16
FY 2018 ANNUAL LISTING OF FEDERALLY OBLIGATED PROJECTS Prepared by: Central Mississippi Planning & Development District 1170 Lakeland Drive - P.O. Box 4935 Jackson, Mississippi 39296-4935 Phone: 601-981-1511 Fax: 601-981-1515 www.cmpdd.org Jackson Metropolitan Planning Organization (MPO)

FY 2018 Annual Listing of Federally Obligated Projects · Phone: 601-981-1511 Fax: 601-981-1515. . Jackson Metropolitan Planning Organization (MPO) Funding Disclaimer This document

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FY 2018 Annual Listing of Federally Obligated Projects · Phone: 601-981-1511 Fax: 601-981-1515. . Jackson Metropolitan Planning Organization (MPO) Funding Disclaimer This document

FY 2018 ANNUAL LISTING OFFEDERALLY OBLIGATED PROJECTS

Prepared by:Central Mississippi Planning & Development District

1170 Lakeland Drive - P.O. Box 4935Jackson, Mississippi 39296-4935

Phone: 601-981-1511 Fax: 601-981-1515www.cmpdd.org

Jackson Metropolitan PlanningOrganization (MPO)

Page 2: FY 2018 Annual Listing of Federally Obligated Projects · Phone: 601-981-1511 Fax: 601-981-1515. . Jackson Metropolitan Planning Organization (MPO) Funding Disclaimer This document

Funding Disclaimer

This document was prepared and published by the Jackson Metropolitan Planning Organization (MPO) and is prepared in cooperation with and financial assistance from the following public agencies: the Mississippi Department of Transportation, the Federal Highway Administration and the Federal Transit Administration under the Metropolitan Planning Program. The contents of this report do not necessarily reflect the official views or policy of the funding agencies.

Non-Discrimination Policy I Equal Employment Opportunity Employer

The Central Mississippi Planning and Development District (CMPDD) does not discriminate on the basis of race, color, religion, sex, age, national origin, disability, political affiliation, or belief in admission to, access to, or operations of its programs, services, or activates. CMPDD provides an equal employment opportunity to all its employees and applicants for employment.

Page 3: FY 2018 Annual Listing of Federally Obligated Projects · Phone: 601-981-1511 Fax: 601-981-1515. . Jackson Metropolitan Planning Organization (MPO) Funding Disclaimer This document

THE JACKSON MPO The Metropolitan Planning Organization (MPO) is a federally mandated planning body responsible for transportation planning in the Jackson Urbanized Area (JUA). Federal regulations require all urbanized areas with a population of at least 50,000 to designate an MPO to carry out the transportation planning process. The Central Mississippi Planning and Development District (CMPDD) was designated as the MPO for the JUA on February 5, 1975 and is responsible for coordinating the transportation planning process and programs for all county and municipal jurisdictions within the MPO’s planning area which includes portions of Hinds, Madison and Rankin Counties. The MPO is the lead agency responsible for developing and administering plans and programs to maintain eligibility and receive federal funds for the transportation systems in the JUA. The primary mission of the MPO is to develop and maintain a transportation planning process that is compliant with federal and state requirements, and supports the development and enhancement of sustainable multimodal facilities, programs and systems in the area. The Jackson MPO functions under a committee structure comprised of the Metropolitan Planning Policy Committee and the Intermodal Technical Committee. The Metropolitan Planning Policy Committee consists of elected and appointed officials representing the county and municipal jurisdictions located in the Jackson MPO planning area boundary (see map above), a public transit services representative and the Director of the Mississippi Department of Transportation (MDOT). This committee also includes the Division Administrator for the Federal Highway Administration (FHWA) in Jackson and the Regional Administrator of the Federal Transit Administration (FTA), each serve as non-voting members. This committee is responsible for making policy decisions regarding the transportation planning process in the JUA. The Intermodal Technical Committee is comprised of representatives whose skills and training are more technical in nature and necessary to undertake comprehensive transportation planning activities for the JUA. Representatives from each of the county and municipal jurisdictions located in the Jackson MPO planning area are included on this committee, as well as representatives of all transportation modes in the area, including streets/highways, public transportation, bicycling/walking, air transportation, rail, and the trucking industry. The Technical Committee serves as an advisory committee to the Metropolitan Planning Policy Committee on all matters relating to the transportation planning process.

FY 2018 ANNUAL LISTING OF FEDERALLY OBLIGATED PROJECTS

PAGE | 1

Page 4: FY 2018 Annual Listing of Federally Obligated Projects · Phone: 601-981-1511 Fax: 601-981-1515. . Jackson Metropolitan Planning Organization (MPO) Funding Disclaimer This document

ABOUT THIS REPORT The annual listing of obligated projects is a record for tracking the progress of federally funded transportation projects included in the MPO’s TIP and the MDOT’s Statewide Transportation Improvement Program (STIP). This listing is updated annually and is intended to increase public awareness of federal spending on transportation projects in the Jackson Metropolitan Planning Organization’s (MPO’s) planning area. Each project included in this report has received federal authorization for funds committed to the project to be obligated. Obligation of federal funds means that a project has received a federal commitment for reimbursement of the federal share of costs incurred for an approved project, and does not necessarily mean that the project was initiated or completed in that year or indicate the total cost of that project. There are instances where funds obligated for a project may exceed the amount estimated in the STIP/TIP. There are also instances where unused funds may be credited back when not needed at the completion of a project phase resulting in a negative obligation or de‐obligation. De-obligation of funds typically occurs when a project has been completed without using the full commitment of obligated funds. It can also occur if a project sponsor decides not to proceed with the approved project or if there is a funding source change for the project. In addition to projects obligated in FY 2018, this report includes projects in which Federal funding remains and is still available for project completion from subsequent obligation years. Obligation occurs for Federal Transit Administration (FTA) projects after FTA grants are awarded. Obligation occurs for Federal Highway Administration (FHWA) projects by phase when a project agreement is executed and FHWA authorizes the federal funds. A project agreement defines specific project elements that are eligible for funding; how financing will occur; and agency roles, responsibilities and liabilities. As mentioned earlier, each project included in the report can be found in the MDOT’s STIP or the MPO’s TIP. A TIP is developed by each MPO (Jackson, Gulf Coast and Hattiesburg) in the state and is a listing of regionally significant projects in each MPO’s planning area. The STIP incorporates projects included in each MPO’s TIP, along with additional projects developed in areas outside of each MPOs’ planning area boundaries. Whereas, the MDOT uses the STIP for the development of priority projects identified in the State’s Long-Range Transportation Plan (LRTP), MPO’s use their TIP’s for the selection of priority projects included in their Metropolitan Transportation Plans (MTP). The STIP and TIP’s are also used as mechanisms for tracking the progress of those projects across the State as they advance through the project development process. The Fixing America’s Surface Transportation Act (FAST Act), signed into law on December 4th, 2015, requires that:

“An annual listing of projects, including investments in pedestrian walkways and bicycle transportation facilities, for which Federal funds have been obligated in the preceding year shall be published or otherwise made available by the cooperative effort of the State, transit operator, and metropolitan planning organization for public review.” 23 CFR 134(j)(7)(B)

This report addresses these requirements by providing a listing of all transportation projects in the Jackson MPO’s planning area in which Federal funds were obligated during Fiscal Year 2018 (October 1, 2017 - September 30, 2018). The Federal Highway Administration (FHWA) defines “obligated” as “the federal government’s legal commitment (promise) to pay or reimburse the States or other entities for the Federal share of a project’s eligible costs”. An “obligated” project is one that has been authorized by the federal government and funds have been obligated or approved for reimbursement.

PAGE | 2

FY 2018 ANNUAL LISTING OF FEDERALLY OBLIGATED PROJECTS

Page 5: FY 2018 Annual Listing of Federally Obligated Projects · Phone: 601-981-1511 Fax: 601-981-1515. . Jackson Metropolitan Planning Organization (MPO) Funding Disclaimer This document

THE TRANSPORTATION IMPROVEMENT PROGRAM (TIP) The TIP is a financially constrained four‐year program for addressing short‐term transportation priorities that are consistent with the Jackson Urbanized Area’s Metropolitan Transportation Plan (MTP). The TIP provides the opportunity to select projects that will implement the transportation planning goals expressed in the MTP. In order for a project to be eligible to receive Surface Transportation Block Grant (STBG) or Transportation Alternative (TA) funds and be included in the TIP, it must be included in the MTP’s list of priority projects. The federal funding used to implement the TIP is administered through the FHWA and the FTA. The amount of federal funding each State receives from the FHWA and FTA is based on the State’s total population as a ratio of the nation’s total population. Each MPO in the State receives its own apportionment from this allocation based off of a similar ratio that compares the population of the urbanized area in the State to the State’s total population. TIP projects are generally funded using an 80% federal/20% local‐match ratio. However, there are some exceptions, safety projects and some projects funded through congressional earmarks, may receive 100% federal funding. For a project to be considered for inclusion in the TIP, a commitment from the sponsoring agency to provide the required local matching funds is required. The projects included in this obligation report are from the 2017‐2020 TIP, which was adopted by the Metropolitan Planning Policy Committee on August 10, 2016. SUMMARY OF OBLIGATED PROJECTS The types of projects for which federal funds were obligated during FY 2018 included bridge improvement/replacement, new roadways, road widening, pavement resurfacing and reconstruction, intersection improvements, interchange improvements, Intelligent Transportation System (ITS) improvements, transit, bicycle/pedestrian facilities, transportation enhancements and safety related projects. The table on page 9 lists all of the projects obligated in FY 2018. Each listed project contains a project description, type of funding used for the project, amount of federal funds obligated, for whom the funds were obligated and date of obligation. In addition most projects include an FMS and External number; these numbers are unique to the MDOT and used to improve tracking of projects and project funds. While federal funding is included in this report, no local or state funds are reported. In FY 2018, Federal funding in the Jackson MPO area was distributed through the following categories: Bridge (BR) ‐ Provides funding for bridge replacement or rehabilitation of substandard bridges for any bridge on a public road. In some instances 100% of federal dollars are eligible when Bridge Credits are available. Bridge Credits are generated as a result of the State spending its own dollars to rehabilitate bridges located on the Federal Highway System. Bridge Credits may be used as a substitute for the 20% match required by States in obligating the annual appropriation of Bridge Replacement Funds. Congestion Mitigation and Air Quality Improvement Program (CMAQ) ‐ The CMAQ program provides a flexible funding source for transportation projects and programs to help meet the requirements of the Clean Air Act. Funding is available to reduce congestion and improve air quality for areas that do not meet the National Ambient Air Quality Standards for ozone, carbon monoxide, or particulate matter (nonattainment areas) and for former nonattainment areas that are now in compliance (maintenance areas).

FY 2018 ANNUAL LISTING OF FEDERALLY OBLIGATED PROJECTS

PAGE | 3

Page 6: FY 2018 Annual Listing of Federally Obligated Projects · Phone: 601-981-1511 Fax: 601-981-1515. . Jackson Metropolitan Planning Organization (MPO) Funding Disclaimer This document

Congressional Earmarks/Discretionary Project Funding - These are funds appropriated by Congress for specific projects including any anticipated grants awarded to MDOT, Office of State Aid Road Construction, or local entities. Delta Regional Transportation Development Program (DRTD) - Now part of the Surface Transportation Block Grant Program, provides Federal-Aid funding for highway planning, development or construction in counties/parishes in the 8 state area within the jurisdiction of the Delta Regional Authority. Projects must have a multi-state impact. Emergency Relief (ER) - Congress authorized in Title 23, United States Code, Section 125, a special program from the Highway Trust Fund for the repair or reconstruction of Federal-aid highways and roads on Federal lands which have suffered serious damage as a result of (1) natural disasters or (2) catastrophic failures from an external cause. This program, commonly referred to as the emergency relief or ER program, supplements the commitment of resources by States, their political subdivisions, or other Federal agencies to help pay for unusually heavy expenses resulting from extraordinary conditions. Ferry Boat Discretionary Program (FBD) - Provides funding for ferry facilities (either vehicular or passenger) that are on a non-Interstate public road and are publicly owned, publicly operated, or majority publicly owned providing substantial public benefits. Projects selected for funding under this program are funded at an 80 percent Federal share. FTA Urbanized Area Formula Program (Section 5307) - Provides funds for capital and operating assistance for transit operations in urbanized areas with populations greater than 50,000 and for transportation related planning. Funds can be for planning, engineering, design and evaluation of transit projects and other technical transportation-related studies; capital investments in bus and bus-related activities such as replacement of buses, overhaul of buses, rebuilding of buses, crime prevention and security equipment and construction of maintenance and passenger facilities; and computer hardware/software. FTA Enhanced Mobility of Seniors and Individuals with Disabilities (Section 5310) - This program supports transportation services planned, designed, and carried out to meet the special transportation needs of seniors and individuals with disabilities in all areas – large urbanized (over 200,000), small urbanized (50,000-200,000), and rural (under 50,000). Eligible projects include both traditional capital investment and nontraditional investment beyond the Americans with Disabilities Act (ADA) complementary paratransit services. Examples of eligible activities for FTA 5310 funding include, but are not limited to: buses and vans, wheelchair lifts, ramps, securement devices, transit-related information technology systems including scheduling/routing/one-call systems; mobility management programs, volunteer driver programs, building an accessible path to a bus stop including curb-cuts, sidewalks, accessible pedestrian signals or other accessible features. FTA Rural Area Program (Section 5311) - This program provides funding to states and federally recognized Indian tribes to support public transportation in rural areas with populations less than 50,000. Funding can be used for planning, capital, operations, job access and reverse commute projects, and the acquisition of public transportation services. Activities eligible under the former Job Access and Reverse Commute Program (Section 5316), which provided services to low-income individuals to access jobs, are now eligible under the Rural Area Formula program.

PAGE | 4

FY 2018 ANNUAL LISTING OF FEDERALLY OBLIGATED PROJECTS

Page 7: FY 2018 Annual Listing of Federally Obligated Projects · Phone: 601-981-1511 Fax: 601-981-1515. . Jackson Metropolitan Planning Organization (MPO) Funding Disclaimer This document

FTA Bus and Bus Facilities Formula Program (Section 5339) - Provides capital funding to replace, rehabilitate and purchase buses and related equipment and to construct bus-related facilities including technological changes or innovations to modify low or no emission vehicles or facilities. Highway Safety Improvement Program (HSIP) - The FAST Act continued the HSIP to achieve a significant reduction in traffic fatalities and serious injuries on all public roads, including non-State-owned public roads and roads on tribal lands. The HSIP requires a data-driven, strategic approach to improving highway safety on all public roads that focuses on performance. Interstate Maintenance Program (IM) - Provides funding to rehabilitate, restore and resurface the Interstate System. Reconstruction is also eligible if it does not add capacity. With the exception of High Occupancy Vehicle (HOV) lanes. National Highway Freight Program (NHFP) - The FAST Act established the NHFP to improve the efficient movement of freight on the National Highway Freight Network (NHFN) and support several goals, including: investing in infrastructure and operational improvements that strengthen economic competitiveness, reduce congestion, reduce the cost of freight transportation, improve reliability, and increase productivity; improving the safety, security, efficiency, and resiliency of freight transportation in rural and urban areas; improving the state of good repair of the NHFN; using innovation and advanced technology to improve NHFN safety, efficiency, and reliability; improving the efficiency and productivity of the NHFN; improving State flexibility to support multi-State corridor planning and address highway freight connectivity; and reducing the environmental impacts of freight movement on the NHFN. National Highway Performance Program (NHPP) - Provides for the condition and performance of the National Highway System (NHS), for the construction of new facilities on the NHS, and to ensure that investments of Federal-aid funds in highway construction are directed to support progress toward the achievement of performance targets established in a State’s asset management plan for the NHS. National Highway System (NHS) - The National Highway System (NHS) consists of roads designated by the Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991 to be important to interstate travel and national defense. The NHS also includes roads that connect other modes of transportation (airports, water ports and railroads) and provide essential paths for international commerce. Rail-Highway Crossings Program (Rails) - The FAST Act continues the Railway-Highway Crossings program, which provides funds for safety improvements to reduce the number of fatalities, injuries, and crashes at public railway-highway grade crossings. Safe Routes to School Program (SRSP) - Funds are made available for infrastructure and non-infrastructure projects, and to administer Safe Routes to School programs that benefit elementary and middle school children in grades K-8. Surface Transportation Block Grant (STBG) - The FAST Act converts the long-standing Surface Transportation Program (STP) into the Surface Transportation Block Grant Program (STBG) which promotes flexibility in State and local transportation decisions and provides flexible funding to best address State and local transportation needs. Surface Transportation funds may be used for projects on the Federal-aid System, which include the NHS and all other roads that are eligible to receive Federal-aid funding. STP/STBG funds are used on several large highway programs that the State of Mississippi has

FY 2018 ANNUAL LISTING OF FEDERALLY OBLIGATED PROJECTS

PAGE | 5

Page 8: FY 2018 Annual Listing of Federally Obligated Projects · Phone: 601-981-1511 Fax: 601-981-1515. . Jackson Metropolitan Planning Organization (MPO) Funding Disclaimer This document

adopted. They include the 1987 Four-Lane Highway Program, the Gaming Roads Program, and the Vision 21 Program. Surface Transportation Program (STP) - STP funds may be used for projects on the Federal-aid System, which include the National Highway System and all other roads that are eligible to receive Federal-aid funding. STP funds have been used on several large highway programs that the State of Mississippi has adopted. They include the 1987 Four-Lane Highway Program, the Gaming Roads Program, and the Vision 21 Program. STP funds can be used on a variety of projects including roadway and bridge preservation, modernization, and expansion on the Federal-aid System. This program was eliminated by the FAST Act and replaced by the Surface Transportation Block Grant Program. Transportation Investment Generating Economic Recovery (TGR) - The eligibility requirements of TIGER allow project sponsors at the State and local levels to obtain funding for multi-modal, multi-jurisdictional projects that are more difficult to support through traditional DOT programs. Eligible projects for TIGER Discretionary Grants are capital projects that include, but are not limited to: road or bridge projects eligible under title 23, United States Code, public transportation projects eligible under chapter 53 of title 49, United States Code, passenger and freight rail transportation projects, port infrastructure investments (including inland port infrastructure and land ports of entry) and intermodal projects. Eligible applicants include: State, local, and tribal governments, transit agencies, port authorities, MPOs, and other political subdivisions of State or local governments. TIGER Discretionary Grants may be used for up to 80 percent of the costs of projects located in an urban area and 100 percent of the costs of a project located in a rural area. Transportation Alternatives Program (TAP) - The TAP provides funding for programs and projects defined as transportation alternatives, including on- and off-road pedestrian and bicycle facilities, infrastructure projects for improving non-driver access to public transportation and enhanced mobility, community improvement activities, and environmental mitigation; recreational trail program projects; safe routes to school projects; and projects for planning, designing, or constructing boulevards and other roadways largely in the right-of-way of former Interstate System routes or other divided highways. This program was eliminated by the FAST Act (see Transportation Alternatives). Transportation Alternatives (TA) - The FAST Act eliminated the MAP-21 Transportation Alternatives Program (TAP) and replaced it with a set-aside of STBG funding for Transportation Alternatives (TA). The set-aside TA funds can be used on all projects and activities that were previously eligible under TAP, encompassing a variety of pedestrian and bicycle connectivity type projects.

PAGE | 6

FY 2018 ANNUAL LISTING OF FEDERALLY OBLIGATED PROJECTS

Page 9: FY 2018 Annual Listing of Federally Obligated Projects · Phone: 601-981-1511 Fax: 601-981-1515. . Jackson Metropolitan Planning Organization (MPO) Funding Disclaimer This document

Jack

son

Urb

aniz

ed A

rea

FY 2

018

FHW

A O

blig

ated

Pro

ject

s

Dat

e si

gned

by

FH

WA

FM

S N

umbe

r Ex

tern

al

Num

ber

TIP/

STIP

R

efer

ence

C

ount

y Fo

r Who

m

Des

crip

tion

Act

ion

Fund

Ty

pe

Fede

ral F

unds

C

hang

e To

tal F

unds

in

TIP

10/1

3/20

17

1024

69

0392

(048

) M

DO

T G

roup

ed

Proj

ect

Hin

ds

MD

OT

SR 1

8 be

twee

n th

e C

opia

h C

L &

SR 2

7 [B

ridge

#25

.1] -

Brid

ge

Rep

lace

men

t M

odifi

ed b

ased

on

cont

ract

pric

es

STBG

$0

.00

10/3

1/20

17

5015

61

0552

(202

) 45

0250

M

adis

on

MD

OT

Mad

ison

Cou

nty

Bond

Pro

ject

[I-5

5, S

R 4

63 &

Con

nect

or R

oads

] per

M

OU

M

odifi

ed to

con

vert

AC fu

nds

for B

ond

Deb

t Se

rvic

e N

HS

$0.0

0

10/3

1/20

17

5015

61

0552

(202

) 45

0250

M

adis

on

MD

OT

Mad

ison

Cou

nty

Bond

Pro

ject

[I-5

5, S

R 4

63 &

Con

nect

or R

oads

] per

M

OU

M

odifi

ed to

con

vert

AC fu

nds

for B

ond

Deb

t Se

rvic

e N

HS

$0.0

0

10/3

1/20

17

5015

61

0552

(202

) 45

0250

M

adis

on

MD

OT

Mad

ison

Cou

nty

Bond

Pro

ject

[I-5

5, S

R 4

63 &

Con

nect

or R

oads

] per

M

OU

M

odifi

ed to

con

vert

AC fu

nds

for B

ond

Deb

t Se

rvic

e ST

P $0

.00

10/3

1/20

17

5015

61

0552

(202

) 45

0250

M

adis

on

MD

OT

Mad

ison

Cou

nty

Bond

Pro

ject

[I-5

5, S

R 4

63 &

Con

nect

or R

oads

] per

M

OU

M

odifi

ed to

con

vert

AC fu

nds

for B

ond

Deb

t Se

rvic

e C

MAQ

$3

,696

,650

.00

10/3

1/20

17

5015

61

0552

(202

) 45

0250

M

adis

on

MD

OT

Mad

ison

Cou

nty

Bond

Pro

ject

[I-5

5, S

R 4

63 &

Con

nect

or R

oads

] per

M

OU

M

odifi

ed to

con

vert

AC fu

nds

for B

ond

Deb

t Se

rvic

e N

HFP

$4

,158

,731

.00

11/3

/201

7 10

5858

02

01(2

16)

MD

OT

Gro

uped

Pr

ojec

t H

inds

M

DO

T I-2

0 R

epla

ce B

ridge

# 4

4.9B

M

odifi

ed to

add

fund

s fo

r a n

ew c

ontra

ct

NH

PP

$1,1

20,0

00.0

0

11/3

/201

7 10

7569

73

14(0

32)

MD

OT

Gro

uped

Pr

ojec

t H

inds

M

DO

T U

S 80

ove

r Pea

rl R

iver

Brid

ge #

46.

4 - B

ridge

Rep

air

New

Pro

ject

ST

BG

$120

,000

.00

11/7

/201

7 10

6918

99

99(5

20)

MD

OT

Gro

uped

Pr

ojec

t H

inds

M

adis

on

MD

OT

I-220

& I-

55 fo

r 11

Brid

ge S

ites

- Brid

ge jo

int r

epai

r M

odifi

ed b

ased

on

final

cos

t dat

a in

pre

p fo

r fin

al v

ouch

er

NH

PP

$26,

295.

00

11/8

/201

7 10

0615

29

04(0

06)

MD

OT

Gro

uped

Pr

ojec

t R

anki

n M

DO

T U

S 80

bet

wee

n Br

ando

n &

Scot

t CL

- Brid

ge R

epai

r M

odifi

ed b

ased

on

final

cos

t dat

a in

pre

p fo

r fin

al v

ouch

er

STBG

$1

76,3

36.0

0

11/8

/201

7 10

0615

29

04(0

09)

MD

OT

Gro

uped

Pr

ojec

t R

anki

n M

DO

T U

S 80

bet

wee

n Br

ando

n &

Scot

t CL

for 7

Brid

ge R

epla

cem

ents

M

odifi

ed b

ased

on

final

cos

t dat

a in

pre

p fo

r fin

al v

ouch

er

STBG

$8

0,25

1.00

11/8

/201

7 10

0615

29

04(0

09)

MD

OT

Gro

uped

Pr

ojec

t R

anki

n M

DO

T U

S 80

bet

wee

n Br

ando

n &

Scot

t CL

for 7

Brid

ge R

epla

cem

ents

M

odifi

ed b

ased

on

final

cos

t dat

a in

pre

p fo

r fin

al v

ouch

er

STBG

$8

0,71

6.00

11/1

7/20

17

1068

17LP

A 01

91(0

26)

MPO

Gro

uped

Pr

ojec

t R

anki

n Pe

arl

City

of P

earl

- Ins

talla

tion

of tr

affic

sig

nals

at U

S 80

& F

low

ood

Dr/C

hild

re R

d &

Pear

son

Rd

& O

ld B

rand

on R

d M

odifi

ed to

redu

ce fu

nds

to p

repa

re to

clo

se

STP

($9,

129.

00)

11/2

0/20

17

1048

60LP

A 72

57(0

01)

4800

21

Hin

ds

Jack

son

City

of J

acks

on -

Dr.

Jess

ie M

osle

y D

rive

Mod

ified

to re

duce

fund

s to

pre

pare

to c

lose

Ea

rmar

k ($

12,2

39.0

0)

$500

,000

.00

11/2

1/20

17

1044

22R

R

7334

(011

) 61

0608

R

anki

n M

DO

T SR

477

from

US

80 to

SR

25

- RR

Sig

nals

Sur

face

& C

onst

ruct

ion

of

Sign

als

To A

utho

rize

Con

stru

ctio

n of

Sig

nals

ST

BG

$294

,406

.00

11/2

9/20

17

1041

02LP

A 73

06(0

04)

4800

01

Hin

ds

Clin

ton

Nor

thsi

de D

rive

Cor

ridor

Impr

ovem

ents

[Pin

ehav

en R

d/N

orth

side

Dr.]

in

the

City

of C

linto

n M

odifi

ed to

redu

ce fu

nds

to p

repa

re to

clo

se

Earm

ark

($7,

282.

00)

$6,6

41,4

42.0

0

12/5

/201

7 10

6613

05

52(2

39)

MD

OT

Gro

uped

Pr

ojec

t H

inds

M

DO

T I-5

5 N

B Ex

it R

amp

to A

tkin

s-Be

asle

y to

repl

ace

sign

trus

s in

the

City

of

Jac

kson

M

odifi

ed b

ased

on

final

cos

t dat

a in

pre

p fo

r fin

al v

ouch

er

IM

$223

.00

12/5

/201

7 10

6613

05

52(2

39)

MD

OT

Gro

uped

Pr

ojec

t H

inds

M

DO

T I-5

5 N

B Ex

it R

amp

to A

tkin

s-Be

asle

y to

repl

ace

sign

trus

s in

the

City

of

Jac

kson

M

odifi

ed b

ased

on

final

cos

t dat

a in

pre

p fo

r fin

al v

ouch

er

NH

PP

$26,

632.

00

12/5

/201

7 10

6613

05

52(2

39)

MD

OT

Gro

uped

Pr

ojec

t H

inds

M

DO

T I-5

5 N

B Ex

it R

amp

to A

tkin

s-Be

asle

y to

repl

ace

sign

trus

s in

the

City

of

Jac

kson

M

odifi

ed b

ased

on

final

cos

t dat

a in

pre

p fo

r fin

al v

ouch

er

NH

PP

$8,9

94.0

0

12/1

2/20

17

1076

43

2904

(018

) M

DO

T G

roup

ed

Proj

ect

Ran

kin

MD

OT

US

80 o

ver K

CS

RR

- Br

idge

Rep

lace

men

t [Br

idge

#s

56.8

A &

B]

New

Pro

ject

BR

$2

0,00

0.00

12/1

2/20

17

1076

43

2904

(018

) M

DO

T G

roup

ed

Proj

ect

Ran

kin

MD

OT

US

80 o

ver K

CS

RR

- Br

idge

Rep

lace

men

t [Br

idge

#s

56.8

A &

B]

New

Pro

ject

N

HPP

$4

2,35

3.00

12/1

2/20

17

1076

43

2904

(018

) M

DO

T G

roup

ed

Proj

ect

Ran

kin

MD

OT

US

80 o

ver K

CS

RR

- Br

idge

Rep

lace

men

t [Br

idge

#s

56.8

A &

B]

New

Pro

ject

N

HPP

$5

37,6

47.0

0

12/2

0/20

17

1045

17LP

A 45

61(0

02)

5400

72

Ran

kin

PRVW

SD

Ros

s Ba

rnet

t Res

ervo

ir Ac

cess

Impr

ovem

ents

M

odifi

ed to

con

vert

AC F

unds

FB

D

$75,

177.

00

$647

,593

.00

12/2

0/20

17

1045

17LP

A 45

61(0

02)

5400

72

Ran

kin

PRVW

SD

Ros

s Ba

rnet

t Res

ervo

ir Ac

cess

Impr

ovem

ents

M

odifi

ed to

con

vert

AC F

unds

ST

BG

$0.0

0

$647

,593

.00

12/2

1/20

17

1072

00LP

A 02

50(0

47)

4800

26

Hin

ds

Jack

son

City

of J

acks

on -

Gre

enin

g th

e G

atew

ays

Mod

ified

bas

ed o

n co

ntra

ct p

rices

TG

R

$28,

048.

00

$8,3

71,9

52.0

0

12/2

1/20

17

1072

41

0201

(234

) 25

0079

H

inds

M

DO

T I-2

0 at

Nor

rell

Rd

- Int

erch

ange

Impr

ovem

ents

& F

ront

age

Rd

Wid

enin

g N

ew P

roje

ct

STBG

$0

.00

1/11

/201

8 10

6799

LPA

0025

(074

) M

PO G

roup

ed

Proj

ect

Hin

ds

Hin

ds C

ount

y H

inds

Cou

nty

BOS

- Res

urfa

cing

Pro

ject

M

odifi

ed to

add

fund

s ba

sed

on fi

nal e

stim

ate

STP

$8,6

73.0

0

$1,0

29,0

73.0

0

1/11

/201

8 10

6880

LPA

6951

(001

) M

PO G

roup

ed

Proj

ect

Ran

kin

Bran

don

City

of B

rand

on -

Suns

et D

rive

& O

verb

y St

reet

- R

esur

face

M

odifi

ed to

redu

ce fu

nds

to p

repa

re to

clo

se

STP

($14

,698

.00)

$1

40,0

00.0

0

1/17

/201

8 10

6347

LPA

7330

(008

) M

DO

T G

roup

ed

Proj

ect

Ran

kin

Flow

ood

City

of F

low

ood

- Wirt

z R

d Bi

ke T

rail

Mod

ified

to c

onve

rt so

me

AC F

unds

to R

eg.

Fund

s ST

P $0

.00

$1

,000

,000

.00

1/17

/201

8 10

5068

LPA

7040

(001

) 54

0060

R

anki

n Pe

arl

Pear

l-Ric

hlan

d In

term

odal

Con

nect

or -

US

49 to

Pea

rson

Rd-

Env

Doc

s M

odifi

ed to

add

fund

s fo

r SA#

2 fo

r air

mon

itorin

g fo

r asb

esto

s de

mol

ition

Ea

rmar

k $1

8,56

0.00

$1

0,01

4,75

1.00

1/17

/201

8 10

6347

LPA

7330

(008

) M

DO

T G

roup

ed

Proj

ect

Ran

kin

Flow

ood

City

of F

low

ood

- Wirt

z R

d Bi

ke T

rail

Mod

ified

to c

onve

rt so

me

AC F

unds

to R

eg.

Fund

s TA

P $4

3,74

9.00

$1

,000

,000

.00

FY 2018 ANNUAL LISTING OF FEDERALLY OBLIGATED PROJECTS

PAGE | 7

Page 10: FY 2018 Annual Listing of Federally Obligated Projects · Phone: 601-981-1511 Fax: 601-981-1515. . Jackson Metropolitan Planning Organization (MPO) Funding Disclaimer This document

Jack

son

Urb

aniz

ed A

rea

FY 2

018

FHW

A O

blig

ated

Pro

ject

s

Dat

e si

gned

by

FH

WA

FM

S N

umbe

r Ex

tern

al

Num

ber

TIP/

STIP

R

efer

ence

C

ount

y Fo

r Who

m

Des

crip

tion

Act

ion

Fund

Ty

pe

Fede

ral F

unds

C

hang

e To

tal F

unds

in

TIP

1/19

/201

8 10

2046

00

83(0

29)

6100

59

Ran

kin

MD

OT

US

49 fr

om F

lore

nce

to S

cale

Are

a in

Ric

hlan

d - R

econ

stru

ctio

n W

iden

to 6

lane

s M

odifi

ed to

con

vert

som

e AC

Fun

ds to

REG

Fu

nds

NH

S $3

,782

,683

.00

1/19

/201

8 10

2046

00

83(0

29)

6100

59

Ran

kin

MD

OT

US

49 fr

om F

lore

nce

to S

cale

Are

a in

Ric

hlan

d - R

econ

stru

ctio

n W

iden

to 6

lane

s M

odifi

ed to

con

vert

som

e AC

Fun

ds to

REG

Fu

nds

STP

$4,5

71,2

80.0

0

1/19

/201

8 10

2046

00

83(0

29)

6100

59

Ran

kin

MD

OT

US

49 fr

om F

lore

nce

to S

cale

Are

a in

Ric

hlan

d - R

econ

stru

ctio

n W

iden

to 6

lane

s M

odifi

ed to

con

vert

som

e AC

Fun

ds to

REG

Fu

nds

NH

PP

$0.0

0

1/22

/201

8 10

6245

05

61(0

70)

MD

OT

Gro

uped

Pr

ojec

t R

anki

n M

DO

T M

S 25

@ L

akel

and

Squa

re &

Tre

etop

s Bl

vd -

Safe

ty -

Inte

rsec

tion

Impr

ovem

ents

M

odifi

ed to

with

draw

pro

ject

H

SIP

($30

,490

.00)

1/25

/201

8 10

6245

05

61(0

72)

MD

OT

Gro

uped

Pr

ojec

t H

inds

M

DO

T M

S 25

@ C

ool P

apa

Bell

- Int

erse

ctio

n Im

prov

emen

ts

Mod

ified

to w

ithdr

aw p

roje

ct

HSI

P ($

5,33

5.00

)

1/25

/201

8 10

2046

00

83(0

34)

6100

59

Ran

kin

MD

OT

US

49 fr

om F

lore

nce

to tr

uck

scal

e ar

ea ju

st S

of I

-20

Mod

ified

to a

dd fu

nds

N

HPP

$9

29,5

70.0

0

1/30

/201

8 10

7597

99

95(0

32)

MD

OT

Gro

uped

Pr

ojec

t H

inds

M

DO

T Ta

nk R

d &

Gre

en G

able

Rd

[Brid

ge #

77.

3 &

77.9

] - B

ridge

Jac

king

N

ew P

roje

ct

STBG

$0

.00

2/21

/201

8 10

7593

LPA

6945

(010

) M

PO G

roup

ed

Proj

ect

Mad

ison

R

anki

n PR

VWSD

Pe

arl R

iver

Val

ley

Wat

er S

uppl

y D

istri

ct -

Upp

er S

pillw

ay R

d - M

ill &

Ove

rlay

Mod

ified

bas

ed o

n co

ntra

ct p

rices

ST

P ($

101,

014.

00)

$1,2

60,0

00.0

0

2/28

/201

8 10

5014

LPA

7305

(007

) 48

0026

H

inds

Ja

ckso

n W

est C

ount

y Li

ne R

oad

Impr

ovem

ent

Mod

ified

to re

duce

fede

ral f

unds

to p

repa

re to

cl

ose

Earm

ark

($6.

00)

$3,6

86,9

46.0

0

2/28

/201

8 10

7358

LPA-

ER

7254

(005

) M

DO

T G

roup

ed

Proj

ect

Hin

ds

Jack

son

City

of J

acks

on -

Wes

t Stre

et B

ridge

ove

r Tow

n C

reek

M

odifi

ed b

ased

on

cont

ract

pric

es

ER

$93,

930.

00

2/28

/201

8 10

6127

02

01(1

97)

2500

73

Hin

ds

MD

OT

I-20

from

the

Nat

chez

Tra

ce P

arkw

ay to

SR

18

- Wid

en to

6 la

nes

Mod

ified

to re

duce

fede

ral f

unds

N

HS

($23

9,74

5.00

)

2/28

/201

8 10

6023

05

52(2

45)

2500

75

Hin

ds

MD

OT

I-55

from

Byr

am to

McD

owel

l Rd

- Rec

onst

ruct

ion

- Phs

e 1

Mod

ified

to re

duce

fund

s to

pre

pare

to c

lose

N

HS

($3,

322.

00)

2/28

/201

8 10

6023

05

52(2

45)

2500

75

Hin

ds

MD

OT

I-55

from

Byr

am to

McD

owel

l Rd

- Rec

onst

ruct

ion

- Phs

e 1

Mod

ified

to re

duce

fund

s to

pre

pare

to c

lose

ST

P ($

19,8

29.0

0)

2/28

/201

8 10

6389

05

52(2

29)

MD

OT

Gro

uped

Pr

ojec

t H

inds

M

DO

T I-5

5 fro

m th

e R

anki

n C

L to

the

Mad

ison

CL

- Mill

& O

verla

y M

odifi

ed b

ased

on

cont

ract

pric

es

NH

PP

$690

,194

.00

2/28

/201

8 10

7358

LPA-

ER

7254

(005

) M

DO

T G

roup

ed

Proj

ect

Hin

ds

Jack

son

City

of J

acks

on -

Wes

t Stre

et B

ridge

ove

r Tow

n C

reek

M

odifi

ed b

ased

on

cont

ract

pric

es

STBG

$0

.00

2/28

/201

8 10

6389

05

52(2

29)

MD

OT

Gro

uped

Pr

ojec

t H

inds

M

DO

T I-5

5 fro

m th

e R

anki

n C

L to

the

Mad

ison

CL

- Mill

& O

verla

y M

odifi

ed b

ased

on

cont

ract

pric

es

CM

AQ

$278

,820

.00

2/28

/201

8 10

6389

05

52(2

29)

MD

OT

Gro

uped

Pr

ojec

t H

inds

M

DO

T I-5

5 fro

m th

e R

anki

n C

L to

the

Mad

ison

CL

- Mill

& O

verla

y M

odifi

ed b

ased

on

cont

ract

pric

es

IM

($1.

00)

2/28

/201

8 10

7557

LPA

6945

(009

) M

PO G

roup

ed

Proj

ect

Mad

ison

R

idge

land

C

ity o

f Rid

gela

nd -

E La

ke H

arbo

ur D

rive

from

Nor

thpa

rk D

rive

to

Brea

kers

Lan

e - R

ehab

M

odifi

ed b

ased

on

cont

ract

pric

es

STP

($18

0,25

5.00

) $1

,712

,000

.00

2/28

/201

8 10

0486

92

04(0

03)

4507

02

Mad

ison

M

DO

T I-5

5 Sp

lit D

iam

ond

Inte

rcha

nge

- Rid

gela

nd C

onne

ctor

to U

S 51

M

odifi

ed to

with

draw

pro

g co

de Z

400

ente

red

in e

rror

CM

AQ

($35

6,03

1.00

)

2/28

/201

8 10

6389

05

52(2

30)

MD

OT

Gro

uped

Pr

ojec

t M

adis

on

MD

OT

I-55

from

the

Hin

ds C

L to

Rid

gela

nd -

Mill

& O

verla

y M

odifi

ed b

ased

on

cont

ract

pric

es

CM

AQ

($52

,509

.00)

2/28

/201

8 10

4626

LPA

7331

(005

) 54

0080

R

anki

n R

anki

n C

ount

y R

anki

n C

ount

y BO

S - O

ld F

anni

n R

d be

twee

n Sp

illway

Rd

& Fl

owoo

d C

orp

Lim

it - W

iden

from

3 to

5 la

nes

Mod

ified

to re

duce

fede

ral f

unds

ST

P ($

8,00

0.00

) $1

0,53

4,49

2.00

3/1/

2018

10

7241

02

01(2

34)

2500

79

Hin

ds

MD

OT

I-20

@ N

orre

ll R

d - I

nter

chan

ge Im

prov

emen

ts &

Fro

ntag

e R

oad

Wid

enin

g M

odifi

ed b

ased

on

cont

ract

pric

es

STBG

$0

.00

3/7/

2018

10

4859

LPA

8323

(004

) 51

0010

M

adis

on

MD

OT

City

of R

idge

land

- La

ke H

arbo

r Dr E

xt c

onne

cts

US

51 to

Hig

hlan

d C

olon

y Pk

wy

Mod

ified

to a

dd fu

nds

for S

A #

4 fo

r PE

Earm

ark

$70,

846.

00

3/20

/201

8 10

4587

LPA

7300

(001

) 48

0020

H

inds

Ja

ckso

n C

ity o

f Jac

kson

- Ly

nch

St Im

prov

emen

ts -

Wig

gins

Rd

to U

S 80

-St

reet

Impr

ovem

ents

Fi

nal V

ouch

er

Earm

ark

($10

2.00

) $5

,007

,375

.00

3/20

/201

8 10

7088

05

61(0

79)

MD

OT

Gro

uped

Pr

ojec

t

Ran

kin

Scot

t Le

ake

MD

OT

SR 2

5 fro

m S

R 4

3 to

SR

483

- M

ill &

Ove

rlay

Fina

l Vou

cher

N

HPP

($

650,

944.

00)

3/23

/201

8 10

7597

99

95(0

32)

MD

OT

Gro

uped

Pr

ojec

t H

inds

M

DO

T Ta

nk R

d &

Gre

en G

able

Rd

[Brid

ge #

77.

3 &

77.9

] - B

ridge

Jac

king

M

odifi

ed b

ased

on

cont

ract

pric

es

STBG

$2

,141

,120

.00

3/29

/201

8 10

6127

02

01(1

97)

2500

73

Hin

ds

MD

OT

I-20

from

the

Nat

chez

Tra

ce P

arkw

ay to

SR

18

- Wid

en to

6 la

nes

Mod

ified

to re

duce

fede

ral f

unds

to p

repa

re to

cl

ose

NH

S ($

214,

860.

00)

3/29

/201

8 10

6588

LPA

0213

(032

) M

DO

T G

roup

ed

Proj

ect

Mad

ison

Col

ony

Park

Pu

blic

Im

prov

emen

t D

istri

ct

Col

ony

Park

Pub

lic Im

prov

emen

t Dis

trict

Mul

ti-U

se P

ath

Mod

ified

to re

duce

fund

s to

pre

pare

to c

lose

STP

($14

2,00

0.00

)

4/2/

2018

10

7540

LPA

8280

(003

) M

PO G

roup

ed

Proj

ect

Hin

ds

Jack

son

City

of J

acks

on -

McD

owel

l Rd

Brid

ge o

ver C

aney

Cre

ek -

Brid

ge

Rep

lace

men

t N

ew P

roje

ct

STP

$250

,000

.00

$2

50,0

00.0

0

4/23

/201

8 10

3408

73

37(0

01)

6101

80

Ran

kin

MD

OT

SR 4

68 E

xt fr

om 2

.6 m

i N o

f US

80 to

SR

475

in F

low

ood

Mod

ified

to re

duce

fund

s to

pre

pare

to c

lose

ST

P ($

19,5

85.0

0)

PAGE | 8

FY 2018 ANNUAL LISTING OF FEDERALLY OBLIGATED PROJECTS

Page 11: FY 2018 Annual Listing of Federally Obligated Projects · Phone: 601-981-1511 Fax: 601-981-1515. . Jackson Metropolitan Planning Organization (MPO) Funding Disclaimer This document

Jack

son

Urb

aniz

ed A

rea

FY 2

018

FHW

A O

blig

ated

Pro

ject

s

Dat

e si

gned

by

FH

WA

FM

S N

umbe

r Ex

tern

al

Num

ber

TIP/

STIP

R

efer

ence

C

ount

y Fo

r Who

m

Des

crip

tion

Act

ion

Fund

Ty

pe

Fede

ral F

unds

C

hang

e To

tal F

unds

in

TIP

4/23

/201

8 10

5536

02

01(1

91)

MD

OT

Gro

uped

Pr

ojec

t R

anki

n M

DO

T I-2

0 W

Bra

ndon

Inte

rcha

nge

for i

nter

chan

ge im

prov

emen

ts

Mod

ified

to a

dd fu

nds

to R

OW

and

rele

ase

CO

NST

R fu

nds

to p

repa

re to

clo

se

HSI

P $5

7,31

7.00

4/23

/201

8 10

5536

02

01(1

91)

MD

OT

Gro

uped

Pr

ojec

t R

anki

n M

DO

T I-2

0 W

Bra

ndon

Inte

rcha

nge

for i

nter

chan

ge im

prov

emen

ts

Mod

ified

to a

dd fu

nds

to R

OW

and

rele

ase

CO

NST

R fu

nds

to p

repa

re to

clo

se

HSI

P ($

207,

654.

00)

4/24

/201

8 10

7641

02

01(2

43)

MD

OT

Gro

uped

Pr

ojec

t H

inds

M

DO

T I-2

0 ne

ar F

arr R

oad

[Brid

ge #

25.

1] B

ridge

Pre

serv

atio

n N

ew P

roje

ct

NH

PP

$0.0

0

5/2/

2018

10

6598

99

99(5

16)

MD

OT

Gro

uped

Pr

ojec

t

Hin

ds

Kem

per

Mad

ison

M

DO

T Br

idge

Joi

nt R

epai

r M

odifi

ed b

ased

on

final

cos

t dat

a in

pre

p fo

r fin

al v

ouch

er

STP

$60,

710.

00

5/2/

2018

10

5555

LPA

7069

(001

) 54

0001

R

anki

n Br

ando

n C

ity o

f Bra

ndon

- C

onst

ruct

E B

rand

on B

y-Pa

ss R

d be

twee

n H

wy

80

& H

wy

18

Mod

ified

bas

ed o

n fin

al c

ost d

ata

and

proc

essi

ng th

e fin

al v

ouch

er

Earm

ark

$47.

00

$735

,000

.00

5/15

/201

8 10

5776

LPA

0025

(069

) M

DO

T G

roup

ed

Proj

ect

Hin

ds

Hin

ds C

ount

y H

inds

Cou

nty

BOS

for G

ary

Rd

Scho

ol S

idew

alk

Inst

alla

tion

Mod

ified

bas

ed o

n fin

al v

ouch

er

SRSP

($

4.00

)

5/16

/201

8 10

5011

20

18(0

08)

MD

OT

Gro

uped

Pr

ojec

t H

inds

M

DO

T FY

201

8 N

atio

nal S

umm

er T

rans

porta

tion

Inst

itute

[NST

I] - J

acks

on

Stat

e U

nive

rsity

[JSU

] N

ew P

roje

ct

STBG

$0

.00

5/29

/201

8 50

1561

05

52(2

02)

4502

50

Mad

ison

M

DO

T M

adis

on C

ount

y Bo

nd P

roje

ct [I

-55,

SR

463

& C

onne

ctor

Roa

ds] p

er

MO

U

Mod

ified

to c

onve

rt AC

fund

s fo

r Bon

d D

ebt

Serv

ice

NH

S $0

.00

5/29

/201

8 50

1561

05

52(2

02)

4502

50

Mad

ison

M

DO

T M

adis

on C

ount

y Bo

nd P

roje

ct [I

-55,

SR

463

& C

onne

ctor

Roa

ds] p

er

MO

U

Mod

ified

to c

onve

rt AC

fund

s fo

r Bon

d D

ebt

Serv

ice

NH

S $0

.00

5/29

/201

8 50

1561

05

52(2

02)

4502

50

Mad

ison

M

DO

T M

adis

on C

ount

y Bo

nd P

roje

ct [I

-55,

SR

463

& C

onne

ctor

Roa

ds] p

er

MO

U

Mod

ified

to c

onve

rt AC

fund

s fo

r Bon

d D

ebt

Serv

ice

STP

$0.0

0

5/

29/2

018

5015

61

0552

(202

) 45

0250

M

adis

on

MD

OT

Mad

ison

Cou

nty

Bond

Pro

ject

[I-5

5, S

R 4

63 &

Con

nect

or R

oads

] per

M

OU

M

odifi

ed to

con

vert

AC fu

nds

for B

ond

Deb

t Se

rvic

e N

HPP

$8

18,4

50.0

0

5/

29/2

018

5015

61

0552

(202

) 45

0250

M

adis

on

MD

OT

Mad

ison

Cou

nty

Bond

Pro

ject

[I-5

5, S

R 4

63 &

Con

nect

or R

oads

] per

M

OU

M

odifi

ed to

con

vert

AC fu

nds

for B

ond

Deb

t Se

rvic

e N

HPP

$9

20,7

56.0

0

5/30

/201

8 10

6823

LPA

7315

(002

) M

PO G

roup

ed

Proj

ect

Hin

ds

Byra

m

City

of B

yram

- Si

wel

l Rd

Res

urfa

cing

from

N o

f Dav

is R

d to

the

Byra

m C

ity L

imits

at M

cClu

er R

d M

odifi

ed b

ased

on

final

vou

cher

ST

P ($

1.00

) $2

96,7

79.0

0

5/30

/201

8 10

0551

LPA

0035

(020

) 25

400

R

anki

n Ai

rpor

t Pa

rkw

ay

Com

mis

sion

Acce

ss R

oad

betw

een

I-55

in J

acks

on to

SR

475

- Tr

affic

& T

oll S

tudy

M

odifi

ed to

redu

ce fe

dera

l fun

ds to

pre

pare

to

clos

e R

ails

($

342.

00)

6/5/

2018

10

6533

05

52(2

37)

MD

OT

Gro

uped

Pr

ojec

t H

inds

M

DO

T I-5

5 @

Riv

ersi

de D

r - B

ridge

Mai

nten

ance

M

odifi

ed b

ased

on

final

cos

t dat

a in

pre

p fo

r fin

al v

ouch

er

STP

$6,0

23.0

0

6/7/

2018

10

7056

LPA

0025

(077

) M

PO G

roup

ed

Proj

ect

Hin

ds

Hin

ds C

ount

y H

inds

Cou

nty

BOS

- 3 lo

catio

ns o

n R

obin

son

Rd

& 1

loca

tion

on

Woo

drow

Wils

on D

rive

- Res

urfa

ce

New

Pro

ject

ST

P $9

58,2

24.0

0

$1,1

96,7

56.0

0

6/7/

2018

10

7643

29

04(0

15)

MD

OT

Gro

uped

Pr

ojec

t R

anki

n M

DO

T U

S 80

nea

r KC

S R

R -

Brid

ge #

56.8

A - B

ridge

Pre

serv

atio

n N

ew P

roje

ct

NH

PP

$0.0

0

6/21

/201

8 10

7641

02

01(2

43)

MD

OT

Gro

uped

Pr

ojec

t H

inds

M

DO

T I-2

0 ne

ar F

arr R

oad

[Brid

ge #

25.

1] B

ridge

Pre

serv

atio

n M

odifi

ed b

ased

on

cont

ract

pric

es

NH

PP

$119

,200

.00

7/12

/201

8 10

6573

LPA

0213

(031

) M

DO

T G

roup

ed

Proj

ect

Mad

ison

R

idge

land

C

ity o

f Rid

gela

nd -

East

Jac

kson

Stre

et M

ulti-

use

Path

N

ew P

roje

ct

TAP

$300

,000

.00

$3

,000

,000

.00

7/18

/201

8 10

4101

05

61(0

78)

6106

00

Ran

kin

MD

OT

SR 2

5 - C

onst

ruct

ion

of a

new

Fro

ntag

e R

oad

Mod

ified

to w

ithdr

aw th

e co

nstru

ctio

n ph

ase.

ST

BG

$0.0

0

7/26

/201

8 10

0585

03

98(0

02)

MD

OT

Gro

uped

Pr

ojec

t H

inds

M

DO

T SR

473

at V

augh

n C

reek

nea

r Ter

ry -

Brid

ge R

epla

cem

ent #

2.70

M

odifi

ed to

redu

ce fu

nds

to p

repa

re to

clo

se

BR

($18

4,50

0.00

)

7/27

/201

8 10

6388

05

52(2

27)

MD

OT

Gro

uped

Pr

ojec

t H

inds

M

DO

T I-5

5 fro

m I-

20 S

plit

to th

e R

anki

n C

L M

odifi

ed to

redu

ce fu

nds

to p

repa

re to

clo

se

NH

PP

($51

,131

.00)

7/31

/201

8 10

6991

02

01(2

35)

MD

OT

Gro

uped

Pr

ojec

t H

inds

M

DO

T I-2

0 ov

er V

alle

y St

reet

- Br

idge

Dec

k R

epai

r (#4

4.1)

M

odifi

ed to

redu

ce fu

nds

to p

repa

re to

clo

se

NH

S ($

18,4

27.0

0)

7/31

/201

8 10

7643

29

04(0

15)

MD

OT

Gro

uped

Pr

ojec

t R

anki

n M

DO

T U

S 80

nea

r KC

S R

R -

Brid

ge #

56.8

A - B

ridge

Pre

serv

atio

n M

odifi

ed b

ased

on

cont

ract

pric

es

NH

PP

$66,

782.

00

8/7/

2018

10

2315

05

52(2

48)

MD

OT

Gro

uped

Pr

ojec

t M

adis

on

MD

OT

I-55

Nor

thbo

und

Brid

ge #

103.

1B o

ver I

-220

Ram

p - B

ridge

Wid

enin

g M

odifi

ed b

ased

on

revi

sed

estim

ate

STBG

$0

.00

8/7/

2018

10

4491

LPA

0450

(020

) M

DO

T G

roup

ed

Proj

ect

Mad

ison

R

anki

n PR

VWSD

Pe

arl R

iver

Val

ley

Wat

er S

uppl

y D

istri

ct -

Har

bor w

alk

bike

pat

h on

Ba

rnet

t Res

ervo

ir M

odifi

ed b

ased

on

final

cos

t dat

a in

pre

p fo

r fin

al v

ouch

er

STP

$70,

622.

00

8/7/

2018

10

5450

LPA

6945

(005

) M

DO

T G

roup

ed

Proj

ect

Mad

ison

R

anki

n PR

VWSD

Pe

arl R

iver

VW

SD -

Gua

rdra

il re

cons

t, dr

ivew

ay c

onst

, & s

igna

l mod

- fro

m G

rant

s Fe

rry to

Bre

aker

s La

ne

Mod

ified

bas

ed o

n fin

al c

ost d

ata

in p

rep

for

final

vou

cher

ST

P $4

,646

.00

8/8/

2018

10

7561

LPA

7331

(006

) M

PO G

roup

ed

Proj

ect

Ran

kin

Flow

ood

City

of F

low

ood

- Old

Fan

nin

Roa

d fro

m L

akel

and

Driv

e N

orth

for

3475

feet

N

ew P

roje

ct

STP

$371

,000

.00

$3

71,0

00.0

0

8/9/

2018

10

6213

LPA

7312

(004

) 48

0006

H

inds

C

linto

n C

ity o

f Clin

ton

- Clin

ton

Pkw

y @

Fai

rmon

t St.

Mod

ified

bas

ed o

n fin

al c

ost d

ata

in p

rep

for

final

vou

cher

ST

P $2

70.0

0

$222

,000

.00

8/10

/201

8 10

2402

05

16(0

10)

4546

3

Mad

ison

M

DO

T SR

463

from

I-55

to S

R 2

2 M

odifi

ed b

ased

on

final

cos

ta d

ata

in p

rep

for

final

vou

cher

ST

BG

$37,

545.

00

FY 2018 ANNUAL LISTING OF FEDERALLY OBLIGATED PROJECTS

PAGE | 9

Page 12: FY 2018 Annual Listing of Federally Obligated Projects · Phone: 601-981-1511 Fax: 601-981-1515. . Jackson Metropolitan Planning Organization (MPO) Funding Disclaimer This document

Fede

ral F

unds

Cha

nge

– Ite

ms

in re

d in

dica

te a

redu

ctio

n in

fund

s fo

r the

resp

ectiv

e pr

ojec

t. Th

ese

redu

ctio

ns c

an b

e fo

r a n

umbe

r of r

easo

ns in

clud

ing,

but

not

lim

ited

to: t

he c

ost o

f the

pro

ject

was

less

than

the

amou

nt o

f fun

ds c

omm

itted

to th

e pr

ojec

t, a

chan

ge in

fund

ing

type

or a

pr

ojec

t spo

nsor

requ

ests

to w

ithdr

aw th

e pr

ojec

t.

Jack

son

Urb

aniz

ed A

rea

FY 2

018

FHW

A O

blig

ated

Pro

ject

s

Dat

e si

gned

by

FH

WA

FM

S N

umbe

r Ex

tern

al

Num

ber

TIP/

STIP

R

efer

ence

C

ount

y Fo

r Who

m

Des

crip

tion

Act

ion

Fund

Ty

pe

Fede

ral F

unds

C

hang

e To

tal F

unds

in

TIP

8/29

/201

8 10

2315

05

52(2

48)

MD

OT

Gro

uped

Pr

ojec

t M

adis

on

MD

OT

I-55

Nor

thbo

und

Brid

ge #

103.

1B o

ver I

-220

Ram

p - B

ridge

Wid

enin

g M

odifi

ed b

ased

on

cont

ract

pric

es

STBG

$1

1,37

0,47

3.00

8/31

/201

8 10

5812

LPA

0250

(035

) M

DO

T G

roup

ed

Proj

ect

Hin

ds

Jack

son

City

of J

acks

on -

Con

stru

ct S

idew

alks

sur

roun

ding

Bar

r Ele

men

tary

Sc

hool

M

odifi

ed to

with

draw

pro

ject

due

to b

ids

wer

e re

ject

ed.

Will

read

verti

se in

nea

r fut

ure.

SR

SP

($42

7,61

4.00

)

8/31

/201

8 10

5812

LPA

0250

(035

) M

DO

T G

roup

ed

Proj

ect

Hin

ds

Jack

son

City

of J

acks

on -

Con

stru

ct S

idew

alks

sur

roun

ding

Bar

r Ele

men

tary

Sc

hool

M

odifi

ed to

with

draw

pro

ject

due

to b

ids

wer

e re

ject

ed.

Will

read

verti

se in

nea

r fut

ure.

TA

P ($

161,

057.

00)

8/31

/201

8 10

7313

LPA

7261

(001

) M

DO

T G

roup

ed

Proj

ect

Hin

ds

Jack

son

City

of J

acks

on -

Mill

Stre

et fr

om C

apito

l Stre

et to

For

tific

atio

n St

reet

- O

verla

y M

odifi

ed to

add

the

cons

truct

ion

phas

e.

STBG

$1

,665

,550

.00

$3

,000

,000

.00

8/31

/201

8 10

7688

LPA

7314

(031

) M

PO G

roup

ed

Proj

ect

Ran

kin

Pear

l

City

of P

earl

- Tra

ffic

Sign

al U

pgra

des

alon

g U

S H

wy

80, B

ierd

eman

R

d. to

Pira

te C

ove/

Fox

Hal

l Rd.

N

ew p

roje

ct

STP

$1,0

26,1

88.0

0

$1,0

26,1

88.0

0

9/5/

2018

10

4102

LPA

7306

(004

) 48

0001

H

inds

C

linto

n N

orth

side

Driv

e C

orrid

or Im

prov

emen

ts (P

ineh

aven

Rd/

Nor

thsi

de D

r.)

in C

ity o

f Clin

ton

Mod

ified

bas

ed o

n fin

al c

osta

dat

a in

pre

p fo

r fin

al v

ouch

er

Earm

ark

$12,

685.

00

$6,6

41,4

42.0

0

9/5/

2018

10

7815

16

81(0

21)

MD

OT

Gro

uped

Pr

ojec

t M

adis

on

MD

OT

US

51 B

ridge

#39

.4 a

t Big

Bla

ck R

iver

- Br

idge

Pai

ntin

g M

odifi

ed b

ased

on

cont

ract

pric

es

STBG

$7

35,8

19.0

0

9/11

/201

8 10

5858

02

01(2

16)

MD

OT

Gro

uped

Pr

ojec

t H

inds

M

DO

T I-2

0 R

epla

ce B

ridge

No.

44.

9B

Mod

ified

to a

dd a

dditi

onal

fund

s to

Pha

se B

PE

N

HPP

$4

0,00

0.00

9/17

/201

8 10

7709

LPA

0086

(006

) M

PO G

roup

ed

Proj

ect

Mad

ison

Fl

ora

Tow

n of

Flo

ra -

Cox

Fer

ry R

oad

from

the

City

Lim

its to

Kea

rney

Par

k R

oad

New

Pro

ject

ST

P $2

89,0

85.0

0

$289

,220

.00

9/17

/201

8 10

7601

LPA

0061

(090

) 54

0080

R

anki

n R

anki

n C

ount

y

Ran

kin

Cou

nty

BOS

- Nor

thsh

ore

Pkw

y/O

ld F

anni

n R

d &

Spillw

ay

Rd/

Hug

hWar

d Bl

vd-re

plac

e si

gnal

s; S

pillw

ay R

d &

Nor

thsh

ore

Pkw

y-ad

d tu

rn la

nes

New

Pro

ject

ST

P $1

,247

,318

.00

$1

,250

,700

.00

9/23

/201

8 10

6023

05

52(2

46)

2500

75

Hin

ds

MD

OT

I-55

from

Byr

am to

McD

owel

l Roa

d M

odifi

ed to

con

vert

AC fu

nds

NH

PP

$0.0

0

9/23

/201

8 10

7631

03

92(0

53)

MD

OT

Gro

uped

Pr

ojec

t H

inds

M

DO

T SR

18

from

Sou

th o

f Ray

mon

d to

I-20

- M

ill &

Ove

rlay

New

Pro

ject

ST

BG

$7,3

39,1

71.0

0

9/23

/201

8 10

6023

05

52(2

46)

2500

75

Hin

ds

MD

OT

I-55

from

Byr

am to

McD

owel

l Roa

d M

odifi

ed to

con

vert

AC fu

nds

STBG

$8

,700

,000

.00

9/24

/201

8 10

7583

LPA

7312

(005

) M

PO G

roup

ed

Proj

ect

Hin

ds

Clin

ton

City

of C

linto

n - C

linto

n Pa

rkw

ay fr

om H

wy

80 to

Nor

thsi

de D

rive

- Mill,

Ba

se R

epai

r, O

verla

y &

Pave

men

t Mar

king

s M

odifi

ed to

with

draw

pro

ject

. ST

P ($

185,

730.

00)

$590

,849

.00

9/24

/201

8 10

6596

LPA

0025

(073

) M

PO G

roup

ed

Proj

ect

Hin

ds

Hin

ds C

ount

y

Hin

ds C

ount

y BO

S - B

yram

Sw

ingi

ng B

ridge

Par

king

Lot

Im

prov

emen

ts

Mod

ified

to re

duce

fund

s to

pre

pare

to c

lose

ST

P ($

2,74

5.00

) $1

24,0

00.0

0

9/24

/201

8 10

7583

LPA

7312

(005

) M

PO G

roup

ed

Proj

ect

Hin

ds

Clin

ton

City

of C

linto

n - C

linto

n Pa

rkw

ay fr

om H

wy

80 to

Nor

thsi

de D

rive

- Mill,

Ba

se R

epai

r, O

verla

y &

Pave

men

t Mar

king

s M

odifi

ed to

with

draw

pro

ject

. ST

P ($

90,0

58.0

0)

$590

,849

.00

9/24

/201

8 10

7609

LPA

7013

(001

) M

PO G

roup

ed

Proj

ect

Hin

ds

Byra

m

City

of B

yram

- H

ende

rson

Roa

d fro

m S

iwel

l Roa

d to

the

City

Lim

its -

Res

urfa

ce

New

Pro

ject

ST

P $7

36,0

15.0

0

$736

,015

.00

9/24

/201

8 10

6058

LPA

8312

(002

) M

DO

T G

roup

ed

Proj

ect

Hin

ds

Jack

son

City

of J

acks

on -

Side

wal

k Im

prov

emen

ts o

n C

apito

l Stre

et

New

pro

ject

D

RTD

$3

6,46

2.00

9/24

/201

8 10

7583

LPA

7312

(005

) M

PO G

roup

ed

Proj

ect

Hin

ds

Clin

ton

City

of C

linto

n - C

linto

n Pa

rkw

ay fr

om H

wy

80 to

Nor

thsi

de D

rive

- Mill,

Ba

se R

epai

r, O

verla

y &

Pave

men

t Mar

king

s M

odifi

ed to

with

draw

pro

ject

. ST

P ($

315,

061.

00)

$590

,849

.00

9/24

/201

8 10

7547

LPA

6929

(008

) M

PO G

roup

ed

Proj

ect

Hin

ds

Jack

son

City

of J

acks

on -

Nor

thsi

de D

rive

from

Nor

th S

tate

St t

o I-5

5 Fr

onta

ge

Rd

- Pav

emen

t Reh

abilit

atio

n an

d Si

dew

alk

Impr

ovem

ents

N

ew p

roje

cts

STBG

$1

,415

,681

.00

$1

,415

,681

.00

9/24

/201

8 10

4859

LPA-

RR

83

23(0

06)

5100

10

Mad

ison

R

idge

land

C

ity o

f Rid

gela

nd -

Lake

Har

bour

Driv

e Ex

tens

ion

- Rai

lway

At G

rade

C

ross

ing

Impr

ovem

ents

M

odifi

ed to

redu

ce fe

dera

l fun

ds to

pre

pare

to

clos

e Ea

rmar

k ($

469,

380.

00)

$5,7

96,4

78.0

0

9/24

/201

8 10

4859

LPA

8323

(007

) 51

0010

M

adis

on

Rid

gela

nd

City

of R

idge

land

- La

ke H

arbo

ur D

rive

Exte

nsio

n - B

ox B

ridge

und

er

CN

IC R

ailro

ad

Mod

ified

to w

ithdr

aw fu

nds,

pro

ject

re-

adve

rtise

d.

STP

($1,

987,

700.

00)

$5,7

96,4

78.0

0

9/24

/201

8 10

4859

LPA

8323

(007

) 51

0010

M

adis

on

Rid

gela

nd

City

of R

idge

land

- La

ke H

arbo

ur D

rive

Exte

nsio

n - B

ox B

ridge

und

er

CN

IC R

ailro

ad

New

Pro

ject

ST

P $1

,987

,700

.00

$5

,796

,478

.00

9/24

/201

8 10

6944

LPA

7354

(004

) M

PO G

roup

ed

Proj

ect

Mad

ison

R

idge

land

C

ity o

f Rid

gela

nd -

Rep

air H

ighl

and

Col

ony

Park

way

from

Bus

ines

s Pa

rk D

rive

to C

ount

y Li

ne R

oad

New

Pro

ject

ST

P $2

15,0

00.0

0

$215

,000

.00

9/25

/201

8 10

6525

LPA

0070

(024

) M

DO

T G

roup

ed

Proj

ect

Mad

ison

C

anto

n C

ity o

f Can

ton

- Sid

ewal

k Im

prov

emen

ts to

Mul

tiple

Loc

atio

ns

New

Pro

ject

SR

SP

$1,1

39,3

15.0

0

PAGE | 10

FY 2018 ANNUAL LISTING OF FEDERALLY OBLIGATED PROJECTS

Page 13: FY 2018 Annual Listing of Federally Obligated Projects · Phone: 601-981-1511 Fax: 601-981-1515. . Jackson Metropolitan Planning Organization (MPO) Funding Disclaimer This document

Jack

son

Urb

aniz

ed A

rea

FY 2

018

FTA

Obl

igat

ed P

roje

cts

Dat

e si

gned

by

FTA

FM

S N

umbe

r C

ount

y Fo

r Who

m

Des

crip

tion

Fund

Typ

e Fe

dera

l Fun

ds

Cha

nge

6/21

/201

2 M

S-90

-X08

1-01

* H

inds

Ja

ckso

n Ac

quire

Sec

urity

Equ

ipm

ent

FTA

5307

$5

3,81

8.00

6/21

/201

2 M

S-90

-X08

1-01

* H

inds

Ja

ckso

n Ac

quire

AD

A Pa

ratra

nsit

Buse

s an

d Eq

uipm

ent

FTA

5307

$7

5,00

0.00

11/1

3/20

13

MS-

18-X

035*

M

adis

on

Mad

ison

Cou

nty

Citi

zens

Ser

vice

s Ag

ency

M

adis

on C

ount

y C

itize

ns S

ervi

ces

Agen

cy -

to s

uppo

rt ad

min

istra

tive,

cap

ital,

and

oper

atin

g as

sist

ance

for t

rans

it se

rvic

es in

M

adis

on C

ount

y, M

S.

FTA

5311

$3

91,3

17.0

0

7/1/

2014

M

S-18

-X03

7*

Hin

ds

Hin

ds C

ount

y H

uman

Res

ourc

e Ag

ency

H

inds

Cou

nty

Hum

an R

esou

rce

Agen

cy -

to s

uppo

rt ad

min

istra

tive,

cap

ital,

and

oper

atin

g as

sist

ance

for t

rans

it se

rvic

es in

H

inds

Cou

nty,

MS.

FT

A 53

11

$349

,120

.00

1/28

/201

5 M

S-90

-X08

8.01

* H

inds

Ja

ckso

n Pl

anni

ng

FTA

5307

$4

35,4

23.0

0

1/28

/201

5 M

S-90

-X08

8.01

* H

inds

Ja

ckso

n Fi

ve y

ear T

rans

it Pl

an

FTA

5307

$3

24,0

00.0

0

1/28

/201

5 M

S-90

-X08

8.01

* H

inds

Ja

ckso

n Pr

even

tativ

e M

aint

enan

ce

FTA

5307

$3

66,4

99.0

0

1/28

/201

5 M

S-90

-X08

8.01

* H

inds

Ja

ckso

n AD

A Pa

ratra

nsit

FTA

5307

$3

66,4

99.0

0

1/28

/201

5 M

S-90

-X08

8.01

* H

inds

Ja

ckso

n JA

MF

Reh

abilit

atio

n FT

A 53

39

$239

,663

.20

1/28

/201

5 M

S-90

-X08

8.01

* H

inds

Ja

ckso

n Ac

quire

AD

A Pa

ratra

nsit

Buse

s an

d Eq

uipm

ent

FTA

5307

$1

54,8

61.0

0

1/28

/201

5 M

S-90

-X08

8.01

* H

inds

Ja

ckso

n Ac

quire

Sup

port

Vehi

cles

FT

A 53

07

$103

,787

.20

1/28

/201

5 M

S-90

-X08

8.01

* H

inds

Ja

ckso

n U

nion

Sta

tion

Reh

abilit

atio

n FT

A 53

39

$21,

476.

00

8/19

/201

5 M

S-34

-000

3*

Hin

ds

Jack

son

Bus

Rep

lace

men

t FT

A 53

07

$340

,000

.00

8/19

/201

5 M

S-34

-000

3*

Hin

ds

Jack

son

Acqu

ire A

DA

Para

trans

it Bu

ses

and

Equi

pmen

t FT

A 53

07

$59,

971.

00

8/25

/201

5 M

S-90

-X09

2-00

* H

inds

Ja

ckso

n U

nion

Sta

tion

Reh

abilit

atio

n FT

A 53

39

$53,

378.

00

8/25

/201

5 M

S-90

-X09

2-00

* H

inds

Ja

ckso

n O

ther

Thi

rd P

arty

Con

tract

ual

FTA

5307

$2

47,0

65.0

0

8/25

/201

5 M

S-90

-X09

2-00

* H

inds

Ja

ckso

n As

soci

ated

Tra

nsit

Enha

ncem

ents

FT

A 53

07

$26,

900.

00

8/25

/201

5 M

S-90

-X09

2-00

* H

inds

Ja

ckso

n O

pera

tions

Ass

ista

nce

FTA

5307

$3

,035

,891

.00

8/25

/201

5 M

S-90

-X09

2-00

* H

inds

Ja

ckso

n AD

A Pa

ratra

nsit

FTA

5307

$8

53,7

76.0

0

8/25

/201

5 M

S-90

-X09

2-00

* H

inds

Ja

ckso

n JA

TRAN

Rid

ersh

ip M

arke

ting

FTA

5307

$1

60,0

00.0

0

8/25

/201

5 M

S-90

-X09

2-00

* H

inds

Ja

ckso

n St

aff T

rain

ing

Activ

ities

FT

A 53

07

$26,

689.

00

8/25

/201

5 M

S-90

-X09

2-00

* H

inds

Ja

ckso

n Pl

anni

ng

FTA

5307

$1

,033

,279

.00

8/25

/201

5 M

S-90

-X09

2-00

* H

inds

Ja

ckso

n Pl

anni

ng

FTA

5307

$2

49,9

89.0

0

12/2

/201

6 M

S-20

16-0

10-0

0*

Hin

ds

Jack

son

Purc

hase

Rad

ios

FTA

5307

$1

79,2

80.0

0

12/2

/201

6 M

S-20

16-0

10-0

0*

Hin

ds

Jack

son

Oth

er T

hird

Par

ty C

ontra

ctua

l FT

A 53

07

$27,

160.

00

12/2

/201

6 M

S-20

16-0

10-0

0*

Hin

ds

Jack

son

Bus

Rep

lace

men

t FT

A 53

07

$800

,000

.00

12/2

/201

6 M

S-20

16-0

10-0

0*

Hin

ds

Jack

son

Acqu

ire A

DA

Para

trans

it Bu

ses

and

Equi

pmen

t FT

A 53

07

$112

,967

.00

12/2

/201

6 M

S-20

16-0

10-0

0*

Hin

ds

Jack

son

Acqu

ire A

DA

Para

trans

it Bu

ses

and

Equi

pmen

t FT

A 53

07

$154

,000

.00

12/2

/201

6 M

S-20

16-0

10-0

0*

Hin

ds

Jack

son

Ope

ratio

ns A

ssis

tanc

e FT

A 53

07

$803

,089

.00

12/2

/201

6 M

S-20

16-0

10-0

0*

Hin

ds

Jack

son

ADA

Para

trans

it FT

A 53

07

$371

,801

.00

12/2

/201

6 M

S-20

16-0

10-0

0*

Hin

ds

Jack

son

Prev

enta

tive

Mai

nten

ance

FT

A 53

07

$1,0

19,7

25.0

0

FY 2018 ANNUAL LISTING OF FEDERALLY OBLIGATED PROJECTS

PAGE | 11

Page 14: FY 2018 Annual Listing of Federally Obligated Projects · Phone: 601-981-1511 Fax: 601-981-1515. . Jackson Metropolitan Planning Organization (MPO) Funding Disclaimer This document

Jack

son

Urb

aniz

ed A

rea

FY 2

018

FTA

Obl

igat

ed P

roje

cts

Dat

e si

gned

by

FTA

FM

S N

umbe

r C

ount

y Fo

r Who

m

Des

crip

tion

Fund

Typ

e Fe

dera

l Fun

ds

Cha

nge

12/2

/201

6 M

S-20

16-0

11.0

0*

Hin

ds

Jack

son

Bus

Rep

lace

men

t FT

A 53

39

$517

,533

.00

12/5

/201

6 M

S-20

16-0

10-0

0*

Hin

ds

Jack

son

Plan

ning

FT

A 53

07

$249

,989

.00

7/7/

2017

M

S-20

17-0

04-0

1*

Hin

ds

Jack

son

Bus

Rep

lace

men

t FT

A 53

39

$247

,650

.00

7/13

/201

7 M

S-20

17-0

04-0

1*

Hin

ds

Jack

son

Ope

ratio

ns A

ssis

tanc

e FT

A 53

07

$1,1

80,2

09.0

0

7/13

/201

7 M

S-20

17-0

04-0

1*

Hin

ds

Jack

son

ADA

Para

trans

it FT

A 53

07

$185

,444

.00

7/13

/201

7 M

S-20

17-0

04-0

1*

Hin

ds

Jack

son

Prev

enta

tive

Mai

nten

ance

FT

A 53

07

$472

,806

.00

7/13

/201

7 M

S-20

17-0

04-0

1*

Hin

ds

Jack

son

Prev

enta

tive

Mai

nten

ance

FT

A 53

07

$346

,550

.00

7/13

/201

7 M

S-20

17-0

04-0

1*

Hin

ds

Jack

son

Staf

f Tra

inin

g Ac

tiviti

es

FTA

5307

$2

0,00

0.00

7/13

/201

7 M

S-20

17-0

04-0

1*

Hin

ds

Jack

son

Plan

ning

FT

A 53

07

$338

,855

.00

8/25

/201

7 M

S-20

17-0

08-0

0 H

inds

Ja

ckso

n M

edic

al M

all F

ound

atio

n Ja

ckso

n M

edic

al M

all F

ound

atio

n - t

o su

ppor

t cap

ital a

nd o

pera

ting

assi

stan

ce fo

r tra

nsit

serv

ices

in J

acks

on, M

S.

FTA

5310

$4

91,6

79.0

0

8/25

/201

7 M

S-20

17-0

08-0

0 H

inds

W

illow

ood

Dev

elop

men

t Cen

ter

Willo

woo

d D

evel

opm

ent C

ente

r - to

sup

port

capi

tal a

ssis

tanc

e fo

r tra

nsit

serv

ices

in J

acks

on, M

S.

FTA

5310

$5

2,80

0.00

8/30

/201

8 M

S-20

18-0

03-0

0 H

inds

Ja

ckso

n Bu

s R

epla

cem

ent

FTA

5339

$3

33,5

80.0

0

9/14

/201

7 M

S-20

17-0

07-0

0 H

inds

W

illow

ood

Dev

elop

men

t Cen

ter

Willo

woo

d D

evel

opm

ent C

ente

r - to

sup

port

capi

tal a

ssis

tanc

e fo

r tra

nsit

serv

ices

in J

acks

on, M

S.

FTA

5339

$8

7,44

4.00

9/21

/201

8 M

S-20

18-0

04-0

0 H

inds

Ja

ckso

n Pl

anni

ng

FTA

5307

$3

00,0

00.0

0

9/21

/201

8 M

S-20

18-0

04-0

0 H

inds

Ja

ckso

n Pr

even

tativ

e M

aint

enan

ce

FTA

5307

$4

11,8

79.0

0

9/21

/201

8 M

S-20

18-0

04-0

0 H

inds

Ja

ckso

n O

pera

tions

Ass

ista

nce

FTA

5307

$1

,180

,209

.00

9/21

/201

8 M

S-20

18-0

04-0

0 H

inds

Ja

ckso

n AD

A Pa

ratra

nsit

FTA

5307

$2

03,9

88.0

0

9/21

/201

8 M

S-20

18-0

04-0

0 H

inds

Ja

ckso

n Bu

s R

epla

cem

ent

FTA

5307

$6

50,0

00.0

0

*Fun

ds fr

om o

lder

gra

nt u

sed

to fu

nd th

is p

roje

ct.

PAGE | 12

FY 2018 ANNUAL LISTING OF FEDERALLY OBLIGATED PROJECTS

Page 15: FY 2018 Annual Listing of Federally Obligated Projects · Phone: 601-981-1511 Fax: 601-981-1515. . Jackson Metropolitan Planning Organization (MPO) Funding Disclaimer This document
Page 16: FY 2018 Annual Listing of Federally Obligated Projects · Phone: 601-981-1511 Fax: 601-981-1515. . Jackson Metropolitan Planning Organization (MPO) Funding Disclaimer This document

Central Mississippi Planningand Development District

P. O. Box 4935Jackson, Mississippi 39296-4935

601-981-1511www.cmpdd.org