FY 2015-16 and FY 2016-17 PID Work Program October 23, 2015 1 of 12 District County Route Begin Postmile End Postmile Purpose & Need Improvement Description SHOPP Program Category SHOPP Program Code (20.10.201.xxx) PID Status % Complete Initiation Date (MM/DD/YYYY) Target Completion Date (MM/DD/YYYY) Dist Dir Approval Date (MM/DD/YYYY) Estimated Project Cost ($M) (Capital + Support Costs) Target Programming Cycle PID Type 1 DN 199 7.55 27.45 Reduce Collisions High Friction Surface Treatment (HFST) Collision Reduction 010 Active 60 4/3/2015 11/1/2015 $ 2.7 2016 PSR-PR 1 LAK 29 9.00 20.70 Reduce Collisions Middletown to Lower Lake, Shoulder Widening, Truck climbing Lane Collision Reduction 010 Active 2 8/7/2014 4/1/2016 $ 8.0 2016 PSR 1 HUM 36 10.50 10.90 Reduce Collisions Horizontal/Vertical Curve Improvement, construct 8-ft shoulders Collision Reduction 010 Active 5 3/9/2015 2/1/2016 $ 4.5 2016 PSR 1 LAK 29 12.78 14.35 Reduce Collisions Coyote Grade Shoulder Widening Collision Reduction 010 Active 5 8/7/2014 4/1/2016 $ 10.3 2016 PSR 1 MEN 20 16.95 17.10 Reduce Collisions Widen Shoulders and Install Guardrail near Jackson State Forest Collision Reduction 010 Active 60 11/17/2014 12/1/2015 $ 1.2 2016 PSR 1 MEN 1 41.75 42.52 Reduce Collisions Shoulder widening, install rumble strip, and MBGR Collision Reduction 010 Active 85 9/30/2014 10/15/2015 $ 1.8 2016 PSR 1 HUM 101 76.10 76.70 Reduce Collisions Intersection Improvement at Harris and Henderson Collision Reduction 010 Proposed 0 7/1/2015 6/1/2017 $ 3.5 2016 PSR 1 HUM 101 78.03 79.44 Safety Improvements Convert Fourth Street in Eureka from two-lane, one-way to three-lane, one-way. Improve pedestrian access. Collision Reduction 010 Active 95 6/17/2014 9/1/2015 $ 5.0 2016 PSR 1 HUM 299 30.70 33.35 Reduce Collisions Widen Shoulders and Install Rumble Strips Collision Reduction 010 Proposed 0 9/1/2015 12/1/2016 $ 5.9 2016 PSR 1 HUM 299 20.50 21.40 20.70 22.00 Reduce Collisions Widen Shoulders and Install Rumble Strips Collision Reduction 010 Proposed 0 9/1/2015 12/1/2016 $ 4.3 2016 PSR 1 HUM 299 34.60 37.15 36.30 37.70 Reduce Collisions Widen Shoulders and Install Rumble Strips Collision Reduction 010 Proposed 0 9/1/2015 12/1/2016 $ 4.4 2016 PSR 1 MEN 1 20.50 20.70 Reduce Collisions Widening, install Sidewalk, drainage, remove guardrail at various locations in Mendocino County Collision Reduction 015 Proposed 0 10/1/2015 9/1/2016 $ 2.4 2018 PSR 1 HUM 299 39.10 39.25 Reduce Collisions Shoulder Widening in Humboldt County near Willow Creek Collision Reduction 015 Proposed 0 8/1/2016 5/1/2017 $ 1.6 2018 PSR 1 HUM 200 1.90 2.40 Reduce Collisions Shoulder Widen and Curve Improvement near Arcata Collision Reduction 015 Proposed 0 8/1/2016 4/1/2017 $ 5.4 2018 PSR 1 LAK 1 VAR VAR Reduce Collisions Upgrade MBGR for LAK and MEN Counties Collision Reduction 015 Complete 100 11/13/2014 6/30/2015 6/19/2015 $ 6.7 2018 PSR 1 DN 101 39.8 39.8 Fish Passage Remediation Long Lead - In Del Norte County on Route 101 near Smith River at Dominie Creek PM 39.78. Bridge 110 Active 0 5/27/2015 10/1/2015 $ 3.5 2016 PSR-PDS 1 LAK 20 5.84 5.84 Bridge Rehabilitation, Bachelor Creek Bridge #14- 0001 Replace or rehabilitate bridge (3 CMP's), Need: STRAIN, ABME Recommendation Bridge 110 Proposed 5 7/1/2015 6/1/2016 $ 2.0 2018 PSSR 1 HUM 101 79.50 80.20 Bridge Rail replacement/upgrade, Eureka Slough #4-22R Bridge Rail replacement/upgrade, Need: STRAIN, ABME Recommendation Bridge 112 Proposed 0 8/1/2015 4/1/2017 $ 2.0 2018 PSSR 1 HUM 96 12.26 12.26 Bridge Rail replacement/upgrade, strengthen girder, and widenTrinity River #04-0137 Bridge Rail replacement/upgrade, Need: STRAIN, ABME Recommendation Bridge 112 Proposed 0 7/1/2015 3/1/2017 $ 3.5 2018 PSSR 1 HUM 96/169 VAR VAR Bridge Rail replacement/upgrade, Aikens Creek #04-0059, Bluff Creek #04-0063, Bluff Creek #04- 0225, Slate Creek #04-0061, Rube Creek #04-0215 Bridge Rail replacement/upgrade, Need: STRAIN, ABME Recommendation Bridge 112 Proposed 0 4/1/2016 4/1/2017 $ 2.5 2018 PSSR 1 HUM 36 11.40 34.52 Hely Creek #4-92, Little Larabee Creek #4-102, Butte Creek #4-116 Bridge Rail replacement/upgrade, Need: STRAIN, ABME Recommendation Bridge 112 Complete 100 7/12/2012 6/30/2015 6/9/2015 $ 23.6 2018 PSSR 1 MEN 1 59.73 59.73 In Mendocino County at Hare Creek Bridge #10- 0175 Bridge Rail replacement/upgrade, Need: STRAIN, ABME Recommendation Bridge 112 Complete 100 7/26/2013 6/30/2015 6/18/2015 $ 21.8 2018 PSSR 1 MEN 1 52.60 52.60 Long Lead - Russian Gulch Bridge Bridge #10-0151 Seismic Restoration, Need: STRAIN, ABME Recommendation Bridge 113 Proposed 0 7/1/2015 6/1/2016 2018 PSR-PDS 1 HUM 96 22.95 22.95 Bridge Seismic Restoration and Rail Upgrade, Klamath River #04-144 Seismic Restoration, Need: STRAIN, ABME Recommendation Bridge 113 Active 5 7/1/2015 1/1/2017 $ 1.3 2018 PSSR 1 MEN 101 162 9.20 8.25 9.50 8.25 Bridge Seismic Restoration, In Mendocino County on Route 101 at the Russian River Bridge #10-0082 and Eel River Bridge #10-0236 Seismic Restoration, Need: STRAIN, ABME Recommendation Bridge 113 Active 10 7/1/2015 12/1/2016 $ 5.7 2018 PSR-PDS 1 HUM 283 0.10 0.40 Bridge Seismic Restoration, Eel River BOH #4-15 Seismic Restoration, Need: STRAIN, ABME Recommendation Bridge 113 Active 5 7/1/2015 12/1/2016 $ 5.8 2018 PSSR 1 MEN 101 R106.57 R106.67 Bridge Seismic Restoration, So Fork Eel River (#10- 0218) Seismic Restoration, Need: STRAIN, ABME Recommendation Bridge 113 Proposed 0 9/8/2015 6/1/2017 $ 2.5 2018 PSSR 1 MEN 1 22.73 22.73 In Mendocino County at Alder Creek Bridge #10- 0116 Seismic Restoration, Need: STRAIN, ABME Recommendation Bridge 113 Discontinued 0 $ 1.5 NA PSSR 1 HUM 36 17.94 R23.91 Bridge Preventative Program In Humboldt County on Route 36 near Bridgeville at Van Duzen River Bridge #04-0284 and Van Duzen River Bridge #04-0293. Bridge 119 Proposed 0 1/1/2016 3/1/2017 $ 1.3 2018 PSSR 1 MEN 1 87.90 90.90 CAPM From South Fork Cottoneva Creek Bridge #10-142 to Junction Route 211. Roadway 121 Active 1 5/1/2016 4/1/2017 $ 2.4 2018 SCVP 1 HUM 101 39.20 48.30 CAPM From Englewood Park UC to Eel River BOH CAPM Roadway 121 Active 0 9/1/2015 6/1/2016 $ 14.4 2018 SCVP 1 MEN 1 62.10 78.90 CAPM Near Fort Bragg from Pudding Creek Br No. 10-158 to about 0.6 MI north of Wages Creek Bridge No. 10-137 Roadway 121 Active 1 8/1/2015 5/1/2016 $ 14.9 2018 SCVP 1 MEN 101 0.00 9.60 CAPM In Mendocino County near Hopland from Men- Sonoma County Line to Hopland Overhead Bridge Roadway 121 Active 10 8/1/2015 5/1/2016 $ 7.3 2018 SCVP 1 MEN 20 26.10 32.80 CAPM 0.4 Miles East of Three Chop Rd to Broaddus Creek Bridge CAPM Roadway 121 Proposed 0 7/1/2015 3/1/2017 $ 6.1 2018 SCVP 1 MEN 1 0.00 15.00 CAPM In Mendocino County at Point Arena from the Sonoma County Line to Port Road. Roadway 121 Proposed 0 5/1/2016 1/1/2017 $ 13.5 2018 SCVP 1 MEN 101 91.30 100.20 CAPM Leggett to Confusion Hill CAPM Roadway 121 Proposed 0 7/1/2016 6/1/2017 $ 8.0 2018 SCVP 1 MEN 101 100.20 106.60 CAPM Confusion Hill to Humboldt County CAPM Roadway 121 Proposed 0 7/1/2016 6/1/2017 $ 11.4 2018 SCVP 1 MEN 101 84.70 91.30 CAPM Cummings to Leggett CAPM Roadway 121 Proposed 0 7/1/2016 10/1/2016 $ 13.1 2018 SCVP 1 MEN 1 78.90 87.80 2R Near Rockport from 0.6 mile North of Wages Crk to South Fork Cottoneva Crk Bridge 2R Roadway 122 Proposed 0 9/1/2015 11/1/2016 $ 10.9 2018 PSR 1 DN 101 12.50 16.30 Realign US Route 101 Long Lead - In Del Norte County on US Route 101 from 0.6 mile south of Wilson Bridge, No. 1-05, to 4.9 miles south of Cushing Creek. Major Damage Restoration 131 Active 15 7/1/2015 6/1/2016 $ 910.0 2018 PSR 1 DN 101 R2.22 R2.22 Construct bridge at Waukell Creek In Del Norte County near Klamath at 1.6 miles South of Klamath River Ovfl #1-32 Major Damage Restoration 131 Complete 100 9/1/2015 10/1/2015 $ 17.6 2016 PSR 1 HUM/ME N 101/271 11.8 16.1 26.7 19.9 Culvert Rehab In Humboldt and Mendocino County at various locations (HUM 101/MEN 101 and 0271) Roadway 151 Active 1 7/1/2015 2/1/2016 $ 3.5 2018 PSR 1 HUM 299 0.00 38.00 Culvert Repair/Replacement In Humboldt County from Jct 101 to Jct 96 Roadway 151 Discontinued 0 $ 5.3 NA PSR 1 DN 199 33.70 33.70 Upgrade Lighting, Conduit, Conductors, Breakers and Transformers for Tunnel Lighting. In Del Norte County at Collier Tunnel. Roadway 170 Proposed 0 8/1/2015 3/1/2016 $ 1.4 2018 PSR 1 DN VAR VAR VAR Upgrade overhead signs to Type XI retro- reflectivity At Various Locations in District 1 Roadway 170 Proposed 0 1/1/2016 12/31/2016 $ 1.4 2018 PSR 1 MEN 101 50.90 51.70 Roadside Safety Improvements In Mendocino County at Oil Well Hill Roadside Preservation 235 Proposed 0 8/1/2015 3/1/2017 $ 2.8 2018 PSR 1 MEN/HU M 101 VAR VAR Roadside Safety Improvements Roadside turnouts Roadside Preservation 235 Proposed 0 10/1/2015 9/30/2016 $ 2.0 2018 PSR 1 MEN 1 VAR VAR Wetland and fish passage remediation Long Lead - On State Route 1 in Mendocino County at Fish Rock Gulch, Men-1-4.64, Doyle Creek, Men- 1-54.62, Mitchell Creek, Men-1-57.81, and Digger Creek, Men-1-58.78 Roadside Preservation 240 Proposed 0 8/1/2015 5/1/2016 $ 12.0 2018 PSR 1 HUM 101 61.70 88.30 62.10 88.60 Construct two auxiliary lanes -- Fortuna and Arcata In Humboldt County in Fortuna from Main St. onramp (NB) to Palmer Blvd. offramp and in Arcata from SR-299 offramp (WB) to Giuntoli Lane offramp (NB). Mobility Improvements 310 Proposed 0 6/1/2016 $ 11.9 2018 PSR 1 DN 199 0.60 0.80 Reconfigure Intersection Near Cresent City for 0.1 mi north of Rte 199/101 Sep #01-58L to Elk Valley Cross Rd Mobility Improvements 310 Proposed 0 8/1/2015 4/1/2016 $ 3.2 2018 PSR 1 DN 101 5.10 5.60 Extend Left Turn Pocket, Install Right & Left Turn Acceleration Lanes & Widen Roadway In Del Norte County near Klamath from 0.7 miles north of the 101/169 Jucntion at Ehlers Way. Mobility Improvements 310 Proposed 0 7/1/2015 12/1/2015 $ 1.5 2018 PSR

FY 2015-16 and FY 2016-17 PID Work Program Mendocino County at Hare Creek Bridge #10-0175 Bridge Rail replacement/upgrade, Need: STRAIN, ABME Recommendation Bridge 112 Complete 100

Embed Size (px)

Citation preview

FY 2015-16 and FY 2016-17 PID Work Program

October 23, 2015 1 of 12

Dist

rict

Coun

ty

Rout

e

Begi

n Po

stm

ile

End

Post

mile

Purp

ose

& N

eed

Impr

ovem

ent D

escr

iptio

n

SHO

PP P

rogr

am C

ateg

ory

SHO

PP P

rogr

am C

ode

(20.

10.2

01.x

xx)

PID

Stat

us

% C

ompl

ete

Initi

atio

n Da

te (M

M/D

D/YY

YY)

Targ

et C

ompl

etio

n Da

te

(MM

/DD/

YYYY

)

Dist

Dir

Appr

oval

Dat

e (M

M/D

D/YY

YY)

Estim

ated

Pro

ject

Cos

t ($M

) (C

apita

l + S

uppo

rt C

osts

)

Targ

et P

rogr

amm

ing

Cycl

e

PID

Type

1 DN 199 7.55 27.45 Reduce Collisions High Friction Surface Treatment (HFST) Collision Reduction 010 Active 60 4/3/2015 11/1/2015 $ 2.7 2016 PSR-PR

1 LAK 29 9.00 20.70 Reduce Collisions Middletown to Lower Lake, Shoulder Widening,

Truck climbing LaneCollision Reduction 010 Active 2 8/7/2014 4/1/2016 $ 8.0 2016 PSR

1 HUM 36 10.50 10.90 Reduce Collisions Horizontal/Vertical Curve Improvement, construct

8-ft shouldersCollision Reduction 010 Active 5 3/9/2015 2/1/2016 $ 4.5 2016 PSR

1 LAK 29 12.78 14.35 Reduce Collisions Coyote Grade Shoulder Widening Collision Reduction 010 Active 5 8/7/2014 4/1/2016 $ 10.3 2016 PSR

1 MEN 20 16.95 17.10 Reduce Collisions Widen Shoulders and Install Guardrail near

Jackson State ForestCollision Reduction 010 Active 60 11/17/2014 12/1/2015 $ 1.2 2016 PSR

1 MEN 1 41.75 42.52 Reduce Collisions Shoulder widening, install rumble strip, and MBGR Collision Reduction 010 Active 85 9/30/2014 10/15/2015 $ 1.8 2016 PSR

1 HUM 101 76.10 76.70 Reduce Collisions Intersection Improvement at Harris and

HendersonCollision Reduction 010 Proposed 0 7/1/2015 6/1/2017 $ 3.5 2016 PSR

1 HUM 101 78.03 79.44 Safety ImprovementsConvert Fourth Street in Eureka from two-lane,

one-way to three-lane, one-way. Improve pedestrian access.

Collision Reduction 010 Active 95 6/17/2014 9/1/2015 $ 5.0 2016 PSR

1 HUM 299 30.70 33.35 Reduce Collisions Widen Shoulders and Install Rumble Strips Collision Reduction 010 Proposed 0 9/1/2015 12/1/2016 $ 5.9 2016 PSR

1 HUM 29920.50 21.40

20.70 22.00

Reduce Collisions Widen Shoulders and Install Rumble Strips Collision Reduction 010 Proposed 0 9/1/2015 12/1/2016 $ 4.3 2016 PSR

1 HUM 29934.60 37.15

36.30 37.70

Reduce Collisions Widen Shoulders and Install Rumble Strips Collision Reduction 010 Proposed 0 9/1/2015 12/1/2016 $ 4.4 2016 PSR

1 MEN 1 20.50 20.70 Reduce Collisions Widening, install Sidewalk, drainage, remove

guardrail at various locations in Mendocino CountyCollision Reduction 015 Proposed 0 10/1/2015 9/1/2016 $ 2.4 2018 PSR

1 HUM 299 39.10 39.25 Reduce Collisions Shoulder Widening in Humboldt County near

Willow CreekCollision Reduction 015 Proposed 0 8/1/2016 5/1/2017 $ 1.6 2018 PSR

1 HUM 200 1.90 2.40 Reduce Collisions Shoulder Widen and Curve Improvement near

ArcataCollision Reduction 015 Proposed 0 8/1/2016 4/1/2017 $ 5.4 2018 PSR

1 LAK 1 VAR VAR Reduce Collisions Upgrade MBGR for LAK and MEN Counties Collision Reduction 015 Complete 100 11/13/2014 6/30/2015 6/19/2015 $ 6.7 2018 PSR

1 DN 101 39.8 39.8 Fish Passage RemediationLong Lead - In Del Norte County on Route 101 near

Smith River at Dominie Creek PM 39.78. Bridge 110 Active 0 5/27/2015 10/1/2015 $ 3.5 2016 PSR-PDS

1 LAK 20 5.84 5.84Bridge Rehabilitation, Bachelor Creek Bridge #14-

0001 Replace or rehabilitate bridge (3 CMP's), Need:

STRAIN, ABME RecommendationBridge 110 Proposed 5 7/1/2015 6/1/2016 $ 2.0 2018 PSSR

1 HUM 101 79.50 80.20Bridge Rail replacement/upgrade, Eureka Slough

#4-22RBridge Rail replacement/upgrade, Need: STRAIN,

ABME RecommendationBridge 112 Proposed 0 8/1/2015 4/1/2017 $ 2.0 2018 PSSR

1 HUM 96 12.26 12.26Bridge Rail replacement/upgrade, strengthen

girder, and widenTrinity River #04-0137Bridge Rail replacement/upgrade, Need: STRAIN,

ABME RecommendationBridge 112 Proposed 0 7/1/2015 3/1/2017 $ 3.5 2018 PSSR

1 HUM 96/169 VAR VAR

Bridge Rail replacement/upgrade, Aikens Creek #04-0059, Bluff Creek #04-0063, Bluff Creek #04-

0225, Slate Creek #04-0061, Rube Creek #04-0215Bridge Rail replacement/upgrade, Need: STRAIN,

ABME RecommendationBridge 112 Proposed 0 4/1/2016 4/1/2017 $ 2.5 2018 PSSR

1 HUM 36 11.40 34.52Hely Creek #4-92, Little Larabee Creek #4-102,

Butte Creek #4-116Bridge Rail replacement/upgrade, Need: STRAIN,

ABME RecommendationBridge 112 Complete 100 7/12/2012 6/30/2015 6/9/2015 $ 23.6 2018 PSSR

1 MEN 1 59.73 59.73In Mendocino County at Hare Creek Bridge #10-

0175Bridge Rail replacement/upgrade, Need: STRAIN,

ABME RecommendationBridge 112 Complete 100 7/26/2013 6/30/2015 6/18/2015 $ 21.8 2018 PSSR

1 MEN 1 52.60 52.60 Long Lead - Russian Gulch Bridge Bridge #10-0151Seismic Restoration, Need: STRAIN, ABME

RecommendationBridge 113 Proposed 0 7/1/2015 6/1/2016 2018 PSR-PDS

1 HUM 96 22.95 22.95Bridge Seismic Restoration and Rail Upgrade,

Klamath River #04-144Seismic Restoration, Need: STRAIN, ABME

RecommendationBridge 113 Active 5 7/1/2015 1/1/2017 $ 1.3 2018 PSSR

1 MEN101 162

9.20 8.25 9.50 8.25

Bridge Seismic Restoration, In Mendocino County on Route 101 at the Russian River Bridge #10-0082

and Eel River Bridge #10-0236Seismic Restoration, Need: STRAIN, ABME

RecommendationBridge 113 Active 10 7/1/2015 12/1/2016 $ 5.7 2018 PSR-PDS

1 HUM 283 0.10 0.40 Bridge Seismic Restoration, Eel River BOH #4-15Seismic Restoration, Need: STRAIN, ABME

RecommendationBridge 113 Active 5 7/1/2015 12/1/2016 $ 5.8 2018 PSSR

1 MEN 101 R106.57 R106.67Bridge Seismic Restoration, So Fork Eel River (#10-

0218)Seismic Restoration, Need: STRAIN, ABME

RecommendationBridge 113 Proposed 0 9/8/2015 6/1/2017 $ 2.5 2018 PSSR

1 MEN 1 22.73 22.73In Mendocino County at Alder Creek Bridge #10-

0116Seismic Restoration, Need: STRAIN, ABME

RecommendationBridge 113 Discontinued 0 $ 1.5 NA PSSR

1 HUM 36 17.94 R23.91 Bridge Preventative ProgramIn Humboldt County on Route 36 near Bridgeville

at Van Duzen River Bridge #04-0284 and Van Duzen River Bridge #04-0293.

Bridge 119 Proposed 0 1/1/2016 3/1/2017 $ 1.3 2018 PSSR

1 MEN 1 87.90 90.90 CAPMFrom South Fork Cottoneva Creek Bridge #10-142

to Junction Route 211. Roadway 121 Active 1 5/1/2016 4/1/2017 $ 2.4 2018 SCVP

1 HUM 101 39.20 48.30 CAPM From Englewood Park UC to Eel River BOH CAPM Roadway 121 Active 0 9/1/2015 6/1/2016 $ 14.4 2018 SCVP

1 MEN 1 62.10 78.90 CAPMNear Fort Bragg from Pudding Creek Br No. 10-158

to about 0.6 MI north of Wages Creek Bridge No. 10-137

Roadway 121 Active 1 8/1/2015 5/1/2016 $ 14.9 2018 SCVP

1 MEN 101 0.00 9.60 CAPMIn Mendocino County near Hopland from Men-

Sonoma County Line to Hopland Overhead BridgeRoadway 121 Active 10 8/1/2015 5/1/2016 $ 7.3 2018 SCVP

1 MEN 20 26.10 32.80 CAPM0.4 Miles East of Three Chop Rd to Broaddus Creek

Bridge CAPMRoadway 121 Proposed 0 7/1/2015 3/1/2017 $ 6.1 2018 SCVP

1 MEN 1 0.00 15.00 CAPMIn Mendocino County at Point Arena from the

Sonoma County Line to Port Road.Roadway 121 Proposed 0 5/1/2016 1/1/2017 $ 13.5 2018 SCVP

1 MEN 101 91.30 100.20 CAPM Leggett to Confusion Hill CAPM Roadway 121 Proposed 0 7/1/2016 6/1/2017 $ 8.0 2018 SCVP

1 MEN 101 100.20 106.60 CAPM Confusion Hill to Humboldt County CAPM Roadway 121 Proposed 0 7/1/2016 6/1/2017 $ 11.4 2018 SCVP1 MEN 101 84.70 91.30 CAPM Cummings to Leggett CAPM Roadway 121 Proposed 0 7/1/2016 10/1/2016 $ 13.1 2018 SCVP

1 MEN 1 78.90 87.80 2RNear Rockport from 0.6 mile North of Wages Crk

to South Fork Cottoneva Crk Bridge 2RRoadway 122 Proposed 0 9/1/2015 11/1/2016 $ 10.9 2018 PSR

1 DN 101 12.50 16.30 Realign US Route 101Long Lead - In Del Norte County on US Route 101 from 0.6 mile south of Wilson Bridge, No. 1-05, to

4.9 miles south of Cushing Creek.Major Damage Restoration 131 Active 15 7/1/2015 6/1/2016 $ 910.0 2018 PSR

1 DN 101 R2.22 R2.22 Construct bridge at Waukell CreekIn Del Norte County near Klamath at 1.6 miles

South of Klamath River Ovfl #1-32Major Damage Restoration 131 Complete 100 9/1/2015 10/1/2015 $ 17.6 2016 PSR

1HUM/ME

N101/271

11.8 16.1

26.7 19.9

Culvert RehabIn Humboldt and Mendocino County at various

locations (HUM 101/MEN 101 and 0271)Roadway 151 Active 1 7/1/2015 2/1/2016 $ 3.5 2018 PSR

1 HUM 299 0.00 38.00 Culvert Repair/Replacement In Humboldt County from Jct 101 to Jct 96 Roadway 151 Discontinued 0 $ 5.3 NA PSR

1 DN 199 33.70 33.70Upgrade Lighting, Conduit, Conductors, Breakers

and Transformers for Tunnel Lighting.In Del Norte County at Collier Tunnel. Roadway 170 Proposed 0 8/1/2015 3/1/2016 $ 1.4 2018 PSR

1 DN VAR VAR VARUpgrade overhead signs to Type XI retro-

reflectivityAt Various Locations in District 1 Roadway 170 Proposed 0 1/1/2016 12/31/2016 $ 1.4 2018 PSR

1 MEN 101 50.90 51.70 Roadside Safety Improvements In Mendocino County at Oil Well Hill Roadside Preservation 235 Proposed 0 8/1/2015 3/1/2017 $ 2.8 2018 PSR

1MEN/HU

M101 VAR VAR Roadside Safety Improvements Roadside turnouts Roadside Preservation 235 Proposed 0 10/1/2015 9/30/2016 $ 2.0 2018 PSR

1 MEN 1 VAR VAR Wetland and fish passage remediation

Long Lead - On State Route 1 in Mendocino County at Fish Rock Gulch, Men-1-4.64, Doyle Creek, Men-1-54.62, Mitchell Creek, Men-1-57.81, and Digger

Creek, Men-1-58.78

Roadside Preservation 240 Proposed 0 8/1/2015 5/1/2016 $ 12.0 2018 PSR

1 HUM 10161.70 88.30

62.10 88.60

Construct two auxiliary lanes -- Fortuna and Arcata

In Humboldt County in Fortuna from Main St. onramp (NB) to Palmer Blvd. offramp and in

Arcata from SR-299 offramp (WB) to Giuntoli Lane offramp (NB).

Mobility Improvements 310 Proposed 0 6/1/2016 $ 11.9 2018 PSR

1 DN 199 0.60 0.80 Reconfigure IntersectionNear Cresent City for 0.1 mi north of Rte 199/101

Sep #01-58L to Elk Valley Cross RdMobility Improvements 310 Proposed 0 8/1/2015 4/1/2016 $ 3.2 2018 PSR

1 DN 101 5.10 5.60Extend Left Turn Pocket, Install Right & Left Turn

Acceleration Lanes & Widen RoadwayIn Del Norte County near Klamath from 0.7 miles

north of the 101/169 Jucntion at Ehlers Way.Mobility Improvements 310 Proposed 0 7/1/2015 12/1/2015 $ 1.5 2018 PSR

FY 2015-16 and FY 2016-17 PID Work Program

October 23, 2015 2 of 12

Dist

rict

Coun

ty

Rout

e

Begi

n Po

stm

ile

End

Post

mile

Purp

ose

& N

eed

Impr

ovem

ent D

escr

iptio

n

SHO

PP P

rogr

am C

ateg

ory

SHO

PP P

rogr

am C

ode

(20.

10.2

01.x

xx)

PID

Stat

us

% C

ompl

ete

Initi

atio

n Da

te (M

M/D

D/YY

YY)

Targ

et C

ompl

etio

n Da

te

(MM

/DD/

YYYY

)

Dist

Dir

Appr

oval

Dat

e (M

M/D

D/YY

YY)

Estim

ated

Pro

ject

Cos

t ($M

) (C

apita

l + S

uppo

rt C

osts

)

Targ

et P

rogr

amm

ing

Cycl

e

PID

Type

1 LAK VAR VAR VARUpgrade Traffic Field Element Microwave

Communication and Traffic Monitoring StationsIn east Lake County at various locations. Mobility Improvements 315 Active 5 8/1/2015 6/1/2016 $ 2.3 2018 PSR

1 LAK/MEN VAR VAR VARUpgrade Traffic Field Element Microwave

Communication and Traffic Monitoring StationsIn west Lake County at various locations and in

Mendocino County in Hopland.Mobility Improvements 315 Active 5 8/1/2015 6/1/2016 $ 2.3 2018 PSR

1 HUM VAR VAR VARUpgrade Traffic Field Element Microwave

Communication and Traffic Monitoring StationsIn Humboldt and Del Norte Counties at various

locations.Mobility Improvements 315 Proposed 0 10/1/2015 9/30/2016 $ 2.3 2018 PSR

1 MEN VAR VAR VARUpgrade Traffic Field Element Microwave

Communication and Traffic Monitoring StationsIn Mendocino County at various locations. Mobility Improvements 315 Proposed 0 10/1/2015 9/30/2016 $ 2.3 2018 PSR

1 HUM 200 R2.66 R2.66Raise structure to improve movement of extra-

legal permit loadsIn Humboldt County near Arcata at Route 200/299

Separation. Bridge No. 04-0184Bridge 322 Proposed 0 8/1/2015 5/1/2016 $ 21.0 2018 PSSR

1 HUM 101 17.80 87.90Arcata OH #04-0079R, South Fork Eel River #04-

0065, #04-0076Strengthen Bridge - Transportation Permit

RequirementsBridge 322 Complete 100 7/1/2014 6/30/2015 6/3/2015 $ 13.9 2018 PSSR

1 HUM 36 21.50 21.50 Install source control measures to control erosion Little Golden Gate, approx 15 miles east of Carlotta Mandates 335 Active 2 7/1/2015 4/1/2016 $ 1.6 2018 PSR

1 LAK 20 2.35 40.35 Install source control mearsures to control erosion Two Locations near the town of Clear Lake Oaks Mandates 335 Active 2 7/1/2015 2/1/2016 $ 1.7 2018 PSR

1 MEN 1 98.10 105.10 Slope erosion repairIn Mendocino County from 7 miles south of

Leggett to the intersection of 101 and 1Mandates 335 Proposed 0 1/1/2016 12/31/2016 $ 1.7 2018 PSR

1 DN 999 VAR VARFire, life, and safety upgrades to maintenance

stationIdlewild Maintenance Station Facilities 352 Proposed 0 7/1/2015 4/1/2016 $ 2.7 2018 PSR

1 HUM 101 74.79 74.79 Seismic Retrofit/Replacement & ADA District 1 Materials Lab Facilities 354 Active 5 7/1/2015 4/1/2016 $ 1.5 2018 PSR

1 HUM 101 77.60 78.20 22 Curb Ramps HUM 101 through Eureka (Wabash to Couplet) Mandates 361 Proposed 0 1/1/2016 10/1/2016 $ 2.5 2018 PSR

1 DN 101 25.70 27.20 Curb Ramps Various locations Mandates 361 Proposed 0 7/1/2015 4/1/2016 $ 2.5 2018 PSR2 TEH 36 12.60 12.10 Safety Improvement Curve Improvement Collision Reduction 10 Proposed 0 6/30/2016 2018 SCVP2 TEH 36 88.00 88.80 Safety Improvement Curve Improvement Collision Reduction 10 Proposed 0 6/30/2016 $ 4.10 2016 SCVP2 LAS 44 31.90 32.60 Safety Improvement Curve Improvement Collision Reduction 10 Active 5 6/29/2015 6/30/2016 $ 2.60 2016 SCVP2 TRI 299 20.00 25.00 CURE - Increase CRZ Trinity River Canyon Increase CRZ Collision Reduction 15 Proposed 0 7/1/2015 6/1/2017 $ 2.54 2018 SCVP

2 SIS '005 0 70.63 On Interstate 5 in Siskiyou County Upgrade MBGR and possilby flatten some slopes. Collision Reduction 15 Proposed 0 6/30/2016 $ 2.00 2018 SCVP

2 TEH '005 0.00 42.12 On Interstate 5 in Tehama CountyUpgrade MBGR and possilby flatten some slopes. Collision Reduction 15

Proposed 0 6/30/2016 $ 2.65

2018PSR

2 SIS 5 2.65 2.65 Replace Deck on SB Arch Structure Sac River BOH Replace Deck Bridge 110 Proposed 0 7/1/2015 6/1/2017 $ 7.93 2018 PSSR or PSR

2 SIS 5 8.29 8.29Place deck-on deck , upgrade rail, new joint seals

and approach slabsAzalea Deck and Rail Rehab Bridge 110 Proposed 0 7/1/2015 6/1/2017 $ 2.97 2018 PSSR or PSR

2 SHA 5 32.16 32.16 place Deck-on-deck or replace deck; O'Brien Deck and Rail Rehab Bridge 110 Proposed 0 7/1/2015 6/1/2017 $ 2.97 2018 PSSR or PSR

2 SIS '096 77.15 77.15 02-0117 Klamath River Scour Mitigation Bridge 111 Proposed 0 6/30/2016 $ 6.15 2018 PSSR2 TEH '099 9.14 9.15 08-00006 Champlin Slough Replace Bridge Bridge 111 Proposed 0 6/30/2016 $ 1.42 2018 PSSR

2 PLU 70 33.07 33.07 Upgrade Railing Indian Creek Bridge Rail Bridge 112 Proposed 0 7/1/2015 6/1/2017 $ 2.98 2018PSSR, PSR or

SCVP

2 SIS '003 R46.9 R48.3In Siskiyou Co. in and near Yreka SIS 3 PM

R46.9/48.3 & SIS 263 PM 49.07/49.41Yreka Rehab Roadway 120 Proposed 0 6/30/2016 $ 8.65 2018 PSSR

2 SHA 299 67.80 77.80 Maintain Pavement and Roadway Facilities Burney CAPM Roadway 121 Proposed 0 7/1/2015 6/1/2017 $ 9.97 2018 CAPM2 SIS 96 41.00 58.00 Rehabiliate Culverts/Fish Passage Portuguese and Cade Creek Roadway 151 Proposed 0 7/1/2015 6/1/2017 $ 4.68 2018 PSR2 MOD 139 0 51 Canby and north of Canby Drainage Restoration Roadway 151 Proposed 0 6/30/2016 $ 1.75 2018 PSR2 TRI 299 43.00 70.00 In Trinity County Drainage Rehabilitation Roadway 151 Proposed 0 6/30/2016 $ 2.25 2018 PSR

2 TRI '003 30 85.068 North and south of Trinity Center

Drainage Restoration in Trinity County near Weaverville at various locations from 0.9 miles

south of Trinity River Bridge to the Siskiyou County Line.

Roadway 151 Proposed 0 6/30/2016 $ 3.96 2018 PSR

2 TEH '036 0 100 In Tehama County Drainage Rehabilitation Roadway 151 Proposed 0 6/30/2016 $ 2.99 2018 PSR2 BUT '070 22 48 Pulga and East of Pulga Drainage Restoration Roadway 151 Proposed 0 6/30/2016 $ 2.93 2018 PSR

2 SIS '096 23 103.42 In Siskiyou County East and West of Happy Camp Drainage Restoration Roadway 151 Proposed 0 6/30/2016 $ 0.92 2018 PSR

2 TRI 299 0 72In Shasta County at various locations on highway

299

Pave areas beyond the gore, relocate signs/electrical components and install

maintenance vehicle pullouts.Collision Reduction 235 Proposed 0 6/30/2016 $ 1.90 2018 SCVP

2 SHA 299 60.60 60.60 Hillcrest SRRA Water quality mandate: upgrade sewage system Collision Reduction 235 Proposed 0 6/30/2016 $ 2.52 2018 SCVP

2 PLU '070 36.80 62.50 In Plumas County Rock fall along the Plumas 70 corridor Collision Reduction 235 Proposed 0 6/30/2016 $ 3.52 2018 PSSR

2 PLU '070 49.80 49.80 Massack SRRA Water quality mandate: upgrade sewage system Collision Reduction 235 Proposed 0 6/30/2016 $ 1.82 2018 SCVP

2 TEH '005 40.70 40.70 Near Cottonwood SB Cottonwood Scales Mobility Improvements 321 Proposed 0 6/30/2016 $ 3.10 2018 PSR

2 SHA '005 15.43 15.4306-0126R East Redding Separation (VC 4.5); 06-0126 L East Redding Separation (VC 4.98); 06-

0126G N5W44 Connector (VC 4.55)In Redding at the SHA 5 SHA 44 Connector Bridge 322 Proposed 0 6/30/2016 $ 4.00 2018 PSSR

2 TRI 299 57.40 73.00SR 299 adjacent to the Trinity River and tributaries

to Trinity River in various locationsStabalize Slope and install STBMP's to reduce

sediment and nutrient dischargeMandates 335 Proposed 0 6/30/2016 $ 2.05 2018 PSR

2 SIS '003 R46.2 R49.4 In Siskiyou County in Yreka on Highway 3 Install/Upgrade Curb Ramps Mandates 361 Proposed 0 6/30/2016 $ 3.98 2018 PSR

3 COL 20 34.80 36.50Widen shoulders to 8 feet, improve bicycle access,

improve CRZWiden shoulders to 8 feet, improve bicycle access,

improve CRZCollision Reduction 015 Proposed 0 7/1/2015 6/30/2016 $6.5 2018 PIR

3 PLA 80 0.00 69.77Upgrade MBGR to current standards and improve

the CRZUpgrade MBGR to current standards and improve

the CRZCollision Reduction 015 Proposed 0 7/1/2015 6/30/2016 $2.7 2018 SCVP

3

EDPLABUTSACYOLSUT

Various Various VariousReplace ADIEM and sand barrel crash cushions to

reduce worker exposureReplace ADIEM and sand barrel crash cushions to

reduce worker exposureCollision Reduction 015 Proposed 0 7/1/2015 6/30/2016 $2.7 2018 SCVP

3SACSOL

12 0.00 0.40Replace Elevators at the Sacramento River Bridge

(Br No. 23-0024)Replace Elevators at the Sacramento River Bridge

(Br No. 23-0024)Bridge 110 Proposed 0 7/1/2015 6/30/2016 $1.3 2018 PSSR

3 BUT 70 28.22 28.22Bridge Deck Rehab - Polyester overlay/new Type B

Seals/misc cat walk upgradeBridge Deck Rehab BR # 12-0134 - Polyester

overlay/new Type B Seals/misc cat walk upgradeBridge 110 Proposed 0 7/1/2015 6/30/2016 $5.6 2018 PSSR

3 SAC 99 7.92 8.404 bridges: Scour Mitigation Consumnes River

Overlow Br. No 24-0021R/L & 20R/L 4 bridges: Scour Mitigation Consumnes River

Overlow Br. No 24-0021R/L & 20R/L Bridge 111 Proposed 0 7/1/2015 6/30/2016 $1.7 2018 PSSR

3 YUB 70 R9.28 13.23At 3 locations in YUB county on Rte 70 from one

mile north of Jct Rte 65/70 to South Marysville UCRail Upgrade on 3 BR: YUB 70 Br # 16-0036, 16-

0033, 16-0035Bridge 112 Proposed 0 7/1/2015 6/30/2016 $1.1 2018 PSSR

3 SUT 99 39.40 40.90Roadway Rehab in Live Oak from 0.1 mil north of

Coleman Ave to north of Ramsdell DriveRoadway Rehab in Live Oak from 0.1 mil north of

Coleman Ave to north of Ramsdell DriveRoadway 120 Proposed 0 7/1/2015 6/30/2016 $4.2 2018 PSR

3 BUT 99 R3.5 4.9 In and near Gridley from Obermeyer Dr to Chico San Dr.

Roadway Rehab Roadway 120 Proposed 0 7/1/2015 6/30/2016 $8.4 2018 PIR

3 NEV 80 13 15.5 In Truckee from west of Donner Park OC (Br # 17-0045) to Trout Creek UC (Br # 17-0031)

Roadway Rehab Roadway 120 Proposed 0 7/1/2015 6/30/2016 $12.1 2018 PSSR

3 SIE 89 20 29.6 In Sierra County from Rte 49 north to Plumas County Line.

HMA Overlay Roadway 122 Proposed 0 7/1/2015 6/30/2016 $3.8 2018 PIR

3 NEV 80 31.05 31.10 Stabilize Cut Slope Stabilize Cut Slope Major Damage Restoration 150 Proposed 0 7/1/2015 6/30/2016 $6.7 2018 PSR3 NEV 80 28.30 28.70 Stabilize Cut Slope Stabilize Cut Slope Major Damage Restoration 150 Proposed 0 7/1/2015 6/30/2016 $6.7 2018 PSR3 ED 50 0.00 7.50 Drainage Rehabilitation Drainage Rehabilitation Roadway 151 Proposed 0 7/1/2015 6/30/2016 $4.2 2018 PSSR

3 SAC 50 R0.59 R3.12Pave Slopes, roadside paving, relocate facilities,

replacement plantingPave Slopes, roadside paving, relocate facilities,

replacement plantingCollision Reduction 235 Proposed 0 7/1/2015 6/30/2016 $3.3 2018 SCVP

3 SUT Various VariousIn Butte, Sutter, Yuba and Glenn counties in

District 3Giant Garter Snake and Swainson's Hawk Habitat

Mitigation for RAMP Pilot ProgramRoadside Preservation 240 Proposed 0 7/1/2015 6/30/2016 $1.5 2018 PSR

3 PLA 65 Various VariousOn Placer 65, at Caltrans Coon Creek Conservation

Ranch (C4 Ranch)

Fund construction & monitoring of a CalTrans-owned and operated wetlands mitigation bank

with a min Placer & Sac County service areaRoadside Preservation 240 Proposed 0 7/1/2015 6/30/2016 $1.1 2018 PSR

3NEVPLAED

2049

193Various Various

Lengthen and Widen existing turnouts, add new turnouts at (1) NEV 20 between five mile house

and I-80 ; (2) NEV 49 Various locations; (3) PLA 193 Various locations

Lengthen and Widen existing turnouts, add new turnouts at (1) NEV 20 between five mile house

and I-80 ; (2) NEV 49 Various locations; (3) PLA 193 Various locations

Mobility Improvements 310 Proposed 0 7/1/2015 6/30/2016 $2.0 2018 SCVP

3 NEV2049

22.20 25.80Widen left turn pockets at Wash Ridge Rd and Harmony; Left turn pockets at Round Valley Rd

and Quail Creek DR

Widen left turn pockets at Wash Ridge Rd and Harmony; Left turn pockets at Round Valley Rd

and Quail Creek DRMobility Improvements 310 Proposed 0 7/1/2015 6/30/2016 $1.6 2018 SCVP

3 SAC 99 12.70 R24.3Replacing existing communication lines with fiber

optics to improve performanceReplacing existing communication lines with fiber

optics to improve performanceMobility Improvements 315 Proposed 0 7/1/2015 6/30/2016 $5.0 2018 SCVP

3 SAC Various 0.00 34.60Upgrade existing TMS/AVC systems at various

locationsUpgrade existing TMS/AVC systems at various

locationsMobility Improvements 315 Proposed 0 7/1/2015 6/30/2016 $3.3 2018 SCVP

3 SUT 20 12.10 17.10 ADA Access

ADA Access; In and near Yuba City on SR 20 from Sycamore Canal to the Yuba Co Line (PM

12.13/17.06) and on SR 99 from south of Franklin Road to Queens Ave OC (PM 29.67/31.31)

Mandates 361 Proposed 0 7/1/2015 6/30/2016 $4.5 2018 SCVP

3 SAC 80 M10.4 12.70 Remove and replace HMA Remove and replace HMA Roadway 121 Proposed 0 7/1/2015 6/30/2016 $6.9 2018 PIR3 SAC 5 25.40 34.60 Remove and Replace HMA Remove and Replace HMA Roadway 121 Proposed 0 7/1/2015 6/30/2016 $22.4 2018 CAPM3 PLA 80 38.30 43.10 Drainage Rehab From Secret Town OC to Mone Vista OC Roadside Preservation 151 Proposed 7/1/2015 6/30/2016 $4.2 2018 PSSR

3 SAC505

0.00 0.00Bridge Preventive Maintenance (Paint)

Sacramento River Viaduct (11 East ramps)Bridge Preventive Maintenance (Paint)

Sacramento River Viaduct (11 East ramps)Bridge 119 Proposed 0 7/1/2015 6/30/2016 $11.2 2018 PIR

3 SAC 5 23.59 23.59 West End Viaduct Bridge No. 24-0069R/L Super-structure strengthening Bridge 110 Proposed 0 10/2/2015 4/1/2016 $7.5 2018 PSR

3 NEV 20 20.90 30.50Widen Shoulders, improve superelevation, remove

trees, widen fill slopesWiden Shoulders, improve superelevation, remove

trees, widen fill slopesCollision Reduction 010 Active 25 12/8/2014 12/15/2015 $4.0 2014 PSR

3 ED 50 22.01 24.10 Improve local traffic circulation Safety improvements Collision Reduction 010 Active 95 7/1/2013 10/1/2015 $40.0 2014 PSSR

3YOLCOLSUT

162080

Various Various Install centerline/shoulder rumble strips Install centerline/shoulder rumble strips Collision Reduction 010 Proposed 0 7/1/2015 6/30/2015 $1.3 2014 SCVP

3GLEBUT

32 Various Various Install centerline/shoulder rumble strips Install centerline/shoulder rumble strips Collision Reduction 010 Proposed 0 7/1/2015 6/30/2015 $0.6 2014 SCVP

3NEV PLA

204980

174267

Various Various Install centerline/shoulder rumble strips Install centerline/shoulder rumble strips Collision Reduction 010 Proposed 0 8/6/2015 11/1/2015 $1.8 2018 SCVP

3 PLA 49 2.22 2.35 Realign RoadwayRealign roadway, retaining walls and replace

culvertsCollision Reduction 010 Proposed 0 8/31/2015 1/15/2016 $2.6 2018 PSR

3 NEV 80 18.28 19.29Construct 12" water supply line to Donner Pass

Inspection FacilityConstruct 12" water supply line to Donner Pass

Inspection FacilityMajor Damage Restoration 131 Proposed 0 9/10/2015 12/1/2015 $3.3 2018 PSR

3 PLA 193 4.10 4.60Widen shoulders to close gap between two wider

sections of roadwayWiden shoulders to close gap between two wider

sections of roadwayCollision Reduction 015 Proposed 0 7/1/2016 6/30/2017 $2.0 2018 PSR

3 PLA2889

2670.00 11.03

Upgrade MBGR to current standards and improve the CRZ

Upgrade MBGR to current standards and improve the CRZ on Routes 28, 89, and 267

Collision Reduction 015 Proposed 0 7/1/2016 6/30/2017 $2.6 2018 SCVP

FY 2015-16 and FY 2016-17 PID Work Program

October 23, 2015 3 of 12

Dist

rict

Coun

ty

Rout

e

Begi

n Po

stm

ile

End

Post

mile

Purp

ose

& N

eed

Impr

ovem

ent D

escr

iptio

n

SHO

PP P

rogr

am C

ateg

ory

SHO

PP P

rogr

am C

ode

(20.

10.2

01.x

xx)

PID

Stat

us

% C

ompl

ete

Initi

atio

n Da

te (M

M/D

D/YY

YY)

Targ

et C

ompl

etio

n Da

te

(MM

/DD/

YYYY

)

Dist

Dir

Appr

oval

Dat

e (M

M/D

D/YY

YY)

Estim

ated

Pro

ject

Cos

t ($M

) (C

apita

l + S

uppo

rt C

osts

)

Targ

et P

rogr

amm

ing

Cycl

e

PID

Type

3 NEV 80 0.00 31.78On Route 80 at various locations in Placer and

Nevada CountiesUpgrade MBGR to current standards and improve

the CRZCollision Reduction 015 Proposed 0 7/1/2016 6/30/2017 $2.6 2018 SCVP

3 SAC 51 1.77 8.52Rail Upgrade on 9 BR: 24 0131, 0153, 0117,

0124K, 0291L, 0293R SAC 80 PM 5.2/8.9 BR.NO. 24 0218, 0203, 0205

Rail Upgrade on 9 BR: 24 0131, 0153, 0117, 0124K, 0291L, 0293R SAC 80 PM 5.2/8.9 BR.NO. 24

0218, 0203, 0205Bridge 112 Proposed 0 7/1/2016 6/30/2017 $8.1 2018 PSSR

3 COL 16 R4.34 R4.4Seismic Retrofit West of Williams on Rte 16

approximately 4.3 miles south of Jct Rte 20 at Bear Creek Bridge; Br #15-0036

Seismic Retrofit West of Williams on Rte 16 approximately 4.3 miles south of Jct Rte 20 at Bear

Creek Bridge; Br #15-0036Bridge 113 Proposed 0 7/1/2016 6/30/2017 $2.2 2018 PSSR

3 SIE 49 R3.7 16.85Seismic Retrofit 3 BR: SIE 49 Br # 13-0002, Br # 13-

0005; Nev 20 Br # 17-0077Seismic Retrofit 3 BR: SIE 49 Br # 13-0002, Br # 13-

0005; Nev 20 Br # 17-0077Bridge 113 Proposed 0 7/1/2016 6/30/2017 $1.8 2018 PSSR

3 ED 49 34.60 38.20Roadway Rehab in El Dorado and Placer counties from Jct Rte 193 in Cool to Borland Ave in Auburn

Roadway Rehab in El Dorado and Placer counties from Jct Rte 193 in Cool to Borland Ave in Auburn

Roadway 120 Proposed 0 7/1/2016 6/30/2017 $19.0 2018 CAPM

3 ED 49 9.00 14.00 HMA Overlay HMA Overlay Roadway 122 Proposed 0 7/1/2016 6/30/2017 $3.0 2018 PSSR3 PLA 80 68.50 69.70 PCC Lane Replacement PCC Lane Replacement Roadway 122 Proposed 0 7/1/2016 6/30/2017 $12.6 2018 CAPM3 NEV 80 31.15 31.27 In Nevada County PM 31.15 to 31.27 Stabilize Cut Slope Major Damage Restoration 150 Proposed 0 7/1/2016 6/30/2017 $6.7 2018 PSR3 SIE 80 1.40 1.59 Stabilize Cut Slope Stabilize Cut Slope Major Damage Restoration 150 Proposed 0 7/1/2016 6/30/2017 $6.7 2018 PSR3 ED 50 7.50 R15 Drainage Rehabilitation Drainage Rehabilitation Roadway 151 Proposed 0 7/1/2016 6/30/2017 $4.2 2018 PSSR

3 SAC 5 12.40 24.82 Rehabilitate Highway Planting and Irrigation Rehabilitate Highway Planting and Irrigation Roadside Preservation 210 Proposed 0 7/1/2016 6/30/2017 $2.0 2018 PSR

3 SAC 99 20.00 23.91Pave Slopes, roadside paving, relocate facilities,

replacement plantingPave Slopes, roadside paving, relocate facilities,

replacement plantingCollision Reduction 235 Proposed 0 7/1/2016 6/30/2017 $2.6 2018 SCVP

3 SAC 99 23.00 R24.35Replace Guardrail with Concrete Barrier, Relocate

Lighting Roadside PavingReplace Guardrail with Concrete Barrier, Relocate

Lighting Roadside PavingCollision Reduction 235 Proposed 0 7/1/2016 6/30/2017 $1.4 2018 SCVP

3SACPLA

80 10.98 18.00Sign safety rails, relocate lighting, roadside paving,

gore pavingSign safety rails, relocate lighting, roadside paving,

gore pavingCollision Reduction 235 Proposed 0 7/1/2016 6/30/2017 $2.4 2018 SCVP

3 BUT 99 Various Various In Tehama CountyFund construction and monitoring of a CalTrans-owned and operated wetlands mitigation bank.

Roadside Preservation 240 Proposed 0 7/1/2016 6/30/2017 $1.9 2018 PSR

3 BUT 99 R34.8 R34.8Widen NB off-ramp to East Ave in Chico to reduce

queueing on mainlineEast Ave off-ramp in Chico Mobility Improvements 310 Proposed 0 7/1/2016 6/30/2017 $1.6 2018 PSR

3 NEV 20 40.18 41.40On Nev 20 in Bear Valley add passing lane to

permit passing of slow moving vehiclesOn Nev 20 in Bear Valley add passing lane to

permit passing of slow moving vehiclesMobility Improvements 310 Proposed 0 7/1/2016 6/30/2017 $1.3 2018 SCVP

3 SAC 51 0.00 6.00 Ramp Meters and TMS Upgrades Ramp Meters and TMS Upgrades Mobility Improvements 315 Proposed 0 7/1/2016 6/30/2017 $2.4 2018 SCVP

3 ED 50 0.00 80.40 Install new ITS systems Phase 2 Install new ITS systems Phase 2 Mobility Improvements 315 Proposed 0 7/1/2016 6/30/2017 $4.0 2018 SCVP

3 BUT 99 R30.0 R37.0 Improve traveler information and data collectionInstall & implement ITS elements in Chico area:

Detection, CCTV, VDS between Southgate at JNO Eaton Road

Mobility Improvements 315 Proposed 0 7/1/2016 6/30/2017 $6.3 2018 SCVP

3 ED 50 Various Variousa) Replace Congestion Warning Signs/Flashing

Beacons with traffic responsive EMSb) Install new ITS systems along ED-50 (Phase I)

a) Placerville- Missouri Flat Rd Interchange, Placerville Dr/Forni Rd, Ray Lawyer Dr, Schnell

School Rd.b) ED-50, PM0/80.44

Mobility Improvements 315 Proposed 0 7/1/2016 6/30/2017 $6.6 2018 SCVP

3 SAC 80 15.00 17.20Repair WIM sensors and equipment and replace

approach slabs

Repair WIM sensors and equipment and replace approach slabs Mobility Improvements 321 Proposed 0 7/1/2016 6/30/2017 $2.1 2018 SCVP

3 YOL 5 4.50 R28.9 Vertical Clearance Transportation Permit Requirement for Bridges Bridge 322 Proposed 0 7/1/2016 6/30/2017 $4.1 2018 PSSR

3 BUT 162 12.10 18.50 ADA AccessADA Access; 0.3 mi East of Wilber Rd to Foothill

Blvd, 0.5 Mi East of City of OrovilleMandates 361 Proposed 0 7/1/2016 6/30/2017 $4.0 2018 SCVP

3 YOL 80 0.00 7.30Roadway Rehab in and near Davis from Solano

County Line to Yolo Causeway (Br#22-45)Roadway Rehab in and near Davis from Solano

County Line to Yolo Causeway (Br#22-45)Roadway 121 Proposed 0 7/1/2016 6/30/2017 $25.4 2018 PSSR

3 BUT 162 15.80 18.00 Remove and Replace HMA Remove and Replace HMA Roadway 121 Proposed 0 7/1/2016 6/30/2017 $5.8 2018 CAPM

3 NEV 49 0.00 7.50 Culvert Rehab Culvert Rehab Roadway 151 Proposed 0 7/1/2016 6/30/2017 $4.1 2018 PSSR

3 COL 5 24.3 24.3 Maxwell SRRAUpgrade sewage system to comply with water

quality standardsCollision Reduction 235 Complete 100 3/1/2014 6/30/2014 6/25/2014 $5.7 2018 SCVP

3 SAC 51 2.61 2.97 Sac 51 American River (24-0003, 2.61) Deck Place Overlay Bridge 110 Complete 100 7/1/2013 5/1/2015 6/29/2015 $105.2 2018 PSSR

3 GLE 162 43.5 84.2

19 Bridges: Br. No.'s 11-10(PM's 67.74), 14(75.64), 23(81.63), 24(82.01), 26(84.11), 98(43.54), 12-41(7.0), 40(8.11), 42(6.67), 56(0.52), 57(0.22)

(Reduce scope - MBJ)

Rail Upgrade Bridge 112 Complete 100 7/1/2013 5/1/2015 6/24/2015 $57.8 2018 PSSR

3 COL 5 2.3 13.85 BRIDGES: (22-0133,PM 26.65), (15-60,3.15), (15-

59,2.3), (15-61,10.31), (15-63, 13.75)Vertcal Clearance Bridge 322 Complete 100 7/1/2012 6/30/2015 6/29/2015 $21.3 2018 PSR

3 SAC 50 L0.6 R5.3In Sacramento from South Park Viaduct (Br#24-

243) to Watt Ave OC (Br#24-34)Rehab Pavement Roadway 120 Complete 100 11/6/2014 12/1/2014 11/7/2014 $156.7 2018 PSSR

3 SAC 5 14.9 24.9In Sacramento from Consumnes River Blvd to

American River Br (Br#24-0068)Roadway Rehab Roadway 120 Complete 100 11/6/2014 12/1/2014 6/30/2015 $175.0 2018 PSSR

3 YUB 65 R0.52 R1.77In Wheatland from 0.18 miles south of Main Street

to Grasshopper Slough Bridge (Br#16-00001)Remove and Replace HMA; Install/Upgrade ADA

curb rampsRoadway 121 Complete 100 2/27/2015 6/1/2015 6/30/2015 $4.7 2018 CAPM

3 YOL 45 0 12.9In Yolo County from Jct Route 113 in Knights

Landing to Colusa County LineCold In-Place Recycle with HMA Overlay Roadway 121 Complete 100 11/24/2014 12/1/2014 11/26/2014 $15.3 2018 CAPM

3 YOL 16 0 19.3In Yolo County from Colusa County Line to Cache

Creek Indian CasinoCold in-place recycle with HMA overlay Roadway 121 Complete 100 11/24/2014 12/1/2014 11/26/2014 $20.6 2018 CAPM

3 COL 20 0 10.2In Colusa and Lake County near Williams from 0.4 miles west of the Lake/Colusa County line to 3.0

miles west of Walnut Drive/Leesville RoadRoadway Rehab Roadway 120 Complete 100 3/5/2015 6/1/2015 6/30/2015 $127.8 2018 PSSR

3 GLE 162 37.6 84.6In Glenn County from approx 8 miles north of Elk

Creek to Butte County LineCold in-place recycle with HMA overlay Roadway 121 Complete 100 11/24/2014 12/1/2014 11/26/2014 $55.9 2018 CAPM

3 GLE 45 0 23.2In Glenn County from Colusa County Line to Jct

Route 32 in Hamilton CityCold In-Place recycle with HMA overlay Roadway 121 Complete 100 11/24/2014 12/1/2014 11/26/2014 $28.3 2018 CAPM

3 YOL 84 0 15.68In Yolo County, approx 8 miles south of West

Sacramento from Solano County line to 4 miles north of Babel Slough Road

CIR w/HMA Overlay Roadway 121 Complete 100 11/6/2014 12/1/2014 11/7/2014 $21.0 2018 CAPM

3 SAC 99 0 21.5

In and near Galt from the San Joaquin Co line to Simmerhorn Rd OC (Br # 24-0138) and Near and in Sacramento from 0.7 mile south of Elk Grove Blvd

OC (Br#24-0019) to MLK Blvd OC (Br#24-0147)

RHMA Overlay Roadway 121 Complete 100 4/17/2015 6/1/2015 6/30/2015 $44.8 2018 CAPM

3 YOL 16 27.5 28.3 Esparto Installation of lighting and improved curb returns Collision Reduction 015 Complete 100 7/1/2013 6/1/2015 6/30/2015 $1.8 2018 PSR

3 YUB 70 13 13.6Yub-70 from Feather River Blvd to Yuba River

BridgeRemove oleander and thrie beam and install concrete median barrier, widen structures

Collision Reduction 015 Complete 100 5/6/2015 6/1/2015 6/26/2015 $6.7 2018 SCVP

3 YOL 16 25.22 25.42On Yol 16 at the western approach to the town of

CapayWiden shoulder and remove vegetation Collision Reduction 015 Complete 100 12/8/2014 5/1/2015 6/30/2015 $1.5 2018 SCVP

3 SAC 50 R7.7 R9.5On Route 50 between Bradshaw Road and Mather

Field RoadConstruct auxiliary lane Mobility Improvements 310 Complete 100 1/15/2015 5/1/2015 6/23/2015 $9.4 2018 SCVP

3 SAC 5 33.1 33.1WIM station on Sac-5 at PM 33.1 located in the NB

lanesWeigh-in motion repairs and concrete pavement

replacementMobility Improvements 321 Complete 100 3/1/2014 6/27/2014 6/23/2014 2.9 2018 SCVP

3 SAC 5 10.9 25.7In and near Sacramento, from Elk Grove Blvd to

Garden HwyConstruct aux lanes at Elk Grove Blvd,

Pocket/Florin Rd, and Garden HwyMobility Improvements 310 Complete 100 4/15/2015 6/1/2015 6/30/2015 $16.0 2018 PSSR

3 PLA 80 2.81 2.81In Placer county on WB I-80 at the Atlantic Blvd on-

rampWiden existing on-ramp and structure over Miners

Ravine to provide a standard 2+1 on-ramp.Mobility Improvements 310 Complete 100 4/15/2015 6/1/2015 6/24/2015 $8.6 2018 PSSR

4 ALA 84 R0.73 R3.06 Improve safety & reduce accidents Install outer separation barriers Collision Reduction 010 Active 0 7/1/2015 6/30/2016 $ 14.0 2016 PIR4 ALA 880 20.9 Improve safety & reduce accidents Re-construct ramp & install traffic signals Collision Reduction 010 Active 0 7/10/2015 6/30/2016 $ 4.0 2016 PIR

4 ALA 880 27.1 27.3 Improve safety & reduce accidentsInstall outer separation barriers on SB I-880 between PM 27.10 and PM 27.32

Collision Reduction 010 Active 5 6/5/2015 12/1/2015 $ 1.5 2016 PIR

4 CC 80 0.0 13.7 Improve safety & reduce accidentsIn Contra Costa County, on Route 80, between PM 0.0 & 13.7 - Install LED lights, and upgrade median barrier.

Collision Reduction 010 Active 0 7/10/2015 6/30/2016 $ 47.3 2016 PIR

4 SON 12 24.2 32.3 Improve safety & reduce accidents Widen shoulders and install shoulder rumble strips Collision Reduction 010 Active 0 7/10/2015 10/30/2016 $ 29.0 2016 PIR

4 ALA 13 6.7 7.2 Improve safety & reduce accidentsInstall concrete barrier between SB SR-13 and the frontage road Monterrey Blvd.

Collision Reduction 010 Active 5 5/27/2015 2/28/2016 $ 3.0 2016 PIR

4

NAPSONSONSON

128101116121

var var Improve safety & reduce accidents High friction road surface treatment Collision Reduction 010 Active 60 12/15/2013 12/31/2015 $ 4.2 2016 PSR-PR

4ALAALACC

SB 880EB 80

NB 680

28.985.8816.9

29.126.3617.1

Improve safety & reduce accidents Install outer separation barriers Collision Reduction 010 Active 10 11/20/2014 1/2/2016 $ 3.8 2016 PIR

4 ALA 80 4.50 R7.61To enhance night time visibility and upgrade median barrier

To install median concrete barrier type G and median lighting from I-80/Rte 13 in Berkeley to 0.4 mile north to Buchanan St. in Albany

Collision Reduction 010 Active 40 4/3/2015 10/30/2015 $ 8.5 2016 PIR

4 SCL 280 11.29 11.29 Improve safety & reduce accidentsReconfigure NB off-ramp at Foothill Expy intersection in the City of Cupertino

Collision Reduction 010 Active 20 12/19/2014 12/31/2015 $ 1.3 2016 PIR

4 SCL 280 18.6 18.6 Improve safety & reduce accidentsInstall signal in the Town of Los Altos Hills, at the southbound Route 280 Off-Ramp/Page Mill Road/Arastradero Road Intersection

Collision Reduction 010 Active 0 2/1/2011 6/30/2016 $ 3.3 2016 PSR

4 SCL17

1010.0

R4.06.55

R16.8Safety Improvement

Install rumble strips and lighting. On Route 17 from 0.1 mile south of Summit Road to E Main Street in Los Gatos and on US 101 from 0.2 mile south of Mesa Road to E Main Avenue in Gilroy and Morgin Hill.

Collision Reduction 010 Active 30 7/21/2014 1/2/2016 $ 4.5 2016 PIR

4 SF 101 0.00 4.24 Mitigate wet pavement accidentsDrainage improvements, overlay existing AC with OGFC, and groove existing PCC pavement

Collision Reduction 010 Active 5 5/15/2015 6/30/2016 $ 17.0 2016 PSR

4 ALA 580 R1.62L R6.0L Improve safety & reduce accidents Safety lighting Collision Reduction 010 Active 5 7/1/2015 6/30/2016 $ 4.0 2018 PIR

4 CC 680 R13.9 22.70 Enhance night-time visibility and minimize glareInstall lighting along the median and upgrade median barrier

Collision Reduction 010 Proposed 0 7/1/2015 6/30/2016 $ 15.0 2016 SCVP

4 SOL 1 0.00 58.36 Improve safety & reduce accidents Construct bike pull out areas Collision Reduction 010 Proposed 0 10/1/2015 6/30/2016 2016 PSR

4 ALACC

1324

580680880

480

160

Var Var Collision reductionIn Alameda & Contra Costa Counties - Rectangular Rapid Flashing Beacons

Collision Reduction 015 Active 0 7/1/2015 6/30/2016 $ 5.5 2018 PIR

4

ALAALACCCC

580680160680

R1.48M3.850.00

R4.18

R1.48M3.850.00

R4.18

Collision reductionInstall concrete barrier and upgrade to MGS guardrail

Collision Reduction 015 Active 0 7/1/2015 6/30/2016 $ 1.3 2018 PIR

FY 2015-16 and FY 2016-17 PID Work Program

October 23, 2015 4 of 12

Dist

rict

Coun

ty

Rout

e

Begi

n Po

stm

ile

End

Post

mile

Purp

ose

& N

eed

Impr

ovem

ent D

escr

iptio

n

SHO

PP P

rogr

am C

ateg

ory

SHO

PP P

rogr

am C

ode

(20.

10.2

01.x

xx)

PID

Stat

us

% C

ompl

ete

Initi

atio

n Da

te (M

M/D

D/YY

YY)

Targ

et C

ompl

etio

n Da

te

(MM

/DD/

YYYY

)

Dist

Dir

Appr

oval

Dat

e (M

M/D

D/YY

YY)

Estim

ated

Pro

ject

Cos

t ($M

) (C

apita

l + S

uppo

rt C

osts

)

Targ

et P

rogr

amm

ing

Cycl

e

PID

Type

4 SCL Var Var Var Collision reductionOn all of the State Routes within Santa Clara County - Install accessible pedestrian signals (APS) and pedestrian countdown timers.

Collision Reduction 015 Active 0 7/1/2015 6/30/2016 $ 6.8 2018 PSR

4 SM Var Var Var Collision reduction

In San Mateo County on Routes 1, 35, 82, 84, 92, 101, 109, 114, 280, and 380 - Install Accessible Pedestrian Signal (APS) systems and pedestrian countdown timers to enhance pedestrian safety

Collision Reduction 015 Active 0 7/1/2015 6/30/2016 $ 5.3 2018 PIR

4SONMRNNAP

Var Var Var Collision reductionIn Sonoma County on Routes 12 & 116,In Marin County on Routes 1 & 131, and in Napa County on Route 29 - Pedestrian Safety Enhancement

Collision Reduction 015 Active 0 7/1/2015 6/30/2016 $ 1.4 2018 PSR

4 ALACC

Var Var Var Collision reduction Upgrade/Install curve warning signs Collision Reduction 015 Proposed 0 9/9/2015 6/30/2016 $ 2.0 2018 PIR

4 SM 101 7.1 7.1 Bridge replacement Replace bridge at Cordilleras Creek #35-0019 Bridge 110 Active 30 8/29/2014 12/31/2015 $ 5.0 2018 PIR

4 ALA 580 R35.0 R35.0 Bridge preservation Bridge preservation - Foothill Blvd UC # 33 0334K Bridge 110 Active 0 7/1/2015 6/30/2016 $ 4.1 2018 PSSR

4 NAP 121 6.4 6.4 Bridge Preservation Replace Bridge- Tulucay Creek Bridge #21-0003 Bridge 110 Active 0 7/1/2015 6/30/2016 $ 8.3 2018 PIR

4 NAP 128 5.1 5.1 Bridge preservation Replace Hopper Slough BR#21-0019 Bridge 110 Active 0 7/1/2015 6/30/2016 $ 6.9 2018 PSSR

4 SM 101 0.01 23.40 Bridge rail replacement/upgrade Bridge Rail Replacement/upgrade Bridge 112 Active 98 7/1/2014 12/31/2015 $ 4.4 2018 PSSR

4 NAP 29 14.1 29.3 Bridge Rail Replacement/UpgradeBridge Rail Replacement/Upgrade- BR#21-0016, 0017, 0018, 0048, 0051

Bridge 112 Active 0 7/1/2015 6/30/2016 $ 1.6 2018 PIR

4 CC 24 R3.47 R3.47 Seismic restoration Seismic restoration- St Stephens Dr OC #28-0111 Bridge 113 Active 0 7/1/2015 6/30/2016 $ 2.8 2018 PSSR

4 SM 280 0.01 20.97 Seismic restorationSeismic restoration at Alpine Road UC #35-0009L/R, Sand Hill Road OC #35-0008, Route 280/380 Sep #35-0217

Bridge 113 Active 0 7/1/2015 6/30/2016 $ 8.3 2018 PSSR

4 ALA 880 27.2 27.2 Bridge preservationSub-structure rehab/scour mitigation- East Creek Slough Br. No. 33-0143

Bridge 119 Active 30 8/29/2014 12/31/2015 $ 1.5 2016 Br. Maint. PID

4 MRN 101 11.2 11.2 Bridge Preservation Maintenance Rehabilitate Culvert- Irwin Creek BR#27 0097 Bridge 119 Active 0 7/1/2015 6/30/2016 $ 1.1 2018 Br. Maint. PID

4 MRN 101 7.4 18.9 Bridge Preservation MaintenancePainting and EQ Restrainer Cable Replacement- Talapais Dr OC BR#27-0072, S101-E37 Connector BR#27 0085F

Bridge 119 Active 0 7/1/2015 6/30/2016 $ 1.1 2018 PIR

4 SM 1 14.0 14.0 Preventive maintenanceRepair or replace sections of the left barrier rail withdelaminations and spalls- Pescadero Cr. 35-0028

Bridge 119 Active 0 7/1/2015 6/30/2016 $ 1.3 2018 Br. Maint. PID

4 SM 1 28.9 40.8 Bridge preservation Sub-structure rehab/scour mitigation Bridge 119 Active 60 7/1/2014 2/1/2016 $ 2.4 2018 Br. Maint. PID

4 SON 101 0.0 0.0 Bridge preservationSub-structure rehab/scour mitigation- San Antonio Creek bridge #20 0019R

Bridge 119 Active 55 9/19/2014 2/29/2016 $ 2.0 2016 Br. Maint. PID

4 SOL 84 2.00 3.00 Bridge preservationCache Slough Ferry (Real McCoy) Fender Rehabilitation

Bridge 119 Complete 100 10/17/2013 8/15/2015 8/17/2015 $ 13.0 2018 Br. Maint. PID

4 SCL 82 19.2 26.4 Capital preventive maintenancePavement preservation (CAPM) Route 237 to San Mateo County Line

Roadway 121 Active 0 7/1/2015 6/30/2016 $ 18.8 2018 CAPM

4 ALA 185 0.3 5.7 Capital preventive maintenancePavement preservation (CAPM) from A Street to Route 112

Roadway 121 Active 0 7/1/2015 6/30/2016 $ 12.4 2018 CAPM

4 SM 84 21.0 25.0 Capital preventive maintenancePavement preservation (CAPM) from Route 280 to Route 101

Roadway 121 Proposed 0 7/1/2015 6/30/2016 $ 13.6 2018 CAPM

4 SON 12 11.0 17.4 Capital preventive maintenancePavement preservation (CAPM) from Llano Road to near Farmers Lane

Roadway 121 Active 0 7/1/2015 6/30/2016 $ 11.7 2018 PIR

4 CC 80 10.1 13.5 Roadway rehabilitation Roadway rehabilitation (2R) Roadway 122 Active 60 9/12/2014 8/30/2015 $ 13.8 2018 PSSR

4 SCL 87 0.0 5.1 Roadway rehabilitationRoadway rehabilitation (2R) from Rte 85 to Rte 280

Roadway 122 Active 0 7/1/2015 12/30/2016 $ 19.4 2018 PSSR

4 SCL 101 0.0 16.0 Roadway rehabilitationRoadway rehabilitation (2R) from San Benito County Line to Dunn Avenue

Roadway 122 Active 0 7/1/2015 12/30/2016 $ 89.6 2018 PSSR

4 SM 82 12.3 15.8 Roadway rehabilitation Roadway rehabilitation (2R) Roadway 122 Proposed 0 7/1/2015 12/30/2016 $ 24.3 2018 PIR

4 SOL 80 15.0 30.7 Roadway rehabilitationRoadway rehabilitation (2R) Phase 3 of previous C,S & OL Project

Roadway 122 Active 0 7/1/2015 12/30/2016 $ 21.6 2018 PIR

4 NAP 121 14.8 14.8 Storm damage permanent restoration Install anchored wire mesh at Wooden Valley Roadway 131 Complete 100 1/14/2015 8/15/2015 8/21/2015 $ 1.1 2018 SCVP

4 ALA 238 7.81 9.3 RelinquishmentNo-cost relinquishment of portions of SR-92/185/238 to the City of Hayward

Mandates 160 Active 5 7/1/2015 6/30/2016 NA NA PSR

4 SCL 101 Var Var Water conservation/Roadside RehabilitationInstall recycled water truck loading standpipes; convert irrigation to recycled water. In Santa Clara on US 101 at various locations.

Roadside Preservation 210 Proposed 0 7/1/2015 6/30/2016 $ 3.0 2018 PSR

4 ALA 580 0.0 R9.0 Reduce the frequency and duration of highway workers' exposure to traffic

Roadside paving including extended gore areas and narrow areas

Roadside Preservation 235 Active 0 7/1/2015 6/30/2016 $ 2.3 2018 PSR

4 CC 4 R31 48 Reduce the frequency and duration of highway workers' exposure to traffic

Install vegetation control under guardrail Roadside Preservation 235 Active 0 7/1/2015 6/30/2016 $ 3.0 2018 PSR

4 SCL 280 R0.0 6.0 Reduce the frequency and duration of highway workers' exposure to traffic

Roadside paving including extended gore areas, narrow areas and area between shoulder and soundwall. In and near San Jose from Rte 101 Separation to Rte 880/17 Separation at various locations.

Roadside Preservation 235 Active 0 7/1/2015 6/30/2016 $ 4.1 2018 PSR

4 SF 101 2.0 4.2 Reduce the frequency and duration of highway workers' exposure to traffic

Anti-vandalism measures, e.g. replace fencing

Roadside Preservation 235 Active 0 7/1/2015 6/30/2016 $ 3.0 2018 PIR

4 SCL 237 7.1 7.8 Operation improvementsConstruct Auxiliary Lane. On eastbound Route 237 from North First St. to Zanker Rd. Interchanges

Mobility Improvements 310 Active 0 7/1/2015 12/31/2016 $ 8.0 2018 PSR

4 SCL 237 7.1 7.8 Operation improvementsConstruct Auxiliary Lane. On westbound Route 237 from North First St. Interchange to Coyote Creek Bridge

Mobility Improvements 310 Active 0 7/1/2015 12/31/2016 $ 9.0 2018 PSR

4 NAP 121 7.1 7.5 Intersection Operation Improvements Improve Intersection Operation Mobility Improvements 310 Active 5 7/1/2014 4/30/2016 $ 7.2 2018 PSR

4 NAP 29 32 33 Storm WaterHigh Priority Reach/TMDL listed pollutant source control/Trash capture device installation

Mandates 335 Active 0 7/1/2015 6/30/2016 $ 6.0 2018 PSR

4 NAP 29 6 7 Storm WaterHigh Priority Reach/TMDL listed pollutant source control/Trash Capture Device Installation

Mandates 335 Proposed 0 12/1/2015 12/31/2016 $ 6.0 2018 PSR

4 MRN 131 0.86 0.86ADA curb ramp upgrade and pedestrian infrastructure

Upgrade curb ramps, sidewalk & install APS (5 curb ramps, 500 LF of sidewalk & 8 APS) at Blackfield Drive/Greenwood Drive intersection

Mandates361378

Active 0 6/5/2015 12/30/2015 $ 1.6 2014 PIR

4 SON 116 11.80 R12.169ADA curb ramp upgrade and pedestrian infrastructure

Upgrade curb ramps, sidewalk & install APS (11 curb ramps, 3,200 LF of sidewalk & 14 APSs) from Brookside lane to River Road in Guerneville

Mandates361378

Active 0 6/5/2015 12/30/2015 $ 0.8 2014 PIR

4 MRN 101 7.4 7.4 ADA compliance Upgrade Curb Ramps Mandates 361 Active 0 7/1/2015 6/30/2016 $ 0.5 2018 PIR4 NAP 29 0.0 14.6 ADA compliance Upgrade Pedestrian facilities Mandates 361 Proposed 0 7/1/2015 6/30/2016 $ 1.0 2018 PSR

4 SCL 82 18.3 21.0 ADA compliance

Construct ADA Improvements. On Route 82 from 0.05 mile south of Crestview Drive Intersection to 0.1 mile south of S Rengstorff Avenue in Mountain View.

Mandates 361 Proposed 0 7/1/2015 6/30/2016 $ 3.0 2018 PSR

4 SCL 82 21.0 23.5 ADA complianceConstruct ADA Improvements. On Route 82 from 0.1 mile south of S Rengstorff Avenue to Metadero Avenue in Mountain View and Palo Alto.

Mandates 361 Proposed 0 7/1/2015 6/30/2016 $ 3.0 2018 PSR

4 MRN 101 13.7 13.7 ADA compliance Upgrade Pedestrian facilities Mandates 361 Proposed 0 7/1/2016 6/30/2017 $ 0.4 2018 PIR

4 ALA 238 2.84 2.96 ADA complianceupgrading the existing curb ramps and sidewalk to

meet current ADA standards.Mandates 378 Proposed 0 7/1/2015 6/30/2016 $ 2.4 2018 PSR

4 ALA 185 0.38 0.9 ADA compliance Upgrade curb ramps & sidewalk Mandates 378 Proposed 0 7/1/2015 6/30/2016 $ 3.4 2018 PSR4 SF 101 5.9 8.1 ADA compliance Construct ADA Improvements Mandates 361 Proposed 0 7/1/2015 6/30/2016 $ 1.7 2018 PIR

4 SCL 152 R21.80 R35.16 Safety Improvement Install median concrete barrier on Route 152 and 237 in Santa Clara County

Collision Reduction 010 Proposed 0 7/1/2015 6/30/2016 $ 35.0 2018 PIR

4 ALA 580 37.0 37.5 Collision reduction Install high friction surface treatment Collision Reduction 015 Proposed 0 7/1/2016 6/30/2017 $ 3.2 2018 PIR4 CC 4 4.5 7.0 Collision reduction Install shoulder rumble strips Collision Reduction 015 Proposed 0 7/1/2016 6/30/2017 $ 1.4 2018 PIR4 MRN 29 0.0 20.0 Collision reduction Upgrade and install MBGR Collision Reduction 015 Proposed 0 7/1/2016 6/30/2017 $ 1.6 2018 PIR4 SON 12 14.5 16.9 Collision reduction Install high friction surface treatment Collision Reduction 015 Proposed 0 7/1/2016 6/30/2017 $ 2.1 2018 PIR4 SON 116 0.0 46.8 Collision reduction Install rumble strips Collision Reduction 015 Proposed 0 7/1/2016 6/30/2017 $ 1.4 2018 PIR

4 ALA

580680880980

Var Var To enhance pedestrian safetyInstall 192 accessible pedestrian signs and countdown timers

Collision Reduction 015 Proposed 0 7/1/2016 6/30/2017 $ 9.0 2018 SCVP

4 CC

42480

123242580680

Var Var To enhance pedestrian safetyInstall 275 accessible pedestrian signs and countdown timers

Collision Reduction 015 Proposed 0 7/1/2016 6/30/2017 $ 9.9 2018 SCVP

4

ALAALAALACCCC

EB 80WB 80NB 84SB 84

SB 880NB 680EB 24 WB 24

3.23.1

10.510.5

R32.016.0R2.0R2.0

3.43.4

10.7510.75R32.716.5R2.4R2.4

Reduce roadway departure collisions High friction road surface treatment Collision Reduction 015 Proposed 0 7/1/2016 6/30/2017 $ 11.1 2018 PIR

4 SCL

9178587

101152237280680880

var var Collision Severity Reduction Clean up roadside environment (CURE) Collision Reduction 015 Proposed 0 7/1/2016 6/30/2017 $ 10.2 2018 SCVP

4 CC 4 0.00 R20.5 Collision Severity Reduction Install/upgrade Metal Beam Guardrail Collision Reduction 015 Proposed 0 7/1/2016 6/30/2017 $ 13.3 2018 SCVP

4 CC 24 0.0 0.0 Bridge preservationMechanical/Ventilation/Electrical Repairs- Caldecott Tunnel Bores 1, 2, & 3

Bridge 110 Proposed 0 7/1/2016 6/30/2017 $ 9.7 2018 PSSR

4 ALA 84 6.9 10.8 Capital preventive maintenance Pavement preservation (CAPM) Roadway 121 Proposed 0 7/1/2016 6/30/2017 $ 6.5 2018 PSSR4 ALA 880 0.0 12.0 Capital preventive maintenance Pavement preservation (CAPM) Roadway 121 Proposed 0 7/1/2016 6/30/2017 $ 37.1 2018 CAPM

FY 2015-16 and FY 2016-17 PID Work Program

October 23, 2015 5 of 12

Dist

rict

Coun

ty

Rout

e

Begi

n Po

stm

ile

End

Post

mile

Purp

ose

& N

eed

Impr

ovem

ent D

escr

iptio

n

SHO

PP P

rogr

am C

ateg

ory

SHO

PP P

rogr

am C

ode

(20.

10.2

01.x

xx)

PID

Stat

us

% C

ompl

ete

Initi

atio

n Da

te (M

M/D

D/YY

YY)

Targ

et C

ompl

etio

n Da

te

(MM

/DD/

YYYY

)

Dist

Dir

Appr

oval

Dat

e (M

M/D

D/YY

YY)

Estim

ated

Pro

ject

Cos

t ($M

) (C

apita

l + S

uppo

rt C

osts

)

Targ

et P

rogr

amm

ing

Cycl

e

PID

Type

4 ALA 61 19.8 21.2 Pavement preservation Pavement preservation (CAPM) Roadway 121 Proposed 0 7/1/2016 6/30/2017 $ 3.3 2018 CAPM4 CC 4 16.8 23.7 Capital preventive maintenance Pavement preservation (CAPM) Roadway 121 Proposed 0 7/1/2016 6/30/2017 $ 13.8 2018 CAPM4 CC 680 12.6 21.2 Pavement preservation Pavement preservation (CAPM) Roadway 121 Proposed 0 7/1/2016 6/30/2017 $ 25.0 2018 CAPM4 MRN 37 11.2 14.6 Capital preventive maintenance Pavement preservation (CAPM) Roadway 121 Proposed 0 7/1/2016 6/30/2017 $ 6.1 2018 CAPM

4 SCL 152 7.6 10.3 Capital preventive maintenancePavement preservation (CAPM)on Route 152 from 0.3 mile west of Santa Teresa Blvd to Route 101

Roadway 121 Proposed 0 7/1/2016 6/30/2017 $ 4.0 2018 CAPM

4 ALA 24 1.8 6.2 Capital preventive maintenance Pavement preservation (CAPM) Roadway 121 Proposed 0 7/1/2016 6/30/2017 $ 25.1 2018 CAPM

4 NAP 29 29.3 36.9 Pavement preservation Pavement preservation (CAPM) Roadway 121 Proposed 0 7/1/2016 6/30/2017 $ 10.4 2018 CAPM

4 SON 101 29.30 54.20 Pavement rehabilitationRoadway rehabilitation (2R) from Geysercille to 101/128 Separation (South)

Roadway 122 Proposed 0 7/1/2016 6/30/2017 $ 82.1 2018 PSSR

4 SON 001 26.7 26.9 Storm permanent restorationgeosynthetically reinforced embankment and tie-back wall

Roadway 150 Proposed 0 7/1/2016 6/30/2017 $ 6.9 2018 PIR

4 MRN 001 0.1 45.2 Storm permanent restoration Rehabilitate Culverts Roadway 151 Proposed 0 7/1/2016 6/30/2017 $ 3.0 2018 PIR

4 NAP 29 5.1 5.1 Storm permanent restorationRehabilitate Culverts near American Canyon at 0.2 mile south of North Kelly Road

Roadway 151 Proposed 0 7/1/2016 6/30/2017 $ 2.5 2018 PSR

4 ALACC

24 5.80.0

6.20.3

Safety Enhancements Replace/upgrade lighting at Caldecott tunnels Roadway 170 Proposed 0 7/1/2016 6/30/2017 $ 2.1 2018 PIR

4 ALA 880 Var Var Water conservation/Roadside Rehabilitation

Convert to Smart Controllers for water conservation and relocate irrigation facilities. Combine with drought tolerant planting, inert materials, soil conditioners.

Roadside Preservation 210 Proposed 0 7/1/2016 6/30/2017 $ 4.0 2018 PIR

4 SCL 152 10 36 Reduce the frequency and duration of highway workers' exposure to traffic

Install vegetation control under guard rail and relocate roadside facilities. In SCl County on Rte 152 at various locations; Also on Route 82 (PM 25.0/26.0) from Churchill Avenue to 0.05 mile south of Quarry Road in Palo Alto.

Roadside Preservation 235 Proposed 0 7/1/2016 6/30/2017 $ 2.3 2018 PSR

4 SON 101 Var Var Reduce the frequency and duration of highway workers' exposure to traffic

Anti-vandalism measures, e.g. replacefencing

Roadside Preservation 235 Proposed 0 7/1/2016 6/30/2017 $ 3.0 2018 PSR

4 ALA 880 31 36 Reduce the frequency and duration of highway workers' exposure to traffic

Roadside paving including gore and extended gore areas and narrow areas. Install maintenance vehicle pullout

Roadside Preservation 235 Proposed 0 7/1/2016 6/30/2017 $ 3.0 2018 PSR

4 ALA 880 4.00 11.30Reduce the frequency and duration of highway workers' exposure to traffic

Pave slopes, areas beyond the gores, from shoulder to soundwall, and install pump station access and safety Improvements.

Roadside Preservation 235 Proposed 0 7/1/2016 6/30/2017 $ 7.0 2018 SCVP

4 ALA 680 0.10 21.00Reduce the frequency and duration of highway workers' exposure to traffic

Pave areas beyond the gore & narrow strips and install maintenance vehicle pullouts

Roadside Preservation 235 Proposed 0 7/1/2016 6/30/2017 $ 6.5 2018 PSSR

4 SCL 17 VAR VAR Roadside Protection and Restoration

Develop prime conservation easement/mitigation bank for special status species and for jurisdictional waters. In Santa Clara County and Watersheds at various locations.

Roadside Preservation 240 Proposed 0 7/1/2016 6/30/2017 $ 2.3 2018 PSR

4 ALA 880 14.7 14.7 Weigh-in-Motion System Install Weigh-in-Motion system Mobility Improvements 321 Proposed 0 7/1/2016 6/30/2017 $ 5.9 2018 PSR-PR

4 ALA 1380

5.8 5.8 Trans Permit Req. for BridgesVertical Clearance- University Ave OC Br. 33-0023 and 13/80 Separation (North) Br. 33 0191G

Bridge 322 Proposed 0 7/1/2016 6/30/2017 $ 15.5 2018 PSSR

4 SOL 80 1.1 1.1 Trans Permit Req. for Bridges Load Capacity- Rte 80/29 Sep #23-0087 Bridge 322 Proposed 0 7/1/2016 6/30/2017 $ 4.8 2018 PSSR

4 CC 24 R0.01 R0.01 Bridge preservation Structure Rehab Bridge 110 Proposed 0 7/1/2016 6/30/2017 $ 289.0 2018 PSSR

4 SF 101 4.12 R4.25 Bridge preservation Bridge painting Bridge 110 Proposed 0 7/1/2016 6/30/2017 $ 125.9 2018 PSSR

4 SOL '080 4.43 4.43 Trans Permit Req. for Bridges Raise the O/C- Sub Standard VC - BCP Bridge 322 Proposed 0 7/1/2016 6/30/2017 $ 18.7 2018 PSSR

4 ALA 680 2.5 6.99 Collision Severity Reduction Alignment, delineation & lighting Collision Reduction 015 Proposed 0 7/1/2016 6/30/2017 $ 2.0 2018 PIR

4 SF '035 2 3.2 CAPM Skyline to 19th Avenue Roadway 121 Proposed 0 7/1/2015 6/30/2016 $ 5.2 2018 CAPM

5 SCR 17 0.19 0.20 Wet Weather Safety ImprovementsDrainage improvements, ramp realignment, retaining wall, shoulder widening and OGAC

overlayCollision Reduction 010 Proposed 0 7/1/2015 3/1/2017 $ 4.3 2018 PSR

5 SCR 129 1.40 1.40 Intersection Safety Improvements ICE - signalized intersection or roundabout Collision Reduction 010 Proposed 0 7/1/2015 6/1/2016 $ 3.7 2018 PSR-PR

5 SCR 152 3.69 8.29 Reduce the potential for cross centerline collisions Centerline Rumble Strip Collision Reduction 010 Complete 100 8/1/2014 9/1/2015 6/11/2015 $ 0.9 2016A SCVP

5 SCR 17 0.00 12.00 Reduce the potential for cross median collisions Median Barrier, inside shoulder and Rumble Strip Collision Reduction 010 Proposed 0 1/1/2016 3/1/2017 $ 2.5 2018 PSR

5 MON 101 53.90 57.10 Reduce the potential for cross median collisions Median Barrier, inside shoulder and Rumble Strip Collision Reduction 010 Complete 100 8/1/2014 9/1/2015 6/18/2015 $ 4.8 2016A PSR-PR

5 SLO 101 51.50 58.70 Reduce the potential for run-off the road collisions Construct inside and outside shoulder rumble strip Collision Reduction 010 Active 10 5/1/2015 6/1/2016 $ 0.8 2016A PSR-PR

5 SB 101 0.00 60.00 Reduce the potential for cross median collisions Median Barrier, inside shoulder and Rumble Strip Collision Reduction 010 Proposed 0 7/1/2016 6/1/2017 $ 1.5 2018 PSR

5 MON 101 0.0 100.0 Reduce the potential for cross median collisions Median Barrier, inside shoulder and Rumble Strip Collision Reduction 010 Proposed 0 9/1/2015 6/1/2016 $ 1.5 2018 PSR

5 MON 68 1.60 L4.1 Reduce the potential for cross centerline collisions Centerline Rumble Strip Collision Reduction 010 Complete 100 8/1/2014 9/1/2015 6/8/2015 $ 0.9 2016A SCVP

5 SB 1 35.00 49.00 Collision Severity ReductionShoulder widening, rumble stripe, guardrail

upgrades, CURE conceptsCollision Reduction 015 Proposed 0 7/1/2016 6/1/2017 $ 16.2 2018 PSR

5 MON 101 87.40 87.80 Market street roadway safety improvements NB On-ramp roadway safety improvements Collision Reduction 015 Proposed 0 7/1/2015 6/1/2016 $ 4.4 2018 PSR

5 VAR Various Various VariousTraffic Signal Upgrades for Pedestrrian

Enhancements

Countdown pedestrian signal (CPS) heads and accesible pedestrian signal (APS) pedestrian

pushbuttonsCollision Reduction 015 Proposed 0 7/1/2015 6/1/2016 $ 3.5 2018 PSR

5 SB 101 21.60 21.62 Bridge RehabililitationReplace Bridge near Goleta at the San Jose Creek

Bridge ( 351-0163 L/R) Bridge 110 Proposed 0 4/1/2016 6/1/2017 $ 13.6 2018

5 SLO 1 0.10 0.10 Bridge Rehabililitation Rehabilitate bridge deck and replace rail Bridge 110 Proposed 0 4/1/2016 6/1/2017 $ 7.9 2018 PSSR

5 SB 154 31.82 32.07 Bridge Rehabililitation Substructure Rehabilitation and Rail Upgrade Bridge 110 Proposed 0 4/1/2016 6/1/2017 $ 15.0 2018 PSSR

5 MON 1 62.90 62.90 Bridge RehabililitationDeck Rehabilitation In Mon County At Garapata

Creek Bridge ( #44-0018)Bridge 110 Proposed 0 4/1/2016 6/1/2017 $ 25.3 2018 PSSR

5 SCR 9 13.50 15.50 Bridge Rail UpgradeIn Scr County near Ben Lomand at San Lorenzo

River Bridge and Kings Creek BridgeBridge 112 Proposed 0 4/1/2016 6/1/2017 $ 1.7 2018 PSSR

5 MON 1 43.10 43.10 Replace Bridge RailUpgrade rail in MON County Near Big Sur at Castro

Canyon (44-0035)Bridge 112 Proposed 0 4/1/2016 6/1/2017 $ 1.6 2018 PSSR

5 SCR 1 13.31 13.31 Bridge Preventative MaintenancePlace Scour Protection near Santa Cruz at Soquel

Creek BridgeBridge 119 Proposed 0 4/1/2016 6/1/2017 $ 1.4 2018 PSR

5 MON 1 28.00 67.80 Bridge Preventative MaintenanceDeck Rehabilitation In MON Co near Big Sur at 5

locationsBridge 119 Proposed 0 4/1/2016 6/1/2017 $ 2.8 2018 PSR

5 SB 101 4.59 6.73 Roadway Rehabilitation Rehabilitate Roadway (3R) Roadway 120 Proposed 0 7/1/2016 3/1/2017 $ 31.9 2018 PSSR

5 SB 1 19.30 20.60 Pavement Preservation Restore Pavement Surface Roadway 121 Proposed 0 7/1/2015 6/1/2016 $ 2.8 2018 CAPM5 SLO 1 10.00 16.77 Pavement Preservation Restore Pavement Surface Roadway 121 Proposed 0 7/1/2015 6/1/2016 $ 3.9 2018 CAPM5 SB 135 11.71 17.79 Pavement Preservation Restore Pavement Surface Roadway 121 Proposed 0 7/1/2015 6/1/2016 $ 7.3 2018 CAPM5 SB 101 R46.2 52.34 Pavement Preservation Restore Pavement Surface Roadway 121 Proposed 0 7/1/2016 6/1/2017 $ 8.3 2018 CAPM5 MON 68 1.12 L4.3 Pavement Preservation Restore Pavement Surface Roadway 121 Proposed 0 7/1/2015 6/1/2016 $ 2.6 2018 CAPM5 MON 101 R91.5 101.30 Pavement Rehabilitation Rehabilitate Pavement (2R) Roadway 122 Proposed 0 3/1/2016 6/1/2017 $ 49.0 2018 PSSR5 MON 1 18.50 18.70 Roadway Protective Betterment Construct Viaduct or retaining wall Mandates 150 Refresher 0 10/1/2015 3/1/2017 $ 11.2 2018 PSR

5 SCR 1 32.10 35.50At all four culvert locations, the culverts have

severe corrosion and have exceeded their 50 year design life.

Jack new culverts at the four locations. Roadway 151 Refresher 0 7/1/2015 6/1/2016 $ 4.1 2018 PSR

5 SB 101 45.50 45.50The culvert requires replacement to protect the

highway from closure due to possible failure of the culvert

Jack a new culvert at this location. Construct a new headwall and repair scour.

Roadway 151 Refresher 0 7/1/2015 6/1/2016 $ 4.2 2018 PSR

5 MON, SCr VAR Various VariousProvide uniform overhead signing with retro-reflective sheeting in compliance with federal

highway standardsReplacement of overhead signs Mobility Improvements 170 Proposed 7/1/2015 6/1/2016 $ 1.4 2018 PSR

5 SB/ SLO 101 68.7/0.0 90.99/8.4 Roadside Safety Improvements

Construct contrasting surface treatment beyond gores, vegetation control under guard rails and

maintenance vehicle pullouts. From Alisos Canyon Road to the Santa Maria River Bridge

Collision Reduction 235 Proposed 0 7/1/2016 6/1/2017 $ 2.5 2018 SCVP

5 MON 101 R2.9 R5.3Drinking water and waste water quality standards

complianceUpgrade wastewater treatment and drinking

water treatment systems to current standardsCollision Reduction 235 Proposed 0 7/1/2015 6/1/2016 $ 5.5 2018 SCVP

5 SB 154 R5.8 R6.1 Operational Improvements Intersection Improvements Mobility Improvements 310 Proposed 0 10/1/2015 12/1/2016 $ 1.0 2018 PSR

5 SLO 101 30.50 59.80 Mobility Construct Transportation Management System Mobility Improvements 315 Proposed 0 7/1/2015 6/1/2016 $ 2.5 2018 PSR

5 MON 101 82.00 101.30 Mobility Construct Transportation Management System Mobility Improvements 315 Proposed 0 7/1/2015 6/1/2016 $ 1.0 2018 PSR

5 SCR 9 8.50 12.99 Mitigation Culver Repair/Pollutant Source Control Mandates 335 Proposed 0 7/1/2015 9/1/2016 $ 3.4 2018 PSR5 SCR 9 12.99 23.90 Mitigation Culver Repair/Pollutant Source Control Mandates 335 Proposed 0 7/1/2015 9/1/2016 $ 3.6 2018 PSR5 MON 68 0.50 0.80 ADA Compliance Provide Accessible Pathway Mandates 361 Proposed 0 1/1/2016 3/1/2017 $ 1.5 2018 PSR

5 SB1

24619.28.6

22.19.6

ADA Compliance Reconstruct pedestrian facilities Mandates 361 Proposed 0 4/1/2016 6/1/2017 $ 3.0 2018 PSR

5 MON 218 R0.2 L0.9 ADA ComplianceReconstruct non-compliant pedestrian facilities

and construct missing sidewalk at gapsMandates 361 Proposed 0 4/1/2016 6/1/2017 $ 1.0 2018 PSR

6 KER 202 R4.89 R4.89 Improve Safety Intersection Widening Collision Reduction 010 Active 0 7/1/2015 6/1/2016 $ 1.00 2018 PSR

6 MAD4149

145Var Var Improve Safety Should & Center Line Rumble Strips Collision Reduction 010 Active 0 8/10/2015 5/30/2016 $ 0.84 2018 PIR

6 TUL 198 R10.472 R10.734 Improve Safety Widen Inside Shoulder & Install Rumble Strips Collision Reduction 010 Active 0 8/10/2015 5/30/2016 $ 0.52 2018 PSR

6 FRE 43 0 8.34 Install Rumble Strip Install Rumble Strip Collision Reduction 015 Proposed 0 7/1/2016 6/1/2017 $ 1.3 2018 PSR6 TUL 99 2.5 11 Install Rumble Strip Install Rumble Strip Collision Reduction 015 Proposed 0 7/1/2016 6/1/2017 $ 1.3 2018 PSR6 KIN 41 32.26 32.26 Replace Bridge Replace Bridge Bridge 110 Proposed 0 7/1/2016 6/15/2017 $ 20.8 2018 PSR6 MAD 99 9.74 9.74 Rehabilitate or Replace Bridge Deck Rehabilitation Bridge 110 Proposed 0 7/1/2016 6/1/2017 $ 2.2 2020 PSR

FY 2015-16 and FY 2016-17 PID Work Program

October 23, 2015 6 of 12

Dist

rict

Coun

ty

Rout

e

Begi

n Po

stm

ile

End

Post

mile

Purp

ose

& N

eed

Impr

ovem

ent D

escr

iptio

n

SHO

PP P

rogr

am C

ateg

ory

SHO

PP P

rogr

am C

ode

(20.

10.2

01.x

xx)

PID

Stat

us

% C

ompl

ete

Initi

atio

n Da

te (M

M/D

D/YY

YY)

Targ

et C

ompl

etio

n Da

te

(MM

/DD/

YYYY

)

Dist

Dir

Appr

oval

Dat

e (M

M/D

D/YY

YY)

Estim

ated

Pro

ject

Cos

t ($M

) (C

apita

l + S

uppo

rt C

osts

)

Targ

et P

rogr

amm

ing

Cycl

e

PID

Type

6 TUL 99 6.15 12.8 Replace Bridge Rail Upgrade Rail Bridge 112 Active 0 7/1/2015 6/1/2016 $ 3.03 2018 PSR6 TUL 245 1.39 4.19 Replace Bridge Rail Upgrade Rail Bridge 112 Active 0 7/1/2015 6/1/2016 $ 2.19 2018 PSR

6 FRE 3370.6372.1875.95

Bridge Pile Restoration Bridge Pile Restoration Bridge 119 Active 0 7/1/2015 6/1/2016 $ 1.95 2018 SCVP

6 FRE 41 22 22.6 Deck Rehabilitation Deck Rehabilitation Bridge 119 Active 0 7/1/2015 6/1/2016 $ 6.5 2018 SCVP6 FRE 99 5.7 11.1 Pavement Reha R/R Ln # 3 CRCP Pavement Rehabilitation (3R) Roadway 120 Active 0 7/1/2015 6/1/2016 $ 16.2 2018 PIR6 KER 14 0 14.5 Pavement Overlay CAPM Roadway 121 Active 0 7/1/2015 6/30/2016 $ 8.9 2018 CAPM6 MAD 99 13.1 19.6 Pavement Overlay CAPM Roadway 121 Active 0 7/1/2015 6/30/2016 $ 8.9 2018 PIR6 FRE 168 18.9 24.7 Pavement Overlay CAPM Roadway 121 Active 0 7/1/2015 6/1/2016 $ 2.4 2018 PSR6 KER 184 8.30 12.13 Pavement Overlay CAPM Roadway 121 Active 0 7/1/2015 6/30/2016 $ 7.0 2018 CAPM6 KER 204 5.1 6.7 Pavement Overlay CAPM Roadway 121 Active 0 7/1/2015 6/1/2016 $ 4.64 2018 PSR

6TULKIN

VAR VAR VAR Repair Stolen/Damaged Electrical SystemReplace/Repair/Secure with wire theft deterrent

measuresCollision Reduction 131 Active 0 7/30/2015 6/2/2016 $ 10.0 2018 PIR

6 KER 5 9.73 9.75 Replace Corroded Culverts Replace, reline Culverts Roadway 151 Proposed 0 7/1/2016 6/1/2017 $ 3.1 2018 PSR6 KER 5 9.75 9.78 Replace Corroded Culverts Replace, reline Culverts Roadway 151 Proposed 0 7/1/2016 6/1/2017 $ 3.1 2018 PSR6 KER 5 9.78 9.8 Replace Corroded Culverts Replace, reline Culverts Roadway 151 Proposed 0 7/1/2016 6/1/2017 $ 3.1 2018 PSR6 KER 5 4.10 5.89 Replace Corroded Culverts Replace, reline Culverts Roadway 151 Proposed 0 7/1/2016 6/30/2017 $ 2.5 2018 PSR6 KER 5 5.97 9.6 Replace Corroded Culverts Replace, reline Culverts Roadway 151 Proposed 0 7/1/2016 6/1/2017 $ 3.2 2018 PSR

6MADFRETUL

99 Various Various Upgrade Obsolete Pumps Replace Obsolete Pumps Roadway 151 Active 0 7/1/2015 6/30/2016 $ 4.32 2018 PSR

6 TUL 190 34.7 39.2 Replace Corroded Culverts Replace Reline Culverts Roadway 151 Proposed 0 7/1/2016 6/1/2017 $ 1.9 2018 PSR

6KERKIN

99198204

Various Various Upgrade Obsolete Pumps Replace Obsolete Pumps Roadway 151 Active 0 7/1/2015 6/30/2016 $ 5.40 2018 PSR

6 FRE 41 21 29.3 Improve water use efficiency Upgrade irrigation system Roadside Preservation 210 Proposed 0 7/1/2016 6/30/2017 $ 1.0 2018 SCVP6 FRE 168 R0.0 R11.7 Improve water use efficiency Upgrade irrigation system Roadside Preservation 210 Active 0 7/1/2015 6/30/2016 $ 1.0 2018 SCVP6 KIN 198 16.6 21.5 Improve water use efficiency Upgrade irrigation system Roadside Preservation 210 Proposed 0 7/1/2016 6/30/2017 $ 1.0 2018 SCVP

6 TUL65

19017.515.0

2218.5

Improve SafetyPave narrow and areas beyond the gores; and

install maintenance vehicle pulloutsRoadside Preservation 235 Active 0 7/1/2015 6/30/2016 $ 3.4 2018 PSR

6 TUL 99 51.8 51.8 Improve Safety SRRA Waste & Drinking Water Roadside Preservation 235 Proposed 0 7/1/2016 6/30/2017 $ 1.8 2018 SCVP

6 TUL 99 22.3 22.3 Improve SafetyUpgrade SRRA waste & drinking water sytems to

comply with water quality standardsRoadside Preservation 235 Active 0 7/1/2015 6/30/2016 $ 2.4 2018 SCVP

6 KIN 198 16.6 21.5 Improve Safety Roadside Safety Improvements Roadside Preservation 235 Active 0 7/1/2015 6/30/2016 $ 2.6 2018 SCVP6 TUL 65 36.95 37.95 Replace curb ramps ADA Curb Ramps Mandates 361 Proposed 0 7/1/2016 6/1/2017 $ 1.0 2018 PSR6 KER 204 0 6.75 Upgrade Ped. Infrastructure ADA Curb Ramps Mandates 361 Proposed 0 7/1/2016 6/1/2017 $ 2.0 2018 PSR6 KER 46 49 50.9 Remove and Replace Pavement Rehabilitation (2R) Roadway 122 Active 0 7/1/2015 6/30/2016 $ 4.8 2018 PIR

6 MAD 41 6.2 9.2In Madera Co from 0.7 so uth of Friant Canal to Jct

145Pavement Rehabilitation (2R) Roadway 120 Complete 100 7/1/2014 4/3/2015 6/16/2015 $ 25.6 2016 PSSR

6 KER '043 0.0 9.3In Kern County near Bakersfield from SR 119 to SR

58 and SR43 to I-5Resurface the existing lanes Roadway 121 Complete 100 3/16/2015 6/30/2015 6/25/2015 $ 14.34 2016 CAPM

6 MAD 99 23 29.3 In Madera Co. from Califa Ave to Chowchilla River Overlay (2R) Roadway 122 Complete 100 10/10/2014 4/1/2015 6/18/2015 $ 30.8 2016 PSSR

6 FRE '099 0.0 14.9In Tulare & Fresno County-Tul 99 PM R53.82/53.94, Fre 99 PM 0.0/14.93

Pave narrow and areas beyond the gores; and install maintenance vehicle pullouts

Roadside Preservation 235 Complete 100 2/2/2015 6/1/2015 6/24/2015 $ 4.26 2016 SCVP

6 KIN 198 8.3 R19.4In Lemoore & Armona - From Route 41/198 Sep to

10th Avenue UCPave narrow and areas beyond the gores; and

install maintenance vehicle pulloutsRoadside Preservation 235 Complete 100 10/29/2014 5/8/2015 6/4/2015 $ 5.04 2016 SCVP

7 LA 1430.63,59.55

30.63,59.55

Improve roadway treatment Place High Friction Surface Treatment (HFST) Collision Reduction 010 Active 70 3/5/2015 9/30/2015 TBD $ 0.5 2016 SCVP

7 LA 605 23.42 23.42 Safety ImprovementTo realign ramp and upgrade the curb ramps to current standards

Collision Reduction 010 Active 0 7/1/2015 5/31/2016 TBD $ 2.0 2016 PSR-PR

7 LA5,10

18.0S0.4

19.019.0

Improve roadway treatmentTo overlay road surface with High Friction Surface Treatment (HFST), upgrade highway light to LED, and install mast lighting

Collision Reduction 010 Active 90 4/1/2015 9/30/2015 TBD $ 4.0 2014 SCVP

7 LA 110 28.650 29.35 Safety Improvement Place High Friction Surface Treatment (HFST) Collision Reduction 010 Proposed 0 7/1/2015 10/15/2015 TBD $ 0.5 2014 SCVP

7 LA 210 R31.24 R31.44 Safety ImprovementTo install Type 60G concrete barrier along center divider separating the freeway from the light rail

Collision Reduction 010 Proposed 0 7/1/2015 5/31/2016 TBD $ 1.9 2016 SCVP

7 LA 60510.129,20.947

15.678,25.584

Improve roadway treatmentPlace High Friction Surface Treatment (HFST) and Groove PCC Pavement

Collision Reduction 010 Active 70 5/29/14 9/30/2015 TBD $ 8.4 2014 SCVP

7 LA 39 32.00 39.00 Reduce severity collisions Install and upgrade MBGR Collision Reduction 015 Proposed 0 7/1/2015 5/31/2016 TBD $ 2.1 2018 SCVP

7 LA 138 37.00 52.00 Reduce severity collisionsInstall centerline and shoulder rumble strip East of Palmdale Downtown

Collision Reduction 015 Proposed 0 7/1/2016 5/31/2017 TBD $ 2.0 2018 SCVP

7 LA 5 13.70 26.70 Reduce severity collisions Install MBGR and concrete barrier Collision Reduction 015 Complete 100 10/9/2013 6/30/2014 2/5/2014 $ 8.8 2016 SCVP

7 LA 105 4.31 4.31 Reduce severity collisionsInstall bauxite high friction pavement treatment EB 105 on/off ramp at Crenshaw Ave

Collision Reduction 015 Proposed 0 7/1/2016 5/31/2017 TBD $ 1.5 2018 SCVP

7 LA 126 3.90 4.09 Reduce severity collisions Install bauxite high friction pavement treatment Collision Reduction 015 Proposed 0 7/1/2016 5/31/2017 TBD $ 2.0 2018 SCVP

7 LA 10 10.12 15.82 Reduce severity collisionsReplace Raised islands with concrete barrier, install safety lighting, overhead sign,

Collision Reduction 015 Proposed 0 7/1/2015 5/31/2017 TBD $ 5.0 2018 PSR

7 LA 10 20.64 31.15 Reduce severity collisionsReplace existing concrete barrier with transition to sign structure pedestal along the HOT lanes of Rte 10 and Rte 110

Collision Reduction 015 Proposed 0 7/1/2015 5/31/2016 TBD $ 2.2 2018 SCVP

7 LA 91 6.00 18.00 Reduce severity collisionsInstall ground-in rumble strips and pavement delineation

Collision Reduction 015 Proposed 0 7/1/2015 5/31/2016 TBD $ 1.8 2018 SCVP

7 LA 118 R9.46 R10.39 Reduce severe collision Upgrade lighting Collision Reduction 015 Proposed 0 7/1/2015 5/31/2017 TBD $ 3.6 2018 SCVP7 LA 2 26.40 82.30 Reduce severity collisions Install and upgrade MBGR Collision Reduction 015 Proposed 0 2/1/2016 12/31/2016 TBD $ 1.7 2018 SCVP

7 LA 5 15.17 15.17 Reduce severity collisionsWidening and lengthen Deceleration lane SB off-ramp to Calzona St./ Indiana

Collision Reduction 015 Proposed 0 7/1/2015 5/31/2017 TBD $ 2.8 2018 PSR

7 VEN 101 0.90 R39.18 Reduce severity collisionsUpgrade Metal Beam Guardrail (MBGR) & End Treatments

Collision Reduction 015 Proposed 0 7/1/2016 5/31/2017 TBD $ 3.2 2018 SCVP

7 LA 5 0.00 19.50 Reduce severity collisions Upgrade curve warning signs on Various Routes Collision Reduction 015 Proposed 0 7/1/2015 12/31/2015 TBD $ 2.5 2018 SCVP

7 LA 14 0.00 78.00 Reduce severity collisions Upgrade curve warning signs on Various Routes Collision Reduction 015 Proposed 0 7/1/2015 5/31/2016 TBD $ 2.8 2018 SCVP

7 LA 110 25.75 30.90 Reduce severe collisionInstall Dynamic message system and Queue warning sign

Collision Reduction 015 Proposed 0 7/1/2015 5/31/2017 TBD $ 3.0 2018 PSR

7 LA 210 36.00 38.00 STRAINRte 210 53 1867 San Gabriel River Br. Hinge Replace

Bridge 110 Proposed 0 7/1/2015 5/31/2017 TBD $ 4.9 2018 PSSR

7 LA 47 0.86 0.86 STRAIN53 1471 Vincent Thomas Br. Deck Rehab and Bridge Restoration

Bridge 110 Proposed 0 7/1/2015 5/31/2017 TBD $ 14.0 2018 PSSR

7 LA 710 23.44 23.44 STRAIN 53 1044 OLYMPIC BLVD UC DECK REHAB Bridge 110 Active 0 7/1/2015 5/31/2017 TBD $ 1.4 2018 PSSR

7 VEN 1 21.54 21.54 STRAIN 52 0040 VENTURA OH SUPERSTRUCTURE REHAB Bridge 110 Active 0 7/1/2015 5/31/2017 TBD $ 5.9 2018 PSSR

7 LA 1 0.04 0.04 STRAIN53 0060 San Gabriel River Bridge Bridge Rail Upgrade

Bridge 110 Active 0 7/1/2015 5/31/2017 TBD $ 7.9 2018 PSSR

7 LA 10 14.23 14.23 STRAIN IN LA CO RTE 010 PM 14.23 SANTA MONICA VIADUCT 53 1301 DECK REHAB

Bridge 110 Proposed 0 7/1/2015 5/31/2017 TBD $ 7.0 2018 PSSR

7 LA 103 0.07 0.07 STRAIN IN LA CO RTE 103 PM 0.07 UNION PACIFIC OH 53 2626 DECK REHAB

Bridge 110 Active 0 7/1/2015 5/31/2017 TBD $ 7.6 2018 PSSR

7 LA 91 R11.65 R11.65 STRAIN EB 91 to NB 710 CON OC 53 2241G Bridge 110 Active 0 7/1/2015 5/31/2017 TBD $ 7.8 2018 PSSR

7 LA 405 0.20 0.30 STRAIN53 1185 San Gabriel River Br53 1737H San Gabriel River Br Subscour Mitigation

Bridge 111 Active 0 7/1/2015 5/31/2017 TBD $ 7.1 2018 PSSR

7 LA 110 22.80 22.83 STRAIN53 0685 6th St OC53 0746 5th St OCBridge Rail Upgrade

Bridge 112 Active 0 7/1/2015 5/31/2017 TBD $ 2.9 2018 PSSR

7 LA 134 12.57 12.57 STRAIN53 0166 Arroyo Seco Bridge Bridge Rail Upgrade

Bridge 112 Active 0 7/1/2015 5/31/2017 TBD $ 5.3 2018 PSSR

7 LA 39 17.82 17.82 STRAIN

53 0113 San Gabriel River53 2052 Ridgeway St UC53 2174 California Aqueduct Seismic Retrofit

Bridge 113 Proposed 0 7/1/2015 5/31/2017 TBD $ 15.7 2018 PSSR

7 LA 5 87.37 87.37 STRAIN 53 1779 TEJON PASS OC SEISMIC RETROFIT Bridge 113 Active 0 7/1/2015 5/31/2017 TBD $ 6.2 2018 PSSR

7 VEN 033 16.13 16.13 STRAINin Ventura county route 033 post mile 16.13 north fork militia creek 52 0173. 2018 shop rtl 6/30/22

Bridge 119 Active 0 7/1/2015 5/31/2017 TBD $ 1.1 2018 PSSR

7 LA 001 35.59 35.59 STRAINin LA Co two locations City of Santa Monica rte 001 pm 35.59 Palisades POC 53 0388, City of Glendale rte 005 pm 27.54 Sonora Ave UC 53 1077L.

Bridge 119 Proposed 0 7/1/2015 5/31/2017 TBD $ 1.1 2018 PSSR

7 LA 10 29.43 29.43 Bridge PaintIn LA Co City of El Monte Route 010 PM 29.43, Peck Road UC, 53 0661

Bridge 119 Proposed 0 7/1/2015 5/31/2017 TBD $ 2.615 2018 PSSR

7 LA 10 29.81 30.84 Remove Overhead and Construct Closure PourIn LA Co City of El Monte Route 010 East El Monte OH 53 0867 PM 29.81, San Gabriel River Br 53 0109L/R PM 30.84

Bridge 119 Proposed 0 7/1/2015 5/31/2017 TBD $ 4.00 2018 PSSR

7 LA 105 14.65 16.39 Storm Drain in OC medianIn LA Co In the Cities of Paramount and Downey Route 105 Paramount Blvd. OC 53 2425 PM 14.65, Ardis Ave OC 53 2572 PM 16.39

Bridge 119 Proposed 0 7/1/2015 5/31/2017 TBD $ 2.125 2018 PSSR

7 LA 10 22.30 28.2 Bridge Deck RehabReplace joint seals, deck methacrylite, polyesther concrete, closure pours

Bridge 119 Active 40 4/9/2015 8/31/2015 TBD $ 6.10 2014 PSSR

7 VEN 150 13.30 19.00 Resurfacing of distressed AC pavement Cold plane and Overlay AC pavement Roadway 121 Proposed 0 7/1/2015 5/31/2017 TBD $ 6.6 2018 CAPM

7 LA 605 20.19 26.00 Resurfacing of distressed PCC pavement Slab replacements and shoulder resurfacing Roadway 121 Active 0 7/1/2015 5/31/2017 TBD $ 14.4 2018 CAPM

7 LA 1 1.00 19.00 Resurfacing of distressed AC pavement Cold plane and Overlay AC pavement Roadway 121 Active 0 7/1/2015 5/31/2016 TBD $ 28.5 2018 CAPM

7 LA 2 R22 82.30 Resurfacing of distressed AC pavement Cold plane and Overlay AC pavement Roadway 121 Active 0 7/1/2015 5/31/2016 TBD $ 36.0 2018 CAPM

7 LA 22 0.00 1.45 Resurfacing of distressed AC pavement Cold plane and Overlay AC pavement Roadway 121 Proposed 0 7/1/2015 5/31/2017 TBD $ 2.5 2018 CAPM

7 VEN 1 18.00 28.48 Resurfacing of distressed AC pavement Cold plane and Overlay AC pavement Roadway 121 Proposed 0 7/1/2015 5/31/2017 TBD $ 21.6 2018 CAPM

7 LA 57 R0.00 R4.45 Pavement Rehabilitation Lane Replacement Roadway 121 Complete 100 8/28/2013 6/30/2015 6/22/2015 $ 23.7 2016 CAPM7 LA 107 0.00 4.80 Pavement Preservation Slab RP/CP & OL AC Roadway 121 Complete 100 7/1/2014 6/1/2015 5/26/2015 $ 14.2 2016 CAPM7 LA 1 19.00 34.60 Resurfacing of distressed AC pavement Cold plane and Overlay AC pavement Roadway 121 Proposed 0 7/1/2015 5/31/2016 TBD $ 25.5 2018 CAPM7 LA 27 0.00 18.60 Resurfacing of distressed AC pavement Cold plane and Overlay AC pavement Roadway 121 Active 0 7/1/2015 5/31/2017 TBD $ 28.3 2018 CAPM

7 LA 605 0.00 10.24Resurfacing and Restoration of distressed PCC pavement

Lane Replacement Roadway 122 Active 0 7/1/2015 5/31/2017 TBD $ 133.8 2018 PSSR

7 LA 5 R59.7 R73.7Resurfacing and Restoration of distressed PCC pavement

Lane Replacement Roadway 122 Active 0 7/1/2015 5/31/2017 TBD $ 140.0 2018 PSSR

FY 2015-16 and FY 2016-17 PID Work Program

October 23, 2015 7 of 12

Dist

rict

Coun

ty

Rout

e

Begi

n Po

stm

ile

End

Post

mile

Purp

ose

& N

eed

Impr

ovem

ent D

escr

iptio

n

SHO

PP P

rogr

am C

ateg

ory

SHO

PP P

rogr

am C

ode

(20.

10.2

01.x

xx)

PID

Stat

us

% C

ompl

ete

Initi

atio

n Da

te (M

M/D

D/YY

YY)

Targ

et C

ompl

etio

n Da

te

(MM

/DD/

YYYY

)

Dist

Dir

Appr

oval

Dat

e (M

M/D

D/YY

YY)

Estim

ated

Pro

ject

Cos

t ($M

) (C

apita

l + S

uppo

rt C

osts

)

Targ

et P

rogr

amm

ing

Cycl

e

PID

Type

7 LA 14 60.70 77.00 Pavement Rehabilitation Reconstruct Pavement Structure and Ramps Roadway 122 Active 20 1/1/2015 12/31/2015 TBD $ 120.0 2018 PSSR

7 VEN 1 4.00 5.00 Repair storm damage to restore beach and slope Place Rock Slope Protection Major Damage Restoration 131 Active 20 5/1/2015 12/31/2015 TBD $ 4.0 2016 PSR

7 LA 47 0.82 0.82Rebuild damaged slope and repair drainage system

Storm Damage Repair and restore slope stability Major Damage Restoration 131 Proposed 0 7/1/2015 12/31/2015 TBD $ 1.1 2016 PSR

7 LA 710 25.40 26.40 Roadway Protective BettermentLoss of support slope and roadway. Slope stabilization, retaining wall, erosion repair.

Roadway 150 Proposed 0 7/1/2015 5/31/2017 TBD $ 6.6 2018 PSSR

7 LA 213 2.80 3.70 Replace/line Damaged Storm Drain Replace/line Damaged Storm Drain Roadway 151 Complete 100 12/1/2013 6/20/2014 7/1/2014 $ 2.8 2016 PSSR

7 LA 10 3.71 13.80 Drainage System Restoration Replace/Repair Culverts Roadway 151 Active 0 7/1/2016 5/31/2017 TBD $ 1.4 2018 PSSR

7 VEN 1 21.81 26.99 Drainage Improvement Culvert replacement/repair Roadway 151 Complete 100 7/1/2014 6/30/2015 6/15/2015 $ 2.1 2016 SCVP

7 LA5,

101,405

11,0.6,4.93

14,6.0,4.93

Drainage Improvement Pump Station Repairs Roadway 151 Complete 100 2/26/2015 6/30/2015 6/17/2015 $ 5.3 2016 SCVP

7 VEN 23 4.82 7.39 Drainage System Restoration Replace/Repair Culverts Roadway 151 Active 0 7/1/2016 5/31/2017 TBD $ 1.2 2018 PSSR

7 LA

5,10,91,605

& 710

19.7,22,

11.89,14.10

& 18.7

36, 24.5,

11.89, 14.10 & 21

Drainage System Restoration Repair/Upgrade pump stations Roadway 151 Active 0 7/1/2016 5/31/2017 TBD $ 2.0 2018 PSSR

7 LA 134 R6.34 R8.23 Drainage Improvement Culvert replacement/repair Roadway 151 Complete 100 7/1/2014 6/30/2015 6/15/2015 $ 2.5 2016 SCVP

7 LA47

1030.10 0.10 Drainage System Restoration

Replace Existing UPRR OH Pump Plant, Upgrade existing POLB Pump Station and construct new storm drain outfall.

Roadway 151 Proposed 0 7/1/2015 5/31/2016 TBD $ 7.0 2018 PSSR

7 LA 110 0.00 31.90Upgrade guide signs to current standards, and increase operational safety by improving visibility.

Upgrade guide signs to retro-reflective panels, & replace overhead signs lighting.

Roadway 170 Proposed 0 7/1/2015 5/31/2016 TBD $ 1.7 2018 PSR

7 LA 405 0.00 48.64Upgrade guide signs to current standards, and increase operational safety by improving visibility.

Upgrade guide signs to retro-reflective panels, & replace overhead signs lighting.

Roadway 170 Active 0 7/1/2015 5/31/2016 TBD $ 1.7 2018 SCVP

7 LA 10 0.00 48.27Upgrade guide signs to current standards, and increase operational safety by improving visibility.

Upgrade guide signs to retro-reflective panels, & replace overhead signs lighting.

Roadway 170 Proposed 0 7/1/2016 5/31/2017 TBD $ 1.9 2018 PSR

7 LA 210 0.00 26.00Upgrade guide signs to current standards, and increase operational safety by improving visibility.

Upgrade guide signs to retro-reflective panels, & replace overhead signs lighting.

Roadway 170 Proposed 0 7/1/2016 5/31/2017 TBD $ 2.5 2018 PSR

7 LA 118 10.10 11.80 Irrigation upgrade for water conservationConvert existing irrigation to smart controller, replace sprinkler heads to rotary

Roadside Preservation 210 Proposed 0 7/1/2015 5/31/2017 TBD $ 1.5 2018 SCVP

7 LA 405 5.00 8.00 Irrigation upgrade for water conservationConvert existing RISC irrigation to smart controllers. Install stream rotor heads to conserve water, follow up to EA 07-2759U1

Roadside Preservation 210 Proposed 0 7/1/2015 5/31/2017 TBD $ 1.5 2018 SCVP

7 VEN 126 R10.2 R12.7 Irrigation upgrade for water conservationConvert existing irrigation to smart controller, replace sprinkler heads to rotary

Roadside Preservation 210 Proposed 0 7/1/2015 5/31/2016 TBD $ 1.5 2018 SCVP

7 VEN 101 0.00 25.80Reduce the frequency and duration of highway workers' exposure to traffic

Relocate appurtenances; Add slope/gore & narrow area paving; MVP: Access gates; Access roads

Roadside Preservation 235 Proposed 0 7/1/2015 5/31/2016 TBD $ 5.7 2018 SCVP

7 LA 110 3.50 15.40Reduce the frequency and duration of highway workers' exposure to traffic

Relocate appurtenances; Add slope/gore & narrow area paving; MVP: Access gates; Access roads

Roadside Preservation 235 Proposed 0 7/1/2016 5/31/2017 TBD $ 2.9 2018 SCVP

7 LA 118 R4.50 R9.10Reduce the frequency and duration of highway workers' exposure to traffic

Relocate appurtenances; Add slope/gore & narrow area paving; MVP: Access gates; Access roads

Roadside Preservation 235 Proposed 0 7/1/2016 5/31/2017 TBD $ 2.9 2018 SCVP

7 LA 118 R9.0 R10.1Reduce the frequency and duration of highway workers' exposure to traffic

Relocate appurtenances; Add slope/gore & narrow area paving; MVP: Access gates; Access roads; RICS

Roadside Preservation 235 Complete 100 7/1/2014 6/30/2015 6/19/2015 $ 3.75 2016 SCVP

7 VEN 118 R24.1 R29.7Reduce the frequency and duration of highway workers' exposure to traffic

Relocate appurtenances; Add slope/gore & narrow area paving; MVP: Access gates; Access roads; RICS

Roadside Preservation 235 Complete 100 7/1/2014 6/30/2015 6/18/2015 $ 4.43 2016 SCVP

7 LA 170 0.00 20.55Reduce the frequency and duration of highway workers' exposure to traffic

Relocate appurtenances; Add slope/gore & narrow area paving; MVP: Access gates; Access roads

Roadside Preservation 235 Proposed 0 7/1/2016 5/31/2017 TBD $ 4.6 2018 SCVP

7 LA 405 12.90 21.50Reduce the frequency and duration of highway workers' exposure to traffic

Relocate appurtenances; Add slope/gore & narrow area paving; MVP: Access gates; Access roads

Roadside Preservation 235 Proposed 0 7/1/2016 5/31/2017 TBD $ 4.5 2018 SCVP

7 LA 605 0.00 4.26Reduce the frequency and duration of highway workers' exposure to traffic

Relocate appurtenances; Add slope/gore & narrow area paving; MVP: Access gates; Access roads

Roadside Preservation 235 Proposed 0 7/1/2016 5/31/2017 TBD $ 2.9 2018 SCVP

7 LA 5 R17.00 R26.70Reduce the frequency and duration of highway workers' exposure to traffic

Relocate appurtenances; Add slope/gore & narrow area paving; MVP: Access gates; Access roads

Roadside Preservation 235 Active 0 7/1/2015 5/31/2016 TBD $ 4.3 2018 SCVP

7 LA 110 14.90 20.60Reduce the frequency and duration of highway workers' exposure to traffic

Relocate appurtenances; Add slope/gore & narrow area paving; MVP: Access gates; Access roads

Roadside Preservation 235 Active 0 7/1/2015 5/31/2016 TBD $ 2.9 2018 SCVP

7 LA 405 7.00 12.90Reduce the frequency and duration of highway workers' exposure to traffic

Relocate appurtenances; Add slope/gore & narrow area paving; MVP: Access gates; Access roads

Roadside Preservation 235 Active 0 7/1/2015 5/31/2017 TBD $ 2.9 2018 SCVP

7 LA 5 R39.40 R44.40Reduce the frequency and duration of highway workers' exposure to traffic

Relocate appurtenances; Add slope/gore & narrow area paving; MVP: Access gates; Access roads

Roadside Preservation 235 Active 0 7/1/2015 5/31/2016 TBD $ 2.9 2018 SCVP

7 LA 57 0.00 R7.7Reduce the frequency and duration of highway workers' exposure to traffic

Relocate appurtenances; Add slope/gore & narrow area paving; MVP: Access gates; Access roads; RICS

Roadside Preservation 235 Active 0 7/1/2015 5/31/2017 TBD $ 2.8 2018 SCVP

7 LA 710 16.50 23.20Reduce the frequency and duration of highway workers' exposure to traffic

Relocate appurtenances; Add slope/gore & narrow area paving; MVP: Access gates; Access roads; RICS

Roadside Preservation 235 Proposed 0 7/1/2015 5/31/2017 TBD $ 2.9 2018 SCVP

7 LA 101 6.30 11.74Reduce the frequency and duration of highway workers' exposure to traffic

Relocate appurtenances; Add slope/gore & narrow area paving; MVP: Access gates; Access roads; RICS

Roadside Preservation 235 Proposed 0 7/1/2015 5/31/2017 TBD $ 4.1 2018 SCVP

7 LA 14 R31.9 R54.31Reduce the frequency and duration of highway workers' exposure to traffic

Relocate appurtenances; Add slope/gore & narrow area paving; MVP: Access gates; Access roads

Roadside Preservation 235 Active 0 7/1/2015 5/31/2016 TBD $ 4.9 2018 SCVP

7 LA 405 39.10 39.10Additional lane on -ramp to improve traffic safety, on-rmap storage and traffic

Modify Ramp Mobility Improvements 310 Proposed 0 7/1/2016 5/31/2017 TBD $ 2.5 2018 PSR

7 LA 5 14.70 15.10Aux. Lanes serve to improve traffic operation on the mainline by providing an additional lane betw on & Off ramps for weaving thereby the thru flow

Add Auxiliary Lane & Realign Off Ramp Mobility Improvements 310 Proposed 0 7/1/2015 5/31/2016 TBD $ 4.0 2018 PSR

7 LA 101 0.10 17.40 Transportation Management System Upgrade Transportation Management System Mobility Improvements 315 Proposed 0 7/1/2016 5/31/2017 TBD $ 8.1 2018 PSR

7 LA 134 0.00 13.34 Transportation Management System Upgrade Transportation Management System Mobility Improvements 315 Proposed 0 7/1/2016 5/31/2017 TBD $ 7.7 2018 PSR

7 LA 5 16.40 26.90 Transportation Management System Upgrade Transportation Management System Mobility Improvements 315 Proposed 0 7/1/2015 5/31/2016 TBD $ 6.8 2018 PSR

7 LA 60 0.55 11.70 Transportation Management System Upgrade Transportation Management System Mobility Improvements 315 Proposed 0 7/1/2015 5/31/2016 TBD $ 7.2 2018 PSR

7 LA 110 25.75 30.90 Transportation Management System

Install Dynamic Message Sign; Fiber optics; Cameras; Sensors Queue warning sign (DMS) plus sensors; Restriping and Pavement Marking including colored/stained pavement surface

Mobility Improvements 315 Proposed 0 7/1/2015 5/31/2017 TBD $ 16.2 2018 PSR

7 LA 91 6.50 20.70 Upgrade Transportation Management System In Los Angeles County from Rte 110 to Orange County Line

Mobility Improvements 315 Proposed 0 7/1/2015 5/31/2017 TBD $ 11.1 2018 PSR

7 LA 10 4.50 18.30In Los Angeles on Route 10 from Bundy Drive to Routes 10/5/101 Separation

Upgrade and Install Transportation Management System for Connected Corridor

Mobility Improvements 315 Proposed 0 7/1/2016 5/31/2017 TBD $ 14.0 2018 PSR

7 LA 110 24.50 25.50 Transportation Management SystemInstall Dynamic Lane Management Lane Lighting System And Upgrade Detection System

Mobility Improvements 315 Proposed 0 7/1/2015 5/31/2016 TBD $ 1.3 2018 PSR

7 LA 5 R54.4 R54.4 201.321 Weigh Stations & WIM Facilities

Castaic: NB Additional improvements to the existing facility, trailer upgrades incl. new restrooms, new perimeter cameras, exterior lighting, interior painting, interior plumbing, safe public entrance to the main building, accessible public/driver restroom and safe parking area for officers. Also, slab replacement/grind all conc. lanes, grind & pave asphalt.

Mobility Improvements 321 Proposed 0 7/1/2015 5/31/2016 TBD $ 1.7 2018 PSR

7 VEN 118 13.80 15.60 201.321 Weigh Stations & WIM Facilities

Moorpark: EB add mobile office similar to the westbound weigh scale facility. WB resurface & stripe, widen area of inspections, add new phone line, and place restricted "No Parking". Also, in LA & Ventura counties, LA 405/PM 12.2, VEN 101/PM 9.2, LA 5/PM 54.4, refresh striping and stencils for all Commercial Vehicle Enforcement Facilities.

Mobility Improvements 321 Proposed 0 7/1/2016 5/31/2017 TBD $ 1.5 2018 PSR

7 VEN 101 9.00 9.20 201.321 Weigh Stations & WIM Facilities

Conejo: NB & SB Slab replacement/grind all conc. lanes, grind & pave all asphalt pavement and replace recessed markers. Provide truck counters and replace existing changeable message sign/s.

Mobility Improvements 321 Proposed 0 7/1/2015 5/31/2016 TBD $ 1.8 2018 PSR

7 LA 10 R13.3 R13.3 Increase Bridge Permit RatingStrengthening of Normandie Avenue UC (53-1565) to achieve permit rating of PPPPP

Bridge 322 Proposed 0 7/1/2015 5/31/2017 TBD $ 10.0 2018 PSSR

7 LA 405 40.08 48.64 Erosion Control Source Control Mandates 335 Active 0 7/1/2015 5/31/2016 TBD $ 4.0 2018 PSR7 LA 101 0.08 1.74 Erosion Control Storm Water Source Control Mandates 335 Active 0 7/1/2015 5/31/2016 TBD $ 3.9 2018 PSR

7 LA 210 36.00 40.60 Target Constituents: trash, metals, and seleniumConstruct BMPs for stormwater mitigation, San Gabriel River Watershed

Mandates 335 Active 0 7/1/2015 5/31/2017 TBD $ 10.5 2018 PSR

7 LA 210 41.30 44.62 Target Constituents: trash, metals, and seleniumConstruct BMPs for stormwater mitigation, San Gabriel River Watershed

Mandates 335 Active 0 7/1/2015 5/31/2017 TBD $ 8.4 2018 PSR

7 LA 210 44.70 52.20 Target Constituents: trash, metals, and seleniumConstruct BMPs for stormwater mitigation, San Gabriel River Watershed

Mandates 335 Proposed 0 7/1/2015 5/31/2017 TBD $ 7.5 2018 PSR

7 LA 405 28.89 29.97 Erosion Control Source Control Mandates 335 Proposed 0 7/1/2015 5/31/2017 TBD $ 1.3 2018 PSR7 LA 710 23.00 27.00 Erosion Control Source Control Mandates 335 Proposed 0 7/1/2015 5/31/2017 TBD $ 4.0 2018 PSR7 LA 10 0.00 45.00 Erosion Control Annual Element Source Control Mandates 335 Proposed 0 7/1/2016 5/31/2017 TBD $ 2.5 2018 PSR

7 LA 60 11.00 20.00 Target Constituents: trash, metals, and seleniumConstruct BMPs for stormwater mitigation, San Gabriel River Watershed

Mandates 335 Active 0 7/1/2015 5/31/2016 TBD $ 8.5 2018 PSR

7 LA 60 20.00 R26.00 Target Constituents: trash, metals, and seleniumConstruct BMPs for stormwater mitigation, San Gabriel River Watershed

Mandates 335 Active 0 7/1/2015 5/31/2016 TBD $ 8.1 2018 PSR

FY 2015-16 and FY 2016-17 PID Work Program

October 23, 2015 8 of 12

Dist

rict

Coun

ty

Rout

e

Begi

n Po

stm

ile

End

Post

mile

Purp

ose

& N

eed

Impr

ovem

ent D

escr

iptio

n

SHO

PP P

rogr

am C

ateg

ory

SHO

PP P

rogr

am C

ode

(20.

10.2

01.x

xx)

PID

Stat

us

% C

ompl

ete

Initi

atio

n Da

te (M

M/D

D/YY

YY)

Targ

et C

ompl

etio

n Da

te

(MM

/DD/

YYYY

)

Dist

Dir

Appr

oval

Dat

e (M

M/D

D/YY

YY)

Estim

ated

Pro

ject

Cos

t ($M

) (C

apita

l + S

uppo

rt C

osts

)

Targ

et P

rogr

amm

ing

Cycl

e

PID

Type

7 LA 60 R28.0 R30.4 Target Constituents: trash, metals, and seleniumConstruct BMPs for stormwater mitigation, Santa Ana River Watershed

Mandates 335 Active 0 7/1/2015 5/31/2017 TBD $ 4.7 2018 PSR

7 LA 71 2.50 4.90 Target Constituents: trash, metals, and seleniumConstruct BMPs for stormwater mitigation - Santa Ana River Watershed; LA-71 (PM2.5 to PM4.9), LA-10 (PM46.0 to PM48.0)

Mandates 335 Active 0 7/1/2015 5/31/2016 TBD $ 4.6 2018 PSSR

7 LA 118 1.50 10.20 Target Constituents: trash, metals, and seleniumConstruct BMPs for stormwater mitigation, Los Angeles River Watershed

Mandates 335 Active 0 7/1/2015 5/31/2017 TBD $ 4.0 2018 PSR

7 LA 118 11.00 14.00 Target Constituents: trash, metals, and seleniumConstruct BMPs for stormwater mitigation, Los Angeles River Watershed

Mandates 335 Active 0 7/1/2015 5/31/2017 TBD $ 4.3 2018 PSR

7 LA 605 R 0.0 R 9.6 Target Constituents: metals and seleniumConstruct BMPs for stormwater mitigation, San Gabriel River Watershed

Mandates 335 Active 0 7/1/2015 5/31/2017 TBD $ 7.1 2018 PSR

7 LA 605 9.60 15.70 Target Constituents: metals and seleniumConstruct BMPs for stormwater mitigation, San Gabriel River Watershed

Mandates 335 Proposed 0 7/1/2016 5/31/2017 TBD $ 4.9 2018 PSR

7 LA 605 16.50 19.50 Target Constituents: metals and seleniumConstruct BMPs for stormwater mitigation, San Gabriel River Watershed

Mandates 335 Proposed 0 7/1/2016 5/31/2017 TBD $ 8.6 2018 PSR

7 LA 605 20.00 26.00 Target Constituents: metals and seleniumConstruct BMPs for stormwater mitigation, San Gabriel River Watershed

Mandates 335 Proposed 0 7/1/2016 5/31/2017 TBD $ 8.3 2018 PSR

7 VEN

1,101, 34, 150

0.00 28.50 Target Constituents: trash, metals, and selenium

construct BMPs for stormwater mitigation - Ventura Coastal Watershed; Ven-101 ( PM 22.0-43.6) , Ven-1 ( 0.0- 28.5) , VEN-34 (PM4.3 to PM17.7), VEN-150 (PM2.5 to PM34.4)

Mandates 335 Active 0 7/1/2015 5/31/2017 TBD $ 4.7 2018 PSR

7 LA 57 & 210 1.5 & 37.0 6.0 & 46.0 Erosion Control Annual Element Source Control Mandates 335 Proposed 0 7/1/2015 5/31/2017 TBD $ 2.5 2018 PSSR7 LA 101 1.00 6.00 Erosion Control Annual Element Source Control Mandates 335 Proposed 0 7/1/2015 5/31/2017 TBD $ 2.5 2018 PSSR

7 LA 5 1.68 1.68 Build Southern Regional Equipment Repair ShopConstruct new Southern Regional Equipment Repair Shop

Facilities 351 Proposed 0 7/1/2015 9/30/2015 TBD $ 29.0 2014 FPSR-PR

7 VEN 336.5 12.8

ADA infrastructure Upgrade ADA ramps and accessibility Mandates 361 Active 0 7/1/2015 5/31/2016 TBD $ 3.84 2018 PSR

7 LA 110 6.76 7.20 ADA infrastructure Upgrade ADA ramps and accessibility Mandates 361 Proposed 0 7/1/2016 5/31/2017 TBD $ 2.80 2018 PSR

7 LA 134 0.00 13.34 ADA infrastructure Upgrade ADA ramps and accessibility Mandates 361 Proposed 0 7/1/2015 5/31/2017 TBD $ 1.80 2018 PSR

7 LA 138 43.42 51.41 ADA infrastructure Upgrade ADA ramps and accessibility Mandates 361 Proposed 0 7/1/2015 5/31/2016 TBD $ 2.40 2018 PSR7 LA 164 1.39 6.90 ADA infrastructure Upgrade ADA ramps and accessibility Mandates 361 Active 0 7/1/2015 5/31/2016 TBD $ 4.50 2018 PSR

7 LA 210 0.00 39.67 ADA infrastructure Upgrade ADA ramps and accessibility Mandates 361 Proposed 0 7/1/2015 5/31/2016 TBD $ 2.00 2018 PSR

7 VEN 118 0.58 25.86 ADA infrastructure Upgrade ADA ramps and accessibility Mandates 361 Proposed 0 7/1/2016 5/31/2017 TBD $ 1.80 2018 PSR

7 VEN 126 0.00 34.60 ADA infrastructure Upgrade ADA ramps and accessibility Mandates 361 Proposed 0 7/1/2015 5/31/2017 TBD $ 3.825 2018 PSR

7 LA 60 0.5 30 ADA infrastructureUpgrade ADA ramps and accessibility (PM 0.5 to PM 30.0)

Mandates 361 Proposed 0 7/1/2016 5/31/2017 TBD $ 2.10 2018 PSR

7 LA 71 0.34 4.50 ADA infrastructureUpgrade ADA ramps and accessibility on Rte 71 (0.3/4.6) and Rte 72(0.0/6.7)

Mandates 361 Proposed 0 7/1/2016 5/31/2017 TBD $ 1.80 2018 PSR

8 SBD 10 5 10 Safety ImprovementINSTALL MEDIAN LIGHTING, REPLACE SIGN

PANELS AND INSTALL HIGH MAST LIGHTING.Collision Reduction 010 Active 50 9/1/2014 10/30/2015 $ 10.7

2014 or2016

PSR

8 RIV 111 0 18.3 Safety ImprovementPLACE CENTERLINE AND SHOULDER RUMBLE

STRIPSCollision Reduction 010 Active 85 1/1/2015 9/30/2015 $ 2.0 2016 SCVP

8 SBD 247 20.3 76.8 Safety ImprovementPLACE CENTERLINE AND SHOULDER RUMBLE

STRIPSCollision Reduction 010 Active 85 10/31/2014 10/5/2015 $ 3.0 2016 PIR

8 SBD 95 9.6 56.5 Safety Improvement SHOULDER RUMBLE STRIPS Collision Reduction 010 Active 80 10/30/2014 9/30/2015 $ 1.8 2016 SCVP

8 SBD 18 97 99.45 Safety ImprovementWIDEN ROADBED & CONSTRUCT RAISED MEDIAN

CURBCollision Reduction 010 Active 75 8/1/2013 9/28/2015 $ 3.9 2016 PSR

8 SBD 62 34.2 34.2 Safety Improvement INSTALL TRAFFIC SIGNAL Collision Reduction 010 Proposed 0 7/1/2015 2/23/2016 $ 1.3 2016 SCVP

8 SBD 15 174.5 175.5 Safety ImprovementCOLD PLANE AND PLACE OGAC USING ¾”

AGGREGATECollision Reduction 010 Proposed 0 7/1/2015 3/8/2016 $ 1.8 2016 SCVP

8 SBD 40 R154.5 R154.5 Bridge Rehab or ReplacementCALIFORNIA/ARIZONA STATE LINE AT COLORADO

RIVER BRIDGE (BR #54-0415)Bridge 110 Proposed 0 8/8/2014 11/15/2015 $ 102.0 2018 PSR-PDS

8 RIV 74 46.1 71.7 Roadway RehabMILL AND OVERLAY PAVEMENT AND INCLUDE

DIGOUTSRoadway 121 Proposed 0 9/1/2015 9/1/2016 $ 15.3 2018 CAPM

8 SBD 10 27.3 28.3 Roadside Preservation/Worker Safety Gore Paving and Place removable exit signs Roadside Preservation 235 Complete 100 4/28/2014 7/21/2014 7/21/2014 $ 2.9 2018 SCVP

8 SBD 18 0.0 100.8 ADA Pedestrian infrastructureClose sidewalk gaps, upgrade curb ramps,

driveway etc..Mandates 361 Proposed 0 4/1/2016 2/20/2017 $ 2.6 2018 PSR

8 SBD 83 6.8 11.0 ADA Pedestrian infrastructureClose sidewalk gaps, upgrade curb ramps,

driveway etc..Mandates 361 Proposed 0 7/1/2016 4/15/2017 $ 2.1 2018 PSR

8 RIV 74 3 54 Bridge Rehabilitation Replace/rail upgrade #56.0169 and #56.0180 Bridge 110 Proposed 0 7/1/2015 4/30/2016 $ 4.3 2018 PSSR

8 SBD 15 123.9 137.7 Roadway Rehab GRIND AND OVERLAY PAVEMENT Roadway 121 Proposed 0 6/1/2016 4/1/2017 $ 133.0 2018 PSSR

8 SBD 40 R25 R50 Collision Severity Reduction Regrade Median Cross Slope Collision Reduction 015 Proposed 0 7/1/2016 4/30/2017 $ 23.9 2018 PSR

8 RIV 60 21.4 R25.3 Stormwater Mitigation Slope, repair and stabilization, Erosion Control Mandates 335 Proposed 0 7/1/2015 5/1/2016 $ 3.2 2018 PSR

8 SBD 38 42.6 49.8 Stormwater MitigationIMPROVE DRAINAGE FACILITIES & MANAGE

STORM WATER RUN-OFFMandates 335 Proposed 0 9/1/2016 5/1/2016 $ 1.9 2018 PSR

8 SBD66

21521.3 21.3 Bridge Rail Replacement/Upgrade Upgrade Rail Bridge 112 Proposed 0 7/1/2015 4/30/2016 $ 1.0 2018 PSSR

8 RIV 60 25.3 28.9 Stormwater Mitigation Slope, repair and stabilization, Erosion Control Mandates 335 Proposed 0 7/1/2015 5/1/2016 $ 1.4 2018 PSR

8 SBD 40 28.9 28.9 Mobility Newberry WIM Mobility Improvements 321 Proposed 0 10/1/2015 6/1/2016 $ 1.5 2018 SCVP

8 SBD 18 37.7 44.3 Stormwater MitigationRetrofit Highway and/or facilities to meet Lake

Elsinore Watershed Nutrient TMDL WLA Mandates 335 Proposed 0 7/1/2015 4/30/2016 $ 1.7 2018 PSR

8 SBD 60 2.6 6.5 Stormwater Mitigation Slope, repair and stabilization, Erosion Control Mandates 335 Proposed 0 7/20/2016 4/1/2017 $ 2.8 2018 PSR

8 RIV 15 15.9 20.3 Stormwater MitigationRetrofit Highway and/or facilities to meet Lake

Elsinore Watershed Nutrient TMDL WLA Mandates 335 Proposed 0 7/1/2015 5/1/2016 $ 3.3 2018 PSR

8 SBD 38 9.2 39.3 Stormwater MitigationIMPROVE DRAINAGE FACILITIES & MANAGE

STORM WATER RUN-OFFMandates 335 Proposed 0 8/1/2016 5/1/2017 $ 7.7 2018 PSR

8 RIV 10 60.9 145.2 Roadway RehabREHABILITATE MAINLINE PAVEMENT, SHOULDERS

AND RAMPSRoadway 122 Proposed 0 9/1/2015 9/1/2016 $ 31.7 2018 PSSR

8 SBD 15 31.5 31.5 Collision Severity Reduction INSTALL METAL BEAM GUARD RAIL Collision Reduction 015 Proposed 0 7/1/2015 5/30/2016 $ 3.8 2018 PSR

8 SBD 18 32.2 36.1 Collision Severity Reduction INSTALL MGS GUARDRAIL Collision Reduction 015 Proposed 0 7/1/2016 3/30/2017 $ 2.0 2018 SCVP

8 RIV 62 0.2 9.1 Collision Severity Reduction RECONSTRUCT MBGR Collision Reduction 015 Proposed 0 7/1/2016 3/30/2017 $ 2.1 2018 SCVP

8 RIV111371

6.6, 8, 74.2

6.6, 8, 74.2

Bridge Seismic Restoration Seismic Restoration 56.0284,56.0285, 56.0492 Bridge 113 Proposed 0 8/1/2015 5/1/2016 $ 3.9 2018 PSSR

8 SBD 15 R17.4 R17.4 Bridge Seismic Restoration Seismic Restoration 54.0916 Bridge 113 Proposed 0 8/1/2016 5/1/2017 $ 3.8 2018 PSSR

8 RIV 10 25.1 44.4 Near Banning Mill and Overlay Roadway 121 Proposed 0 6/1/2016 4/1/2017 $ 46.3 2018 CAPM

8 SBD 395 0 35.5 In/Near Adelanto CapM Roadway 121 Proposed 0 7/1/2016 4/1/2017 $ 21.3 2018 CAPM

8 SBD 15 75.3 123.9 Near Barstow Cap M Roadway 121 Proposed 0 7/1/2016 4/1/2017 $ 58.3 2018 CAPM

8 SBD 95 64.5 80.5 Near Needles Cap M Roadway 121 Proposed 0 7/1/2016 4/1/2017 $ 9.6 2018 CAPM8 SBD 215 3.7 7.3 In/Near San Bernardino Roadway Rehab Roadway 122 Proposed 0 6/1/2016 4/1/2017 $ 31.7 2018 PSSR8 SBD 18 44 68 Drainage System Restoration Repair & replace culverts Roadway 151 Proposed 0 12/1/2015 12/1/2016 $ 10.0 2018 Supp

8 RIV 95 14 36.2 Permanent RestorationCONSTRUCT CONCRETE/RSP APRONS TO PROTECT

ROADWAY & INCREASE CULVERT CAPACITYMajor Damage Restoration 131 Active 15 2/17/2015 10/15/2015 $ 3.5 2016 SCVP

8 SBD 62 121 126 Permanent Restoration CONSTRUCT CONCRETE/RSP APRONS Major Damage Restoration 131 Active 15 2/17/2015 10/15/2015 $ 5.2 2016 SCVP

8 RIV 15 4.9 6.6 Highway Planting Restoration INSTALL LANDSCAPING & UPGRADE IRRIGATION Roadside Preservation 210 Proposed 0 7/1/2016 3/30/2017 $ 2.0 2018 SCVP

8 RIV 60 7.6 7.8 Highway Planting Restoration INSTALL LANDSCAPING & UPGRADE IRRIGATION Roadside Preservation 210 Proposed 0 7/1/2016 3/30/2017 $ 2.0 2018 SCVP

8 RIV 10 0.0 14.3 Roadside Preservation/Worker Safety GORE PAVING & PLACE REMOVABLE EXIT SIGNS Collision Reduction 235 Proposed 0 7/1/2015 5/30/2016 $ 4.0 2018 PSR

8 RIV 15 0.0 52.2 Roadside Preservation/Worker Safety GORE PAVING & PLACE REMOVABLE EXIT SIGNS Collision Reduction 235 Proposed 0 7/1/2015 2/28/2016 $ 5.5 2018 PSR

8 RIV 10 0.0 39.1 Roadside Preservation/Worker Safety GORE PAVING & PLACE REMOVABLE EXIT SIGNS Collision Reduction 235 Proposed 0 7/1/2016 3/30/2017 $ 6.1 2018 PSR

8 SBD 15 0.0 R21.6 Roadside Preservation/Worker Safety GORE PAVING & PLACE REMOVABLE EXIT SIGNS Collision Reduction 235 Proposed 0 7/1/2016 2/28/2017 $ 5.9 2018 PSR

8 SBD 71 0.0 8.5 Operational ImprovementsTMS (ALSO RIV-71-R0.0/G3.32; SBD-71 NR CHINO

HILLS FR LA CO LN TO RIV CO LN & RIV-71 NR CORONA FR SBD CO LN TO JCT RTE 91 )

Mobility Improvements 315 Proposed 0 12/1/2015 12/1/2016 $ 9.0 2018 PSR

8 SBD 15 0.0 186.2 ADA Pedestrian infrastructureClose sidewalk gaps, upgrade curb ramps,

driveway etc..Mandates 361 Proposed 0 7/1/2016 4/15/2017 $ 2.1 2018 PSR

8 RIV 79 0.0 15.6 Roadway Rehab Mill and overlay Roadway 121 Complete 100 10/31/2014 4/30/2015 4/30/2015 $ 7.6 2018 CAPM

8 SBD 10 10 25 Collision Severity ReductionREPLACE DMBB, MBGR AND K-RAIL WITH

CONCRETE BARRIERSCollision Reduction 015 Proposed 0 10/1/2015 6/20/2016 $ 27.7 2018 PSR

8 RIV 91 10.2 10.2 Bridge Upgrade Bridge Rehab. And vertical clearance #56.0368 Bridge 110 Proposed 0 7/1/2016 4/1/2017 $ 3.0 2018 PSR

8 Riv 60 12.2 12.2 Bridge Upgrade Replace/rail upgrade #56-0507R Bridge 110 Proposed 0 10/15/2015 6/20/2015 $ 3.0 2018 PSR

FY 2015-16 and FY 2016-17 PID Work Program

October 23, 2015 9 of 12

Dist

rict

Coun

ty

Rout

e

Begi

n Po

stm

ile

End

Post

mile

Purp

ose

& N

eed

Impr

ovem

ent D

escr

iptio

n

SHO

PP P

rogr

am C

ateg

ory

SHO

PP P

rogr

am C

ode

(20.

10.2

01.x

xx)

PID

Stat

us

% C

ompl

ete

Initi

atio

n Da

te (M

M/D

D/YY

YY)

Targ

et C

ompl

etio

n Da

te

(MM

/DD/

YYYY

)

Dist

Dir

Appr

oval

Dat

e (M

M/D

D/YY

YY)

Estim

ated

Pro

ject

Cos

t ($M

) (C

apita

l + S

uppo

rt C

osts

)

Targ

et P

rogr

amm

ing

Cycl

e

PID

Type

8 SBD bldg 5730 Various Various Maintenance FacilityBUILD MAINTENANCE FACILITY ADJACENT TO

SOUTHERN REGION LAB.Facilities 352 Proposed 0 8/1/2015 4/1/2016 $ 24.7 2018 PSR

8 SBD 60 7.4 9.1 Operational ImprovementsADD WB AUX LANE, ADD EB DECELERATION LANE,

WIDEN RAMPS & BRIDGESMobility Improvements 310 Proposed 0 8/1/2016 2/15/2017 $ 15.0 2018 PSR

8 SBD 66 20.1 S23.4 ADA Pedestrian infrastructureClose sidewalk gaps, upgrade curb ramps,

driveway etc..Mandates 361 Proposed 0 7/20/2015 4/15/2016 $ 2.1 2018 PSR

8 SBD1018

215

22.495.43.7

22.495.43.7

Bridge Preventative Maint.

4 bridges; GRIND PCC DECK & PLACE POLYESTER OVERLAY, REPLACE JOINT SEALS, REPAIR FIRE

DAMAGE & REPAIR/REPLACE BRACING & WIND BRACING

Bridge 119 Proposed 0 8/24/2015 6/1/2016 $ 2.5 2018 PSSR

8 SBD 395 0.0 45.9 Roadway Rehab GRIND AND OVERLAY PAVEMENT Roadway 121 Proposed 0 12/1/2015 8/1/2016 $ 7.7 2018 CAPM8 SBD 18 101.0 115.9 Roadway Rehab GRIND AND OVERLAY PAVEMENT Roadway 121 Proposed 0 10/1/2015 6/1/2016 $ 10.7 2018 CAPM

8 RIV 111 47.2 55.3 on State Route 111 Mill and Overlay Roadway 121 Proposed 0 12/1/2015 8/1/2016 $ 9.1 2018 CAPM

8 SBD 66 20.1 23.4 On State Route 66 Mill and Overlay Roadway 121 Proposed 0 12/1/2015 8/1/2016 $ 4.0 2018 CAPM

8 RIV 10 0.0 57.6On Interstate 10 from San Bernardino Countyline

to Pennsylvania and from Monterey to Jct 86

Replace outside two lanes, slab replacement, mill and overlay ramps and shoulders (Segment

1:0.0/8.2, Segment 2:57.2/57.6)Roadway 122 Proposed 0 4/1/2016 3/1/2017 $ 108.8 2018 PSSR

8 SBD 10 29.4 39.2 Operational Improvements

TMS (NEAR LAKE ELSINORE N/B BTWN RAILROAD CANYON UC & MAIN ST UC. ALSO RIV 15 S BTWN

NICHOLS RD OC & LAKE ST UC & RIV 74 N/B FROM 74/15 JCT TO RIVERSIDE ST)

Mobility Improvements 315 Proposed 0 12/1/2015 12/1/2016 $ 5.6 2018 PSR

8 SBD 66 Various Various Relinquishment Relinquishment Mandates 160 Proposed 0 12/1/2015 5/1/2016 $ 5.2 2018 PSSR8 RIV 111 Various Various Relinquishment Relinquishment Mandates 160 Proposed 0 7/1/2016 4/30/2017 $ 5.2 2018 PSSR8 RIV 74 Various Various Relinquishment Relinquishment Mandates 160 Proposed 0 7/1/2016 4/30/2017 $ 5.2 2018 PSSR

8 RIV 10 71.8 72.4 Upgrade SRRA 15 MI E/O INDIO AT CACTUS CITY SRRA (EB & WB) Roadside Preservation 250 Proposed 0 7/1/2016 2/1/2017 $ 12.0 2018 PSR

8 SBD 10 22.1 22.1 Operational ImprovementsWIDEN RAMP FROM ONE LANE TO TWO LANES AT

THE EB ON-RAMPMobility Improvements 310 Proposed 0 8/1/2016 2/15/2017 $ 2.3 2018 SCVP

8 SBD 215 7.0 17.8 Operational ImprovementsNSTALL FOC BACKBONE, RMS, CMS, CCTV, VDS,

ESU, TOS, HUB & WIDEN ON-RAMPSMobility Improvements 315 Proposed 0 12/1/2015 12/1/2016 $ 6.4 2018 PSR

8 SBD 40 R100.0 R125.0 Collision Severity Reduction Regrade Median Cross Slope Collision Reduction 015 Complete 100 8/8/2013 6/30/2015 6/30/2015 $ 37.8 2018 PSR8 RIV 15 23.9 33.4 Roadway Rehab Slab replacement Roadway 121 Complete 100 9/3/2014 6/26/2015 6/26/2015 $ 26.3 2018 PIR8 RIV 15 38.2 51.5 Roadway Rehab Slab replacement Roadway 121 Complete 100 9/3/2014 6/26/2015 6/26/2015 $ 30.5 2018 PIR

8RIVSBD

10 0.0 39.6 ADA Pedestrian infrastructureClose sidewalk gaps, upgrade curb ramps,

driveway etc..Mandates 361 Proposed 0 7/1/2016 4/15/2017 $ 2.9 2018 PSR

8 SBD 15 71.6 75.0 ADA Pedestrian infrastructureClose sidewalk gaps, upgrade curb ramps,

driveway etc..Mandates 361 Proposed 0 7/1/2016 4/15/2017 $ 1.6 2018 PSR

8 SBD 210 R21.76 R33.18 Replace signs Replace Signs Roadway 170 Proposed 0 7/1/2016 4/30/2017 $ 4.2 2018 Supp

8 RIV

10627486

111195

Various Various Advance Mitigation ProgramVARIOUS LOCATIONS ON RTES 10, 62, 74, 86, 111

& 195Roadside Preservation 240 Proposed 0 1/28/2017 2/28/2017 $ 4.6 2018 PSR

8 RIV 15 19.1 20.9 Operational Improvements INSTALL CHANGEABLE MESSAGE SIGNS (CMS'S) Mobility Improvements 315 Discontinued 0 8/1/2016 5/15/2017 $ 2.7 2018 PSR

9 INY 395 37.70 37.70 Mitigation bank Mt. Cartago mitigation bank Roadside Preservation 240 Active 0 7/1/2016 6/30/2016 $ 5.0 2018 PSR9 INY 168 16.20 17.90 provide consistent cross section 168 Safety Improvements Collision Reduction 015 Active 1/15/2014 6/30/2016 $ 2.6 2018 PSR9 MNO 395 57.90 59.96 Construct Shoulders Conway Ranch Shoulders Collision Reduction 015 Proposed 6/30/2016 $ 6.6 2018 PSR9 MNO 395 Var Var Construct Chain up areas Mono County Chain Up Area Roadside Preservation 235 Proposed 6/30/2016 $ 6.0 2018 SCVP9 INY 395 117.30 117.80 ADA improvements Meadow Farms ADA Mandates 378 Proposed 6/30/2017 $ 6.7 2018 PSR9 MNO 395 77.00 80.50 CAPM Buckeye CAPM Roadway 121 Proposed 6/30/2016 $ 1.8 2018 CAPM9 MNO 395 36.10 40.10 CAPM Deadman CAPM Roadway 121 Proposed 6/30/2016 $ 2.5 2018 CAPM9 MNO NA NA NA Buy Mitigation Credits Mono Mitigation Bank Roadside Preservation 240 Proposed 6/30/2016 $ 2.0 2018 SCVP

9 INY 395 54.60 57.50In Inyo County on US 395 from 2.8 miles south of

Lone Pine to East Muir StreetSouth Lone Pine CAPM Roadway 121 Complete 6/30/2015 6/24/2015 $ 4.0 2016 CAPM

9 MNO 395 6.80 9.90In Mono County from 2.4 miles south of Lower

Rock Creek Rd to 0.4 mile south of Rock Creek RdShoulder Widening Collision Reduction 015 Complete 6/30/2014 6/30/2014 $ 20.3 2016 PSR

10AMAALP

16498889

Various Various Collision ReductionInstall shoulder rumble strips and center line

rumble stripsCollision Reduction 010 Proposed 0 7/1/2015 6/30/2016 $ 2.60 2016 SCVP

10 MER 59 16.1 16.1 Safety Improvements Roundabout Collision Reduction 010 Active 20 1/12/2015 6/30/2016 $ 3.96 2016 SCVP

10 MER 140 40.7 40.7 Safety Improvements Signal installation/RAB Collision Reduction 010 Proposed 0 7/1/2015 6/30/2016 $ 4.55 2016 SCVP

10MER

STA

33

33

R13.2417.21.4

R15.4226.4

27.09Safety Improvements Rumble Strip installation Collision Reduction 010 Active 80 10/1/2014 6/30/2016 $ 2.51 2016 SCVP

10MERSTA

140165

Various Various Safety Improvements Rumble Strip installation Collision Reduction 010 Proposed 0 7/1/2015 12/1/2015 $ 6.50 2016 SCVP

10MERSTASJ

999999

Various Various Safety Improvements Rumble Strip installation Collision Reduction 010 Active 40 10/1/2014 7/30/2015 7/3/2015 $ 2.93 2014 SCVP

10MPATUO

49140

Various Various Safety Improvements Rumble Strip installation Collision Reduction 010 Proposed 0 7/1/2015 12/1/2015 $ 2.60 2016 SCVP

10 SJ 88 22.093 22.093 Safety Improvements Signal installation Collision Reduction 010 Proposed 0 7/1/2015 6/30/2016 $ 5.10 2016 SCVP

10

SJSTACALALP

4 Various Various Collision ReductionInstall shoulder rumble strips and center line

rumble stripsCollision Reduction 010 Proposed 0 7/1/2015 6/30/2016 $ 6.4 2016 SCVP

10

SJSTATUOMPA

120108

Various Various Collision ReductionInstall shoulder rumble strips and center line

rumble stripsCollision Reduction 010 Proposed 0 7/1/2015 6/30/2016 2.353 2016 PIR

10 STA 99 18.2 18.4 Safety ImprovementsSouthbound on- and off-ramp acceleration and

deceleration lanesCollision Reduction 010 Active 80 5/5/2014 7/30/2015 7/3/2015 5.5 2014 SCVP

10STAMPA

132132

0.014.59

51.0615.0

Safety Improvements Rumble Strip installation Collision Reduction 010 Active 80 10/1/2014 6/30/2016 2.67 2016 SCVP

10 TUO 1080.0

49.033.050.0

Safety Improvements Rumble Strip installation Collision Reduction 010 Proposed 0 7/1/2015 12/1/2015 1.69 2016 SCVP

10 MER 140 2.02 49Extend existing culverts, relocate head walls, and

realign access roads to irrigation canalsUpgrade Safety Devices Collision Reduction 015 Proposed 95 7/21/2015 9/1/2015 $ 4.3 2016 PSR

10 MER 152 13.85 18.39 Collision severity reduction Upgrade safety devices Collision Reduction 015 Proposed 0 7/1/2016 6/30/2017 $ 3.0 2018 SCVP10 SJ 88 6.11 19.1 Collision severity reduction Upgrade safety devices Collision Reduction 015 Proposed 0 7/1/2015 6/30/2016 $ 2.3 2018 PIR10 SJ 120 0 21.19 Collision severity reduction Upgrade safety devices Collision Reduction 015 Proposed 0 7/1/2016 6/30/2017 $ 2.2 2018 SCVP

10SJ STA

MER5 5

52

14.9 0.9 5.3

40 16.03 32.92

Collision severity reduction Upgrade safety devices Collision Reduction 015 Proposed 0 7/1/2015 6/30/2016 $ 2.1 2018 SCVP

10 STA 132 0 51.06 Collision severity reduction Upgrade safety devices Collision Reduction 015 Proposed 0 7/1/2016 6/30/2017 $ 3.0 2018 SCVP10 SJ 5 26.5 26.5 Bridge Rehab Bridge Rehab Bridge 110 Proposed 0 7/1/2015 6/30/2016 $ 12.5 2018 PSSR

10SJ

MER99

1521

18.520.6

Bridge Rehab Bridge Rehab Bridge 110 Complete 100 5/30/2014 13,167,00 2016 PSSR

10 AMA 49 0.10 0.10In Amador County at the Mokelumne River Bridge

(#26 0012)Replace the existing bridge rails with the current

standard plan railing.Bridge 112 Proposed 0 7/1/2016 6/30/2017 $ 4.9 2018 PSSR

10 CAL4

1249

16.20 16.40Upgrade the existing bridge railings in order to

meet the current criteria for bridge railsBridge Rail Upgrade Bridge 112 Proposed 0 7/1/2016 6/30/2017 $ 3.0 2018 PSSR

10 CAL 4 Various Various

In Calaveras County on State Route 4 and State Route 26 at Angels Creek (#30 0008), South Fork Mokelumne River Bridge (#30 0022) and North

Fork Mokelumne River Bridge (#30 0049)

Upgrade bridge rails of three bridges Bridge 112 Active 0 6/1/2015 9/30/2015 $ 4.9 2018 PSSR

10 SJ5

205R12.7R13.2

R13.4R13.4

On Interstate 5 and Interstate 205 in San Joaquin County at Paradise Cut Bridge

Bridge Seismic Restoration Bridge 113 Complete 100 5/5/2014 $ 44,021.0 2016 PSR

10 SJ 4 R16.6 R16.6

Provide preventive maintenance in order to delay or minimize the bridge's future rehabilitation

needs; rebuild Hinge 32 in order to mitigate the effect of temperature's lateral displacement and

prevent debris from entering the hinge

Reconstruct Hinge 32 Bridge 119 Proposed 0 7/1/2015 6/30/2016 $ 3.1 2018 PSSR

10 STA 99 R13.9 R15.10To provide preventive maintenance in order to

delay or minimize the bridges' future rehabilitation needs

Remove and Replace Bridge Deck Asphalt Concrete (AC) Overlay with Polyester Concrete,

Replace Approach Slabs and Joint SealsBridge 119 Proposed 0 7/1/2015 6/30/2016 $ 4.4 2018 PSSR

10 MER 165 0 11.7 Near Los Banos, From I-5 to Henry Miller Rd 3R Roadway 120 Proposed 0 7/1/2016 6/30/2017 $ 27.5 2018 PSSR

10 MPA 140 12 22 Cap M Pvmt Preservation Roadway 121 Active 30 8/1/2014 12/30/2015 $ 11.4 2018 CAPM

10 MPA 140 25 51.8 Cap M Pvmt Preservation Roadway 121 Proposed 0 7/1/2015 6/30/2016 $ 19.9 2018 PIR10 MPA 49 0 18.5 Cap M Pvmt Preservation Roadway 121 Proposed 0 7/1/2016 6/30/2017 $ 14.4 2018 CAPM10 TUO 108 R18.9 37.4 Cap M Pvmt Preservation Roadway 121 Proposed 0 7/1/2015 6/30/2016 $ 15.6 2018 CAPM10 SJ 4 R15.5 R16.5 2R Pvmt Rehab Roadway 122 Proposed 0 7/1/2015 6/30/2016 $ 10.0 2018 PSSR10 MER 99 21 24 2R Pavement Rehabilitation Roadway 122 Complete 7/7/2014 $ 63,086.0 2016 PSSR

10SJ

STAMER

99 Various Various Major Damage (Permanent Restoration) Tree pruning and tree removal Major Damage Restoration 131 Proposed 0 8/31/2015 12/30/2015 $ 7.0 2016 SCVP

10 CAL 26 21.4 38.31 Stabilize eroding slopesInstall source control measures to control erosion

on 12 locations along route 26Mobility Improvements 150 Active 99 7/1/2015 6/30/2016 $ 7.1 2018 PSR

10 SJ

41299

120

21.6517.2821.650.42

33.617.2833.600.42

Upgrade existing drainage pump plants Replace Drainage pumps Roadway 151 Proposed 0 7/1/2016 6/30/2017 $ 2.4 2018 SCVP

FY 2015-16 and FY 2016-17 PID Work Program

October 23, 2015 10 of 12

Dist

rict

Coun

ty

Rout

e

Begi

n Po

stm

ile

End

Post

mile

Purp

ose

& N

eed

Impr

ovem

ent D

escr

iptio

n

SHO

PP P

rogr

am C

ateg

ory

SHO

PP P

rogr

am C

ode

(20.

10.2

01.x

xx)

PID

Stat

us

% C

ompl

ete

Initi

atio

n Da

te (M

M/D

D/YY

YY)

Targ

et C

ompl

etio

n Da

te

(MM

/DD/

YYYY

)

Dist

Dir

Appr

oval

Dat

e (M

M/D

D/YY

YY)

Estim

ated

Pro

ject

Cos

t ($M

) (C

apita

l + S

uppo

rt C

osts

)

Targ

et P

rogr

amm

ing

Cycl

e

PID

Type

10STAMER

9959

10.0314.0

16.814.0

In Stanislaus at Ceres Main Canal PP (#38 0007W), Crows Landing Road OC PP (#38 0077W),

Tuolumne Blvd. UC PP (#38 0096W), Kansas Avenue OC PP (#38 0086W) and in Merced at

Livingston UP PP (#39 0222W)

Replace Drainage Pumps at various locations Roadway 151 Proposed 0 7/1/2015 6/30/2016 $ 2.8 2018 PIR

10 SJ 5 3.5 48.97

In San Joaquin county on State Route 4 (from Postmile 2.0 to 3.4), on Interstate 5 (from Postmile

3.5 to 48.97), and on State Route 99 (at Postmile 31.35) - total of 5972 linear feet

Drainage System Restoration Roadway 151 Complete 100 5/9/2014 $5,640.00 2016 SCVP

10 ALP4,

88,89

Various Various in Alpine County on Route 4, 88, 89 Drainage System Restoration Roadway 151 Complete 100 5/13/2015 $6,646.00 2016 SCVP

10SJ

ALP88

13.50.28

14.12.56

In the City of Lockeford Drainage System Restoration Roadway 151 Complete 100 6/2/2014 $3,235.00 2016 SCVP

10ALP

AMATUO

var Various VariousReplace drainage culverts in Alpine, Amador and

Tuolumne countiesDrainage System Restoration Roadway 151 Complete 100 5/13/2015 $7,379.00 2016 SCVP

10 SJ 99 12 29.4 Roadside Safety Improvements Roadside Safety Improvements Roadside Preservation 235 Proposed 0 7/1/2016 6/30/2017 $ 3.1 2018 SCVP

10 SJ45

15.025.3

16.527

Roadside Safety Improvements Roadside Safety Improvements Roadside Preservation 235 Proposed 0 7/1/2016 6/30/2017 $ 2.7 2018 SCVP

10 STA 99 13.8 17.6 Roadside Safety Improvements Roadside Safety Improvements Roadside Preservation 235 Proposed 0 7/1/2015 6/30/2016 $ 1.4 2018 PIR

10 STA '099 R1.1 R7.3 In TurlockPlace MVPs, pave extended gores and slope

pavingRoadside Preservation 235 Complete 100 6/30/2015 $3,392.00 2016 SCVP

10 SJ 120 R2.6 T7.2In San Joaquin County on State Route 120 at

McKinley to SR 99 in MantecaConstruct roadside paving, MVP's and access

gates Roadside Preservation 235 Complete 100 6/30/2015 $5,225.00 2016 SCVP

10 SJ 205 2.3 R9.7 Patterson to I5 in/near TracyConstruct roadside paving, MVP's and access

gates Roadside Preservation 235 Complete 100 6/15/2015 $4,289.00 2016 SCVP

10 SJ '005 16.1 25.4 Louise Ave to 8 Mile Rd. in Lathrop/StocktonConstruct roadside paving, MVP's and access

gates Roadside Preservation 235 Complete 100 5/27/2015 $4,394.00 2016 SCVP

10 MER 5 0.4 0.8 Replace Rest Area Replace Rest Area Roadside Preservation 250 Proposed 0 7/1/2015 1/1/2017 $ 11.0 2018 PSR

10 CAL 4 29.1 29.6Improve mainline traffic flow and reduce traffic

delay. Construct Two-Way Left Turn Lane Mobility Improvements 310 Proposed 0 7/1/2016 4/1/2017 $ 1.4 2018 SCVP

10 MER152

511.36.28

11.36.28

STAA ImprovementSTAA Improvements on MER 152-SR 33

Interchange and on SR 5/SR 165 interchangeMobility Improvements 310 Proposed 0 7/1/2016 6/30/2017 $ 1.4 2018 SCVP

10 TUO 49 15.31 15.4 Improve intersection LOS and delay.Install traffic signal, extend left turn channelization

and improve STAA turning radius.Mobility Improvements 310 Proposed 0 7/1/2015 5/31/2015 $ 1.3 2018 SCVP

10 STA '099 13.4 13.8On SR 99 NB between Hatch Road and South 9th

StreetConstruct auxiliary lanes Mobility Improvements 310 Complete 100 4/24/2015 $8,699.00 2016 SCVP

10 SJ45

12.025.0

21.133.0

Transportation Management Sysytem

Installation of ramp meters, CMS's CCTV's, TMS's, and FO for connectivity on I-5 from Charter Way to Hammer Lane and on SR 4 from I-5 to S. Union St. (

Phase 2)

Mobility Improvements 315 Proposed 0 7/1/2015 6/30/2016 $ 4.0 2018 SCVP

10 SJ 120 R1.1 R5.6 In San Joaquin County on State Route 120 Contingency Project: Install Ramp Meters Mobility Improvements 315 Proposed 0 7/1/2015 6/30/2016 $ 3.3 2018 SCVP10 SJ '004 R16.0 R19.4 In San Joaquin County on State Route 4 Contingency Project: Install Ramp Meters Mobility Improvements 315 Proposed 0 7/1/2015 6/30/2016 $ 3.5 2018 SCVP

10SJ

STATUO

1205

99Various Various Transportation Management Sysytem

Upgrade & repair existing obsolete and broken TMS elements & improve communication

Mobility Improvements 315 Proposed 0 7/1/2016 6/30/2017 $ 2.5 2018 SCVP

10 SJ 26 1.11 1.11 In San Joaquin County on State Route 26 Increase Bridge Vertical Clearance Bridge 322 Proposed 0 7/1/2015 6/30/2016 $ 9.9 2018 PSR10 MPA 140 21.2 22.08 ADA pedestrian safety Install ADA curb ramps and sidewalk Mandates 361 Proposed 0 7/1/2015 6/30/2016 $ 1.2 2018 SCVP

10 STA108120

Various VariousThe purpose is to upgrade the pedestrian facilities to current ADA standards. The need is to improve

mobility and pedestrian accessibility

Upgrade curb ramps and sidewalks to current Americans with Disabilities Act (ADA) standards

Mandates 361 Proposed 0 7/1/2016 6/30/2017 $ 2.5 2018 SCVP

10 STA 108 22 33 ADA pedestrian safety Install ADA curb ramps and sidewalk Mandates 361 Proposed 0 7/1/2016 6/30/2017 $ 2.5 2018 SCVP

10 MER 165 8.1 10.91In the City of Los Banos, address pedestrian

facilitiesImprove pedestrian accessibility Mandates 361 Complete 3/16/2015 $ 3,741.0 2016 PSR

11 SD 5 51 52 Run-off Road Collision Place High Friction Surface Treatment Collision Reduction 010 Proposed 0 12/1/2015 6/30/2017 $ 1.2 2018 PSR-PR11 SD 52 13 T14.8 Construct Median Barrier Construct Median Barrier Collision Reduction 010 Active 5 12/1/2015 6/30/2016 $ 3.0 2018 PSR-PR11 SD 125 14 14 Construct Outer Separation Barrier Construct Outer Separation Barrier Collision Reduction 010 Active 10 12/1/2015 6/30/2016 $ 2.3 2018 PSR-PR

11 SD 5 0.3 20 Run-off Road CollisionUpgrade end treatments and install shoulder

rumble stripsCollision Reduction 015 Proposed 0 7/1/2015 6/30/2016 $ 6.0 2018 PSR-PR

11 IMP 86 11.3 19.2 Run-off Road CollisionUpgrade end treatments and install shoulder

rumble stripsCollision Reduction 015 Proposed 0 7/1/2015 6/30/2017 $ 6.0 2018 PSR-PR

11 SD 94 50.6 50.7 Campo Creek Br # 57 0120 Bridge Rehab and Rail Upgrade Bridge 110 Proposed 0 7/1/2015 4/30/2017 $ 3.5 2018 PSR

11 SD 163 1.6 2.78Route 163 Washington St OC to Quince St OC & E8-

S163 Connector OCBridge Rail Upgrade +5 Bridge 112 Proposed 0 7/1/2015 4/30/2017 $ 2.7 2018 PSR

11 SD 75 20.4 20.49 Coronado Bay Bridge (Paint Span 25) Bridge Presrvation Bridge 119 Proposed 0 7/1/2015 6/30/2016 $ 2.3 2018 SCVP

11 SD 8 R32 R41.7 Lane Replacement - Pavement Rehabilitation - 2R Lane Replacement - Pavement Rehabilitation - 2R Roadway 122 Proposed 0 7/1/2015 6/30/2017 $ 16.4 2018 CAPM

11 SD 54 0.0 6.4 Pavement Rehabilitation Pavement Rehabilitation Roadway 121 Proposed 0 7/1/2015 6/30/2016 $ 17.6 2018 CAPM11 SD 125 13.0 22.3 Pavement Rehabilitation Pavement Rehabilitation Roadway 121 Proposed 0 7/1/2015 6/30/2017 $ 23.0 2018 CAPM11 SD 5 9 65 Culvert Replacement Culvert Replacement Roadway 151 Proposed 0 7/1/2016 6/30/2017 $ 5.5 2018 PSR11 SD 8 23 61 Culvert Replacement Culvert Replacement Roadway 151 Proposed 0 7/1/2015 6/30/2016 $ 4.0 2018 PSR

11 SD 76 35 52 Culvert Replacement/ Fish Passage Culvert Replacement Roadway 151 Proposed 0 7/1/2015 6/30/2016 $ 10.0 2018 PSR

11 SD 78 37 62 Culvert Replacement Culvert Replacement Roadway 151 Proposed 0 7/1/2016 6/30/2017 $ 3.0 2018 PSR11 SD 94 9 65 Culvert Replacement Culvert Replacement Roadway 151 Proposed 0 7/1/2016 6/30/2017 $ 3.0 2018 PSR11 SD '005 0.35 72.37 In San Diego County Sign Replacement Facilities 170 Proposed 0 7/1/2015 6/30/2016 $ 2.5 2018 PSR

11 SD 8 7.0 17.0 Irrigation upgrade for water conservation

Convert RICS, stand alone controllers and manual systems to "smart" web based irrigation control

systems. Water delivery systems will also be modified to increase irrigation efficiency. To

follow .235 Worker Safety EA's 40970 (15/16 CY) & 41130k (18/19 CY). Also .230 Maint Acess EA

261703 (const completed 6/2013)

Roadside Preservation 210 Proposed 0 7/1/2015 6/30/2016 $ 1.9 2018 SCVP

11 SD 8 12.0 13.0Reduce the frequency and duration of highway

workers' exposure to traffic

Relocate appurtenances; add concrete barrier/end treatment, slope/gore/narrow area paving, MVP,

gates/fencingRoadside Preservation 235 Proposed 90 3/1/2015 6/30/2016 $ 6.0 2018 SCVP

11 SD 8 13.0 17.4Reduce the frequency and duration of highway

workers' exposure to traffic

Relocate appurtenances; add concrete barrier/end treatment, slope/gore/narrow area paving, MVP,

gates/fencingRoadside Preservation 235 Proposed 60 11/30/2014 6/30/2016 $ 3.5 2018 SCVP

11 SD 8.0 18.7 23.6Reduce the frequency and duration of highway

workers' exposure to traffic

Relocate appurtenances; add concrete barrier/end treatment, slope/gore/narrow area paving, MVP,

gates/fencingRoadside Preservation 235 Proposed 0 7/1/2016 6/30/2017 $ 3.3 2018 SCVP

11 SD 52 0.0 5.5Reduce the frequency and duration of highway

workers' exposure to traffic

Relocate appurtenances; add concrete barrier/end treatment, slope/gore/narrow area paving, MVP,

gates/fencingRoadside Preservation 235 Proposed 0 7/1/2015 6/30/2016 $ 4.0 2018 SCVP

11 SD 56 0.0 4.5Reduce the frequency and duration of highway

workers' exposure to traffic

Relocate appurtenances; add concrete barrier/end treatment, slope/gore/narrow area paving, MVP,

gates/fencingRoadside Preservation 235 Proposed 0 7/1/2016 6/30/2017 $ 3.0 2018 SCVP

11 SD 94.0 4.4 7.3Reduce the frequency and duration of highway

workers' exposure to traffic

Relocate appurtenances; add concrete barrier/end treatment, slope/gore/narrow area paving, MVP,

gates/fencingRoadside Preservation 235 Proposed 0 7/1/2016 6/30/2017 $ 3.7 2018 SCVP

11 IMP 111 0.0 7.7Reduce the frequency and duration of highway

workers' exposure to traffic

Relocate appurtenances; add concrete barrier/end treatment, slope/gore/narrow area paving, MVP,

gates/fencingRoadside Preservation 235 Proposed 0 7/1/2015 6/30/2017 $ 3.0 2018 SCVP

11 SD 125 9.6 13.2Reduce the frequency and duration of highway

workers' exposure to traffic

Relocate appurtenances; add concrete barrier/end treatment, slope/gore/narrow area paving, MVP,

gates/fencingRoadside Preservation 235 Proposed 60 11/2/2014 6/30/2016 $ 4.0 2018 SCVP

11 SD 805 21.1 23.6Reduce the frequency and duration of highway

workers' exposure to traffic

Relocate appurtenances; add concrete barrier/end treatment, slope/gore/narrow area paving, MVP,

gates/fencingRoadside Preservation 235 Proposed 60 11/30/2014 6/30/2016 $ 3.0 2018 SCVP

11 SD 5 10 15.7 Install Ramp Metering SystemsReduce Delay in Interstate 5 between the

mentioned PMsMobility Improvements 315 Proposed 0 7/1/2015 6/30/2017 $ 26.2 2018 PSR

11 SD 5 30 60 Replace Weight Station Replace Weight Station Mobility Improvements 321 Proposed 0 7/12/2016 6/30/2017 $ 0.6 2018 SCVP

11 SD 5 R29 R34.2 Sediment Source ControlRetrofit Permanent Treatment BMP's/Slope

StablilizationMandates 335 Proposed 0 7/1/2015 6/30/2016 $ 5.0 2018 PSR

11 SD 54 0 T14.212 Mandated by ADA Install and Upgrade Curb Ramps to ADA Standards Mandates 361 Proposed 0 7/15/2016 6/15/2017 $ 2.0 2018 SCVP

11 IMP 111 R0.0 40.798 Mandated by ADA Install and Upgrade Curb Ramps to ADA Standards Mandates 361 Proposed 0 7/15/2015 6/15/2016 $ 4.3 2018 SCVP

11 SD 94 1.416 R16.48 Mandated by ADA Install and Upgrade Curb Ramps to ADA Standards Mandates 361 Proposed 0 7/15/2016 6/30/2016 $ 4.5 2018 SCVP

11 SD 5 18 26 Stormwater MitigationMetals and Nutrients TMDLS. Construct sand

filters and infiltration devices (Rte 5)Mandates 335 Proposed 0 7/1/2016 6/30/2016 $ 6.0 2018 PSR

11 SD '075 20.5 21.5 San Diego-Coronado Bridge (Br# 57 0857) Foundation Rehabilitation I-1 Bridge 110 Proposed $ 6.0 TBD PSR-PDS

12 ORA 24116.668

&18.318

16.668&

18.318

Vertical curve correction and drainage improvement

Improvements consist of ramp profile correction, OGAC pavement, cross-slope adjustment and

replacement of temporary K-rail with concrete barrier & Improve off-ramp corner sight distanceSanta Margarita Pkwy On-Ramp to NB Route 241

&Santa Margarita Parkway Off-Ramp from NB Route

241

Collision Reduction 010 Active 30% 6/6/2013 12/31/2015 $ 1.6 2014 PIR

12 ORA 22 R12.030 R12.636To enhance area lighting, safety and meet ADA

standardsInstall safety lighting and modify safety control

devices on Rte 22 WB@Glassel St OCCollision Reduction 010 Proposed 0% 3/26/2015 6/30/2016 $ 0.7 2014 PIR

12 ORA 22 R9.916 R9.916To enhance area lighting, safety and meet ADA

standardsAdd additional safety lightings and install TCD's on

Route 22 WB from Rte 5/57 ConnectorCollision Reduction 010 Proposed 0% 3/25/2015 6/30/2016 $ 0.4 2014 PIR

12 ORA 57 R11.06 R11.47To enhance area lighting, safety and meet ADA

standardsOn SR-57 from SB off WB 22/Laveta/Bristol to SB

off to Chapman Avenue in the City of OrangeCollision Reduction 010 Proposed 0% 5/13/2015 6/30/2016 $ 1.2 2014 PIR

FY 2015-16 and FY 2016-17 PID Work Program

October 23, 2015 11 of 12

Dist

rict

Coun

ty

Rout

e

Begi

n Po

stm

ile

End

Post

mile

Purp

ose

& N

eed

Impr

ovem

ent D

escr

iptio

n

SHO

PP P

rogr

am C

ateg

ory

SHO

PP P

rogr

am C

ode

(20.

10.2

01.x

xx)

PID

Stat

us

% C

ompl

ete

Initi

atio

n Da

te (M

M/D

D/YY

YY)

Targ

et C

ompl

etio

n Da

te

(MM

/DD/

YYYY

)

Dist

Dir

Appr

oval

Dat

e (M

M/D

D/YY

YY)

Estim

ated

Pro

ject

Cos

t ($M

) (C

apita

l + S

uppo

rt C

osts

)

Targ

et P

rogr

amm

ing

Cycl

e

PID

Type

12 ORA 57 11.96 11.96 Bridge Seismic Restoration 55 0400 Santa Ana River Bridge retrofit Bridge 113 Proposed 0% 7/1/2016 6/30/2017 $ 4.7 2018 PIR

12 ORA 73 23.96 24.16 Address geometric deficiency of roadway.

Modify the existing lane configuration on the off-ramp from 1 lane to 1.5 lanes at the exit gore to allow 2 through lanes from the off-ramp onto SB

MacArthur Bl.Southbound Route 73 at MacArthur Bl Off-Ramp,

in the City of Newport Beach

Collision Reduction 010 Active 25% 5/28/2014 3/31/2016 $ 2.9 2014 PIR

12 ORA 124.851 &32.721

24.851 &32.721

To enhance traffic signal and safety lighting to meet ADA standards

(1) Modify signals (2) Install safety lighting (3) Update ADA to current standards (4) Refresh

stripings and pavement markings.On Route 1 at 6th Street in Huntington Beach and

at Seal Beach Blvd. in Seal Beach.

Collision Reduction 010 Active 85% 5/13/2014 8/30/2015 $ 0.9 2014 PIR

12 ORA 73 16.86 17.06 To mitigate currently occuring wet accidents

Cold-plane and resurface roadway with OGAC roadway and restripe all traffic lanes.

SB Rte 73, north of Rte 133, in the City of Laguna Beach

Collision Reduction 010 Active 10% 5/15/2014 6/30/2016 $ 0.4 2014 PIR

12 ORA 395.308.14

5.308.14

To enhance area lighting, safety and meet ADA standards

Modify signals, safety lighting, bring ADA to standard, and refresh striping if needed.

On State Route 39 at Trask Avenue, City of Westminster and at MacDonald Street, City of

Hungtington Beach

Collision Reduction 010 Active 25% 7/30/2014 3/31/2016 $ 0.8 2014 PIR

12 ORA 39 5.14 5.14To enhance area lighting, safety and meet ADA

standards

Modify signals, safety lighting, bring ADA to standard, and refresh striping if needed.

On Route 39 at Heil Avenue in Huntington BeachCollision Reduction 010 Active 25% 9/3/2014 12/31/2015 $ 0.7 2014 PIR

12 ORA 405 19.01 19.01To enhance area lighting, safety and meet ADA

standards

Improve HFST, safety lighting and bring guardrail to standard.

On Rte I-405 on-ramp from Westminster Ave in the City of Westminster

Collision Reduction 010 Active 15% 7/22/2014 12/31/2015 $ 0.8 2014 PIR

12 ORA 405 12.10 20.30 Upgrade metal beam guardrail

Replace temporary railing with concrete barrier, construct new drainage box inlet, relocate

overhead sign structures, contruct transition btwn. Conc. Berrier type 50 & 60.

On I-405 between Fairview and Garden Grove Fwy Rte 22

Collision Reduction 010 Active 35% 12/3/2014 12/31/2015 $ 4.7 2014 PIR

12 ORA 74 11.50 16.60 To improve surface runoff and prevent accidents.

Super elevation corrections, open graded AC, safety lighting lighting, shoulder wdng and high

friction surface treatment.On Route 74 from PM 11.5 to Orange/Riverside

county line

Collision Reduction 010 Active 25% 12/23/2014 3/31/2016 $ 25.8 2014 PIR

12 ORA 405 6.90 12.10 Upgrade metal beam guardrail

Replace temporary railing with concrete barrier, construct new drainage box inlet, relocate

overhead sign structures, contruct transition btwn. Conc. Barrier type 50 & 60.

On I-405 from Jamboree Blvd to post mile 12.1 south of Santa Ana River 55-258 in the cities of

Irvine and Costa Mesa

Collision Reduction 010 Active 25% 12/2/2014 12/31/2015 $ 3.2 2014 PIR

12 ORA 90 5.93 5.93To enhance area lighting, safety and meet ADA

standards

Modify signals, safety lighting, bring ADA to standard, and refresh pavement delineation. On Route 90 at Castlegate L/Placentia in the City of

Brea

Collision Reduction 010 Active 20% 1/12/2015 12/31/2015 $ 0.5 2014 PIR

12 ORA 5 35.02 35.02To enhance area lighting, safety and meet ADA

standards

Modify signals, install high visibility LED for improved visibility, bring ADA to standard, and

refresh pavement delineation. Route 5 northbound off State College Blvd. and The City

Drive

Collision Reduction 010 Active 10% 3/5/2015 3/31/2016 $ 0.7 2014 PIR

12 ORA 405 5.83 5.83To enhance area lighting, safety and meet ADA

standards

Modify signals, install high visibility LED for improved visibility, bring ADA to standard, and

refresh pavement delineation. Route 405 southbound off Culver Drive, in the City of Irvine

Collision Reduction 010 Active 10% 3/5/2015 3/31/2016 $ 0.7 2014 PIR

12 ORA 74 13.29 13.29 Bridge Rail Replacement & UpgradeUpgrade Non-standard rails.

55 0064 San Juan CanyonBridge 112 Proposed 0% 7/1/2015 6/30/2016 $ 1.0 2018 PIR

12 ORA 90 2.60 5.10 Pavement PreservationRemove and replace AC pavement

In Fullerton, Brea, from Harbor Boulevard to State College Boulevard

Roadway 121 Proposed 0% 7/1/2015 6/30/2016 $ 4.5 2018 PIR

12 ORA 5 19.95 30.30 Collision Severity ReductionMBGR Upgrade

Rte.5 from Rte. 405 to Rte. 55Collision Reduction 015 Proposed 0% 7/1/2015 6/30/2016 $ 7.5 2018 PIR

12 ORA 55 17.23 17.23To enhance area lighting, safety and meet ADA

standards

HFST overlay, safety lighting, optical speed bar, bring ADA to standards, high visibility striping per NSSP 84-9, on Route 55 SB off to Lincoln/Tustin.

Collision Reduction 010 Proposed 0% 7/8/2015 6/30/2016 2014 PIR

12 ORA 91 8.18 8.18To enhance area lighting, safety and meet ADA

standards

OGAC resurfacing of EB SR-91 off-ramp to Tustin Avenue, pavement deliniation, slope stabilization

along right shoulder of off-ramp, make ADA ramps, guard rail enhancement as needed.

Collision Reduction 010 Proposed 0% 7/9/2015 6/30/2016 2014 PIR

12 ORA 91 0.314 0.314 Operational ImprovementsWiden the off-ramp at the terminus - Within R/W,

CE level Env. Doc.EB SR-91 off-ramp to Orangethorpe Avenue.

Mobility Improvements 310 Proposed 0% 7/1/2015 6/30/2016 $ 1.1 2018 PIR

12 ORA 405 0.00 10.28 Collision Severity Reduction MBGR Upgrade

Rte. 405 from Rte. 5 to Rte. 73Collision Reduction 015 Proposed 0% 7/1/2016 6/30/2017 $ 7.5 2018 PIR

12 ORA 405 24.10 24.10 Bridge Scour MitigationDrive H Piles to modify foundations.55 0413F S405-N605 Connector OC

Bridge 111 Proposed 0% 7/1/2015 6/30/2016 $ 3.3 2018 PIR

12 ORA 73 26.56 26.56 Bridge Rail Replacement & UpgradeUpgrade Non-standard rails.

55 0539L Route 73/55 Separation55 0539R Route 73/55 Separation

Bridge 112 Proposed 0% 7/1/2016 6/30/2017 $ 2.9 2018 PIR

12 ORA 605 0.00 R1.60 Pavement PreservationShoulder & ramps

EB SR 22 to Katella Ave.Roadway 121 Proposed 0% 7/1/2016 6/30/2017 $ 6.0 2018 PIR

12 ORA 1 29.90 33.70 Pavement Preservation

Remove and replace AC pavementIn Huntington Beach and Seal Beach,

Unincorporated OC, Warner Avenue to the LA county line

Roadway 121 Proposed 0% 7/1/2015 6/30/2016 $ 5.5 2018 PIR

12 ORA 405 16.9 24.2 Pavement Rehabilitation for I-405Along I-405 in the City of Westminster, Huntington

Beach and Seal BeachRoadway 121 Complete 100% 7/1/2014 6/30/2015 6/17/2015 $ 14.0 2016 PIR

12 ORA 39 15.15 15.91 Drainage System Restoration

Mitigate flooding by installing a new drainage system.

On Beach Blvd. from Manchester Ave. to Craig Street

Roadway 151 Proposed 0% 7/1/2016 6/30/2017 $ 4.3 2018 PIR

12 ORA 5 3.29 3.29 Drainage System RestorationDrainage repair

I-5 at Avenida Pico, in the City of San ClementeRoadway 151 Proposed 0% 7/1/2015 6/30/2016 $ 2.5 2018 PIR

12 ORA 5 29.60 44.40 Signs and lighting rehabilitation

Signs & Lighting RehabilitationReplace overhead signs that lost reflectivity with

new high (Retro-Reflective" signs.Both directions of I-5 between SR-55 and LA

county line

Roadway 170 Proposed 0% 7/1/2016 6/30/2017 $ 2.5 2018 PIR

12 ORA 5 34.50 37.40 Roadside Safety Improvements

Relocate facilities away from traffic, construct roadside paving, access gates and trails toimprove

worker safety.In Santa Ana and Anaheim from Santa Ana River to

Harbor Blvd.

Collision Reduction 235 Proposed 0% 7/1/2015 6/30/2016 $ 3.0 2018 PIR

12 ORA 5 37.40 40.90 Roadside Safety Improvements

Relocate facilities away from traffic, construct roadside paving, access gates and trails toimprove

worker safety.In Anaheim from Harbor Blvd to La Palma Ave

Collision Reduction 235 Proposed 0% 7/1/2015 6/30/2016 $ 3.0 2018 PIR

12 ORA 5 40.90 41.90 Roadside Safety Improvements

Relocate facilities away from traffic, construct roadside paving, access gates and trails toimprove

worker safety.In Anaheim from La Palma Ave to Magnolia Ave

Collision Reduction 235 Proposed 0% 7/1/2016 6/30/2017 $ 3.0 2018 PIR

12 ORA 5 41.90 43.10 Roadside Safety Improvements

Relocate facilities away from traffic, construct roadside paving, access gates and trails toimprove

worker safety.In Anaheim, Fullerton and Buena Park from

Magnolia Ave to Stanton Ave and on Route 91 from Stanton Ave to Brookhurst St (PM 2.8/3.8)

Collision Reduction 235 Proposed 0% 7/1/2016 6/30/2017 $ 3.0 2018 PIR

12 ORA 55 17.20 17.20 Operational ImprovementsConstruct roundabout to address backup to the

maineline downstream of the NB SR-55 ramp intersection at Lincoln.

Mobility Improvements 310 Proposed 0% 7/1/2016 6/30/2017 $ 3.0 2018 PIR

FY 2015-16 and FY 2016-17 PID Work Program

October 23, 2015 12 of 12

Dist

rict

Coun

ty

Rout

e

Begi

n Po

stm

ile

End

Post

mile

Purp

ose

& N

eed

Impr

ovem

ent D

escr

iptio

n

SHO

PP P

rogr

am C

ateg

ory

SHO

PP P

rogr

am C

ode

(20.

10.2

01.x

xx)

PID

Stat

us

% C

ompl

ete

Initi

atio

n Da

te (M

M/D

D/YY

YY)

Targ

et C

ompl

etio

n Da

te

(MM

/DD/

YYYY

)

Dist

Dir

Appr

oval

Dat

e (M

M/D

D/YY

YY)

Estim

ated

Pro

ject

Cos

t ($M

) (C

apita

l + S

uppo

rt C

osts

)

Targ

et P

rogr

amm

ing

Cycl

e

PID

Type

12 ORA 133 8.3 9.2 Operational Improvements

Extend the no. 4 lane on southbound SR-133 from SB I-5 connector and add a second lane to NB 405

connector.In the City of Irvine, SB Route 133 between I-405

and I-5

Mobility Improvements 310 Proposed 0% 7/1/2015 6/30/2016 $ 2.5 2018 PIR

12 ORA5

5791

33.0/10.6/R2.6/& 0.0/

43.216.6R4.17.2

Transportation Management System Improvements

Integrated Corridor Management along Routes 5, 57, and 91 to include additional ITS elements,

striping, overhead signs, and miscellaneous roadway improvements. Project proposes to

efficiently manage traffic flow during planned and unplanned events in coordination with OCTA and

the cities of Fullerton, Anaheim, Orange, Santa Ana, and Buena Park.

Mobility Improvements 315 Proposed 0% 7/1/2015 6/30/2016 $ 22.6 2018 PIR

12 ORA 1 13.0 33.6Transportation Management System

Improvements

Signals rehabilitation - Replace heads and fitter and upgrade poles due to damages caused by salt

water.Various locations on Route 1 Pacific Coast Highway

Mobility Improvements 315 Proposed 0% 7/1/2015 6/30/2016 $ 3.1 2018 PIR

12 ORA 57 21.1 21.7 StormwaterSlope stabilization and/or Slope Revegetation for

source control.On SR-57 from Lambert Road to Tonner Canyon

Mandates 335 Proposed 0% 7/1/2016 6/30/2017 $ 3.0 2018 PIR

12 ORA 1 12.2 13.3 Stormwater along ASBSStabilize bio-swales along NB PCH in the City of

Newport Beach.Mandates 335 Proposed 0% 7/1/2015 6/30/2016 $ 3.0 2018 PIR

12 ORA 1 5.5 7.9ADA Access Improvements & ADA Pedestrian

Infrastructure

ADA Improvements /Curb Ramps.On Route 1 from 7th Street to Moss Street in the

City of Laguna BeachMandates 361 Proposed 0% 7/1/2015 6/30/2016 $ 8.0 2018 PIR

12 ORA 74 13.29 13.29 Bridge Rail Replacement & UpgradeUpgrade Non-standard rails.

55 0064 San Juan CanyonBridge 112 Proposed 0% 7/1/2015 6/30/2016 $ 1.0 2018 PIR

12 ORA 90 2.60 5.10 Pavement PreservationRemove and replace AC pavement

In Fullerton, Brea, from Harbor Boulevard to State College Boulevard

Roadway 121 Proposed 0% 7/1/2015 6/30/2016 $ 4.5 2018 PIR

12 ORA 5 19.95 30.30 Collision Severity ReductionMBGR Upgrade

Rte.5 from Rte. 405 to Rte. 55Collision Reduction 015 Proposed 0% 7/1/2015 6/30/2016 $ 7.5 2018 PIR

12 ORA 55 17.23 17.23To enhance area lighting, safety and meet ADA

standards

HFST overlay, safety lighting, optical speed bar, bring ADA to standards, high visibility striping per NSSP 84-9, on Route 55 SB off to Lincoln/Tustin.

Collision Reduction 010 Proposed 0% 7/8/2015 6/30/2016 2014 PIR

12 ORA 91 8.18 8.18To enhance area lighting, safety and meet ADA

standards

OGAC resurfacing of EB SR-91 off-ramp to Tustin Avenue, pavement deliniation, slope stabilization

along right shoulder of off-ramp, make ADA ramps, guard rail enhancement as needed.

Collision Reduction 010 Proposed 0% 7/9/2015 6/30/2016 2014 PIR

12 ORA 91 0.314 0.314 Operational ImprovementsWiden the off-ramp at the terminus - Within R/W,

CE level Env. Doc.EB SR-91 off-ramp to Orangethorpe Avenue.

Mobility Improvements 310 Proposed 0% 7/1/2015 6/30/2016 $ 1.1 2018 PIR