PROJECT DESCRIPTION

BART currently provides transportation services to over 430,000 Bay Area residents each weekday,

providing the lowest GHG-emitting form of public transportation, on a passenger-per-mile basis, in the

nation. At the same time, BART is dedicated to facilitating Transit-Oriented Development (TOD) projects

to further lower transportation-related environmental impacts and emissions. However, as the

manager of 46,000 parking spaces throughout the Bay Area, BART also realizes the significant impacts of

its management decisions and planning for traditional vehicle travel to and from BART, including

decisions that encourage the use of electric vehicle use and electric vehicle charging at BART managed

parking lots.

As a result, BART has chosen to test new management and infrastructure polices and designs for electric

vehicle use at its new Warm Springs station scheduled to open in the latter-half of Q2 2016. Specifically,

BART intends to use the results of its Electric Vehicle Charging Demonstration at the new Warm Springs

Station to inform future policies for electric vehicle charging infrastructure throughout the BART system

over the next 2-10 years.

The proposed Electric Vehicle Charging Demonstration at the Warm Springs BART is shovel ready, with

significant initial work already complete, such as underground conduit runs and concrete EV charging

stubs construction complete. However, additional wiring and electrical work still needs to be

done. Moreover, while not applying for the solar PV bonus, the Warm Springs Station will have

approximately 350 kW of solar PV capacity installed on the station, helping to offset the demand of the

EV chargers. Additionally, the project is located in a Priority Development Area (PDA), with the new

BART station and extension being a key component of the development for that area. BART has initial

plans to coordinate with the proposed EV charging stations, with both onsite demand and local solar PV

generation, making the operation of the installation a true demonstration and deployment project.

David_Silva
Text Box
Foundations for EV Chargers in Northwest lot

COST ESTIMATE FROM LICENSED CONTRACTOR

Licensed Contractor

The installation of the EV chargers will be completed by the Warm Springs Constructors Design-Build

Team. (See attached document listing the approved subcontractors on the team.)

Estimate Infrastructure Costs

Attached find an internal BART spreadsheet that estimates EV charging infrastructure costs. Some of

these measures have already been installed, but it is estimated that approximately $300,000 worth if

materials and installation work is required.

Price Quote

Attached find a price quote for Level 2 single and duel point chargers from ChargePoint. These values

were used to derive the cost per unit for the chargers specifically (before additional eligible

infrastructure costs were factored in).

When factoring in installation materials and labor, the price per unit increases to the following:

Assuming 23 chargers total, comprised of 18 L2 duel port ($18,107 x 18) and 5 L2 single port ($20,547)

the total project cost is about $460,300.

Single Port Quote (assumed 36 chargers) Duel Port Quote (assumed 18 chargers)

Total Charger Unit Quote 205,524$ 152,028$

Ineligible Costs (23,243)$ (16,961)$

Total Eligible Charger Unit Quote 182,281$ 135,067$

Total Quote/Charger Unit 5,063.36$ 7,503.72$

Total Cost/Charger including Infrastructure Costs 18,107$ 20,547$

Warm Springs Constructors Design-Build Team Kiewit/Mass A Joint Venture

Design Subcontractors Construction Subcontractors Material & Procurement Subcontractors

Abtahi Engineering Management Consultants (S) Ascent Elevator Services, Inc. (S) Alstom Signaling Inc. Auriga Corporation (M)(S) Bagatelos Architectural Glass Systems, Inc. CMC Rebar D&D Surveying Inc. (M) Bay Cities Paving & Grading, Inc. (M) Cal-Con Pumping, LLC (W) DKS Associates (S) Best Contracting Services, Inc. Central Concrete ESE Consulting Engineers, Inc. (W)(S) Blocka Corporation, Inc. Costless Maintenance Services Company Inc. (W) FMG Architects (W) California Tile Installers (S) Cummins Central Power HNTB Corporation Coats Plumbing (M) EFCO, Corp. HQE International (W)(S) Cubic Transportation Systems, Inc. ERICO International Corporation Josephine's Personnel Services, Inc. (W)(S) Economy Trucking Services, Inc. (W)(S) Fitzgerald Formliners (S) Kal Krishnan Consulting Services (M)(S) ELock Technologies LLC Geo Options Inc. NBA Engineering (W)(S) Holland Engineering Rail Solutions George Reed Inc. OLMM Consulting Engineers (M)(S) John Jackson Masonry Gonsalves & Santucci Inc. DBA: Conco Pumping Parikh Consultants, Inc. (M)(S) Keystone Ridge Designs H D Supply Waterworks LTD Stevens & Associates (M)(S) Kwan Wo Ironworks Inc. (W) H.J. Skelton LTD WRECO (M)(S) LaBat's Tree Care (W) Hanson Aggregates YEI Engineers, Inc. (M)(S) Landavazo Bros. Inc. (M) Integrity Wire Inc. (W) Landscape Forms Inc. J. Gosnell Sales Company (W) Liberty Fire System (M)(S) Jensen Precast M.F. Maher, Inc. LB Foster Masterpiece Painting (M) Landavazo Bros. Inc. (M) Nitta Erosion Control (W)(S) MAC Products Inc. Oliveria Fence, Inc. (W)(S) Meyers Controlled Power LLC Pacific Coast Steel Municon Consultants (W)(S) Progress Rail Services Corp. Omega Industries, Inc. RMT Landscape Contractors, Inc. (M) Omega Pacific Electric Supply Inc. (M)(S) Retaining Walls Co. (S) Pinnacle Petroleum, Inc. (W)(S) San Francisco Transport Services, Inc. (W)(S) Rail Services Corp. San Jose Transportation (M)(S) San Diego Precast Concrete Inc. DBA: Pomeroy Schindler Elevator Corp. Stevens Creek Quarry Sierra Traffic Markings, Inc. The Reinforced Earth Company Watertight Restoration Inc. (S) Tri-C Manufacturing Inc. (S) US Concrete Precast Concrete Group VAE Nortrack North America, Inc. Legend West Coast Aggregates (M) = Minority Business Enterprise (W) = Women Business Enterprise (S) = Small Business Enterprise

Change Notice No. 083.1 ‐ Electric Vehicle Charging Station and Conduit for Jumpers at North Transition Structure Updated: 08/14/15 S. Chow

Warm Springs Constructors ‐ Cost Proposal BART ‐ Oversight Manager's EstimateItem Sub/Vendor Quantity UOM Labor Equipment Material Subcontractor Total Quantity UOM Labor Equipment Material Subcontractor Total

Construction Costs 50,490$             5,487$               131,761$          291,890$          479,627$                  39,288$             1,836$               104,638$          159,128$          304,890$                 

Add ‐ Revised EV duct bank & conduits ‐$                      ‐$                      ‐$                      291,890$         291,890$                 ‐$                       ‐$                       ‐$                      159,128$         159,128$                Furnish & install grounding in collector pull boxes SFE 96 ea 33,600$            33,600$                   12 ea 4,395$              4,395$                    

Furnish & install wire SFE 83,740 LF 152,810$         152,810$                 27,101 LF 49,253$            49,253$                  Furnish & install vehicle charging stations SFE 36 ea 105,480$         105,480$                 36 ea 105,480$         105,480$                

Changes to Electrical Equipment at Ancillary Building WSC 50,490$           5,487$              131,761$         ‐$                      187,738$                 39,288$            1,836$               104,638$         ‐$                      145,761$                Receive and install equipment/materials 80 hr 6,871$              6,871$                     40 hr 3,453$               3,453$                    Forklift support ‐ receive equipment/materials 23 hr 1,495$              1,495$                     20 hr 1,289$               1,289$                    Trucks ‐ transport equipment/materials 146 hr 3,992$              3,992$                     20 hr 547$                  547$                       

‐$                              ‐$                             Misc. Materials 1 LS 2,000$              2,000$                     1 LS 2,000$              2,000$                    Form Pour Strip Equipment pad 18 hr 1,556$              250$                 1,806$                     18 hr 908$                  250$                 1,158$                    Grounding 1 LS 4,016$              1,026$              5,042$                     1 LS 4,000$               1,000$              5,000$                    Sales tax on concrete pad, grounding 9 % 295$                 295$                        9 % 293$                 293$                       

‐$                              ‐$                             Conduits and Wires ‐$                              ‐$                             Furnish and install GRS conduits (transformer to switchboard & panelboard) 660 LF 27,031$            10,663$            37,694$                   526 LF 11,429$             8,388$              19,817$                  Furnish, pull & terminate wires 11,977 LF 8,251$              61,975$            70,226$                   11,610 LF 11,296$             47,193$            58,489$                  Sales tax on wires & conduits 9 % 6,537$              6,537$                     9 % 5,002$              5,002$                    

‐$                              ‐$                             Circuit Breaker, Transformer, L1A Electrical Panel ‐$                              ‐$                             Furnish 1000A circuit breaker, 500kVA (480V‐208/120V) transformer, L1A electrical panel 1 LS 48,500$            48,500$                   1 LS 37,168$            37,168$                  Sales tax 9 % 4,365$              4,365$                     9 % 3,345$              3,345$                    Credit 225V circuit breaker (furnish & install) 0 ea ‐$                              0 ea ‐$                       ‐$                      ‐$                             Sales tax 9 % ‐$                              9 % ‐$                      ‐$                             Install new L1‐A electric panel 12 hr 1,037$              1,037$                     42 hr 3,626$               3,626$                    Install 1000A breaker at switchboard A1 20 hr 1,729$              1,729$                     8 hr 691$                  691$                       Install 500kva Transformer 45 hr 3,885$               3,885$                    

SUMMARY 479,627$                  304,890$                 

Construction Costs 50,490$            5,487$              131,761$         291,890$         479,627$                 39,288$             1,836$               104,638$         159,128$         304,890$                

Markups 14,782$            2,664$              20,394$            30,159$            67,999$                   9,925$               (4,439)$              16,109$            18,421$            40,015$                  

G&A (7.54%) 1,865$                    1,420$                   Gross Receipts Tax (0.01%) 55$                          52$                         Bond (1%) 8,994$                    5,221$                   

Total Construction Costs for 36 Level 1 EV Chargers, including wiring, grounding, panel and transformer 558,541$       351,598$      

Page 1 of 1

 

 

 

$1,980.00Shipping andHandling

$11,547.00Tax

$138,501.00Subtotal

9325 Sky Park Ct. Suite 100San Diego, CA 92123San Diego

Ship To

California Center for Sustainable EnergyShip To Name

9325 Sky Park Court, Suite 100San Diego, CA 92123US

Bill To

California Center for Sustainable EnergyBill To Name

Elizabeth KennedyContact Name

[email protected]

(858) 633-8579Phone

[email protected]

949.521.3386Phone

Brendan ODonnellPrepared By

1/1/2016Expiration Date

12/1/2015Created Date00103551Quote Number

Contact Information **Please verify that Billing & Shipping details are accurate

Quoted Line Items

Product Quoted Product DescriptionSalesPrice

Quantity Total Price

CT4021-GW1Dual Output Gateway Option USA, Bollard Unit - 208/240V @30A with CordManagement

$7,210.00 2.00 $14,420.00

CT4021 Dual Output, Bollard Unit - 208/240V @30A with Cord Management $6,695.00 16.00 $107,120.00

CPSUPPORT-ACTIVE

Station Activation & Configuration Service. Activate ChargePoint Service Plans.Activate ChargePoint Warranties. Configure Radio Groups. Configure CustomGroups. Configure Connections. Configure Access Control. Configure VisibilityControl. Configure Pricing. Configure Reports and Alerts.

$349.00 18.00 $6,282.00

CTSW-SAS-COMM-1

1 Year Pre-Paid Commercial Network Service Plan. Designed for employers,businesses and the government, this plan includes 24x7x365 driver support,access control, general reporting, OTA upgrades, payment processing, flexiblepricing policies, reservations and more.

$280.00 36.00 $10,080.00

CT4000-SITEVALID

On-Site Validation of electrical capacity, transformers, panels, breakers, wiring,cellular coverage and that station installation meets all ChargePoint publishedrequirements. Note that a failed Site Validation will incur a second validation fee torepeat the validation after the site deficiencies are corrected. Site is defined as agroup of stations all connected to the same electrical panel. Site Validation is notrequired when installation was performed by a ChargePoint national Operationsand Maintenance (O&M) Partner or a Channel Partner that has qualified toself-certify.

$599.00 1.00 $599.00

CT4000-ASSURE

Initial 1 year of ChargePoint Assure for the CT4000. Parts and On-Site Labor torepair or replace any manufacturing defect. Includes remote monitoring of stationand proactive repair dispatch. A successful Site Validation is required to activatethe initial ChargePoint Assure coverage if site prep and station install are notperformed by a ChargePoint National O&M Partner.

$0.00 18.00 $0.00

Totals

elizabeth.kennedy
Rectangle
elizabeth.kennedy
Callout
These costs were not included in the cost estimate per charger.

 

 

 

 

 5 prepaid years for $570 per year, per port

 4 prepaid years for $583.75 per year, per port

 3 prepaid years for $605 per year, per port

 2 prepaid years for $642.50 per year, per port

 1 prepaid year for $715 per year, per port

  * Can only be combined with ASSURE4** Can only be combined with ASSURE3

DC Fast pricing is the twice the price of Level2 AC service planpricing.  NOTE: dual nozzle, sequential charging only requires oneService Plan.

 

Prepaid Service Provider Network Plan Designed for Utilities and EVSPs, this plan includes everythingprovided in both corporate and commercial service plans plus:white-label braded driver website, load management and driveranalytics.

 

 5 prepaid years for $221 per year, per port *

 4 prepaid years for $227.50 per year, per port **

 3 prepaid years for $235 per year, per port

 2 prepaid years for $250 per year, per port

 1 prepaid year for $280 per year, per port

  * Can only be combined with ASSURE4** Can only be combined with ASSURE3

 

Prepaid Commercial Network PlanDesigned for employers, businesses and the government, this planincludes 24x7x365 driver support, access control, general reporting,OTA upgrades, payment processing, flexible pricing policies,reservations and more.

 

____________ 

____________

 

Initial and Date Below

 

  No plan selected

 

 4 additional years billed at $757 per year, per station

 3 additional years billed at $774 per year, per station

 2 additional years billed at $791 per year, per station

 1 additional year billed at $817 per year, per station

 

 4 additional prepaid years for $645 per year, per station

 3 additional prepaid years for $688 per year, per station

 2 additional prepaid years for $705 per year, per station

 1 additional prepaid year for $740 per year, per station

 

COMMIT PLANSFor up to a total of five committed years of ChargePoint Assure forthe CT4000 billed per year, per station. Annual billing occurs after thefirst initial year of Assure maintenance.

 

PREPAID PLANSFor up to a total of five prepaid years of ChargePoint Assure.

 

Parts and On-Site Labor to repair or replace any manufacturing defect. Includes remote monitoring of station and proactive repair dispatch. Asuccessful Site Validation is required to activate the initial ChargePoint Assure coverage if site prep and station install are not performed by aChargePoint National O&M Partner. Choose a prepaid plan or a committed annual billing plan below.

 

Note: Shipping fees and sales tax (in applicablestates) will be applied to this quote at time ofinvoicing.

$152,028.00Grand Total

CT4000 ChargePoint Assure Maintenance Options

Network Service Plan Options

Quote Acceptance

 

 

 

 

Over 22,300 charging points deployed across the US and CanadaOver 150,000 drivers carry ChargePoint cards, significantly more than any other charging station providerMake the real-time status of your stations visible to EV drivers on EV charging mapsDrivers can find stations through their mobile phones or other smart devices and get turn-by-turn directionsChargePoint is embedded into in-dash navigation systems of major auto OEMsServices delivered from the cloud so your IT Group is not required24 x 7 x 365 driver support available via 800 number (live, not automated)24 x 7 x 365 monitoring of the ChargePoint network by ChargePoint. We can find problems and resolve them before your customers13 x 5 station owner support available. 8AM EST to 6PM PST. No other supplier provides this level of supportCentrally manage all stations through a secure online portal. Change pricing on all or some stations. Change greeting messages.Provide access controlTrack and report on station utilization, energy costs, and greenhouse gas savingsCreate different groups and assign each group their own pricing, access, etc. (e.g. employees vs. visitors)Create customer loyalty programs through ChargePoint Connections (included with Commercial Network Software)Stations accept ChargePoint cards, credit cards, and direct access through smart phones. Very flexible pricing scenarios availableFree software upgrades with software subscription. Stations are always up-to-date thanks to over-the-air software updatesThe most complete EV charging solution in the industryThe most comprehensive Parts and Dispatch Labor warranty in the industry with Assure Warranty and Post Warranty MaintenanceplansGuaranteed Uptime and service response time with Assure Warranty and Post Warranty Maintenance plansProactive station monitoring and dispatch to ensure maximum uptime and usabilityMonthly summary and quarterly detailed station performance metrics reports with Assure coverage delivered to youVandalism and Accident labor repair costs coverage with Assure warranty and post warranty maintenance plans

 

  _______________________________________________________

  _______________________________________________________

  _______________________________________________________

  _______________________________________________________

 

 _______________________________________________________

 

                                        Accepted by:           Signature:

Name:

Title:

Date:

Delivery:(Date or ASAP Required)

 

By signing this quote I hereby acknowledge that I have the authority to purchase the product detailed on this document on behalf ofmy organization. Furthermore, I agree to the above terms and conditions and that this signed quote shall act as a purchase order. 

 

All pricing is confidential between Customer and ChargePoint.All prices are Fob Source.Customer to be invoiced at time of shipment.All invoices are Net 30 days. Credit checks are required for new customers.Pricing does not include installation or mounting services. These can be quoted separately.Additional Purchase Terms and Conditions can be found at http://www.chargepoint.com/termsandconditions

Why ChargePoint?

 

 

 

$3,960.00Shipping andHandling

$15,471.00Tax

$186,093.00Subtotal

9325 Sky Park Ct. Suite 100San Diego, CA 92123San Diego

Ship To

California Center for Sustainable EnergyShip To Name

9325 Sky Park Court, Suite 100San Diego, CA 92123US

Bill To

California Center for Sustainable EnergyBill To Name

Elizabeth KennedyContact Name

[email protected]

(858) 633-8579Phone

[email protected]

949.521.3386Phone

Brendan ODonnellPrepared By

1/1/2016Expiration Date

12/1/2015Created Date00103553Quote Number

Contact Information **Please verify that Billing & Shipping details are accurate

Quoted Line Items

Product Quoted Product DescriptionSalesPrice

Quantity Total Price

CT4011-GW1Single Output Gateway Option USA, Bollard Unit - 208/240V @30A with CordManagement

$5,010.00 2.00 $10,020.00

CT4011 Single Output, Bollard Unit - 208/240V @30A with Cord Management $4,495.00 34.00 $152,830.00

CPSUPPORT-ACTIVE

Station Activation & Configuration Service. Activate ChargePoint Service Plans.Activate ChargePoint Warranties. Configure Radio Groups. Configure CustomGroups. Configure Connections. Configure Access Control. Configure VisibilityControl. Configure Pricing. Configure Reports and Alerts.

$349.00 36.00 $12,564.00

CTSW-SAS-COMM-1

1 Year Pre-Paid Commercial Network Service Plan. Designed for employers,businesses and the government, this plan includes 24x7x365 driver support,access control, general reporting, OTA upgrades, payment processing, flexiblepricing policies, reservations and more.

$280.00 36.00 $10,080.00

CT4000-SITEVALID

On-Site Validation of electrical capacity, transformers, panels, breakers, wiring,cellular coverage and that station installation meets all ChargePoint publishedrequirements. Note that a failed Site Validation will incur a second validation fee torepeat the validation after the site deficiencies are corrected. Site is defined as agroup of stations all connected to the same electrical panel. Site Validation is notrequired when installation was performed by a ChargePoint national Operationsand Maintenance (O&M) Partner or a Channel Partner that has qualified toself-certify.

$599.00 1.00 $599.00

CT4000-ASSURE

Initial 1 year of ChargePoint Assure for the CT4000. Parts and On-Site Labor torepair or replace any manufacturing defect. Includes remote monitoring of stationand proactive repair dispatch. A successful Site Validation is required to activatethe initial ChargePoint Assure coverage if site prep and station install are notperformed by a ChargePoint National O&M Partner.

$0.00 36.00 $0.00

Totals

elizabeth.kennedy
Rectangle
elizabeth.kennedy
Callout
These costs were not included in the cost estimate per charger.

 

 

 

 

 5 prepaid years for $570 per year, per port

 4 prepaid years for $583.75 per year, per port

 3 prepaid years for $605 per year, per port

 2 prepaid years for $642.50 per year, per port

 1 prepaid year for $715 per year, per port

  * Can only be combined with ASSURE4** Can only be combined with ASSURE3

DC Fast pricing is the twice the price of Level2 AC service planpricing.  NOTE: dual nozzle, sequential charging only requires oneService Plan.

 

Prepaid Service Provider Network Plan Designed for Utilities and EVSPs, this plan includes everythingprovided in both corporate and commercial service plans plus:white-label braded driver website, load management and driveranalytics.

 

 5 prepaid years for $221 per year, per port *

 4 prepaid years for $227.50 per year, per port **

 3 prepaid years for $235 per year, per port

 2 prepaid years for $250 per year, per port

 1 prepaid year for $280 per year, per port

  * Can only be combined with ASSURE4** Can only be combined with ASSURE3

 

Prepaid Commercial Network PlanDesigned for employers, businesses and the government, this planincludes 24x7x365 driver support, access control, general reporting,OTA upgrades, payment processing, flexible pricing policies,reservations and more.

 

____________ 

____________

 

Initial and Date Below

 

  No plan selected

 

 4 additional years billed at $757 per year, per station

 3 additional years billed at $774 per year, per station

 2 additional years billed at $791 per year, per station

 1 additional year billed at $817 per year, per station

 

 4 additional prepaid years for $645 per year, per station

 3 additional prepaid years for $688 per year, per station

 2 additional prepaid years for $705 per year, per station

 1 additional prepaid year for $740 per year, per station

 

COMMIT PLANSFor up to a total of five committed years of ChargePoint Assure forthe CT4000 billed per year, per station. Annual billing occurs after thefirst initial year of Assure maintenance.

 

PREPAID PLANSFor up to a total of five prepaid years of ChargePoint Assure.

 

Parts and On-Site Labor to repair or replace any manufacturing defect. Includes remote monitoring of station and proactive repair dispatch. Asuccessful Site Validation is required to activate the initial ChargePoint Assure coverage if site prep and station install are not performed by aChargePoint National O&M Partner. Choose a prepaid plan or a committed annual billing plan below.

 

Note: Shipping fees and sales tax (in applicablestates) will be applied to this quote at time ofinvoicing.

$205,524.00Grand Total

CT4000 ChargePoint Assure Maintenance Options

Network Service Plan Options

Quote Acceptance

 

 

 

 

Over 22,300 charging points deployed across the US and CanadaOver 150,000 drivers carry ChargePoint cards, significantly more than any other charging station providerMake the real-time status of your stations visible to EV drivers on EV charging mapsDrivers can find stations through their mobile phones or other smart devices and get turn-by-turn directionsChargePoint is embedded into in-dash navigation systems of major auto OEMsServices delivered from the cloud so your IT Group is not required24 x 7 x 365 driver support available via 800 number (live, not automated)24 x 7 x 365 monitoring of the ChargePoint network by ChargePoint. We can find problems and resolve them before your customers13 x 5 station owner support available. 8AM EST to 6PM PST. No other supplier provides this level of supportCentrally manage all stations through a secure online portal. Change pricing on all or some stations. Change greeting messages.Provide access controlTrack and report on station utilization, energy costs, and greenhouse gas savingsCreate different groups and assign each group their own pricing, access, etc. (e.g. employees vs. visitors)Create customer loyalty programs through ChargePoint Connections (included with Commercial Network Software)Stations accept ChargePoint cards, credit cards, and direct access through smart phones. Very flexible pricing scenarios availableFree software upgrades with software subscription. Stations are always up-to-date thanks to over-the-air software updatesThe most complete EV charging solution in the industryThe most comprehensive Parts and Dispatch Labor warranty in the industry with Assure Warranty and Post Warranty MaintenanceplansGuaranteed Uptime and service response time with Assure Warranty and Post Warranty Maintenance plansProactive station monitoring and dispatch to ensure maximum uptime and usabilityMonthly summary and quarterly detailed station performance metrics reports with Assure coverage delivered to youVandalism and Accident labor repair costs coverage with Assure warranty and post warranty maintenance plans

 

  _______________________________________________________

  _______________________________________________________

  _______________________________________________________

  _______________________________________________________

 

 _______________________________________________________

 

                                        Accepted by:           Signature:

Name:

Title:

Date:

Delivery:(Date or ASAP Required)

 

By signing this quote I hereby acknowledge that I have the authority to purchase the product detailed on this document on behalf ofmy organization. Furthermore, I agree to the above terms and conditions and that this signed quote shall act as a purchase order. 

 

All pricing is confidential between Customer and ChargePoint.All prices are Fob Source.Customer to be invoiced at time of shipment.All invoices are Net 30 days. Credit checks are required for new customers.Pricing does not include installation or mounting services. These can be quoted separately.Additional Purchase Terms and Conditions can be found at http://www.chargepoint.com/termsandconditions

Why ChargePoint?

ADDITIONAL DOCUMENTATION

Proof of Authority to Install & Operate

As the developer of the Warm Springs transit station, BART has authority to install charging stations at

the site. See Letter of Commitment for more details.

Proof of Insurance

BART will provide appropriate insurance documentation and a W-9, as needed, during the construction

phase.