Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
FWC 2014
Brazilian Airspace
PRESENTED BY:
Lt Col Luiz R B Medeiros
International Operators Conference | Tampa, FL | March 17 – 20, 2014
Wednesday, 19 MAR | 1:15 p.m – 2:30 p.m.
FWC 2014 Brazilian Airspace
• Present an overview of the Brazilian airspace during the FWC
2014 (focusing on general aviation).
Objective
2
FWC 2014 Brazilian Airspace
• DECEA (Department of Airspace Control) and CGNA (Centre of
Management of Air Navigation) concept
• Air Defense concept
• General Aviation
• Publications
Roadmap
3
FWC 2014 Brazilian Airspace
• DECEA (Department of Airspace Control) and CGNA (Centre of
Management of Air Navigation) concept
Previous events
Demand and Capacity
Human resources training
Technical support
Operational improvements
Information sharing
Roadmap
4
FWC 2014 Brazilian Airspace
CGNA
The Centre of Management of Air Navigation’s missions is to
harmonize the management of air traffic flow, air space and other
activities related to air navigation, providing operational
management of SISCEAB’s current actions and effective
supervision of all rendered services.
BALANCE DEMAND & CAPACITY
Roadmap
5
FWC 2014 Brazilian Airspace
• DECEA (Department of Airspace Control) and CGNA (Centre of Management of Air Navigation) concept
Previous events
FWC 2006 Germany and FWC 2010 South Africa analysis and lessons learnt
EURO 2012 and LONDON 2012 (participation as observers – EUROCONTROL CFMU and UK NATS) analysis and lessons learnt
RIO+20, FCC 2013 and WYD 2013 planning, analysis and lessons learnt
Super Bowl 2014 (participations as observers – FAA Command Centre)
Super Bowl 2015 planning *
Roadmap
6
FWC 2014 Brazilian Airspace
• DECEA (Department of Airspace Control) and CGNA (Centre of
Management of Air Navigation) concept
Demand and Capacity
Who our guests are and How can we support them?
Roadmap
7
FWC 2014 Brazilian Airspace
• DECEA (Department of Airspace Control) and CGNA (Centre of
Management of Air Navigation) concept
Human resources training
ATCO (English speaking, increased air traffic, threats)
AIR DEFENSE ATCO (English speaking, increased air traffic,
threats)
ATFM (English speaking, increased air traffic, Coordinated airports,
threats)
AIS (English speaking, Coordinated airports, slots)
Roadmap
8
FWC 2014 Brazilian Airspace
• DECEA (Department of Airspace Control) and CGNA (Centre of
Management of Air Navigation) concept
Technical support
NAV AID maintenance planning
SAGITARIUS (ATC software)
SIGMA (ATFM software)
Roadmap
9
FWC 2014 Brazilian Airspace
• DECEA (Department of Airspace Control) and CGNA (Centre of
Management of Air Navigation) concept
Operational improvements
Roadmap
10
FWC 2014 Brazilian Airspace
• DECEA (Department of Airspace Control) and CGNA (Centre of
Management of Air Navigation) concept
Information sharing
Brazilian airlines, International airlines, IATA, General Aviation
Association, Airports, FAA Command Centre, EUROCONTROL
CFMU, Government, stakeholders,…
NBAA !!!!
Roadmap
11
FWC 2014 Brazilian Airspace
• Air Defense concept
RESERVED AREA (WHITE AREA)
Dimensions corresponding to TMA localities and vertical limits from
ground level to FL145.
RESTRICTED AREA (YELLOW AREA)
7 NM radius centered on the football stadium and vertical limits from
ground level to FL145.
PROHIBITED AREA (RED AREA)
4 NM radius centered on the football stadium and vertical limits from
ground level to FL145.
The areas will be activated only on match days, a few hours before
until a few hours after the matches.
Roadmap
12
FWC 2014 Brazilian Airspace
• Air Defense concept
Roadmap
13
FWC 2014 Brazilian Airspace
• Air Defense concept
Roadmap
14
FWC 2014 Brazilian Airspace
• General Aviation
AIC (Aeronautical Information Circular)
SLOT ALLOCATION REGULATION FOR AIR TAXI AND GENERAL
AVIATION AIRCRAFT AT COORDENATED AERODROME
THOUGHOUT FIFA BRASIL SOCCER WORLD CUP 2014
This aeronautical information circular (AIC) purpose is detailing the
procedures for the landings and departures of air taxi and general
aviation aircraft at coordinated aerodromes, throughout FIFA Brazil
2014 Soccer World Cup, modifying the rules in AIP Brazil Part ENR
1.9 and ICA 100-11 (Flight Plan) items 3.2.1, 3.3.1, 5.3.1 and 5.4.1.
Roadmap
15
FWC 2014 Brazilian Airspace
• General Aviation
AIC (Aeronautical Information Circular)
SLOTS
The validity period of an ATC SLOT is from 5 minutes before until 15
minutes after the time allotted on the CGNA Integrated SLOT
Central (CIS) worksheet, except when the landing and departure
operations are delayed by the following reasons: adverse
meteorological conditions; stoppage in the provision o ATS services;
interdiction or impracticability of the airport infrastructure; and
implementation of air traffic flow management (ATFM) measures.
Roadmap
16
FWC 2014 Brazilian Airspace
• General Aviation
AIC (Aeronautical Information Circular)
• AIR TAXI USERS AND GENERAL AVIATION ASSIGNMENTS:
• a) Arrange for the register in the SLOT System, in accordance
with instructions in the CIS WEBSITE
(http://www.cgna.gov.br/full_web_slot);
• b) Forward, via e-mail to CIS: [email protected],
the respective CA and/or AVANAC of the aircraft that will be
registered under the LOGIN;
• c) Operate the CIS SLOT System;
Roadmap
17
FWC 2014 Brazilian Airspace
• General Aviation
AIC (Aeronautical Information Circular)
• AIR TAXI USERS AND GENERAL AVIATION ASSIGNMENTS:
• d) Include in the FPL, complete or simplified, the ATC SLOT
code provided by the CIS SLOT System;
• e) File a Flight Plan to an aerodrome nearby the coordinated
airport and, in the item 18 of t he FPL and/or Flight Notification,
add the following remark: RMK/OPT, in case the aircraft wants to
use a landing opportunity SLOT, example: RMK/OPT SBSP; and
• f) Contact the APP, of which jurisdiction is the coordinated
aerodrome, and reinforce his flight intents, in case the aircraft
wants to use an opportunity SLOT.
Roadmap
18
FWC 2014 Brazilian Airspace
• Publications
Roadmap
19