O B J E C T I V E S
CCC 419 Interior Upgrades
heduled maintenance: painting and carpeting replacement
Address existing aging materials in corridors and damage to walls
Provide finishes and fixtures that are durable, easy to maintainand long lasting
Improve existing lighting in main lobby
Improve lighting in public corridors
Provide accessibility to existing mail area Increase safety and security where possible
8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31
3/24
CCC 419 Interior Upgrades
A R E A S O F I M P O R T A N C EIN ORDER OF CONCERN
Update of all finishes in common corridors (wall finish, carpet, anddoor signage) Update and add new interior hallway lighting for safety andfunctional reasons Install corner protection in common corridors Retain existing corridor trim and stain to match new wall panels Update light fixtures in front lobby Create new mail area for easier accessibility
8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31
4/24
CCC 419 Interior Upgrades
C O N S T R A I N T S
Financial (budget)
Some existing finishes are permanent and may be costly to removeor modify
Coordination with other repairs in the building
8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31
5/24
8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31
6/24
Existing Conditions Common Corridors:
CCC 419 Interior Upgrades
Dark - Lighting not sufficient
Carpet is worn and stretched in areas
Walls are scuffed and wall paper torn
Baseboard are scuffed in areas
Signage for common doors (GarbageRoom) are not bilingual
8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31
7/24
Main Corridors
Typical Corridor Plan:
CCC 419 Interior Upgrades
Typical Floor Plan (corridors on each floor are actually different)
STAIR
STAIR
E LE V. N 0 3 E LE V. N 0 4
STAIR
CORRIDOR
LOBBY
8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31
8/24
CCC 419 Interior Upgrades
Carpet is worn and shrinking in areas
Baseboards are scuffed and worn
Wall covering is ripped and is comingof the wall in areas
Wall corners are damaged
Existing Conditions Corridors:
8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31
9/24
CCC 419 Interior Upgrades
Corridor baseboards and door trimbadly scuffed in areas
Unit doors and trim need to matchbaseboard finish
Existing Conditions Corridor Finishes:
8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31
10/24
Existing Conditions Corridor Signage:
CCC 419 Interior Upgrades
Signage of doors to common areas notbilingual for residents
8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31
11/24
8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31
12/24
8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31
13/24
Proposed Corridor Option 1
1/4 DRYWALL, PAINTED WITHNATURAL LINEN, BENJAMIN MOORE
1/4 OAK VENEER PANEL C/WFASTENERS - TO BE DETERMINED
COMO 1925 LIGHT, SISTEMALUXFIXTURE BOX MOUNTED TO MATCHEXISTING HEIGHT IN CORRIDOR
SILK ROAD BEIGE, OLYMPIA TILE
INTERFACE CARPET TILE
STYLE-LAYOUTCOLOUR -DRAWING
WOOD TRIM
CCC 419 Interior Upgrades
8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31
14/24
Proposed Corridor Option 2
1/4 DRYWALL, PAINTED WITH, BENJAMINMOORE PAINT. COLOUR - HC-89NORTHHAMPTON PUTTY
MIROLA 3040, EUREKA LIGHTINGFIXTURE BOX MOUNTED TO MATCHEXISTING HEIGHT IN CORRIDOR
REGAL CHOCOLATE BROWN - OLYMPIA TILE
INTERFACE CARPET TILESTYLE- GEOMETRYCOLOUR -CONTOUR
CCC 419 Interior Upgrades
8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31
15/24
Proposed Corridor Option 3
1/4 DRYWALL, PAINTED WITH HC-80BLEEKER BEIGE, BENJAMIN MOORE PAINT
MODENA WALL 1911 LIGHT, SISTEMALUXFIXTURE BOX MOUNTED TO MATCHEXISTING HEIGHT IN CORRIDOR
WOOD TRIM
1/4 DRYWALL, PAINTED WITH HC-89NORTHHAMPTON PUTTY, BENJAMINMOORE PAINT
SILK ROAD BEIGE, OLYMPIA TILE
INTERFACE CARPET TILESTYLE-LAYOUTCOLOUR -DRAWING
CCC 419 Interior Upgrades
8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31
16/24
Flooring Suggestions:
CCC 419 Interior Upgrades
'Interface' Carpet Tiles (commercial grade)
Easy to maintain, easy to replace
Costeffective and highly durable
Readily available in a wide variety of colours and patterns
Recyclable
Interface Carpet Style Layout,Colour: Drawing
Interface Carpet Style Drawing,Colour: Contour
8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31
17/24
Flooring Suggestions:Ceramic Tile Boarder
CCC 419 Interior Upgrades
'Olympia' Porcelain tile, Regal & Silk Road Series
Easy to maintain
High quality, very durable
Readily available in a wide variety of colours, textures, and sizes.
Durability and easy maintenance of tile, combined with the acousticbenefits of carpeting
Regal Series - Chocolate BrownOlympia Tile
Silk Road - BeigeOlympia Tile
8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31
18/24
Common Corridor Lighting Options
CCC 419 Interior Upgrades
New Wall Lights in Corridors to Replace Existing Lights
Option 2 Wall Sconce
Systemalux Light - Modena Wall 1911
Option 1 Wall Sconce Option 3 Wall SconceSystemalux Light - Como 1925
Eureka Lighting - Mirola 3040
8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31
19/24
Wall suggestions:
PAINT - Option 1 & 2
CCC 419 Interior Upgrades
Acrylic paint
Easy to maintain
Costeffective
Option 1 - Natural Linen
Option 2 & 3 - NorthhamptonPutty
Option 3 - Bleeker Beige
8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31
20/24
Wall suggestions:
Option 1
CCC 419 Interior Upgrades
WOOD LAMINATE PANELS OVER EXISTINGWALL COVERING
Easy to maintain, easy to replace
Costeffective and highly durable
Wood laminate paneling will add a more uniformand distinguished look
(Maple or Birch, Satin Finish) (Chrome Carriage Bolts)
8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31
21/24
CCC 419 Interior Upgrades
ESTIMATE OPTION 1 Quantity Unit Unit Rate Amount Remarks
Demolition
Removal of Carpet 5027 sf $0.38 $1,911
New Construction
Wood Veneer (to lower halfof wall) 5831 sf $7.00 $40,817 1/4", maple finished
Fasteners (4 corners) 1950 ea $0.50 $975 Metal Screws with caps
Finishing 14,437 sf $0.75 $10,827.75
1/4 Drywall 7772 sf $1.86 $14,456
Wood Trim 1944 lf $4.60 $8,943Paint - Walls 7772 sf $0.75 $5829
Paint - Ceiling 5027 sf $0.75 $3771Carpet 4055 sf $5.50 $22,303
Perimeter Tiles 972 sf $6.00 $5832
Corner Protection - StainlessSteel 192 lf $29.40 $5645
Wall sconces (Hallway) 50 # $350 $17,150
SUB-TOTAL $138,460
Labour & O.H. 30% $41,538
SUB-TOTAL $179,998
Contingency 10% $17,999
TOTAL $197,997
Cost Estimates - Option 1
8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31
22/24
CCC 419 Interior Upgrades
ESTIMATE OPTION 2 Quantity Unit Unit Rate Amount Remarks
Demolition
Removal of Carpet 5027 sf $0.38 $1911
New Construction
1/4 Drywall 13608 sf $1.86 $25,311
Paint - Walls 13608 sf $0.75 $10,206
Paint - Ceiling 5027 sf $0.75 $3771
Carpet 4055 sf $5.50 $22,303
Perimeter Tiles 972 sf $6.00 $5832
Corner Protection - StainlessSteel 192 lf $29.40 $5645
Wall sconces (Hallway) 50 # $350 $17,150
SUB-TOTAL $92,129
Labour & O.H. 30% $27,639
SUB-TOTAL $119,768
Contingency 10% $11,977
TOTAL $131,745
Cost Estimates - Option 2
8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31
23/24
CCC 419 Interior Upgrades
Cost Estimates - Option 3
ESTIMATE OPTION 3 Quantity Unit Unit Rate Amount Remarks
Demolition
Removal of Carpet 5027 sf $0.38 $1911
New Construction
1/4 Drywall 13608 sf $1.86 $25,311
Paint - Walls 13608 sf $0.75 $10,206
Wood Trim 1944 lf $4.60 $8,943
Paint - Ceiling 5027 sf $0.75 $3771Carpet 4055 sf $5.50 $22,303
Perimeter Tiles 972 sf $6.00 $5832
Corner Protection - StainlessSteel 192 lf $29.40 $5645
Wall sconces (Hallway) 50 # $250 $12,500
SUB-TOTAL $96,422
Labour & O.H. 30% $28,927
SUB-TOTAL $125,349
Contingency 10% $12,545
TOTAL $137,894
8/14/2019 Gallery Court Hallways, Presentation to Special Meeting July 31
24/24
292 Main Street, Ottawa Ontario K1S 1E1
Phone (613) 231-2245Fax (613) 234-3176E-mail [email protected]
Pawel Fiett, Architect