FY 2006 Department Overview Presentation
Sal Chiarelli, Director of Physical Plant
July 19, 2005
2
Physical Plant Department255 Employees
• Heat Plant (11)• HVAC (16)• Controls (5)• Plumbing (12)• Electric shop (11)• CPR Shop (18)• Custodial (102)• TCO Asbestos/Lead (10)• Automotive (3)• Medical Complex (13)
• Recycling Sol. Waste (6)
• Administration (13)• Energy Management (1)
• Service Ops. (2)
• Material Management (3)
• Grounds/Moving (16)
• Project Management (2)
• Med. Complex Proj. (6)
• Trinity (5)
3
4
•Internal Partners (customers)
• UVM Staff• UVM Faculty• UVM Administration• Students• Residential Life• Parking and Transportation• Police Services• Athletics• Risk management• Campus Planning• Architectural/Engineering• All other AFS departments.
5
Customer Expectations
• Be invisible
• Like a utility
• I paid already (grants 50%)
• Varies according to the individual
• Be right over service
• Everything is an emergency
• Sometimes there is little or no planning
6
External Partners
•Local Utilities, VGS,BED,BPW
•State Organization
•APPA,NECERAPPA
•FAHC
•City of Burlington
•Vendors/Suppliers
•A/E Firms
•Contractors
7
Some Current Physical Plant Issues
• Deferred Maintenance • Longer hours of operation• More events/set ups. (not staffed for this)• Research requires less tolerance for down time• Energy efficiency• Higher than average turnover • Limited space for implementing zone maintenance • New codes/regulatory requirements eat at the budget. • Operating dollar increase is creating a buying power
issue • Significantly less management of the Physical Plant as a
result of cuts.
8
What Else Is Making Our Jobs Challenging
• More Research facilities
• Longer hours
• All spaces open to all people
• Eating/drinking normal
• More access to food and drink
• More utilization of space
• Everyone wants Air Conditioning
• There is a general feeling that all services should be free
• Building are getting older
• Newer buildings are more sophisticated
• Limited hiring pool in our area
• Construction/capital projects eats up PPD resources
• Limited IT resources in AFS
9
Where do we use technology
• FAMIS
• KRONOS
• Boiler controls
• Energy Management
• Card Access
• Thermography
• Building Automation
• Text Paging
• Cell Phones
• Predictive Maintenance
• Gas Purchasing
• Elevator Controls
• Water Treatment
• Metering
• Invoicing
• CADD
• All Typical Office Applications
• Many other areas
10
How Have We Changed The Department • Self Study
• Increased Communication
• Increased Visibility
• Job Order Contracting
• FAMIS
• KRONOS
• NEXTEL
• Paging
• Boiler Control System
• Facilities Assessment
11
12
The goals for the project are as follows:
• Capture the relevant historical information
• Provide new information about customer satisfaction, employee issues, staffing, industry changes and innovations;
• Identify opportunities for increasing efficiency within the department;
• Develop priorities that will clarify funding requirements for the department and assist in the budgeting process;
• Develop an understanding of the external and internal drivers that force choices and changes within the department;
• Make recommendations for change and innovation for programs and services;
• Develop a replicable process that also increases the capacity of the staff to undertake similar studies in the future;
• Identify the consequences of not taking specific action or making sustainable changes; and
• Improve the department’s morale by creating a participatory process of self-study.
13
How Did We Get Info• Focus groups
– Faculty
– Students
– PPD Staff
– Colleagues
• Surveys
• SWOT
• History
•Other Institutions
•APPA
•Current Database WO system
•Wellness Survey
•PPD Customer Surveys
14
S.W.O.T.’s
Strengths (Internal) Weaknesses (Internal) Opportunities (External) Threats (External)
Campus LocationCustomer ServiceEmployee Expertise and Dedication Well-respected work forceKnowledgeable leadershipDiverse Work ForceTeam WorkCustomer Feedback
Campus LocationPreventive MaintenanceLoss of Corporate KnowledgeLack of Centralization Formal Training ProgramCommunicationDeferred MaintenanceOrganizational StructurePerformance Measures and AccountabilityEmployee RecognitionMoraleInadequate Financial ResourcesInformation Technology (IT)Undefined Priority ManagementFinancial Systems & Tools
Bench marking with similar institutionsPartnering (Utilities, Services and Purchasing)Creative Financing (Grants, Loans and Bonds)Utilizing Faculty (Staff Development and Technology)Centralization of Similar Campus ServicesOutsourcingCustomer InputSenior (Upper-administrative) Level DirectionChange of Customer ExpectationsUtility Deregulation
OutsourcingInsufficient FundingCode Compliance IssuesMedia (Television, newspaper and radio)Changes (Technology, Environmental and Socioeconomic)Legal Issues (Personnel and Environmental)Changes in Upper-administrative, senior positionsWages and Salaries not competitiveUnforeseen expenditures (Personnel and projects)Key Personnel RetiringInstitutional CompetitionCustomer DissatisfactionUtility Cost Fluctuations
Common Denominators
15
Strategic Planning
• Re-evaluate our mission
• Create our Vision
• Develop goals
• Create strategies to reach goals
• Align with the University
16
Mission
• To maintain facilities, perform related services and provide responsible stewardship of the University of Vermont’s physical assets in support of the University’s mission.
17
Vision• To be a highly effective facilities organization through:
– Continuous improvement and innovation
– Maximizing resources
– Encouraging employee growth and job satisfaction
– Promoting the values of UVM’s Common Ground and supporting the needs of the Campus Community
18
Am
eric
an U
niv
Bin
gham
ton
UB
uckn
ell U
nive
rsity
Car
negi
e M
ello
n C
olga
te U
nive
rsity
D
artm
outh
Col
lege
H
aver
ford
Col
lege
It
haca
Col
lege
K
eene
Sta
te C
olle
ge
Mid
dleb
ury
Col
lege
M
ontc
lair
Sta
te
Rut
gers
U
niv
of C
onne
ctic
utU
niv
of M
aryl
and
UM
ASS
Am
hers
tU
New
Bru
nsw
ick
Vill
anov
a W
est.
New
Eng
land
U
niv
of V
erm
ont
Organizational chart
Produces Annual Report
Union labor
Employs student labor
Employs part-time labor
"Zones" for maintenance
Provides employee uniforms
Use employee identification badges
Provide/fund saftey shoes
Provide hand tools to trades
Employee orientation program
Employee recognition/awards
Formal employee training & development
Use electronic time/attendance
Maintain policies/procedures centrally
Use communication tools
Custodial combined w/Res Life
Recharge departments for services
Has own accounts payable function
Provides "free" service estimates
Has central stockroom
Uses integrated supply contracts
Periodic facilities condition audit
Computerized work order system
Performs minor renovation services
Has central gasoline pump system
Has central heating system
Has central cooling system
Has cogeneration
Fuel contract competitvely bid
Has energy management program
Energy policy/enforcement
Benchmarking/Surveying
19
Outsourcing OfServices ‘01 Data
Summary of FY01 "Major" Outsourcing Activity: Sort by Shop
Department Function (F) or Task/ResponsibilityVendor (V)
Asbestos/Lead V ATCAsbestos/Lead V Clay PointAsbestos/Lead V All CycleAsbestos/Lead V AldersonAsbestos/Lead V EHMAutomotive V List was blankCHP V Barclay Water ManagementCHP V Westinghouse Process Control Co.CPR V Kevin ArmstrongCPR V Kris PalmerCPR V Able Paint & GlassCPR V Heritage EnvironmentalCPR V Hawthorn's RoofingCustodial V Coye: dust mop supplierCustodial V Terminex: pest controlCustodial V Kenco: supplies as neededCustodial V Lacey's: carpet replacementCustodial V Gordon's: shade repairElectrical V Simplex fire alarm serviceElectrical V Otis Elevator Co.Energy V C.E.D.: lamp ballastsEnergy V Burgess: lamp ballastsEnergy V Magnetek: motorsEnergy V Bearing Spec.Energy V Bailey AssociatesGrounds V Marcelino, IncGrounds V Levinsky: hort & turf maintenanceGrounds V Pleasant ValleyGrounds V D.J. Tree ServiceGrounds V Bartlett Tree ServiceHVAC/P V A. Marcelino & Co.HVAC/P V Vermont Heating & VentilatingHVAC/P V Cedar Ridge SprinklerHVAC/P V Barclay Water ManagementHVAC/P V Demag riggers & crane serviceMed Plex V Simplex: fire alarmsMed Plex V Packaged A/C units: NEASIMed Plex V Alpine RefrigerationMed Plex V Chiller servicesMMW V Burgess: electrical suppliesMMW V White River Paper: linersMMW V Kenco: paperMMW V Blodgetts: HVAC suppliesMMW V Gregory: building suppliesRecycling V Global RecyclingRecycling V Chittenden Solid Waste DistrictRecycling V WSIRecycling V All CycleSOS V No outside vendors listed
20
Services Analysis Charts Page 97 SS
21
Physical Plant (Non-Utility)Budget Cuts OverThe Years.
This equates to approximately 21% of today’s budget
Year Rescission/Cut
1983 45500
1990 104178
1992 205377
1993 68477
1994 697823
1995 216983
1996 241299
1997 252279
2001 300000
2002 400000
2003 361168
2005 179000
TOTAL (06) $3,359,094Cumulative Total Over The Years. Lost Spending
$36,581,000
Today’s Dollars lost Spending Over The Years
$59,745,000
22
Some Regulatory/Code Issues That Have Forced Change
• ADA• Elevator• Life Safety• Carbon Monoxide• Historical Preservation• Asbestos Abatement• Lead• Mold/Fungi• Pesticide Application• Energy Codes• Backflow prevention• Spill Prevention• Underground Storage
Tank
•Asbestos Awareness•Bloodborne Pathogens•Radiation Safety•Personal Equipment Protection•ADA•FMLA•Confined Space•Lock-Out Tag-Out•Right To Know (Haz Com)•Fall Protection•Respiratory Protection
23
Some Departmental Licensing/Certifications
• Back Flow Prevention
• Electrical Joureyman
• Electrical Master
• Electrical Apprentice
• Plumber Apprentice
• Plumber Master
• Plumber Journeyman
• Natural Gas Certification
• Air Cond/Refrigeration
• Fire Alarm T-1
• Fire Alarm TQP
• Professional Engineer
•Refrigerant Processing•Lead Inspector•Lead Contractor Entity•Asbestos Inspector•CDL Driving•Fuel Oil Installer•Operating Engineer•Pesticide•Asbestos Project Designer•Asbestos Entity•Asbestos Project Monitor
24
SOURCES OF FUNDS (2005)
SOURCE AMOUNT
General Fund 21,535
Parking and Transportation 365
Residential Life 4,235
Bond Money (One Time Dollars) 7,875
Departmental Projects 1,130
25
Breakdown By Unit (05 Dollars)
Shop/Unit AMOUNT (1000)
Heat Plant 725
HVAC/ Plumbing 2,600
Controls
CPR Shop 1,415
Custodial 3,975
Electric 895
TCO Asbestos/Lead 850
Automotive 200
Medical Complex Projects
Grants
Administration 1,400
Energy Management
Project Management
Service Operations
Medical Complex Maintenance
1,350
Recycling Solid Waste 600
Material Management 100
Grounds management 1,700
Utilities/Other 11,455
TOTAL $27,265
PPD Budget
Administration5%
Grounds Management6%
Utilities42%
Heat Plant3%
HVAC/ Plumbing10%
Carpentry Painting Roofing
5%
Custodial 15%
Electrical3%
TCO Asbestos/Lead3%
Automotive1%
Medical Complex Maintenance
5%
Material Management0%
Recycling Solid Waste2%
Heat Plant
HVAC/ Plumbing
Carpentry Painting Roofing
Custodial
Electrical
TCO Asbestos/Lead
Automotive
Administration
Medical Complex Maintenance
Recycling Solid Waste
Material Management
Grounds Management
Utilities
26
Example of the complexity of 1 units responsibilities. (Hand Out) Grounds TasksTASKS/RESPONSIBILITIES SEASON
GENERAL FUND IN HOUSE
GF CONTRACT SERVICES
TOTAL GENERAL
FUND RESID. LIFE IN HOUSE
RESID. LIFE CONTRACT SERVICES
TOTAL RES. LIFE
PARKING & TRANSPORT
ATION IN HOUSE
PARKING & TRANSPORT
ATION CONTRACT
TOTAL PARKING &
TRANSPORTATION
STORM POND IN HOUSE
STORM POND CONTRACT
TOTAL STORM POND
ATHLETICS IN HOUSE
ATHLETICS CONTRACT
TOTAL ATHLETICS
ENGLESBY IN HOUSE
TOTAL TRINITY
IN HOUSE TRINITY CONTRACT
TOTAL TRINITY
MEMORIAL PROGRAM
MISC RES LIFE
BUDGETS
MOVES AND OTHER MISC.
TOTAL ALL BUDGETS
% OF TOTAL BUDGET UVM CONTRACT
HORTICULTURE MAINTENANCE 71,103 88,963 160,066 67,427 33,946 101,373 7,856 7,856 0 122 122 5,230 0 1,400 1,400 110 276,157 18% 151,848 124,309
EDGE PLANT BEDS SP 0 0 0 0 0 0 0 0% 0 0
MULCH PLANT BEDS SP 0 0 0 0 0 0 0 0% 0 0
WEED PLANT BEDS S 0 0 0 0 0 0 0 0% 0 0
PLANT TREES AND SHRUBS SP, S, F 0 0 0 0 0 0 0 0% 0 0
PLANT FLOWERS SP, F 0 0 0 0 0 0 0 0% 0 0
SHEAR AND PRUNE SHRUBS ANNUAL 0 0 0 0 0 0 0 0% 0 0
PRUNE TREES ANNUAL 0 0 0 0 0 0 0 0% 0 0
REMOVE TREES AND SHRUBS SP, S, F 0 0 0 0 0 0 0 0% 0 0
HAUL BARK MULCH W 0 0 0 0 0 0 0 0% 0 0
LANDSCAPE DESIGN ANNUAL 0 0 0 0 0 0 0 0% 0 0
WATER TREES, SHRUBS, FLOWERS S 0 0 0 0 0 0 0 0% 0 0
PURCHASE TREES, SHRUBS, FLOWERS 0 0 0 0 0 0 0% 0 0
VINE REMOVAL FROM BLDGS. SP,S,F 0 0 0 0 0 0 0 0% 0 0
TURF MAINTENANCE 82,843 15,403 98,246 42,218 42,218 42,457 42,457 0 0 414 30,700 30,700 3,753 217,788 14% 171,685 46,103
MOW AND TRIM TURF SP,S,F 0 0 0 0 0 0 0 0% 0 0
REPAIR DAMAGED TURF SP,S,F 0 0 0 0 0 0 0 0% 0 0
TOPSOIL, GRADE, SEED SP,S,F 0 0 0 0 0 0 0 0% 0 0
STAKE ROPE INSTALL/ MAINTAIN SP,S,F 0 0 0 0 0 0 0 0% 0 0
LEAF CLEAN UP F 0 0 0 0 0 0 0 0% 0 0
MAINTAIN AND OPERATE IRRIGATION SP,S,F 0 0 0 0 0 0 0 0% 0 0
FERTILIZE SP,F 0 0 0 0 0 0 0 0% 0 0
WEED CONTROL S,F 0 0 0 0 0 0 0 0% 0 0
SOIL, SEED, FERTILIZER SP,S,F 0 0 0 0 0 0 0% 0 0
ATHLETIC FIELD MAINTENENCE 28,060 28,060 0 0 0 29,423 1,590 31,013 0 59,073 4% 57,483 1,590
MOW AND TRIM TURF SP,S,F 0 0 0 0 0 0 0 0% 0 0
AERATE SP,S,F 0 0 0 0 0 0 0 0% 0 0
OVERSEED SP,S,F 0 0 0 0 0 0 0 0% 0 0
FERTILIZE SP,S,F 0 0 0 0 0 0 0 0% 0 0
INFIELD PREP SP,S,F 0 0 0 0 0 0 0 0% 0 0
COORDINATE WITH EXPOS S,F 0 0 0 0 0 0 0 0% 0 0
DEBRIS 56,255 56,255 36,961 36,961 30,055 30,055 343 343 320 320 281 0 124,215 8% 124,215 0
EMPTY TRASH RECEPTACLES ANNUAL 0 0 0 0 0 0 0 0% 0 0
PICK UP LOOSE TRASH ON GROUNDS ANNUAL 0 0 0 0 0 0 0 0% 0 0
REMOVE POSTERS, STICKERS, SIGNS ANNUAL 0 0 0 0 0 0 0 0% 0 0
REMOVE GRAFFITI ANNUAL 0 0 0 0 0 0 0 0% 0 0
PICK UP DEAD ANIMALS ANNUAL 0 0 0 0 0 0 0 0% 0 0
CLEAN WINDOW WELLS LEAVES, H2O ANNUAL 0 0 0 0 0 0 0 0% 0 0
STORM POND MAINTENANCE 14,030 14,030 0 0 2,000 23,108 25,108 0 0 39,138 3% 16,030 23,108
MONITOR AND CLEAN STORM DRAINS ANNUAL 0 0 0 0 0 0 0 0% 0 0
REPAIR/REPLACE CATCH BASINS ANNUAL 0 0 0 0 0 0 0 0% 0 0
SNOW REMOVAL 91,445 5,500 96,945 64,989 64,989 92,411 77,797 170,208 0 0 21 18,931 18,931 3,272 354,366 23% 252,138 102,228
SNOW PLOW ROADS AND LOTS W 0 0 0 0 0 0 0 0% 0 0
SHOVEL WALKS AND STEPS W 0 0 0 0 0 0 0 0% 0 0
SAND/SALT WALKS LOTS ROADS W 0 0 0 0 0 0 0 0% 0 0
HAUL SNOW PILES W 0 0 0 0 0 0 0 0% 0 0
MONITOR FOR SLIPPERY AREAS W 0 0 0 0 0 0 0 0% 0 0
MAINTAIN ROADS, WALKS, LOTS 14,545 6,830 21,375 15,323 15,323 18,757 18,757 0 0 1,425 1,425 56,880 4% 48,625 8,255
FILL POTHOLES ANNUAL 0 0 0 0 0 0 0 0% 0 0
GRADE DIRT LOTS, ROADS SP,S,F 0 0 0 0 0 0 0 0% 0 0
MONITOR FOR MAINTENANCE SP,S,F 0 0 0 0 0 0 0 0% 0 0
CLEAN FUEL/ANTIFREEZE SPILLS ANNUAL 0 0 0 0 0 0 0 0% 0 0
REMOVE WINTER SAND SP 0 0 0 0 0 0 0 0% 0 0
MECHANICAL R&M 71,884 52,081 123,965 0 0 0 0 0 347 124,312 8% 72,231 52,081
LIGHT REPAIRS ON TRUCKS/ EQUIPANNUAL 0 0 0 0 0 0 0 0% 0 0
MOWING EQUIPMENT R&M SP,S,F 0 0 0 0 0 0 0 0% 0 0
SNOW REMOVAL EQUIP. R&M F,W 0 0 0 0 0 0 0 0% 0 0
ORDER/PURCHASE PARTS ANNUAL 0 0 0 0 0 0 0 0% 0 0
WINTER EQUIPMENT CHANGE OVER F 0 0 0 0 0 0 0 0% 0 0
SPRING EQUIPMENT CHANGE OVER W 0 0 0 0 0 0 0 0% 0 0
GROUNDS TOOLS 0 0 0 0 0 0 0% 0 0
TRADES R&M 7,124 7,124 0 0 0 0 0 7,124 0% 7,124 0
MOVING & DELIVERY SERVICES 14,030 14,030 0 0 0 0 0 83 49,005 63,118 4% 63,118 0
COORDINATE MOVES/DELIVERIES ANNUAL 0 0 0 0 0 0 0 0% 0 0
MOVE FURNITURE/SUPPLIES/OTHER ANNUAL 0 0 0 0 0 0 0 0% 0 0
DELIVERTABLES/CHAIRS/OTHERS ANNUAL 0 0 0 0 0 0 0 0% 0 0
SET UP/TAKE DOWN OUTDOOR EVENTANNUAL 0 0 0 0 0 0 0 0% 0 0
GROUNDS FUELING SYSTEM 22,400 22,400 0 0 0 0 0 22,400 1% 22,400 0
MONOTOR ANNUAL 0 0 0 0 0 0 0 0% 0 0
ARRANGE FOR FULE ANNUAL 0 0 0 0 0 0 0 0% 0 0
ORDER FUEL ANNUAL 0 0 0 0 0 0 0 0% 0 0
MEMORIAL ITEMS 14,030 14,030 0 0 0 0 0 32,237 46,267 3% 46,267 0
PLANT TREES AND SHRUBS SP,S,F 0 0 0 0 0 0 0 0% 0 0
INSTALL PLAQUES SP,S,F 0 0 0 0 0 0 0 0% 0 0
INSTALL BENCHES SP,S,F 0 0 0 0 0 0 0 0% 0 0
MISCELLANEOUS 42,090 7,000 49,090 15,148 15,148 6,254 6,254 344 344 0 4,690 4,690 75,526 5% 63,836 11,690
UNLOCK BIKE LOCKS SP,S,F 0 0 0 0 0 0 0 0% 0 0
PURCHASE/MAINTAIN BIKE RACKS SP,S,F 0 0 0 0 0 0 0 0% 0 0
MAINTAIN BENCHES SP,S,F 0 0 0 0 0 0 0 0% 0 0
MAINTAIN FENCES SP,S,F 0 0 0 0 0 0 0 0% 0 0
INSTALL CHRISTMAS LIGHTS W 0 0 0 0 0 0 0 0% 0 0
CLEAN OPERATE FOUNTAIN SP,S,F 0 0 0 0 0 0 0 0% 0 0
MAINTAIN POND ENGLESBY SP,S,F 0 0 0 0 0 0 0 0% 0 0
REVIEW CONSTRUCTION DOCUMENTSANNUAL 0 0 0 0 0 0 0 0% 0 0
COORDINATE EVENTS ANNUAL 0 0 0 0 0 0 0 0% 0 0
SIT ON UNIVERSITY COMMITTEES ANNUAL 0 0 0 0 0 0 0 0% 0 0
EQUIPMENT PURCHASE 66,685 66,685 0 0 0 0 0 66,685 4% 66,685 0
TOTALS 596,524 175,777 772,301 242,066 33,946 276,012 197,790 77,797 275,587 2,687 23,108 25,795 29,865 1,590 31,455 5,946 0 57,146 57,146 32,237 7,565 49,005 1,533,049 100% 1,163,685 369,364
27
Grounds Tasks
MISCELLANEOUS, 75,526, 5%EQUIPMENT PURCHASE,
66,685, 4% HORTICULTURE MAINTENANCE, 276,157, 18%
TURF MAINTENANCE, 217,788, 14%
ATHLETIC FIELD MAINTENENCE, 59,073, 4%
DEBRIS , 124,215, 8%
STORM POND MAINTENANCE, 39,138, 3%SNOW REMOVAL, 354,366,
24%
MAINTAIN ROADS, WALKS, LOTS, 56,880, 4%
MECHANICAL R&M, 124,312, 8%
TRADES R&M, 7,124, 0%
MOVING & DELIVERY SERVICES, 63,118, 4%
GROUNDS FUELING SYSTEM, 22,400, 1%
MEMORIAL ITEMS, 46,267, 3%
HORTICULTURE MAINTENANCE
TURF MAINTENANCE
ATHLETIC FIELD MAINTENENCE
DEBRIS
STORM POND MAINTENANCE
SNOW REMOVAL
MAINTAIN ROADS, WALKS, LOTS
MECHANICAL R&M
TRADES R&M
MOVING & DELIVERY SERVICES
GROUNDS FUELING SYSTEM
MEMORIAL ITEMS
MISCELLANEOUS
EQUIPMENT PURCHASE
28
Energy Conservation
• Pro-active
• Working with departments
• Formed a Utility Team
• More proactive in repairs
• Working with utilities
• Real time metering
• Get message out to students/faculty/staff
29
The University of VermontElectrical Consumption (FY '75 - FY '05)
8
9
10
11
12
13
14
15
16
17
18
'75 '76 '77 '78 '79 '80 '81 '82 '83 '84 '85 '86 '87 '88 '89 '90 '91 '92 '93 '94 '95 '96 '97 '98 '99 '00 '01 '02 '03 '04
Fiscal Year (FY)
Kw
H /
Sq
. Ft.
8
9
10
11
12
13
14
15
16
17
18
No Energy Conservation With Energy Conservation
Trend (With Energy Con.) Trend (No Energy Con.)
Avoided Cost Figure (Estim ated for FY'04):Based upon 3,816,286 Sq. Ft. and19,081,430 Kw H @ $0.10 / Kw H = $1,908,143
By taking a proactive approach w ith energy conservation, UVM has reduced greenhouse gases involved w ith the generation of electricity by, at least, the follow ing quantities (thru FY '03): CO2 - 6,700 tons SO2 - 36 tons NOX - 12 tons
30
Some Actions Taken As A Result Of The Study
Customer Focus• Maintenance specialists
• Building contact person
• Road show
• Mastering the maze
• Surveys
• Monthly meetings/visits
• Building contact info sessions
• FAMIS
31
Some Communication Improvements
• Deans/Department Heads
• Unit meetings
• Cell phones
• Getting people out- seminars, training etc
• Emergency Logs
• Required Email
• Email Lists
• ESL
• Translators Bosnian/Vietnamese
• Web Site
• Services Day Lunch
• Annual report
32
33
34
Creating A Team Atmosphere• Walk around
• Show up
• Discuss issues
• Support from the top
• Everyone is important
• All hands meetings
• Bring people to shops
• Dept heads come to meetings
35
All Hands Meeting
• Everyone attend
• Presentations of accomplishments
• Give people a chance to show off
• Get the message out
• Part of the big picture
• Invite guest speakers
36
Sharing Information/Resources
• More valuable if you share
• People holding back
• No interdepartmental sharing of resources
• Types
• Prints, specs, databases, vendors
• Look for best practices
37
38
Custodial Vendor Managed InventoryUniversity Of Maryland Model
• Goals– Reduce inventory
– Stop complaints
– Let custodians/supervisors work
– Standardization
• Solution – Looked for best practice
– Vendor managed inventory
39
Business Partners
• Long term commitments
• Team approach
• Responsibility
• Help us reduce waste
• Assist with best practices
40
Facilities Standards
• One of everything on campus
• No consistency
• Negative impact on operations costs
• Not intended to limit design intent
• Partnering with A/E to create final
document (Dartmouth Model)
41
42
Utilities Master Plan
What are the opportunities
• Tri-generation (electric/steam/chilled water)
• Own more of our infrastructure
• Central chilled water plant
• Capacities
• Plan the campus
• Reduce demand
• Spend less per square foot as the campus grows
43
Facilities Management Software (FAMIS)• Space management
• Work control
• Capital Projects
• Key Control
• Inventory
• Wireless interface
• Scheduling
44
45
Event and Room Scheduling
• Duplicates
• Conflicts
• 1000/1000/1000
• Consistency
• Revisions
• Scheduled maintenance
• Block out rooms
• Hiring new position (PPD Events Coordinator)
46
47
48
UNIVERSITY OF VERMONTFACILITIES RENEWAL PROJECTIONS
THROUGH FISCAL YEAR 2015(Calculated in FY' 05 Dollars)
SITE & TOTALALL FACILITIES UTILITIES
Current Backlog (through FY'10 170,500,000 7,000,000 177,500,000 Renewal (FY'11-FY'15) 48,514,400 2,200,000 50,714,400
Sub-total 219,014,400 9,200,000 228,214,400ANTICIPATED REDUCTIONSGeneral Obligation Bonds
Residential Hall Renovations: Living/Learning ('05) (7,724,178) (7,724,178) Wing/Davis/Wilks ('06) (5,874,923) (5,874,923) Slade ('06) (777,979) (777,979) Mason/Simpson/Hamilton ('07) (3,638,196) (3,638,196) Harris/Millis ('08) (3,979,739) (3,979,739) Marsh/Austin/Tupper ('07) (3,189,713) (3,189,713) Coolidge ('10) (632,843) (632,843) Chittenden/Buckham/Wills ('10) (859,965) (859,965)Sub-total Residential Hall Renovations (26,677,536) (26,677,536)
Deferred Maintenance: Future Bond Allocation (24,000,000) (1,000,000) (25,000,000) Utility Infrastructure Upgrades (3,000,000) (3,000,000) Sub-total Deferred Maintenance (24,000,000) (1,000,000) (28,000,000)
OTHER SOURCES
General Funds: Annual Budget Allocation (18,000,000) (3,000,000) (21,000,000)
State Capital AppropriationsWilliams Hall FY07/08 (3,000,000) (3,000,000)Other Projects FY09-15 (10,500,000) (10,500,000)
Anticipated Demolitions: Carrigan Building (567,576) (567,576) UVM Bookstore (900,000) (900,000) 622 Main Street (198,072) (198,072) Ag Engineering (492,966) (492,966) BioResearch Lab (523,604) (523,604) Sub-total Anticipated Demolitions (2,682,218) (2,682,218)
ANTICIPATED BACKLOG (2015) 144,654,646 5,200,000 136,354,646
49
50
Project Management
• Facilities condition audit
• New project management position
• Charge projects
• New project management module
• Consistency
• Job Order Contracting
51
Time and Attendance• Computerized
• Free up resources for other use
• Fair
• Flexibility
• Reporting
52
53
Some Results So Far• Accountable
• Reinvest in department/university
• Prioritization
• More proactive less reactive
• Better trained
• Less Down Time
• Participatory Process
• Highly effective
• Agile
• Reduction in emergencies and recurring problems
• Improved morale (in some areas) /reduce turnover