FY 13 Project Listing by Operational Area Detail FY2013 IS&T Project Report April.xlsx Page 1 of 34 modified by: D. Segaloff modified on: 3/21/2013 Area Project (if a priority project add an asterisk) Sponsor Associate Director Project Manager Business Impact (Problem This Will Solve) Budget (SWD To Start) or GIB Project Start date Project End Date Revised Project End Date Upcoming Key Milestones Issues (most critical) Risks (most critical) Status (Green, Yellow, Red) AS Day to Day Operations Improvements Job Scheduling Outsourcing Negotiation phase Alison Alden Mike Howard Marilyn Smith Bart Dahlstrom Sophie Wong Creation of a team to identify, organize and successfully manage the operational needs of SAP related Administrative Systems. The primary goals are to document solution landscape, research application performance management functionality and implement batch scheduler functionality. GIB 12/3/12 2/28/13 Final recommendations w negotiated costs & contract review Green AS Support & Enhancements Alison Alden Mike Howard Marilyn Smith Bart Dahlstrom Frank Quern The project focuses on addressing the organization, process and procedures of Administrative Systems support and enhancement work stream. The primary goals of the project are: significantly reduce the backlog of issues and develop a recommendation for ongoing sustainable staffing and procedure model. GIB 9/15/11 12/31/13 Green AS Global Initiatives Short Term Mike Howard Bart Dahlstrom Bob Casey The project's goal is to address a number of short term administrative systems needs to support the SingaporeMIT Alliance for Research and Technology (SMART). The list of improvements include: document attachments, interface improvements, fixed assets, data warehouse reports, data warehouse financial tables and workflow. Currently only workflow is the only outstanding item. VPF 4/1/11 TBD The final workflow deliverable is on hold until it can be prioritized against other initiatives in the VPF queue Red AS SAP Portal Bart Dahlstrom Bart Dahlstrom Hao Wen Determine the path for SAPWeb and SAPWebSS SWD 10/1/12 3/31/13 Green AS Applicant Tracking System Implementation Wayne Turner Bart Dahlstrom Doug Walsh SaaS, Reporting, Integration, authentication. Peoplefluent product; could based platform SWD 11/30/12 6/30/13 Green AS Plant Maintenance Realignment Program Phase II Implementation Martin Dugal Bart Dahlstrom Jim Fragala Implement a redesigned web interface for the user community and redesigned back end processing for the Facilities department SWD 1/1/13 9/30/13 Kick off Project Green AS APR 3.0 Implementation Gerry O'Toole Bart Dahlstrom Kevin Lyons Implement the edit functionality created as a results of the APR Edit Prototype project SWD 9/4/12 4/15/13 Green AS Segregation of Duties Mike Howard Bart Dahlstrom Sandy Pata Role Integration SWD 7/1/12 6/30/13 Approved by ASPCC, Israel, IT Governance Green

FY2013 IS&T Project Report - Aprilist.mit.edu/sites/default/files/about/FY2013 IS&T Project Report... · improvements,-fixed-assets,-data warehouse-reports,-data warehouse-financial-tables-and-workflow.--Currently-only-workflow-is-the-only-outstanding-item

Embed Size (px)

Citation preview

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 1 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

AS

Day  to  Day  Operations  Improvements    -­‐  Job  Scheduling  Outsourcing  Negotiation  phase

Alison  AldenMike  HowardMarilyn  Smith

Bart  Dahlstrom

Sophie  Wong

Creation  of  a  team  to  identify,  organize  and  successfully  manage  the  operational  needs  of  SAP  related  Administrative  Systems.    The  primary  goals  are  to  document  solution  landscape,  research  application  performance  management  functionality  and  implement  batch  scheduler  functionality.

GIB 12/3/12 2/28/13Final  recommendations  w  negotiated  costs  &  contract  review

Green

AS Support  &  Enhancements

Alison  AldenMike  HowardMarilyn  Smith

Bart  Dahlstrom

Frank  Quern

The  project  focuses  on  addressing  the  organization,  process  and  procedures  of  Administrative  Systems  support  and  enhancement  work  stream.    The  primary  goals  of  the  project  are:    significantly  reduce  the  backlog  of  issues  and  develop  a  recommendation  for  ongoing  sustainable  staffing  and  procedure  model.

GIB 9/15/11 12/31/13 Green

AS Global  Initiatives  -­‐  Short  Term

Mike  Howard

Bart  Dahlstrom

Bob  Casey

The  project's  goal  is  to  address  a  number  of  short  term  administrative  systems  needs  to  support  the  Singapore-­‐MIT    Alliance  for  Research  and  Technology  (SMART).    The  list  of  improvements  include:    document  attachments,  interface  improvements,  fixed  assets,  data  warehouse  reports,  data  warehouse  financial  tables  and  workflow.    Currently  only  workflow  is  the  only  outstanding  item.

VPF 4/1/11 TBD

The  final  workflow  deliverable  is  on  hold  until  it  can  be  prioritized  against  other  initiatives  in  the  VPF  queue

Red

AS SAP  Portal Bart  Dahlstrom

Bart  Dahlstrom

Hao  Wen Determine  the  path  for  SAPWeb  and  SAPWebSS

SWD 10/1/12 3/31/13 Green

ASApplicant  Tracking  System  Implementation

Wayne  Turner

Bart  Dahlstrom

Doug  WalshSaaS,  Reporting,  Integration,  authentication.  Peoplefluent  product;  could  based  platform

SWD 11/30/12 6/30/13 Green

AS

Plant  Maintenance  Realignment  Program  -­‐  Phase  II  Implementation

Martin  Dugal Bart  Dahlstrom

Jim  Fragala

Implement  a  redesigned  web  interface  for  the  user  community  and  redesigned  back  end  processing  for  the  Facilities  department

SWD 1/1/13 9/30/13 Kick  off  Project Green

AS APR  3.0  Implementation

Gerry  O'Toole

Bart  Dahlstrom

Kevin  LyonsImplement  the  edit  functionality  created  as  a  results  of  the  APR  Edit  Prototype  project

SWD 9/4/12 4/15/13 Green

AS Segregation  of  Duties Mike  Howard

Bart  Dahlstrom

Sandy  Pata Role  Integration SWD 7/1/12 6/30/13 Approved  by  ASPCC,  Israel,  IT  Governance

Green

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 2 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

AS SAP  GRC Mike  Howard

Bart  Dahlstrom

Siobhan  Cunningham

Segregation  of  Duties  Tool SWD 7/1/12 6/30/13 Servers/OS  -­‐  12/31;  6  233K  SAP  install  -­‐  1/7/13

restrict  production  IS&T  access

Green

AS Hiring  Experience  Provisioning  Analysis

Wayne  Turner

Bart  Dahlstrom

Doug  WalshProcess  &  information  flows  and  timing  required  to  provision  employees  -­‐  discovery  phase

SWD 11/1/12 1/31/13 01/31/2013:    Final  Presentation

Green

AS Elana Israel  Ruiz Bart  Dahlstrom

Bill  V.

ES Intelligent  Messaging Mary  Callahan

Eamon  Kearns

Rene  Little Enhanced  system  messaging  to  aid  the  advising  process.

SWD 2/1/12 TBD Freshman  requirements  signed  off.

Green

ESWork  flow  and  Revision  Processing  (WARP)

Stu  Schmill Eamon  Kearns

Madge  Lewis SWD 7/1/11 1/1/13 3/1/13 Entering  Warranty  Period Green

ES Oracle  Forms  Replacement  (Phase  1)

Eamon  Kearns

Eamon  Kearns

Michelle  Manchenton

Removal  of  Oracle  Forms.Convert  150  forms  to  new  Grails,  Open  Source  system

SWD 1/1/12 TBD Yellow

ES Stellar  Attendance

Dan  Hastings,  Christine  Ortiz

Eamon  Kearns

Derek  Jaeger Gradebook  no  longer  used  for  attendance.

SWD 10/1/11 3/1/13 Beta  Release  in  Fall   Green

ES Student  Accounts  Implementation

Betsy  Hicks   Eamon  Kearns

Lori  Singer Streamlined  Student  Accounts  process  with  enhanced  tools.

SWD 7/1/11 6/30/13 Green

ES Enrollment  Management

Diana  Henderson  &  Mary  Callahan

Eamon  Kearns

Rene  Little

Over  enrollment  in  classes  resulting  in  students  unable  to  take  classes  for  which  they  registered.

SWD 2/1/12 TBD Recommendations  to  sponsors  January  2013

Green

ES Digitization  of  Forms  and  Petitions

Mary  Callahan

Eamon  Kearns

Zahida  Tahir Removal  of  paper  forms  and  processes.

SWD 7/1/11 TBD Green

ES Scheduling  Implementation

Mary  Callahan

Eamon  Kearns

Lori  Singer Replace  high  risk  application  with  additional  requested  functionality.  

SWD 1/1/12 TBD Green

ES OSE/WTW  upgrade Eamon  Kearns

Eamon  Kearns

Michelle  Manchenton

GIB 3/1/12 1/1/13 3/1/13 Green

ES Early  Warning  SystemJulie  Norman  &  Mary  Callahan

Eamon  Kearns

Derek  JaegerEasier  way  to  determine  if  students  are  having  issues  with  classes.

SWD 4/1/12 TBD Project  start.Pilot  in  Spring  2013

Green

ES NCAA  Compliance John  Benedick

Eamon  Kearns

Michelle  Manchenton

Digitizing  paper  process  for  athletes,  ensuring  NCAA  compliance

SWD 6/1/12 Summer  2013

Test  environment  is  operational

Green

ES MITSIS  to  PowerFaids  -­‐  Phase  1

Betsy  Hicks   Eamon  Kearns

Eamon  Kearns

Eliminate  dropbox  direct  connections;  quickwinds  that  can  be  handled  in  a  day  vs  significant  enhancements.    2  year  project

SWD 6/1/12 12/31/13 Green

ES Google  Apps  for  Stellar  -­‐  API's

Dan  Hastings Eamon  Kearns

Derek  Jaeger SWD 10/1/12 Spring  2013 Green

ES MITSIS  upgrading  to  Oracle  11

IS&T  ADs Eamon  Kearns

Zhida  Taher Next  Version  of  Oracle  forms  -­‐  need  to  move  to  Java  7

SWD 7/1/12 9/15/13 Green

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 3 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

DM Database  migrations  to  11G

Database  Admin

Mary  Weisse

Rob  Grenier

The  database  administration  has  a  long  term  goal  of  moving  all  Oracle  database  to  Oracle  version  11.2.  Currently  we  are  approximately  28%  of  the  way  there.  The  databases,  current  version,  and  assigned  DBA  can  be  found  at:  https://wikis.mit.edu/confluence/di.

GIB 7/1/11 12/31/12 6/28/13Some  apps  may  not  be  11G  compliant.

None Red

DM RAFT  Phase  3 Claude  Canizares

Mary  Weisse

Amon  Horne Implementation  of  Phase  3    6-­‐6  week  sprints

GIB 6/1/12 9/30/1312/3/2012  Sprint  23/20/2013  Framework  Completed

COEUS  Award  Budget

Completed  in  usability

DM RAFT  Phase  3 Claude  Canizares

Mary  Weisse

Amon  Horne Implementation  of  Phase  3    6-­‐6  week  sprints

GIB 5/1/13 6/30/13 Sprint  3   Green

DMSAP  Solution  Manager  Infrastructure  Monitoring

Mary  Weisse

Ron  Parker

This  is  an  effort  to  extend  and  enhance  the  automated  monitoring  of  key  SAP  infrastructure  components.  It  is  intended  to  strengthen  notifications  to  technical  staff,  during  off-­‐shift  as  well  as  on-­‐shift  hours,  in  order  to  facilitate  the  timely  remediation  of  issues  impacting  the  effectiveness  of  SAP  system  operations.  

GIB 6/1/12 9/30/12

6/2013  Delayed  due  to  other  work

Red

DM SAP  HANA  -­‐  Energy  Use  Case  Feasibility

Israel  Ruiz,  Marilyn  Smith,  Bart  Dahlstrom,    Walt  Henry,  Peter  Cooper

Mary  Weisse

Laxmi  RaoAssess  the  feasibility  of  analysis  Energy  data  with  HANA  in  memory  appliance.

GIB 3/20/12 5/30/12 6/30/13 Waiting  for  vendor  to  respond.

The  Vendor  may  not  have  the  resources  available  to  meet  our  timeline.

Red

DM MGHPCC  -­‐  Operations  Planning

Marilyn  Smith

Mary  Weisse

Laxmi  Rao Support  MGHPCC  Plannng  teams. GIB ongoing Green

DM Campus  Energy  Task  Force

Israel  Ruiz,  Prof.  Glicksman

Mary  Weisse

Laxmi  Rao Support  Task  Force  activities. GIB ongoing

Campus  Energy  Task  Force  helping  with  data  acquisition  and  browser  based  display  of  solar  power  production  on  roof  of  W20  -­‐  End  of  Feb  2013

Green

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 4 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

DM Space  Economy  -­‐  Phase  2

Marty  Schmidt

Mary  Weisse

Scott  Thorne

The  MIT  Space  Management  System  provides  a  means  for  recording  and  analyzing  the  use  of  space  across  the  Institute  at  the  level  of  the  Principal  Investigator  (PI).    The  initiative  emerged  in  response  to  the  Institute  Task  Force  Working  Group  on  space.  Prior  to  the  development  of  this  system,  detailed  information  on  space  use  was  captured  only  at  the  DLCI  level.      All  academic  and  research  units  at  MIT  are  required  to  maintain  their  Space  Management  System  data.

Fixed  Cost  Funded  by  Provost.

2/1/13 4/30/13

Move  to  RAFT  Framework

Move  the  system  to  a  production  state

Increased  functionality

Scope  creep Green

DM Cognos Deb  Leitch Mary  Weisse

Scott  Thorne Replace  BrioQuery.   GIB 7/1/11 6/30/14

3  Focus  Groups  Kicking  off  in  March:    Payroll,  Travel,  Budget.  Student,  Asst  Dean  &  VPF  Focus  Group  in  Spring/Summer..                                                                                                                                                                      Current:    65  reports  built  and  available.

Projects  need  to  understand  that  reporting  is  gathered  through  the  focus  groups.    Need  lead  time  to  kick  them  off  and  administer.

*Right  people  aren't  present  in  the  focus  group                        *Keeping  up  with  the  demand  of  both  projects  and  ongoing  focus  groups.

Green

DM GoldenGate  POC Database  Admin

Mary  Weisse

Rob  GrenierDiscovery  effort  to  test  Oracle's  GoldenGate  product  for  system  replication

GIB 9/1/12

Need  to  verify  threshhold  for  systems  with  heavy  volume  transactions

Green

DM Oracle  11g  Patching Database  Admin

Mary  Weisse

Rob  Grenier Keep  Oracle  DBs  at  current  patch  levels

GIB Green

DM Migrate  MITID  to  RAC  environment

Database  Admin

Mary  Weisse

Rob  GrenierMigrate  MITID  to  RAC  environment  to  provide  for  high  availability

GIB 4/1/13 6/30/13 Green

DM SAP  GUI  -­‐  Mac  &  Windows

Marilyn  Smith

Mary  Weisse

Ron  Parker Deploy  new  versions  to  support  new  Mac  &  Windows  OS

GIB tbd tbd

DM SAP  Disaster  Recovery  test

Marilyn  Smith

Mary  Weisse

Ron  Parker Disaster  Recovery  testing GIB 4/1/13 4/30/13 Green

DM Client  Sync Marilyn  Smith

Mary  Weisse

Ron  Parker

Discovery  &  Implementation  of  Client  Sync  which  will  allow  SAP  client  systems  to  be  built  and  deployed  quicker

GIB 6/1/13 9/30/13 Green

DM SAP  MITID  RFD  Server  Migration

Marilyn  Smith

Mary  Weisse

Ron  Parker Migrate  SAP  MITID  RFD  Server  to  the  MITID  Service

GIB tbd 6/30/13 Green

DM SAP  ADS/PI  Landscapte Marilyn  Smith

Mary  Weisse

Ron  ParkerUpgrade  the  ADS/PI  Landscape  from  Netweaver  7.1  to  Netweaver  7.3

GIB tbd 6/30/13

Usually  done  with  the  Support  Packs,  an  issue  has  delayed  this  until  June

Red

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 5 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

DM

Evaluation  of  New  Technologies  to  implement  Energy  Conservation

Facilitites Mary  Weisse

Laxmi  RaoW91  Energy  efficiency  measure  in  progress  evaluating  4  HFAC  options  end  June  2013

GIB 7/1/12 6/30/13 Green

DMCampus  Wide  &  W91  High  Performance  Computing

Marty  Schmidt

Mary  Weisse

Laxmi  Rao Capacity  and  Load  Determination GIB 1/3/12 2/29/2013 Green

DM Data  Cookbook Deb  Leitch Mary  Weisse

Scott  Thorne Implementation,  documentation  and  rollout  for  Metadata

GIB 11/1/12 6/30/14 Green

SE DrupalCloud Smith Steve  Buckley

Bill  Karas Self  Service $183  SW 9/1/12 6/30/13Pilot  Phase  2,  Portal  Site  development,  NFS  vs  AFS  performance  testing.

Automation  of  account,  installation  and  touchstone.    Finding  performance  bottlenecks.

Scalability,  performance

Green

SE Develop  On  Line  Training  Catalogue

Smith Steve  Buckley

Mark Self  Service GIB 7/1/11 6/30/12 6/30/13 Green

SE Kerberos  1.12 Kerberos  Consortium

Steve  Buckley

Thomas  Hardjono

Security $150k  SW 1/1/13 TBD Green

SE Offices  Directory Reference  Publication

Steve  Buckley

Bill  Karas Replacement GIB 7/14/11 TBDOutsourced  Design  Started,    Devleoper  review  of  BRD  in  process.    TRD  due.

Green

SEDCAD:  Aero  Astro  Student  database  (WebP)

Aero  Astro Steve  Buckley

Myra  Hope  Eskridge

GIB 3/24/11 3/30/13 TBD Green

SE DCAD:  Corporation  Committees  DB  (ConP)

Office  of  the  Corporation

Steve  Buckley

Myra  Hope  Eskridge

GIB 8/4/11 12/29/12 12/31/13 Green

SE DCAD:    ODGE  Advising  Database

Office  of  the  Dean  for  Graduate  Education

Steve  Buckley

Peggy  Conant

GIB 11/17/11 12/28/12 5/31/13 Deployment Green

SEDCAD:  MedWeb  Website  Redesign  (WebP)

MIT  Medical Steve  Buckley

Lizz  McManus

GIB 3/26/12 6/30/13 Green

SE DCAD:  Runstadler  Lab  Database  

Biological  Engineering

Steve  Buckley

Peggy  Conant

GIB 4/9/12 TBD Green

SE DCAD:  Getfit  2013  Enhancements

MIT  Medical Steve  Buckley

Chris  Giles GIB 6/26/12 4/30/13 Green

SE DCAD:  Vendor  Management  Website

VPF  (Office  of  the  VP  for  Finance)

Steve  Buckley

Chris  Giles GIB 6/29/12 TBD Green

SE DCAD:  Shopmitprod  Updates

VPF  (Office  of  the  VP  for  Finance)

Steve  Buckley

Cecilia  Marra GIB 7/2/12 TBD Green

SE DCAD:  Media  Lab  HOP  Implementation

MIT  Media  Lab

Steve  Buckley

Lizz  McManus

GIB 7/20/12 TBD Green

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 6 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

SE DCAD:  HST  FileMaker  SME  Consulting

HST  (Health  Sciences  and  Technology)

Steve  Buckley

Peggy  Conant

GIB 7/1/12 6/30/13 Green

SE DCAD:  OEOP  Database  Upgrade

School  of  Engineering

Steve  Buckley

Myra  Hope  Eskridge

GIB 8/15/12 TBD Green

SE DCAD:  EVPT  Website  (DrupalCloud  Pilot)

EVPT  (Office  of  the  Executive  Vice  President  and  Treasurer

Steve  Buckley

Chris  Giles GIB 8/23/12 5/31/13 Green

SE DCAD:  Physics  -­‐  DAPAS  Customization  (FMP)

Department  of  Physics

Steve  Buckley

Peggy  Conant

GIB 8/24/12 TBD Green

SE DCAD:  OEOP    (Drupal  Cloud  Pilot)

School  of  Engineering

Steve  Buckley

Chris  Giles GIB 8/29/12 TBD Green

SE DCAD:  UAAP  S^3  and  SDS  Integration  (FMP)

UAAP  (Office  of  Undergraduate  Advising  and  Academic  Programming)

Steve  Buckley

Myra  Hope  Eskridge

GIB 10/1/12 6/28/13 Green

SE DCAD:  Scopeweb  Blog  Redesign

Graduate  Program  in  Science  Writing

Steve  Buckley

Myra  Hope  Eskridge

GIB 10/1/12 4/30/13 Green

SEDCAD:MITIMCo    Website  (Drupal  Cloud  Pilot)

MIT  Investment  Management  Company

Steve  Buckley

Chris  Giles GIB 10/15/12 2/22/13 Green

SEDCAD:  VPF  Sponsored  Accts  DB  Enhancements  (FMP)

VPF  (Office  of  the  VP  for  Finance)

Steve  Buckley

Chris  Giles GIB 10/24/12 TBD Green

SEDCAD:    ISchO  FileMaker  Archive  (FMP)

International  Scholars  Office

Steve  Buckley

Myra  Hope  Eskridge

GIB 10/24/12 4/30/13 Green

SE DCAD:  OME  TSR  Scheduling  Website

Office  for  Minority  Education

Steve  Buckley

Peggy  Conant

GIB 10/30/12 TBD Green

SEDCAD:  PSC  25th  Anniversary  Site  (Drupal  Cloud  Pilot)

PSC  (Public  Services  Center)

Steve  Buckley

Chris  Giles GIB 11/13/12 4/30/13 Green

SE VPF  Process  Documentation  (ConP)

VPF  (Office  of  the  VP  for  Finance)

Steve  Buckley

Myra  Hope  Eskridge

GIB 11/16/12 TBD Green

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 7 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

SE FL&L  Website  Redesign  (WebP)

FL&L  (Foreign  Languages  &  Literatures)

Steve  Buckley

Lizz  McManus

GIB 11/26/12 TBD Green

SE DCAD:  IMES  Website  Phase  2  (WebP)

Institute  for  Medical  Engineering  and  Science

Steve  Buckley

Myra  Hope  Eskridge

GIB 12/7/12 6/28/13 Green

SE MIT  Together  services  web  site  (DruC)

DUE  (Dean  for  Undergraduate  Education

Steve  Buckley

Chris  Giles GIB 12/10/12 TBD Green

SE DITR-­‐MITSS  DB  Enhancements  (FMP)

IS&T  (Information  Services  and  Technology)

Steve  Buckley

Peggy  Conant

GIB 12/17/12 1/31/13 3/31/13 Green

SE DUE/TLL  Sites  Code  Review  (WebP)

DUE  (Dean  for  Undergraduate  Education

Steve  Buckley

Cecilia  Marra GIB 12/26/12 2/28/13 4/30/13 Green

SE MIT  Police  Web  Site  Redesign  (WebP)

MIT  Police Steve  Buckley

Lizz  McManus

GIB 2/4/13 TBD Green

SE GetFit  2014 MIT  Medical Steve  Buckley

Chris  Giles GIB 2/5/13 TBD Green

SE CITE  Web  Site  Redesign  (WebP)

Comprehensive  Initiative  for  Technology  Evaluation

Steve  Buckley

Lizz  McManus

GIB 2/7/13 TBD Green

SE GECD  Drupal  7  Rebuild  (WebP)

Global Education and Career Development Center

Steve  Buckley

Chris  Giles GIB 2/14/13 TBD Green

SE Accelerated  Automation  *

Smith Steve  Buckley

Don  Flanders Quality,  efficiency $420K  SW 7/1/11 6/30/12 6/30/13Back  on  track  and  will  meet  60%  by  next  Support  Pack  cycle

BA  &  Business  Availability.

BA  &  Business  Availability.

Yellow

SE Mapping  Project Facilities Steve  Buckley

Justin  Anderson

Self  Service $750K  SW 2/1/12 6/30/13 3/1/14 Service  release Support  with  SDKApplication  key  management

Yellow

SE DCAD:  CRE  Wordpress  Migration

Center  for  Real  Estate

Steve  Buckley

Lizz  McManus

GIB 6/29/12 12/14/12 5/31/13 Client  delay Yellow

SE DCAD:  LEM  Website    (DrupalCloud  Pilot)

Lutheran  Episcopal  Ministry  at  MIT

Steve  Buckley

Chris  Giles GIB 7/17/12 TBD desired  hostname  in  use

Yellow

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 8 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

SE DCAD:  Biology  -­‐  Customize  DAPAS

Department  of  Biology

Steve  Buckley

Myra  Hope  Eskridge

GIB 10/1/12 TBD Awaiting  readiness  to  start  from  client

Yellow

CS

Customer  Support  Strategic  Directions:  Central  vs.  Local,  Foundational  ITSM,  Customer  Focus1.  CS  Process  Mapping:    Service  Request  Fulfillment2.  *Expanding  hours  &  channels  for  help3.  Major  Incident  -­‐  Trend  Identification4.  Redefining  support

Head,  IS&T  (tba)

Barbara  Goguen  &  Mark  Silis

Chris  Gresham,  Pat  Sheppard4.  Chris  Gresham,  Dave  Conlon

Set  and  communicate  direction,  priorities.    Get  institutional  support.1.  Document  all  existing  processes  used  in  Customer  Support;  understand  gaps  between  existing  processes  and  ITIL-­‐like  processes.2.  Users  working  with  their  computers  at  all  hours  redefine  the  meaning  of  "help  during  business  hours".3.  Allows  us  to  start  managing  major  incidents  or  problems  rather  than  just  resolving  incidents.4.  Constantly  changing  browsers,  consumerization,  and  changing  customer  expectations  make  the  terms  "supported"  and  "unsupported"  less  meaningful  and  less  useful.

GIB1/15/2012

4.  2/27/2012

9/30/2013

3.  1/31/13

Proposal  for  distributed  support  pilot  1/31/13;  tie  efforts  to  streamline  repair  service  to  changes  in  how  we  organize  and  staff  distributed  support1.  Began  effort  to  map  service  request  fulfillment  process:  accounts  mail  forwarding  and  software  acquisition;  first  CS  candidates  for  Remedy.2.  Sloan  STS  also  interested  in  a  facilitated,  moderated,  rewards-­‐based,    peer-­‐to-­‐peer  social  networking  help  option.    Meeting  to  discuss  shared  ideas  scheduled  for  Jan  2013.3.  Changes  implemented  in  RT  to  allow  for  trend  tracking;    Help  Desk  and  DITR  using  new  functionality.4.  Define  better  language,  ways  to  share  more  information  before  start  of  fall  semester,  Update  IS&T  website.

Need  to  break  down  roadmap  as  well  as  use  different  words  to  describe  where  we  are  heading  with  customer  support.2.  Need  to  ensure  we  are  being  mindful  of  resources  and  determining  the  most  efficient  way  to  provide  greater  access  to  needed  help.

Focus  on  people  and  experience  rather  than  technology  makes  it  complicated.    Rushing  to  get  something  done  that  does  not  result  in  desired  customer  experience.2.  Unclear  priority  re  extended  help  hours.  Other  explorations:    Satellite  clinics,  chat  tools,  social  networking,    limited  online  support  after  hours.

green

4.  under  discussion  /  on  hold

CS/OIRemedy  8  Prototype:  Request  and  Incident  Management

Barbara  Goguen  and  Mark  Silis

Barbara  Goguen  and  Mark  Silis

Patricia  Sheppard

IS&T  has  a  need  to  integrate  our  functions  to  allow  staff  to  document,  develop,  update,  release,  change  and  track  service  offerings,  as  well  as  share  information  in  real  time  across  the  department  and  with  our  customers  (IT  Service  Management).    This  project  will  develop  a  prototype  that  clearly  illustrate  the  benefit  and  end  state  of  ITSM  using  MIT  specific  use  cases,  assets  and  workflow  and  lay  the  groundwork  for  future  implementation.

GIB 2/1/13 6/30/13 3/1/13:  Vendor  proposal  in  negotiations

Green

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 9 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

CS Cyrus  RetirementMark  Silis  &  Barbara  Goguen

Mark  Silis  &  Barbara  Goguen

Barbara  Johnson  with  Deb  Bowser  &  Chris  Gresham

Success  will  be  migration  of  all  accounts  from  Cyrus  imap  servers  to  Exchange.  Deactivated  accounts  will  not  be  moved.  Migrations    include  all  affiliate  and  sponsored  guest  accounts,  faculty,  staff,  student.  Many  accounts,  within  faculty  and  staff  groups,  require  a  hi-­‐touch  approach.

GIB/TNSC summer  2012

end  of  calendar  year  2013

Completed  accts:  -­‐-­‐1,000  Lincoln  Lab  -­‐-­‐1500  SMTP  forwarded-­‐-­‐~2000  deactivated  -­‐-­‐  ~500  Facilities-­‐-­‐  various  individuals/deptsMarch:-­‐-­‐  932  Webmail  only  users  in  progress

Aging  Cyrus  infrastructure  will  be  more  stable  with  the  fewest  users  possible.

-­‐-­‐Time  intensive  nature  of  hi-­‐touch  client  work-­‐-­‐  Manual  steps  in  process  requires  close  coordination-­‐-­‐  Tools  in  use  to  automate  the  migration  encounter  errors  and  cannot  handle  high  volume

Yellow

CSProcess  &  Tools  for  collecting  and  using  Customer  Feedback

Barbara  Goguen

Barbara  Goguen

Barbara  Goguen

Current  surveying  tool  is  broken  -­‐  need  to  explore  alternatives  and  get  something  new  in  place  while  at  same  time  explore  how  to  broaden  its  usefulness.

GIB Several  starts  and  stops  to  date.    

We  are  the  ones  most  affected  by  this.    Can  run  surveys,  just  manually  intensive  right  now.

On  Hold

CS Knowledge  Management  2.0

Barbara  Goguen

Barbara  Goguen

Lisa  Robinson  convenes  KM  Core  team

After  reskinning  and  upgrade,  where  to  next?

GIB 9/1/12

-­‐-­‐Moving  sap  help  files  into  KB,  working  with  VPF  to  get  them  their  own  space  and  content  into  KB-­‐-­‐  Investigation  of  future  direction,  platform  etc.  (ongoing)

Green

CS Google  Apps  Near  Term  Proposal/Plan

Barbara  Goguen

Barbara  Goguen

Oliver  Thomas

Now  that  we  have  Google  Apps  for  Ed  licensed  and  administered  in-­‐house,  need  to  determine  how  to  set  it  up  for  success

GIB 9/1/12 1/31/13

Oliver  working  on  proposal  to  bring  forward    for  authentication  and  groups  integration,  provisioning  and  de-­‐provisioning,  and  self-­‐service.    Once  done,  handoff  of  service  to  identified  service  owner.-­‐  Google  Apps  integration  mtg  3/8/13

Green

CS Usability  /  Accessibility  IS&T  Projects

 various Barbara  Goguen

Mary  Zeigler

Consulting  services  for  IS&T  Software  Projects  to  ensure  they  meet  accessibility  and  usability  standards  

SWD various various

Projects:-­‐  LMS  Gradebook  module-­‐  Drupal  Cloud  service-­‐  2  internal  projects,  focused  on  lending  expertise,  structure  and  objectivity  to  gathering  user  input  to  and  feedback  for  CS  services.

Green

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 10 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

CSUsability  /  Accessibility  MIT  Community  Projects

 various Barbara  Goguen

Mary  Zeigler

Consulting  services  for  MIT  Community  to  ensure  web  and  other  platform  content  meets  accessibility  and  usability  standards  

n/a various various

25  development  or  community  projects.    Highlights:  -­‐  EdX:  2  projects-­‐  OCW-­‐  Course  21W.789-­‐  Comparative  Media  Studies-­‐  18  academic  courses  receiving  accessibility  consulting  services

Green

CS Emergency  Response:  MIT  Alert

Barbara  Goguen

Barbara  Goguen

Jeff  Schiller

MIT  Emergency  Response  System  needs  tighter  linkages  with  key  providers,  e.g.  Campus  Police.    Improved  authentication  model  and  feedback  mechanisms.

GIB

Jeff  implemented  change  in  authentication  model  to  remove  second  password  key  cards.    Also  worked  to  enable  emergency  button  in  Police  Dispatch  to  be  able  to  send  message  to  the  MIR3  system  via  C*Cure  to  notify  EOC.    Currently  proposing  there  be  an  acknowledgement  sent  back  to  Dispatch  so  that  they  will  know  that  the  message  has  been  sent  and  received.    Jeff  ready  to  implement  if/when  he  gets  agreement.

Green

CS

Future  of  Education  Task  Force.  Online  Learning  and  Hands-­‐on  Experience  Task  Force.

Sanjay  Sarma Barbara  Goguen

Oliver  Thomas

Presidental  Task  force  to  examine  future  of  Digital  Learning.    To  understand  and  meet  educational  needs  of  the  future.

2/1/13 6/1/13

This  is  one  of  9  task  forces,  comprised  mostly  of  faculty  and  students  with  1  staff  member  on  each.    Oliver's  work  has  involved  inventorying  existing  experiments  such  as  iLabs,  other  inexpensive  kits  to  promote  hands-­‐on  learning.    Oliver  working  on  presentation  about  augmented  reality.    All  task  forces  scheduled  to  report  back  on  May  17  during  retreat  with  Sanjay  Sarma.

Green

CS/OI Electronic  Identity  and  Entitlement

ITGCMark  Silis  &  Barbara  Goguen

Garry  Zacheiss  &  Oliver  Thomas

No  more  lack  of  clarity  over  what  an  mit.edu  username  means,  and  what  it  entitles  the  user  to  do.

Detailed  document  with  recommendations  completed.    Review  by  ITGC  completed.    Needs  to  be  presented  in  simpler  form  to  Academic  Council  and  get  approval  there.    Marilyn  working  on  securing  spot  on  Academic  Council  agenda.  

We  should  not  under-­‐estimate  the  work  involved  in  implementing  recommended  changes.

Green

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 11 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

CS/OIRemedy  8  Prototype:  Request  and  Incident  Management

Barbara  Goguen  and  Mark  Silis

Barbara  Goguen  and  Mark  Silis

Patricia  Sheppard

IS&T  has  a  need  to  integrate  our  functions  to  allow  staff  to  document,  develop,  update,  release,  change  and  track  service  offerings,  as  well  as  share  information  in  real  time  across  the  department  and  with  our  customers  (IT  Service  Management).    This  project  will  develop  a  prototype  that  clearly  illustrate  the  benefit  and  end  state  of  ITSM  using  MIT  specific  use  cases,  assets  and  workflow  and  lay  the  groundwork  for  future  implementation.

GIB 2/1/13 6/30/13

Contract  executed  4/10/13.    Consultant  review  to  begin  4/17.    Development  work  to  strat  no  later  than  6/3/13

Green

OIOI:  Expansion  of  Remedy  Change  Management  

Barbara  Goguen  and  Mark  Silis

Mark  Silis

TBD  for  each  group  of  services.    Patricia  Sheppard  coordinating  this  effort  as  part  of  the  overall  ITSM  Program

Only  a  subset  of  service  offerings  are  currently  utilizing  change  management  to  document  changes  to  both  applications  and  infrastructure.    This  effort  will  roll  out  Remedy  Change  Management  to  an  additional  group  of  service  offerings.

GIB 2/4/13 9/30/13

PCI  (Merchant  Services)  in  business  analysis  phase  for  April,  change  documentation  on  target  for  May.    Reporting  and  Forecasting  Tool  (RAFT)  delyed  until  May  due  to  development  sprint.    Network  Opertions  demo  complete  and  service  selection  scheduled  for  4/17/13

Need  to  identify  change  advocate  for  each  service.

Green

OI

OI:  Demise  (mostly)  open  wireless  infrastructure  to  reduce  MIT  risk.    Handle:  SECURE  WIRELESS

ITGC Mark  Silis Deb  Bowser MIT  community  wireless  transmissions  are  now  highly  vulnerable  to  interception.

HW:  $0;  SW:  $0;  SWEB:  $10k  (design,  development,  interfacing)      Gazillions  of  hours  talking  about  it!!!

Oct  '10 Aug  '11 Fall  2013 Interim  step  of  reenabling  DHCP  regisration  on  the  open  network.

Support  for  game  consoles.    Support  for  other  devices  that  do  not  support  WPA2  Enterprise.    Encourage  migration  in  a  painless  manner.

Green

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 12 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

OI

OI:  Building  W91  Renovation

Mark  Silis Mark  Silis Robert  Lanigan

Supporting  renovation. Wiring  Cost  -­‐  $150,000.00,    Equipment  Cost  -­‐  $85,000.00,    Construction  Cost  -­‐  $150,000.00,    Funded  by  ?Facilities  Project  Budget?.    FTE  in  FY12  -­‐  3%,    Total  FTE  -­‐  10%.

3/1/12 3/1/13 LCN  to  start  installation  November  12th,  2012.    Phase  One  Completion  December  19th.  2nd  floor  demo  underway,  completion  of  occupancy  March  2013.                              Project  Completed.

Green

OI

OI:  Building  NW16  Cable  Renewal  (Construction  Only)

Mark  Silis Mark  Silis Shaun  Palma/John  Morgante

Will  provide  robust  network  for  IS&T  services.    It  will  increase  reliability  and  reduce  length  of  any  downtime.

Wiring  Cost  -­‐  $200,000.00,    Equipment  Cost  -­‐  $130,000.00,    Construction  Cost  -­‐  $200,000.00,    Funded  by  IS&T.    Total  FTE  -­‐  10%.

12/2/11 6/15/14 75%  Complete  of  Bid  Documents.    In  Final  Stages  of  Engineering.

Green

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 13 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

OI

OI:  Building  NW17  Cable  Renewal    (Construction  Only)

Mark  Silis Mark  Silis Shaun  Palma/John  Morgante

Will  provide  robust  network  for  IS&T  services.    It  will  increase  reliability  and  reduce  length  of  any  downtime.

Wiring  Cost  -­‐  $225,000.00,    Equipment  Cost  -­‐  $145,000.00,    Construction  Cost  -­‐  $200,000.00,    Funded  by  IS&T.    Total  FTE  -­‐  10%.

12/2/11 6/15/14 75%  Complete  of  Bid  Documents.    In  Final  Stages  of  Engineering.

Green

OI

OI:  Building  NW21  Cable  Renewal    (Construction  Only)

Mark  Silis Mark  Silis Shaun  Palma/John  Morgante

Will  provide  robust  network  for  IS&T  services.    It  will  increase  reliability  and  reduce  length  of  any  downtime.

Wiring  Cost  -­‐  $175,000.00,    Equipment  Cost  -­‐  $120,000.00,    Construction  Cost  -­‐  $400,000.00,    Funded  by  IS&T.    Total  FTE  -­‐  10%.

12/2/11 6/15/14 75%  Complete  of  Bid  Documents.    In  Final  Stages  of  Engineering.

Green

OI

OI:  Building  NW22  Cable  Renewal    (Construction  Only)

Mark  Silis Mark  Silis Shaun  Palma/John  Morgante

Will  provide  robust  network  for  IS&T  services.    It  will  increase  reliability  and  reduce  length  of  any  downtime.

Wiring  Cost  -­‐  $125,000.00,    Equipment  Cost  -­‐  $95,000.00,    Construction  Cost  -­‐  $10,000.00,    Funded  by  IS&T.    Total  FTE  -­‐  10%.

12/2/11 6/15/14 75%  Complete  of  Bid  Documents.    In  Final  Stages  of  Engineering.

Green

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 14 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

OI

OI:  Building  E52  Building  Renovation

Mark  Silis Mark  Silis John  Morgante

Will  provide  robust  network  for  IS&T  services.    It  will  increase  reliability  and  reduce  length  of  any  downtime.

In  Planning.

7/1/10 8/1/15 100%  design  document  due  January  2013 Green

OI

OI:  Virtual  Desktop EVP Mark  Silis Garry  Zacheiss

Introduce  Vmware  View  infrastructure  to  reduce  management  overhead  of  managed  desktop  systems.

Software  licensing:  $450k/3  years,  SWEB:  .5  FTE,  $62,500/year

9/1/10 12/20/11 8/31/13 Direction  change  to  consider  cloud  vendors;  selected  vendor  (Horizon  Private  Cloud)  and  completed  pilot  project.    Now  negotiating  pricing  with  vendor.

Project  delayed  by  Exchange  2010  rollout  making  use  of  same  resources

NONE

Green

OI

OI:  IDD  Environment  Refactor

Mark  Silis Mark  Silis Garry  Zacheiss

Increase  redundancy  and  reduce  scope  of  potential  failures  in  IDD  application  environments  by  separating  out  Java  application  containers  and  Apache  application  into  separate  server  pools  by  business  area

SWEB:  .75  FTE,  $93,600/year

4/1/12 12/31/12 6/30/13 Completed  relocation  of  Events  Calendar  application  to  dedicated  infrastructure  across  all  three  tiers.    In-­‐process  for  migrating  EHS  applications  to  dedicated  infrastructure.  EHS  production  migration  scheduled  for  January  2013.

Need  to  share  white  paper  describing  new  environment  with  Admin  Systems  BA  teams  and  discuss  business  impact

Green

OI

OI:  Enterprise  Storage  Renewal

Mark  Silis Mark  Silis Garry  Zacheiss

Ensure  IS&T  enterprise  storage  systems  are  kept  current  by  retiring  EMC  DMX  3000  arrays  for  VMAX  arrays.

FY12:  Capital:  $2.1MM/3  years,  SWEB:  2FTE,  $250,000/yearFY13  capital:  $1MM,  SWEB  same  as  FY12

7/1/11 6/30/12 6/30/13 Completed  FY12  goals.For  FY13,  complete  renewal  of  EMC  DMX-­‐3000  arrays  to  EMC  VMAX  10k  arrays  (3/31/13).    E40  systems  complete.    OC11  systems  outstanding:  non-­‐virtualized  production  SAP.    To  be  complete  by  end  of  4/2013.

Schedule  incurred  some  delay  due  to  construction  delay  with  OC11-­‐755  data  center.  One  batch  of  array  has  been  renewed.  New  batch  is  to  be  done.

Green

OI

OI:  Cisco  Call  Manager Mark  Silis Mark  Silis Dennis  Baron Improve  reliability  of  services  that  are  dependent  on  call  manager  -­‐  telepresence,  etc.

Capital:  SW:              FTE:    1  Maint:

4/20/12 4/30/12 6/30/13 Build  and  test  API  location  data  by  8/31/12

Internal  resource  availability Green

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 15 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

OI

OI:  E911 Mark  Silis Mark  Silis Dennis  Baron Meet  commitment  to  City  of  Cambridge  to  provide  calling  location  on  911  calls

Capital:  {cost  of  2  Cisco  MCS  servers}  SW:  {cost  of  Cisco  Unified  Communication  Manager  8.6  software}            FTE:1  Maint:  0

3/1/11 12/31/12 6/30/13 Gain  access  to  test  server.      Contract  in  procurement.

Internal  resource  availability

Green

OI

OI:  IPTV Mark  Silis Mark  Silis Chris  Murphy

Migrate  off  of  legacy  analog/QAM  cable  system  to  an  IP  based  service,  as  with  the  VoIP  transition.    This  eliminates  the  need  to  maintain  separate  cabling  infrastructures  while  providing  a  more  versitile  infrastructure.

Capital:  widevine  server...$8,909.49minerva  server...$28,992.75  includes  hardware  maintenance  with  lion's  share  of  cost  software/license  supportRGB  Networks...$14,600.00  Set  Top  Boxes...$8,125.00    SW:    Came  with  hardware          FTE:  1  Maint:  0

9/1/10 On-­‐going Convert  to  username/password  authentication.  Additon  of  VOD  content.    Expected  early  2/2013.

Ongoing  costs  still  unknown.    Some  dorms  with  subpar  network  infrastructures.    Set-­‐top  box  still  in  development.

Green

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 16 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

OI

OI:  MeetingPlace/WebEx

Mark  Silis Mark  Silis Dennis  Baron To  meet  the  needs  to  the  community  in  providing  a  collaborative  online  conferencing  solution

Capital:  {cost  of  2  Cisco  MCS  servers}  SW:  {cost  of  Cisco  Meeting  Place  8.6}            FTE:    2  Maint:  0

2/4/09 3/31/13 Pilot  status  check  by  Jan  2013 Work  with  Cisco  on  a  solution  for  Mac  bug  by  the  end  of  December

No  firm  commitment  from  Cisco  on  a  fix  to  support  Macs Green

OIOI:  MGHPCC Claude  

CanizaresMark  Silis Taeminn  

SongProvide  a  large  scale  HPC  co-­‐location  facility

GIB:  .3FTE 6/1/10 2/28/13 6/30/13 Completion  of  Network  connections  to  LL,  MIT,  HU,  BU,  Umass,  NEU,  NOX

Umass  not  ready  to  complete  connection

Green

OIOI:  Electronic  Discovery

OGC  (Jay  Wilcoxson  )

Mark  Silis Sophie  Wong Develop  process  for  efficient  preservation  process  for  ESI

GIB:   7/31/12 On-­‐going Waiting  for  Jay  and  Paula  to  draft  Electronic  Discovery  policy  for  review

Green

OI

OI:  Dark  Fiber  Chicopee  ILA

Mark  Silis John  Morgante

Will  provide  fiber  connectivity  to  MGHPCC  and  Lincoln  Labs

$60,000  on  construction  of  conduits  and  fiber

5/1/12 11/15/12 1/31/13 Fiber  Testing  conducted  and  fiber  work  completed.  Service  available  for  LL  and  MGHPCC

Final  test  results  for  one  strand  is  expected  from  HG&E  to  close  the  project

Green

OIOI:  Dark  Fiber  FSILG Mark  Silis John  

MorganteWill  provide  dedicated  fiber  to  most  of  the  FSILG's.

Approximetly  $350k

5/1/12 6/1/14 Phase  II  planning  underway.  Finishing  Amendment  to  contract,  Fiber  design.  

Street  pathways  being  avaliable

Can't  get  to  the  FSILG Green

OI

OI:  N52  Ductbank  to  233  Mass  Ave

Mark  Silis John  Morgante

Get  cabling  out  of  old  N42/new  novartis  facility.

Approximetly  $150k  (not  IS&T  funded)

6/1/11 5/1/13 3/15/14 Start  design  phase  of  ductbank.

City  of  Cambridge Don't  make  the  date  of  easement  expiration.

Green

OIOI:  219  Vassar  Street  Childcare  Facility-­‐W64

Mark  Silis John  Morgante

Add  more  childcare  on  Campus. Facilities  Funded.

7/1/12 7/1/13 IT  Design  wrap  up-­‐  January  2013 Green

OI

OI:  Building  2  Entire  North  Wing

Mark  Silis Robert  Lanigan

Gut  Renovation.    Chemistry In  budget/design  process.

7/1/12 8/1/13 Submit  Budget/design  Spring  2014.  Demo  underway. Green

OI

OI:  Building  2  Entire  East  and  South  Wings

Mark  Silis Robert  Lanigan

Gut  Renovation.    Math In  budget/design  process.

9/1/12 9/1/14 Submit  Budget/design  Spring  2014. Green

OI

OI:  Retire  McAfee  and  Recommend  new  Anti-­‐Virus  Products

Mark  Silis Mark  Silis Sophie  Wong  (PM)  Andrew  Munchbach  (SME)

Improve  defenses  of  desktops  and  laptops  (for  Mac  and  Windows)  against  conventional  malware,  and  increase  knowledge  of  malware  infection  on  campus  by  IS&T

HW:  TBD;  SW:  TBD;  SWEB:  TBD

Nov  '12 Jun  '13 Confirm  vendor  choice  decision

Delay  in  Pilot  rollout  may  delay  project  completion  date

Green

OI

OI:  Analog  Intercom  Replacement  in  Eastgate  and  Westgate

Mark  Silis Shaun  Palma Enable  us  to  decomision  analog  phones  in  these  2  residences.

In  Design. 7/1/11 9/1/13 Design  work  completed  by  Spring  2013. Green

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 17 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

OI

OI:  Virtual  Colocation  Pilot

Mark  Silis Mark  Silis Garry  Zacheiss

Provide  self-­‐service  access  to  MIT's  "private  cloud"  and  attract  additional  DLC  workloads  to  IS&T  data  centers.

Capital:  ~$200k  (Isilon  storage,  4  Cisco  UCS  blade  servers)SWEB:  .4  FTE  for  duration  of  pilot

7/1/12 6/30/13 Announcement  of  start  of  pilot  to  IT  Partners  (11/1/12)Complete  on-­‐boarding  of  pilot  users  in  environment  (11/19/12)Pilot  continues;  usage  increased  to  approximately  20  DLCs  including  internal  IS&T  use.

Lack  of  support  for  MacOS  X  browsers  noted  by  pilot  users.

Green

OI

OI:  Dropbox  Evaluation Mark  Silis Mark  Silis Garry  Zacheiss

Provide  modern  file-­‐sharing  and  collaboration  tool  for  MIT  community.

SWEB:  .1  FTESoftware  licensing  TBD  if  decision  to  move  forward

7/1/12 1-­‐Feb   Provision  test  accounts  via  Active  Directory  to  pilot  users  In  OI  (11/9/2012).    Contract  negotations  complete.    Working  with  IS&T  finance  to  determine  funding.

Need  to  determine  FY14+  funding  for  service.

Green

OI

OI:  Oracle  Forms  11g  Upgrade

Mark  Silis Mark  Silis Kevin  Mullins Provide  support  for  Java  7  (needed  for  more  recently  written  applications)  for  MITSIS  applications  making  use  of  Oracle  Forms

SWEB:  .5  FTE

11/5/12 7/1/13 Download  Oracle  Forms  11G  and  attempt  installation  in  sandbox  environment  to  determine  scope  of  changes  (to  be  complete  by  end  of  November)

Migration  from  OAS  application  server  to  WebLogic  may  require  significant  staff  retraining;  scope  unknown  until  evaluation  completed.

Green

OI

OI:  Cloud  Backup  Evaluation

Eamon  Kearns

Mark  Silis Dave  Kalenderian

Inform  future  decisions  regarding  evolution  of  how  IS&T  provides  data  backup  and  archiving  services  to  the  community.

SWEB:  .25  FTESoftware  licensing  TBD  if  decision  to  move  forward

8/1/12 4/1/13 Complete  evaluation  of  EMC  Mozy  Enterprise  (12/31/13).    CrashPlan  pilot  complete.    Avamar  pilot  in  process.

Backup  performance  for  "cloud"  offerings  may  be  insufficient  for  user  community.

Green

OI

OI:  Acquire  and  provide  Securit  Awareness  training  form  SANS

Mark  Silis Mark  Silis Monique  Yeaton

Raise  overall  security  awareness  of  faculty,  staff  and  students

HW:  uses  existing  LMS;  SANS  SW:  TBD;  Media:  $10K;  SWEB:  TBD

April  '12 Apr  '13 June  '13 Pilot  May  2013  and  Full  Roll-­‐out  (Published)  June  2013.

None None

Green

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 18 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

OI

OI:  Oracle  Forms  11g  Upgrade

Mark  Silis Mark  Silis Kevin  Mullins Provide  support  for  Java  7  (needed  for  more  recently  written  applications)  for  MITSIS  applications  making  use  of  Oracle  Forms

SWEB:  .5  FTE

11/5/12 7/1/13 Download  Oracle  Forms  11G  and  attempt  installation  in  sandbox  environment  to  determine  scope  of  changes.    Dev  environment  confirmed  working;  prototyping  Touchstone  authentication.

Migration  from  OAS  application  server  to  WebLogic  may  require  significant  staff  retraining;  scope  unknown  until  evaluation  completed.

Green

OI

OI:  Acive  Directory  Remediation

Barbara  Goguen  and  Mark  Silis

Mark  Silis  &  Barbara  Goguen

Richard  Edelson

The  primary  goal  is  to  simplify  the  Active  Directory  environment  to  enable  streamlined  operationsand  administration,  as  well  as  uniform  collaboration  and  support  throughout  the  organization.  Of  highest  priority  is  1)  to  allow  departmental  administrators  the  ability  to  manage  computer  objects  in  Win.mit.edu  withnative  Microsoft  tools  by  removing  Moira’s  capability  to  control  computer  object  location  andcontainer  association,  and  2)  reduce  the  number  of  applications  deployed  by  group  policy.

GIB 7/1/12 7/1/13 AD  Trigger  development  underway  for  completion  mid  June.  Altiris  software  distribution  is  still  in  progress,  not  complete.  Software  release  process  TBD.

Need  decision  on  go  live  for  cross  realm  removal  (group  policy  change).    Also  need  to  determine  whether  IS&T  will  offer  AD  and  Altiris  as  a  software  deployemnt  service  to  other  DLCs.

Green

OI

OI:  Infoblox  Implementation

Mark  Silis Mark  Silis Dan  Logcher Replace  the  old  DNS  infrastructure  with  Infoblox  which  will  position  MITs  network  to  meet  the  demands  for  emerging  technologies  such  as  IPv6.

Capital:  {cost  of  infoblox  hardware}  SW:    0          FTE:3  Maint:  0

1/12/12 9/1/12 12/31/12 Moira  Infoblox  system  update  is  to  be  working  before  project  can  move  forward.

On-­‐Hold.  Need  to  purchase  more  equipment  to  provide  redundancy.  Need  to  review  design  proposed  by  Infoblox.

Red

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 19 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

OI

OI:  AT&T  DAS  Project Mark  Silis Mark  Silis Marco  Gomes

In  building  cellular  coverage  to  all  our  campus  buildings

Wiring  Cost  -­‐  $40,000.00,    Police  Details  -­‐  $15,000.00.    Funded  by  IS&T  to  make  ready  for  AT&T.    FTE  in  FY12  -­‐  130%.    Total  FTE  -­‐  350%.

7/1/10 12/2/13 2/27/15 Ammendment  Completed.    Phase  2  Launch.

Verizon  and  Sprint  in  discussion  with  AT&T  on  T&C

AT&T  budget  release  for  future  DAS  work.    Labor  disputes  could  delay  progress  of  onsite  work.

Yellow

OI

OI:  Buildings  E17  &  E18  Renovation

Mark  Silis Mark  Silis Robert  Lanigan

Will  provide  robust  network  for  IS&T  services.    It  will  increase  reliability  and  reduce  length  of  any  downtime.

Equipment  Cost  -­‐  $500,000.00,  Funding  by  Facilities  Project  Budget.    FTE  in  FY12  -­‐  7%,  Total  FTE  -­‐  15%.  

9/1/11 1/2/13 6/30/13 Waiting  for  modular  furniture  on  the  1st  floor.

Per  facility  plan  adjusetment

Yellow

OI

OI:  Managed  Descktop  -­‐  Altris

Mark  Silis Mark  Silis Matt  Harrington  /  Richard  Edelson

The scope of this project is to utilize Altiris for the automating of inventory collection and software deployment on all Win Domain systems

.5  FTE 7/1/12 12/13/13 Application  distribution  (MS  Office,  IDF  and  TSM)  FY14  Q1  and  software  release  process  finalized  by  FY14  Q2

4/13:  deployment  of  software  with  work  around  only  -­‐  ticket  open  with  Symantec

Unclear  if  product  is  headed  to  end  of  life  -­‐  decision  on  whether  to  continue  by  May  Sponsor  Meeting  

Yellow

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 20 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

OI

OI:  WiFi  Locks Mark  Silis Mark  Silis Matt  Isgur Provide  a  Wifi  lock  solution  for  IS&T  telephone  rooms  across  campus.

Capital:  $17,994.28  for  Assa  Abloy  locks  SW:    0    (Persona  gave  the  software  to  MIT  for  free)          FTE:    1  Maint:  0

Jan  '12 On-­‐going Implement  Ccure  integration,  develop  a  project  plan,  figure  out  how  to  roll  the  units  out  and  which  locations  are  high  priority,  confirm  that  facilities  will  take  care  of  the  battery  changes

CMO  working  on  responsibilities  with  facilities.

Yellow

OIOI:  Office  365  Evaluation

Mark  Silis Mark  Silis Sophie  Wong Review  the  usage  of  Office  365  for  a  pilot  group

GIB: 9/1/12 7/31/13 TBD On  hold  due  to  resource  issues  -­‐  mtg  4/26  to  discuss  Exchange  upgrade  priorities

resource  priorities Delays  in  Development  buildout

Red

OI

OI:  Yammer Mark  Silis Sophie  Wong Evaluate  supportability  of  Yammer  as  a  SNS  tool  at  MIT

GIB: 9/1/12 3/31/13 Project  statement Lack  of  committed  project  sponsorship

Red

OI

OI:  Managed  Desktop  -­‐  Domain  Join

Mark  Silis Mark  Silis ? The scope of this project is to improve efficiencies and customer satisfaction for our Windows customers by automating inventory collection, alerting and software deployment.

Capital:  $62,921,  SWEB  35  hours  for  a  total  cost  of  $2,335  ,  Maintenance  NA

6/12:  ON  HOLD  -­‐  AD  Remediation  project  needs  to  be  complete  before  work  can  commence

Issues  with  non  standard  domain

FY14  consulting  service  will  be  needed Yellow  -­‐  ON  

HOLD

Completed  Projects

AS

Day  to  Day  Operations  Improvements    -­‐  Job  Scheduling  Outsourcing  Evaluation  phase

Alison  AldenMike  HowardMarilyn  Smith

Bart  Dahlstrom

Sophie  Wong

Creation  of  a  team  to  identify,  organize  and  successfully  manage  the  operational  needs  of  SAP  related  Administrative  Systems.    The  primary  goals  are  to  document  solution  landscape,  research  application  performance  management  functionality  and  implement  batch  scheduler  functionality.

GIB 4/1/12 10/1/12 11/28/12

10/2012:    Complete  RFP  for  outsourcing  of  batch  scheduling

Recommendations  12/2012

Completed

AS Applicant  Tracking  System  Evaluation

Wayne  Turner

Bart  Dahlstrom

Doug  Walsh

Select  an  Applicant  Tracking  System  to  support  the  strategic  roadmap  of  HR  and  Staffing  Services

SWD 3/1/12 9/28/12 09/2012:    Select  vendor Completed

AS edX  Company  Code Basil  Stewart Bart  Dahlstrom

Siobhan  Cunningham

Co-­‐mingled  funds,  need  to  separate  from  MIT.  501C3  status  pending

GIB 11/1/12 production Completed

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 21 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

ESReplacement  of  Independent  Activities  Period  (IAP)  

Julie  Norman Eamon  Kearns

Madge  Lewis Replace  high  risk  application.   SWD 7/1/11 9/1/12 Rollout  in  Summer. Slightly  behind  in  development.

If  deadline  is  missed,  will  need  to  wait  a  year  for  go  live.

Completed

ES Stellar  Gradebook

Dan  Hastings,  Christine  Ortiz

Eamon  Kearns

Derek  Jaeger Standalone  grade  book  with  enhanced  requested  functionality.

SWD 7/1/11 10/1/12 Full  Rollout  in  Fall. Completed

ES Stellar  Mobile Eamon  Kearns

Eamon  Kearns

Derek  Jaeger Provide  enhanced  mobile  interface  to  MyStellar.

GIB 2/1/12 10/1/12 Initial  Release  in  Summer. Completed

ES Online  Grading Mary  Callahan

Eamon  Kearns

Zahida  Tahir Final  grades  no  longer  data  entered  by  registrar.

SWD 7/1/10 9/1/12 Project  completion  in  Fall. Completed

ES PowerFaids  -­‐  NET  Partner

Betsy  Hicks   Eamon  Kearns

Eamon  Kearns

Provide  financial  award  information  online

SWD 6/1/12 Nov  2012  Go  Live

Completed

ES Moving  WEBSIS  to  Touchstone

IS&T  ADs Eamon  Kearns

Andrea  Collins

SWD 7/1/12 Go  Live  10/28/12

Completed

DMRoles  Migration  to  high  availability  RAC  environment

Scott  Thorne Mary  Weisse

Rob  Grenier  &  Rob  Campanella

With  increased  use  of  the  ROLES  database  it  is  even  more  critical  and  imperative  that  it  be  moved  to  an  HA  (High  Availability)  RAC  (Oracle  Real  Application  Clusters)  environment  to  ensure  maximum  protection  from  outages.

GIB 11/1/11 12/31/12The  RAC  test  environment  should  be  ready  for  testing  by  the  end  of  the  week.

Final  cutover  timing  and  Race  training  for  the  DBA  staff.

The  cutover  risk  is  low  as  we  will  be  able  to  resort  back  to  the  original  server  if  necessary.

Completed

DM Space  Economy  -­‐  Phase  1

Marty  Schmidt

Mary  Weisse

Scott  Thorne

The  MIT  Space  Management  System  provides  a  means  for  recording  and  analyzing  the  use  of  space  across  the  Institute  at  the  level  of  the  Principal  Investigator  (PI).    The  initiative  emerged  in  response  to  the  Institute  Task  Force  Working  Group  on  space.  Prior  to  the  development  of  this  system,  detailed  information  on  space  use  was  captured  only  at  the  DLCI  level.      All  academic  and  research  units  at  MIT  are  required  to  maintain  their  Space  Management  System  data.

Fixed  Cost  Funded  by  Provost.

Initial  Rollout  11/21/11    Modifications  &  Enhancements    6/12/12.

Initial  Rollout  4/16/12    Modifications  &  Enhancements    7/9/12.

Initial  Rollout  4/30/12    Completed.  Modifications  &  Enhancements  7/9/12

Support  of  committee  as  needed:  Eath  Day,  Energy  Week,  Etc.

Waiting  on  decision  as  to    whether  all  departments  will  provide  an  initial  spreadsheet  to  load  data  or  enter  data  by  hand.

*  Design  was  done  by  the  steering  committee  with  no  user  involvement.  Risk  is  that  it  may  not  meet  user  needs  or  expectations.

Completed

DM Separate  SAP  Discovery  Environment

Mary  Weisse

Ron  ParkerRequired  for  SAP  project  and  Support  and  Enhancement  package  discovery  efforts.

GIB 6/4/12 7/15/12Installation  of  SAP  Enhancement  Package  6  for  ERP  6.0.

An  SAP  production  footprint  is  required  to  support  this  effort.

Completed

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 22 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

DM Space  Economy  -­‐  Phase  1  Update

Marty  Schmidt

Mary  Weisse

Scott  Thorne

The  MIT  Space  Management  System  provides  a  means  for  recording  and  analyzing  the  use  of  space  across  the  Institute  at  the  level  of  the  Principal  Investigator  (PI).    The  initiative  emerged  in  response  to  the  Institute  Task  Force  Working  Group  on  space.  Prior  to  the  development  of  this  system,  detailed  information  on  space  use  was  captured  only  at  the  DLCI  level.      All  academic  and  research  units  at  MIT  are  required  to  maintain  their  Space  Management  System  data.

Fixed  Cost  Funded  by  Provost.

12/1/12 12/30/12 Scope  creep Completed

DM MITSIS  database  migration  to  11G

Eamon  Kearns

Mary  Weisse

Rob  Grenier

The  current  MITSIS  database  version  (10.2.0.3)  is  not  only  2  patchsets  behind  (it  should  be  at  10.2.0.5)  but  was  officially  desupported  7/30/2011.  While  we  have  extended  support  that  only  covers  us  till  7/30/2013  and  in  the  meantime  we  are  vulnerable  to  bugs  and  potential  security  issues  that  are  fixed  in  11.2  (as  well  as  the  missing  10G  patchsets).  That  may  seem  like  a  long  time  off  but  given  the  complexity  of  thee  MITSIS  environment  and  all  it's  associated  dependencies  this  will  be  a  challenging  move  and  will  require  great  planning  and  testing.

GIB 9/1/11 9/30/12  -­‐  10/31/12

2/29/2013 The  DEV  environment  is  ready  for  testing.

We  can  not  move  forward  with  out  full  support  of  the  Student  Services.

We  find  ourselves  on  an  unsupported  platform  in  July  of  2012.

Completed

SE President's  Website Reif Steve  Buckley

7/2/12 7/2/12 Completed

SE President  Emeritus  Website

Hockfield Steve  Buckley

7/2/12 7/2/12 Completed

SE Kerberos  for  Windows Kerberos  Board

Steve  Buckley

Hardjono Security $104K  GIB 6/1/12 6/30/12 7/30/12 Final  Release Independently  build  to  sign

Completed

SE Kerberos  for  Android Kerberos  Board

Steve  Buckley

Hardjono Security $10K  GIB 6/1/11 6/30/12 10/30/12 Java  bindings Completed

SE Develop  ABAP  User  Experience  Principles

Smith Steve  Buckley

Lyons Self  Service 0 3/1/12 8/30/12 Completed

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 23 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

SE Drupal  Cloud Smith Steve  Buckley

Rossetti Self  Service $155k  GIB 7/1/11 1/30/13

Two  pilot  launches  per  week.    Launching  site  for  Robin  Elices  in  January.    Launching  portal  site  in  January.

Automation  of  account,  installation  and  touchstone.    Finding  performance  bottlenecks.

Completed

SEDCAD:  VPF  Sponsored  Accounts  Status  dB  (FMP)

VPF  (Office  of  the  VP  for  Finance)

Steve  Buckley

Chris  Giles 7/27/11 4/30/12 8/13/12 Completed

SEDCAD:  Title  IX  Web  Site  (Drupal  Cloud  Pilot)

Office  of  the  General  Counsel  (OGC)

Steve  Buckley

Chris  Giles 2/23/12 9/28/12 Completed

SEDCAD:  Community  Giving  Updates  (WebP)

Community  Services  Office

Steve  Buckley

Lizz  McManus

3/26/12 7/20/12 Completed

SE DCAD:  OME  MAP  module  (FMP)

Office  for  Minority  Education

Steve  Buckley

Peggy  Conant

7/15/12 10/17/12 Completed

SEDCAD:  Nelson  Lab  Website    (DrupalCloud  Pilot)

Keith  Nelson  Group  (Chemistry  Department)

Steve  Buckley

Chris  Giles 7/17/12 9/14/12 Completed

SEDCAD:  Biomimetics  website  (DrupalCloud  Pilot)

Department  of  Biological  Engineering

Steve  Buckley

Chris  Giles 8/2/12 9/14/12 Completed

SEDCAD:  Engineering  PhDs  Website  (DrupalCloud  Pilot)

School  of  Engineering

Steve  Buckley

Chris  Giles 8/2/12 9/14/12 Completed

SE DCAD:  SUMS  Website  (DrupalCloud  Pilot)

Society  of  Undergraduate  Materials  Scientists  (DMSE)

Steve  Buckley

Chris  Giles 8/2/12 9/14/12 Completed

SEDCAD:Roman  Stocker  Lab  Website  (Drupal  Cloud  Pilot)

School  of  Engineering

Steve  Buckley

Chris  Giles 8/3/12 10/31/12 Completed

SEDCAD:  First  Generation  Website  (DrupalCloud  Pilot)

Dean  for  Undergraduate  Education

Steve  Buckley

Chris  Giles 8/10/12 9/14/12 Completed

SEDCAD:  Communicator's  Toolkit  Fixes

Communication  Production  Services

Steve  Buckley

Myra  Hope  Eskridge

8/16/12 10/19/12 Completed

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 24 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

SE DCAD:  IMES  Website  (DrupalCloud  profile)

Institute  for  Medical  Engineering  and  Science

Steve  Buckley

Myra  Hope  Eskridge

9/10/12 10/12/12 Completed

SEDCAD:  Media  Lab  IRP  Website  (Drupal  Cloud  Pilot)

MIT  Media  Lab

Steve  Buckley

Chris  Giles 10/15/12 10/24/12 Completed

SEDCAD:  Novartis-­‐MIT  Website  (Drupal  Cloud  Pilot)

Novartis-­‐MIT  Center

Steve  Buckley

Chris  Giles 10/15/12 10/24/12 Completed

SEDCAD:  Athena  Release  Team  (Drupal  Cloud  Pilot)

IS&T  (Information  Services  and  Technology)

Steve  Buckley

Chris  Giles 10/22/12 10/31/12 (no  content  yet) Completed

SEDCAD:  Bates  Lab  Website  (Drupal  Cloud  Pilot)

Bates  Lab Steve  Buckley

Chris  Giles 10/29/12 11/7/12 Completed

SEDCAD:  Microsystems  Website  (Drupal  Cloud  Pilot)

Microsystems  Technology  Lab

Steve  Buckley

Chris  Giles 10/29/12 11/7/12 (no  content  yet) Completed

SE DCAD:  DSL  advising  database  (FMP)

DSL  (Dean  for  Student  Life)

Steve  Buckley

Cecilia  Marra 1/24/12 12/31/12 No  response  from  client

Cancelled

SE DCAD:  DMSE  Drupal  7  site  evaluation

MSE  (Department  of  Materials  Science  and  Engineering)

Steve  Buckley

Cecilia  Marra 3/16/12 4/23/12

Client  likely  using  internal  dev/hosting  resources  (SoE)

Cancelled

SEDCAD:  UAAP  Student/Advisor  Data  Management  (FMP)

UAAP  (Office  of  Undergraduate  Advising  and  Academic  Programming)

Steve  Buckley

Myra  Hope  Eskridge

7/1/10 6/29/12 11/30/12 Completed

SE DCAD:  MIT  Medical  Websites  Evaluations

MIT  Medical Steve  Buckley

Lizz  McManus

3/28/12 11/30/12 Completed

SE DCAD:  Getfit  Drupal  7  Rebuild

MIT  Medical Steve  Buckley

Chris  Giles 6/18/12 11/30/12 Completed

SE DCAD:  LMP  Website  (Drupal  Cloud  Pilot)

Lab  for  Manufacturing  and  Productivity

Steve  Buckley

Chris  Giles 6/29/12 11/21/12 Completed

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 25 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

SEDCAD:  Community  Giving  Updates  FY13  (WebP)

Community  Services  Office

Steve  Buckley

Lizz  McManus

8/1/12 11/30/12 Completed

SE DCAD:  MIT  Story  Code  Review

Office  of  the  President

Steve  Buckley

Cecilia  Marra 8/9/12 11/30/12 Completed

SE DCAD:  Medical  Intranet  Fixes  (WebP)

MIT  Medical Steve  Buckley

Lizz  McManus

8/20/12 11/30/12 Completed

SEDCAD:  Swager  Lab    Website  (Drupal  Cloud  Pilot)

Swager  Group    

Steve  Buckley

Chris  Giles 8/29/12 11/21/12 Completed

SEDCAD:  Outreach  Website  Enhancements

Public  Service  Center

Steve  Buckley

Cecilia  Marra 10/1/12 11/15/12 Completed

SE President's  Website Reif Steve  Buckley

7/2/12 7/2/12 Completed

SE President  Emeritus  Website

Hockfield Steve  Buckley

7/2/12 7/2/12 Completed

SE Kerberos  for  Windows Kerberos  Board

Steve  Buckley

Hardjono Security $104K  GIB 6/1/12 6/30/12 7/30/12 Final  Release Independently  build  to  sign

Completed

SE Kerberos  for  Android Kerberos  Board

Steve  Buckley

Hardjono Security $10K  GIB 6/1/11 6/30/12 10/30/12 Java  bindings Completed

SE Develop  ABAP  User  Experience  Principles

Smith Steve  Buckley

Lyons Self  Service 0 3/1/12 8/30/12 Completed

SE Drupal  Cloud Smith Steve  Buckley

Rossetti Self  Service $155k  GIB 7/1/11 1/30/13

Two  pilot  launches  per  week.    Launching  site  for  Robin  Elices  in  January.    Launching  portal  site  in  January.

Automation  of  account,  installation  and  touchstone.    Finding  performance  bottlenecks.

Completed

SEDCAD:  VPF  Sponsored  Accounts  Status  dB  (FMP)

VPF  (Office  of  the  VP  for  Finance)

Steve  Buckley

Chris  Giles 7/27/11 4/30/12 8/13/12 Completed

SEDCAD:  Title  IX  Web  Site  (Drupal  Cloud  Pilot)

Office  of  the  General  Counsel  (OGC)

Steve  Buckley

Chris  Giles 2/23/12 9/28/12 Completed

SEDCAD:  Community  Giving  Updates  (WebP)

Community  Services  Office

Steve  Buckley

Lizz  McManus

3/26/12 7/20/12 Completed

SE DCAD:  OME  MAP  module  (FMP)

Office  for  Minority  Education

Steve  Buckley

Peggy  Conant

7/15/12 10/17/12 Completed

SEDCAD:  Nelson  Lab  Website    (DrupalCloud  Pilot)

Keith  Nelson  Group  (Chemistry  Department)

Steve  Buckley

Chris  Giles 7/17/12 9/14/12 Completed

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 26 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

SEDCAD:  Biomimetics  website  (DrupalCloud  Pilot)

Department  of  Biological  Engineering

Steve  Buckley

Chris  Giles 8/2/12 9/14/12 Completed

SEDCAD:  Engineering  PhDs  Website  (DrupalCloud  Pilot)

School  of  Engineering

Steve  Buckley

Chris  Giles 8/2/12 9/14/12 Completed

SE DCAD:  SUMS  Website  (DrupalCloud  Pilot)

Society  of  Undergraduate  Materials  Scientists  (DMSE)

Steve  Buckley

Chris  Giles 8/2/12 9/14/12 Completed

SEDCAD:Roman  Stocker  Lab  Website  (Drupal  Cloud  Pilot)

School  of  Engineering

Steve  Buckley

Chris  Giles 8/3/12 10/31/12 Completed

SEDCAD:  First  Generation  Website  (DrupalCloud  Pilot)

Dean  for  Undergraduate  Education

Steve  Buckley

Chris  Giles 8/10/12 9/14/12 Completed

SEDCAD:  Communicator's  Toolkit  Fixes

Communication  Production  Services

Steve  Buckley

Myra  Hope  Eskridge

8/16/12 10/19/12 Completed

SE DCAD:  IMES  Website  (DrupalCloud  profile)

Institute  for  Medical  Engineering  and  Science

Steve  Buckley

Myra  Hope  Eskridge

9/10/12 10/12/12 Completed

SEDCAD:  Media  Lab  IRP  Website  (Drupal  Cloud  Pilot)

MIT  Media  Lab

Steve  Buckley

Chris  Giles 10/15/12 10/24/12 Completed

SEDCAD:  Novartis-­‐MIT  Website  (Drupal  Cloud  Pilot)

Novartis-­‐MIT  Center

Steve  Buckley

Chris  Giles 10/15/12 10/24/12 Completed

SEDCAD:  Athena  Release  Team  (Drupal  Cloud  Pilot)

IS&T  (Information  Services  and  Technology)

Steve  Buckley

Chris  Giles 10/22/12 10/31/12 (no  content  yet) Completed

SEDCAD:  Bates  Lab  Website  (Drupal  Cloud  Pilot)

Bates  Lab Steve  Buckley

Chris  Giles 10/29/12 11/7/12 Completed

SEDCAD:  Microsystems  Website  (Drupal  Cloud  Pilot)

Microsystems  Technology  Lab

Steve  Buckley

Chris  Giles 10/29/12 11/7/12 (no  content  yet) Completed

SEDCAD:  Faculty  Newsletter  Website  (WebP)

Office  of  the  Provost

Steve  Buckley

Chris  Giles GIB 10/24/11 TBD Cancelled

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 27 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

SEDCAD:  VPF  Site  Migration  (DrupalCloud  Pilot)

VPF  (Office  of  the  VP  for  Finance)

Steve  Buckley

Chris  Giles GIB 7/12/12 TBD Cancelled

SEDCAD:Roman  Stocker  Lab  Website  (Drupal  Cloud  Pilot)

School  of  Engineering

Steve  Buckley

Chris  Giles GIB 8/3/12 10/22/12 working  out  ease  of  use    issues

Cancelled

SEDCAD:  Mighty  Rachel  Website  (Drupal  Cloud  Pilot)

Rachel  Morton,  Department  of  Nuclear  Science  and  Engineering

Steve  Buckley

Chris  Giles GIB 10/15/12 TBD Cancelled

SE DCAD:PFSC  Website  (Drupal  Cloud  Pilot)

Plasma  Science  and  Fusion  Center

Steve  Buckley

Chris  Giles GIB 10/15/12 TBD Cancelled

SEDCAD:  Graphic  Identity  Website  (Drupal  Cloud  Pilot)

Communication  Production  Services

Steve  Buckley

Chris  Giles GIB 11/12/12 TBD Cancelled

SE EECS  web  site  (Drupal  Cloud  Pilot)

EECS  (Department  of  Electrical  Engineering  and  Computer  Science)

Steve  Buckley

Chris  Giles GIB 11/15/12 TBD Cancelled

SE LIDS  Website  (WebP)

Laboratory  for  Information  and  Decision  Systems

Steve  Buckley

Lizz  McManus

GIB 12/26/12 TBD Cancelled

SE OGCR  News  and  Events  (ConP)

Office  of  Government  and  Community  Relations

Steve  Buckley

Lizz  McManus

GIB 1/11/13 TBD Cancelled

SE Kerberos  for  Windows Kerberos  Consortium

Steve  Buckley

Thomas  Hardjono

Security $150k  SW 7/14/11 12/7/12 Completed

SE Kerberos  1.11 Kerberos  Consortium

Steve  Buckley

Thomas  Hardjono

Security $150k  SW 1/1/12 12/17/12 Completed

SE Kerberos  for  Android Kerberos  Consortium

Steve  Buckley

Thomas  Hardjono

Security GIB 7/1/12 11/19/12 Completed

SEDCAD:  Registrar's  Classroom  inventory  db  (FMP)

Registrar's  Office

Steve  Buckley

Peggy  Conant

GIB 2/18/11 6/30/12 3/15/13 Completed

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 28 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

SEDCAD:    Complex  Systems  for  Development

ESD Steve  Buckley

Bill  Karas GIB 3/7/13 3/7/13 Completed

SE DCAD:  Army  ROTC  Website

Department  of  Undergraduate  Education

Steve  Buckley

Lizz  McManus

GIB 3/19/12 12/28/12 1/31/13 Completed

SEDCAD_    Medical  Peer  Counseling  Web  App  (Con)

MIT  Medical Steve  Buckley

Chris  Giles GIB 8/16/12 2/6/13 Completed

SE DCAD:  Wellness  App  Updates

MIT  Medical Steve  Buckley

Chris  Giles GIB 8/16/12 11/30/12 1/31/13 Completed

SE DCAD:  CopyTech  Website  Code  Review

Communication  Production  Services

Steve  Buckley

Cecilia  Marra GIB 8/29/12 11/30/12 2/15/13 Completed

SE DCAD:  President  Reif  Ideabank

Office  of  the  President

Steve  Buckley

Lizz  McManus

GIB 10/10/12 11/15/12 2/15/13 Deferred  to  expanded  Future  of  Education  site

Completed

SE DCAD:  OME  Plug-­‐in  and  Kiosk  Emails

Office  for  Minority  Education

Steve  Buckley

Peggy  Conant

GIB 10/11/12 12/15/12 1/31/13 Deployment Completed

SE DCAD:  ACDL  Website  (Drupal  Cloud  Pilot)

Department  of  Aeronautics  and  Astonautics

Steve  Buckley

Chris  Giles GIB 10/15/12 2/7/13 Completed

SEDCAD:  Sustainability      Website  (Drupal  Cloud  Pilot)

Environment,  Health  and  Safety

Steve  Buckley

Chris  Giles GIB 10/15/12 2/14/13 Completed

SEDCAD:  Student  Conference    Website  (Drupal  Cloud  Pilot)

American  Nuclear  Society

Steve  Buckley

Chris  Giles GIB 10/15/12 3/2/13 Completed

SE DCAD:  Studio  Lottery  Database

School  of  Architecture  and  Planning

Steve  Buckley

Peggy  Conant

GIB 10/31/12 1/31/13 Completed

SE DCAD:  Eilaf  Ahmed  (Drupal  Cloud  Pilot)

Eliaf  Ahmed,  postdoc  in  Chemistry  Department

Steve  Buckley

Chris  Giles GIB 11/12/12 11/19/13 Completed

SE DCAD:    ACT  equipment  reservation  db  (FMP)

ACT  (MIT  Program  in  Art,  Culture,  and  Technology)

Steve  Buckley

Peggy  Conant

GIB 11/14/12 12/7/12 Completed

SE DCAD:    MITEI  Query  Fix  (FMP)

MITEI  (MIT  Energy  Initiative

Steve  Buckley

Cecilia  Marra GIB 11/15/12 12/17/12 3/19/13 Completed

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 29 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

SE IS&T  Software  Portfolio  (FMP)

IS&T  (Information  Services  and  Technology)

Steve  Buckley

Peggy  Conant

Peggy  Conant

GIB 11/15/12 1/31/13 2/28/13 Completed

SE ATIC  Website  (Drupal  Cloud  Pilot)

IS&T  (Information  Services  and  Technology)

Steve  Buckley

Chris  Giles GIB 11/15/12 2/13/13 Completed

SEEd  Carlevale  -­‐  personal  site  (Drupal  Cloud  Pilot)

Department  of  Nuclear  Science  and  Engineering

Steve  Buckley

Chris  Giles GIB 11/15/12 2/13/13 Completed

SEGalina  Osmolovskaya  personal  site  (Drupal  Cloud  Pilot)

CSAIL  (Computer  Science  &  Artificial  Intelligence  Lab)

Steve  Buckley

Chris  Giles GIB 11/15/12 2/13/13 Completed

SEMIT  News  Office  test  web  site  (Drupal  Cloud  Pilot)

MIT  News  Office

Steve  Buckley

Chris  Giles GIB 11/15/12 2/13/13 Completed

SE CAC  Events  Guide  (WebP)

Campus  Activities  Complex

Steve  Buckley

Cecilia  Marra GIB 1/11/13 1/31/13 Completed

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 30 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

SEPresidential  Fellow  Letter  Scripts  and  Formats  (FMP)

ODGE  (Office  of  the  Dean  for  Graduate  Education)

Steve  Buckley

Peggy  Conant GIB 1/18/13 3/6/13 Completed

SEDevelopment  Drupal  Sites  (4)  (DrupalCloud)

School  of  Engineering

Steve  Buckley Chris  Giles GIB 2/6/13 2/7/13 Completed

SE Commencement  Website  (DrupalCloud)

Office  of  Institute  Affairs

Steve  Buckley

Chris  Giles GIB 2/6/13 2/15/13 Completed

SE MacPartners  Web  Site  (DrupalCloud)

IS&T  (Information  Services  and  Technology)

Steve  Buckley

Chris  Giles GIB 2/14/13 2/26/13 Completed

SE FMSE  website  (DrupalCloud)

School  of  Engineering

Steve  Buckley

Chris  Giles GIB 2/14/13 2/15/13 Completed

SEMIT  Future  of  Education  Task  Force  Web  Site

Office  of  the  Executive  Vice  President  and  Treasurer

Steve  Buckley

Chris  Giles GIB 2/14/13 4/30/13 Completed

SEFaculty  Professional  Web  Site  (DrupalCloud)

Brain  and  Cognitive  Sciences

Steve  Buckley

Chris  Giles GIB 2/14/13 2/26/13 Completed

SEKerberos  Consortium  Web  Site  (DrupalCloud)

Kerberos  Consortium

Steve  Buckley

Chris  Giles GIB 3/4/13 3/5/13 Completed

CS *Streamlined  walkins  intake  process

Barbara  Goguen

Barbara  Goguen

Chris  Gresham

Replaced  paper  intake  forms  with  iPad  web.    Helps  automate  the  collection  of  key  information,  as  well  as  the  management  of  the  queue  when  more  than  one  customer  is  waiting.

GIB 9/15/11Key  walkins  staff  start  working  with  iPads  and  understanding  applicability.  

Decoupling  walkins  from  repair  center;  rethinking  approach

Closed  out,  change  in  focus

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 31 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

CS Service  Portfolio  Prototype

Barbara  Goguen

Barbara  Goguen

Pat  Sheppard

IS&T  staff  are  not  sure  of  "who  to  go  to  for  what",  or  what  our  service  dependencies  are.      A  complete  listing  of  the  services  provided  by  IS&T  (internal  db  with  key  contacts  and  descriptions  of  each  service)  will  answer  many  of  those  questions.

11/1/11 11/1/12

Phase  I:  Prototype  completed  March  2012.    Phase  2:  exploration  of  the  right  tool  to  house  and  access  the  services  information.  (currently  underway).  Sponsor  Meeting  8/22  to  discuss  next  steps  (see  ITSM  Tool  Discovery  project  below)

Prototype  completed.    Next  phase  dependent  on  ITSM  Tool  Discovery  (see  below).

Completed

CS MITx  Accessibility Marilyn  Smith

Barbara  Goguen

Mary  Ziegler

Cannot  apply  same  "brick  and  mortar"  policies  to  online  textbook  copyright.    Need  guidelines  for  minimum  things  we  can  do  now,  and  what  should  be  planned  for  in  future  as  MITx  grows.

GIB 3/15/12 Completed

Initial  meeting  with  Mary  Z.,  OGC,  Disability  Services,  and  MITx.    Need  several  additional  conversations.    

Have  to  be  careful  to  walk  the  line  between  compliance  and  agility.

Completed

CS MIT  2030  Teaching  &  Learning  Spaces

Dan  Hastings,  Marty  Schmidt,  Christine  Ortiz

Barbara  Goguen

Oliver  Thomas

Improve  the  use  of  space  to  facilitate  new  ways  of  teaching  and  learning.

GIB Completed Report  should  be  going  to  sponsors  soon.

Completed

CSTelepresence  Equipped  Conf  Rooms  as  a  Service

Steve  Gass  &  Barbara  Goguen

Barbara  Goguen

Oliver  Thomas?

Success  will  mean  two  well  equipped,  publicly  schedulable  rooms  will  get  used  for  high  quality  video  conferencing  to  support  the  mission  and  work  of  MIT.

GIB 3/26/12 1/31/13

Documentation  that  summarizes  the  rooms  and  services,  as  well  as  how  to  reserver  and  prepare  can  be  found  at  https://kb.mit.edu/confluence/display/mitcontrib/How+to+plan+your+video+call+for+Cisco+TelePresence+units.

To  date,  telepresence  use  has  relied  heavily  on  hand-­‐holding  from  back  end  service  providers.    This  project  should  move  us  toward  a  more  scalable  support.

Completed

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 32 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

CS/OI ITSM  Tool  DiscoveryBarbara  Goguen  and  Mark  Silis

Barbara  Goguen  and  Mark  Silis

Pat  Sheppard

Currently  staff  involved  with  day-­‐to-­‐day  operations  and  support  do  not  work  in  a  unified  system  where  the  processes  are  clearly  understood  and  consistent.    This  project  will    evaluate  IT  Service  Management  tools  that  can    facilitate  collaboration  across  teams  within  the  same  areas  as  well  as  across  the  organization.

GIB 8/29/12 10/31/12

Completed.    Just  working  out  final  contract  and  licensing  costs.

8/29:  BMC  overview    9/20:  BMC  use  cases        9/27:  Sponsor  meeting                                  9/28:  Gartner  consult  (3rd  party  CMDB  viewers)                                  10/1:  NEU  demo                    TBD:  Gartner  consult  10/9:  ServiceNow  overview                                      10/15:  ServiceNow  use  cases                                                10/22:  Gartner  consult  (3rd  party  request  management  front  ends)                                                              10/31:  Final  recommendation    11/7:  Sponsor  meeting

Evaluation  completed.  Sponsor  meeting  rescheduled  for  11/7/12.    Next  steps:  business  case  that  includes  clear  support  and  maintenance  plan  including  resources  needed  (12/15/12).    Contact  vendors  for  initial  licensing  proposals  (to  include  professional  services  and  any  additional  tools).

Completed

OI

OI:  Provision  MITnet  with  Border  Protection  Devices  (FW,  IDS,  IPS).    Handle:  BORDERPROTECTION

ITGC Mark  Silis Mike  Halsall BP  will  provide  us  with  the  eventual  possibility  of  seeing  how  MITnet  is  being  used,  a  capability  to  detect  anomalous  behavior  from  on-­‐campus,  and  even  possibly  the  ability  to  block  or  reduce  the  risk  due  to  suspicious  traffic  from  off-­‐campus.

HW  Cap:$799k;  SW:  $30k  p.a.;  SWEB:  $30k  (installation,  configuration,  tuning,  logging)

Oct  '10 Aug  '11 Oct  '12 In  operation  but  with  a  reduced  level  of  networks  visible.

Completed

OI

OI:  Provision  IST  Security  efforts  with  a  modern  log  management  and  analysis  capability.    Handle  :  SPLUNK

ITGC Mark  Silis Mike  Halsall IST  Security  will  be  more  efficient  and  effective  in  their  response  to    issues  reported  to  them,  or  detected  by  BP  (possible  future  use)

HW:  $0  (VMs);  SW:  $10k  license,  $12k  p.a.;  SWEB:  $10k  (installation,  configuration,  interfacing,  analysis)

Oct  '10 Aug  '11 Oct  '12 In  operation  but  with  a  subset  of  optimal  data  feeds.

Completed

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 33 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

OI

OI:  Housing  Analog  Project

Mark  Silis Mark  Silis Shaun  Palma This  will  enable  IS&T  to  remove  analog  lines  from  in  dorm  rooms.

Wiring  Cost  -­‐  $75,000.00,    Funded  by  IS&T.    FTE  in  FY12  -­‐  10%,    Total  FTE  10%.

7/1/11 4/13/12 9/1/12 Planning  for  removal  of  Anaolg  from  Dorm  Rooms  by  Sep

Completed

OI

OI:  Unity  Transition Mark  Silis Mark  Silis Dennis  Baron Standardize  on  a  single  messaging  service  for  MIT  telephones  allowing  ease  of  future  upgrades  and  feature  enhancements.

Capital:  {cost  of  2  Cisco  MCS  servers}  SW:  {cost  of  Cisco  Unity  Connection  Licenses}            FTE:  3  Maint:  {cost  of  additional  licenses}

1/3/11 8/31/11 10/1/12 Call  tree  migration  (3  month  work  once  PO  is  issued)  from  Octel/Iperia  to  Unity

Completed

OI

OI:  Building  10  Cable  Renewal

Mark  Silis Mark  Silis Robert  Lanigan

Will  provide  robust  network  for  IS&T  services.    It  will  increase  reliability  and  reduce  length  of  any  downtime.

Wiring  Cost  -­‐  $750,000.00,    Equipment  Cost  -­‐  $475,000.00,    Construction  Cost  -­‐  $300,000.00,    Funded  by  IS&T.    FTE  for  FY12  -­‐  20%,  Total  FTE  -­‐  30%.

5/1/11 8/20/12 12/31/12 VOIP  cutover  completed  November  2012.    Demo  of  old  cabling  completed  December  2012.  Project  Completed>

Completed

OI

OI:  Identity  Life  Cycle  Discovery

Mark  Silis Mark  Silis Taeminn  Song

Understand  the  current  state  of  Identity  life  cycle  management  at  MIT

GIB:  .1  FTE 12/1/10 6/29/12 Complted  phase.  waiting  on  next  step  after  AC  presentation

When  approval  is  made,  a  new  implementation  project  will  be  defined

Completed

FY  13  Project  Listing  by  Operational  Area

DetailFY2013  IS&T  Project  Report  -­‐  April.xlsx Page 34 of 34

modified  by:  D.  Segaloffmodified  on:  3/21/2013

Area

Project  (if  a  priority  project  add  an  

asterisk) SponsorAssociate  Director

Project  Manager

Business  Impact  (Problem  This  Will  Solve)

Budget  (SWD  To  Start)  or  GIB

Project  Start  date

Project  End  Date

Revised  Project  End  Date Upcoming  Key  Milestones

Issues  (most  critical)

Risks  (most  critical)

Status  (Green,  

Yellow,  Red)

OI

OI:  Managed  Desktop  -­‐  Casper  Installation  and  Rollout

Mark  Silis Mark  Silis Sar  Haidar The scope of this project is to improve efficiencies and customer satisfaction for our Mac customers by automating inventory collection, alerting and software deployment

Capital:  $38,450  for  SW  and  $2,156  for  HW  Install  FTE:2,  Rollout  SWEB:  696  hours  $22,000,  Maintenance  $20,800

7/1/11 11/11  (Install)  

6/30/12 Completed:  all  new  machines  have  Casper  as  part  of  the  base  image  (customers  need  to  opt  out)

Completed

OI

OI:  SAP  Job  Scheduler  Outsourcing

IS&T  ADs Mark  Silis Sophie  Wong Evaulate  alternatives  for  dailyoperations  of  batch  jobs  

GIB: 6/2/12 12/31/12 2/28/13  (Phase  2  -­‐  scope  increased  to  include  negotiation  phase)

none

Completed