    O B J E C T I V E S

    CCC 419 Interior Upgrades

    heduled maintenance: painting and carpeting replacement

    Address existing aging materials in corridors and damage to walls

    Provide finishes and fixtures that are durable, easy to maintainand long lasting

    Improve existing lighting in main lobby

    Improve lighting in public corridors

    Provide accessibility to existing mail area Increase safety and security where possible

  • 8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31

    3/24

    CCC 419 Interior Upgrades

    A R E A S O F I M P O R T A N C EIN ORDER OF CONCERN

    Update of all finishes in common corridors (wall finish, carpet, anddoor signage) Update and add new interior hallway lighting for safety andfunctional reasons Install corner protection in common corridors Retain existing corridor trim and stain to match new wall panels Update light fixtures in front lobby Create new mail area for easier accessibility

  • 8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31

    4/24

    CCC 419 Interior Upgrades

    C O N S T R A I N T S

    Financial (budget)

    Some existing finishes are permanent and may be costly to removeor modify

    Coordination with other repairs in the building

  • 8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31

    5/24

  • 8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31

    6/24

    Existing Conditions Common Corridors:

    CCC 419 Interior Upgrades

    Dark - Lighting not sufficient

    Carpet is worn and stretched in areas

    Walls are scuffed and wall paper torn

    Baseboard are scuffed in areas

    Signage for common doors (GarbageRoom) are not bilingual

  • 8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31

    7/24

    Main Corridors

    Typical Corridor Plan:

    CCC 419 Interior Upgrades

    Typical Floor Plan (corridors on each floor are actually different)

    STAIR

    STAIR

    E LE V. N 0 3 E LE V. N 0 4

    STAIR

    CORRIDOR

    LOBBY

  • 8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31

    8/24

    CCC 419 Interior Upgrades

    Carpet is worn and shrinking in areas

    Baseboards are scuffed and worn

    Wall covering is ripped and is comingof the wall in areas

    Wall corners are damaged

    Existing Conditions Corridors:

  • 8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31

    9/24

    CCC 419 Interior Upgrades

    Corridor baseboards and door trimbadly scuffed in areas

    Unit doors and trim need to matchbaseboard finish

    Existing Conditions Corridor Finishes:

  • 8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31

    10/24

    Existing Conditions Corridor Signage:

    CCC 419 Interior Upgrades

    Signage of doors to common areas notbilingual for residents

  • 8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31

    11/24

  • 8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31

    12/24

  • 8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31

    13/24

    Proposed Corridor Option 1

    1/4 DRYWALL, PAINTED WITHNATURAL LINEN, BENJAMIN MOORE

    1/4 OAK VENEER PANEL C/WFASTENERS - TO BE DETERMINED

    COMO 1925 LIGHT, SISTEMALUXFIXTURE BOX MOUNTED TO MATCHEXISTING HEIGHT IN CORRIDOR

    SILK ROAD BEIGE, OLYMPIA TILE

    INTERFACE CARPET TILE

    STYLE-LAYOUTCOLOUR -DRAWING

    WOOD TRIM

    CCC 419 Interior Upgrades

  • 8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31

    14/24

    Proposed Corridor Option 2

    1/4 DRYWALL, PAINTED WITH, BENJAMINMOORE PAINT. COLOUR - HC-89NORTHHAMPTON PUTTY

    MIROLA 3040, EUREKA LIGHTINGFIXTURE BOX MOUNTED TO MATCHEXISTING HEIGHT IN CORRIDOR

    REGAL CHOCOLATE BROWN - OLYMPIA TILE

    INTERFACE CARPET TILESTYLE- GEOMETRYCOLOUR -CONTOUR

    CCC 419 Interior Upgrades

  • 8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31

    15/24

    Proposed Corridor Option 3

    1/4 DRYWALL, PAINTED WITH HC-80BLEEKER BEIGE, BENJAMIN MOORE PAINT

    MODENA WALL 1911 LIGHT, SISTEMALUXFIXTURE BOX MOUNTED TO MATCHEXISTING HEIGHT IN CORRIDOR

    WOOD TRIM

    1/4 DRYWALL, PAINTED WITH HC-89NORTHHAMPTON PUTTY, BENJAMINMOORE PAINT

    SILK ROAD BEIGE, OLYMPIA TILE

    INTERFACE CARPET TILESTYLE-LAYOUTCOLOUR -DRAWING

    CCC 419 Interior Upgrades

  • 8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31

    16/24

    Flooring Suggestions:

    CCC 419 Interior Upgrades

    'Interface' Carpet Tiles (commercial grade)

    Easy to maintain, easy to replace

    Costeffective and highly durable

    Readily available in a wide variety of colours and patterns

    Recyclable

    Interface Carpet Style Layout,Colour: Drawing

    Interface Carpet Style Drawing,Colour: Contour

  • 8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31

    17/24

    Flooring Suggestions:Ceramic Tile Boarder

    CCC 419 Interior Upgrades

    'Olympia' Porcelain tile, Regal & Silk Road Series

    Easy to maintain

    High quality, very durable

    Readily available in a wide variety of colours, textures, and sizes.

    Durability and easy maintenance of tile, combined with the acousticbenefits of carpeting

    Regal Series - Chocolate BrownOlympia Tile

    Silk Road - BeigeOlympia Tile

  • 8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31

    18/24

    Common Corridor Lighting Options

    CCC 419 Interior Upgrades

    New Wall Lights in Corridors to Replace Existing Lights

    Option 2 Wall Sconce

    Systemalux Light - Modena Wall 1911

    Option 1 Wall Sconce Option 3 Wall SconceSystemalux Light - Como 1925

    Eureka Lighting - Mirola 3040

  • 8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31

    19/24

    Wall suggestions:

    PAINT - Option 1 & 2

    CCC 419 Interior Upgrades

    Acrylic paint

    Easy to maintain

    Costeffective

    Option 1 - Natural Linen

    Option 2 & 3 - NorthhamptonPutty

    Option 3 - Bleeker Beige

  • 8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31

    20/24

    Wall suggestions:

    Option 1

    CCC 419 Interior Upgrades

    WOOD LAMINATE PANELS OVER EXISTINGWALL COVERING

    Easy to maintain, easy to replace

    Costeffective and highly durable

    Wood laminate paneling will add a more uniformand distinguished look

    (Maple or Birch, Satin Finish) (Chrome Carriage Bolts)

  • 8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31

    21/24

    CCC 419 Interior Upgrades

    ESTIMATE OPTION 1 Quantity Unit Unit Rate Amount Remarks

    Demolition

    Removal of Carpet 5027 sf $0.38 $1,911

    New Construction

    Wood Veneer (to lower halfof wall) 5831 sf $7.00 $40,817 1/4", maple finished

    Fasteners (4 corners) 1950 ea $0.50 $975 Metal Screws with caps

    Finishing 14,437 sf $0.75 $10,827.75

    1/4 Drywall 7772 sf $1.86 $14,456

    Wood Trim 1944 lf $4.60 $8,943Paint - Walls 7772 sf $0.75 $5829

    Paint - Ceiling 5027 sf $0.75 $3771Carpet 4055 sf $5.50 $22,303

    Perimeter Tiles 972 sf $6.00 $5832

    Corner Protection - StainlessSteel 192 lf $29.40 $5645

    Wall sconces (Hallway) 50 # $350 $17,150

    SUB-TOTAL $138,460

    Labour & O.H. 30% $41,538

    SUB-TOTAL $179,998

    Contingency 10% $17,999

    TOTAL $197,997

    Cost Estimates - Option 1

  • 8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31

    22/24

    CCC 419 Interior Upgrades

    ESTIMATE OPTION 2 Quantity Unit Unit Rate Amount Remarks

    Demolition

    Removal of Carpet 5027 sf $0.38 $1911

    New Construction

    1/4 Drywall 13608 sf $1.86 $25,311

    Paint - Walls 13608 sf $0.75 $10,206

    Paint - Ceiling 5027 sf $0.75 $3771

    Carpet 4055 sf $5.50 $22,303

    Perimeter Tiles 972 sf $6.00 $5832

    Corner Protection - StainlessSteel 192 lf $29.40 $5645

    Wall sconces (Hallway) 50 # $350 $17,150

    SUB-TOTAL $92,129

    Labour & O.H. 30% $27,639

    SUB-TOTAL $119,768

    Contingency 10% $11,977

    TOTAL $131,745

    Cost Estimates - Option 2

  • 8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31

    23/24

    CCC 419 Interior Upgrades

    Cost Estimates - Option 3

    ESTIMATE OPTION 3 Quantity Unit Unit Rate Amount Remarks

    Demolition

    Removal of Carpet 5027 sf $0.38 $1911

    New Construction

    1/4 Drywall 13608 sf $1.86 $25,311

    Paint - Walls 13608 sf $0.75 $10,206

    Wood Trim 1944 lf $4.60 $8,943

    Paint - Ceiling 5027 sf $0.75 $3771Carpet 4055 sf $5.50 $22,303

    Perimeter Tiles 972 sf $6.00 $5832

    Corner Protection - StainlessSteel 192 lf $29.40 $5645

    Wall sconces (Hallway) 50 # $250 $12,500

    SUB-TOTAL $96,422

    Labour & O.H. 30% $28,927

    SUB-TOTAL $125,349

    Contingency 10% $12,545

    TOTAL $137,894

  • 8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31

    24/24

    292 Main Street, Ottawa Ontario K1S 1E1

    Phone (613) 231-2245Fax (613) 234-3176E-mail [email protected]

    Pawel Fiett, Architect