battery capacity(indoor

    and outdoor)

    16 Battery back-up test (incase of OD BTS with BB)

    17 Measure the voltage at battery bank terminals (indoor and out door )

    18Graesing at Battery Terminals ( Check in case of ID& OD and needful action for

    OD).

    19Check whether the connectors are loose or corroded(incase of OD AC BTS with

    BB)

    20 Check the signal indicators of SMPS rectifiers and BTS power

    21 EB status22 EB availability (in Hours)

    23 DG capacity

    24 DG Automation

    25 Check Temperature inside Shelter

    26 EARTH PIT (Connection check between Pits & IGB/EGB)

    27 Total site DC Load in Amps

    28 MTS DC Load in Amps

    29 Site Battery Back up (In hours)

    30 Tenancy with Number & name

    31 Caution Board

    32 Danger Board

    33 Warning Board

    34 DCEM availability(Mention Reading also)35 EB Meter Reading

    36 DG Meter Reading

    37 Ac capacity / working condition

    S.No Item Date Closed

    Site Details

    External Alarm Status (Need to be verified from

    OMC Engineer Name (For Alarm verification)

    Power check

    SSTL Audit Remarks

  • 8/12/2019 Ganganagar New (Autosaved)

    12/14

    1

    4

    2

    3

  • 8/12/2019 Ganganagar New (Autosaved)

    13/14

    Remarks

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    QuarterlyTo be reported 1st time only.

    To be reported 1st time only.

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    Quarterly

    Name / Signature of closing authority

    OMCR)

    Verification of external alarms from the listed

    ones.(whichever is extended)

  • 8/12/2019 Ganganagar New (Autosaved)

    14/14