Page 1: Future monopile design · Future monopile design Do monopiles have a future? Recent developments by DONG Energy to monopile design Future development to monopile design – The PISA

DGF / DONG Energy

Future monopile design

Alastair Muir Wood MEng CEng MICE MInstRE

1 April 2014

Page 2: Future monopile design · Future monopile design Do monopiles have a future? Recent developments by DONG Energy to monopile design Future development to monopile design – The PISA

Future monopile design

Do monopiles have a future?

Recent developments by DONG Energy to monopile design

Future development to monopile design – The PISA Project

2

Page 3: Future monopile design · Future monopile design Do monopiles have a future? Recent developments by DONG Energy to monopile design Future development to monopile design – The PISA

The P-y model

3

p

p

H

M

S

Page 4: Future monopile design · Future monopile design Do monopiles have a future? Recent developments by DONG Energy to monopile design Future development to monopile design – The PISA

Offshore foundations - 2011

4

0

1

2

3

4

5

6

7

0 10 20 30 40 50 60 70 80

Tu

rbin

e S

ize /

MW

Maximum Water Depth / m LAT

Gravity Base

Jacket/Tripod

Monopile

The limit of the monopile?

UK ROUND III PROJECTS

Page 5: Future monopile design · Future monopile design Do monopiles have a future? Recent developments by DONG Energy to monopile design Future development to monopile design – The PISA

Water depths at Hornsea

5

0

200

400

600

800

1000

1200

1400

15-20 20-25 25-30 30-35 35-40 40-45 45-50 50-55 55-60 60-65 65-70 70-75

Fre

qu

en

cy o

f avera

ge w

ate

r d

ep

th in

1km

by 1

km

sq

uare

Water Depth

Whole Hornsea Zone

Hornsea Project 1

Page 6: Future monopile design · Future monopile design Do monopiles have a future? Recent developments by DONG Energy to monopile design Future development to monopile design – The PISA

Offshore foundations - 2011

6

0

1

2

3

4

5

6

7

0 10 20 30 40 50 60 70 80

Tu

rbin

e S

ize /

MW

Maximum Water Depth / m LAT

Gravity Base

Jacket/Tripod

Monopile

The limit of the monopile?

UK ROUND III PROJECTS

Page 7: Future monopile design · Future monopile design Do monopiles have a future? Recent developments by DONG Energy to monopile design Future development to monopile design – The PISA

Offshore foundations - 2014

7

0

1

2

3

4

5

6

7

0 10 20 30 40 50 60 70 80

Tu

rbin

e S

ize /

MW

Maximum Water Depth / m LAT

Gravity Base

Jacket/Tripod

Monopile

Gunfleet sands III

Westermost

Rough

Gode Wind

The limit of the monopile?

Page 8: Future monopile design · Future monopile design Do monopiles have a future? Recent developments by DONG Energy to monopile design Future development to monopile design – The PISA

Offshore foundations - 2014

8

0

1

2

3

4

5

6

7

0 10 20 30 40 50 60 70 80

Tu

rbin

e S

ize /

MW

Maximum Water Depth / m LAT

Gravity Base

Jacket/Tripod

Monopile

Gunfleet sands III

Westermost

Rough Gode Wind

• Monitoring of existing

monopiles

• Refining existing

design methods based

on results from

monitoring

• Optimisation of

monopiles during

design

UK ROUND III PROJECTS

Page 9: Future monopile design · Future monopile design Do monopiles have a future? Recent developments by DONG Energy to monopile design Future development to monopile design – The PISA

9

Can we go further?

Maximum measured load

Page 10: Future monopile design · Future monopile design Do monopiles have a future? Recent developments by DONG Energy to monopile design Future development to monopile design – The PISA

10 10

Academic Work Group

University of Oxford Principal Investigator: Dr Byron Byrne

Professor Guy Houlsby, Dr Harvey Burd, Dr Chris Martin, Dr Ross McAdam

Imperial College London Professor Richard Jardine, Professor David Potts,

Professor Lidija Zdravkovic, Dr David Taborda

University College Dublin Dr Ken Gavin, Dr Paul Doherty

Independent Technical Review Panel

Chairman: Professor Gudmund Eiksund

Liv Hamre Dr Fabian Kirsch

Tim Camp Professor Werner Rucker

Discretionary Project Steering Committee

Jan Matthiesen

Morten Liingaard

Chris Leach

Daniel Bartminn /

Emmet Donegan

Alan Smith / Mike Rose Pål Johannes Strøm Eivind Sønju Kasper Roed Jensen

Project Partner Technical Experts

Marc Costa Ros

Christian Le Blanc

Pedro Barbosa Moreira

Volker Herwig / Emmet

Donegan / Daniel Bartminn

Alan Smith / Mike Rose Pål Johannes Strøm

-

Wolfeckart Semm

Manouchehr Hassanzadeh

Miguel Lanca Coelho

Lead Partner

Project Manager: Jesper Skov Gretlund

Technical Manager:

Alastair Muir Wood

Assisting Consultants

UXO Consultant

Structural designer

Advanced

numerical

modelling

Testing Contractors

Page 11: Future monopile design · Future monopile design Do monopiles have a future? Recent developments by DONG Energy to monopile design Future development to monopile design – The PISA

Project plan

Numerical simulations

Field tests Draft lateral load

methodology

Validated design

methodology

Design of field

tests

Validation

Parametric study of

geometry and soils

Page 12: Future monopile design · Future monopile design Do monopiles have a future? Recent developments by DONG Energy to monopile design Future development to monopile design – The PISA

Preliminary results of the numerical analysis

12

0

10

20

30

40

50

60

70

80

0 0,5 1 1,5 2

H (

MN

)

δground (m)

FE

Basic API

*P-y + S-y spring model

*

Page 13: Future monopile design · Future monopile design Do monopiles have a future? Recent developments by DONG Energy to monopile design Future development to monopile design – The PISA

Planning the tests…

13

Cowden

Dunkirk

10m

Page 14: Future monopile design · Future monopile design Do monopiles have a future? Recent developments by DONG Energy to monopile design Future development to monopile design – The PISA

Pile geometry

14

Steel

Mult

Displacement

Mom

ent

Failure of soil

before steel

Failure of steel

before soil

0.1D

Page 15: Future monopile design · Future monopile design Do monopiles have a future? Recent developments by DONG Energy to monopile design Future development to monopile design – The PISA

What test geometry?

15

10 20 30 40

Length / Diameter

150

100

50

Existing tests Jackets

Current

Monopiles

Future

Monopiles

Diameter /

thickness*

* t is the average buried thickness

STEEL LIMITING

SOIL LIMITING

Page 16: Future monopile design · Future monopile design Do monopiles have a future? Recent developments by DONG Energy to monopile design Future development to monopile design – The PISA

16

Aging

Creep

Locked in Thermal Stresses

Bacterial corrosion

Bacterial leaching

Carbonation

Curing

Plasticity

Stre

ss

Strain

Peak compressive

stress

Peak tensile stress

Test

results

Design

model

Conclusion: The analogy with concrete

Page 17: Future monopile design · Future monopile design Do monopiles have a future? Recent developments by DONG Energy to monopile design Future development to monopile design – The PISA

17

Unload reload behaviour

Accumulated deformations

Densification

Pore pressure development and dissipation

Damping

Creep

Various L/D ratios

Different diameters

Load

Displacement

Current

Design model

Conclusions

Reality

Age hardening

Other installation methods

Post PISA