Future LNG market and energy landscape in Japan
Behind the Scenes of the Easing Supply and Demand Balance- “Demand”
Various Sources
2014 Jan-June (yoy gross) 2014 July-Dec (yoy) 2015 Jan-June (yoy)
Korea; LNG Demand for Power Sector
Generation Volume by Source (yoy TWh) LNG Import Volume (MT)
Korea custom, Kepco
Mt $/t Natural Gas Import Price
China; Natural Gas Supply in Winter
Natural Gas Import Volume (Winter)
China Custom
India; Highly Price Sensitive Market
Total RLNG Consumption - 45.2 mmscmd(2014)
Waterborne
LNG Import Volume (MT)
Fall in LNG Prices and LNG Imports
$/mmbtu Mt Japanese LNG Import Price Asian LNG Imports
Renewable 13-14%
Nuclear 10-11%
Natural Gas 18%
Coal 25%
LPG 3%
Power 28%
PES
486million kL
50.3million kL
TFC
326million kL
Safety
Energy Security ; Self-Sufficiency of Energy Supply
Economic Growth ; Reduction of Power Supply Costs
Environment Protection; Reduction of GHG Emissions
Fuel 72%
Energy Saving
Oil 30%
Self Sufficient
24.3%
Long-term Enerrgy Outlook in Japan to 2030
New Energy Policy in Japan
METI
Outlook for Power Generation Mix
METI
Average of 10 years
prior to Great
Earthquake
FY 2030
Oil 12 % 3 %
Coal 24 % 26 %
LNG 27 % 27 %
Nuclear 27% 22-20 %
Renewables
PV
11% 22-24 %
7.0 %
Wind 1.7 %
Geothermal 1.0-1.1%
Hydro 8.8-9.2%
Biomass 3.7-4.6%
- Liberalization of full retail market (2017)
- Neutrality of pipeline network of three gas companies (2022/4)
Gas Industry Reform
- Establishing a regional transmission organization (2015)
- Starting full retail competition (Price regulation to be continued) (2016)
- Legal unbundling of T/D divisions (2018-2020)
- Abolishing price regulation (2018-2020)
Electricity Industry Reform
Electricity / Gas Industry Reform: Market Liberalization
METI HP
Tokyo E: KASHIWAZAKI・K Hokuriku E: SHIGA
JAPC:TSURUGA
Kansai E:MIHAMA
Kansai E:OHI
Kansai E:TAKAHAMA
Chugoku E:SHIMANE
Hokkaido E:TOMARI
Tohoku E :HIGASHIDORI
Tokyo E:FUKUSHIMA 1
Tohoku E:ONAGAWA
Tokyo E:FUKUSHIMA2
Chubu E:HAMAOKA
Shikoku E:IKATA Kyushu E:SENDAI
Kyushu E:GENKAI JAPC:TOKAI2
To be decommissioned 14
On hold 18
Applied for restart 23
6 1 1
1
1
2
2
2
7
2
2
3
3
3
4
1
5
2 3 1 4
4
2
2 3 1 4
2 1 2 1 3
2 1 3
1 2 3
1
1 3
6 1 2 3 4 5
1 2 3 4
1 2
4 5
2
Source:Companies’ HP etc.
Status of Existing Nuclear Power Plants
1
Restart 2
Ap
plic
atio
n fo
r Ins
pe
ctio
n
Pre- Service
Inspection
Public
Acceptance
Pe
rmis
sio
n
Pu
blic
Co
mm
en
t
Co
mm
erc
ial O
pera
tion
Ap
pro
va
l
July 2013 Sep. 2014 Aug 2015
Schedule of Sendai Plant #1 is by Kyusyu E shown in The above flow chart is quoted from the material published by Kansai EP
Process of Restart Operation of Nuclear Power
Assessment Process
of
“Reactor Installment
License Application”
Assessment Process of
“Construction Plan Application”
Assessment Process of
“Safety Regulation Application”
Mar 2015
May2015
Ap
pro
va
l
Sep
2015
Outlook for LNG Demand Based on Nuclear Power Re-start Scenario
FY
Changes in Electricity Supply and Demand
Japanese Electricity Demand
FY 2005 2010 2013 2014
Photovoltaic 1,420 3,620 14,320 23,710
Wind 1,090 2,440 2,710 2,930
Biomass 2,150 2,400 2,370 2,520
Geothermal - 500 501 510
Generation Capacity of Renewable Energy TWh
MW
Desired
Feature of LNG
14
Decreased supply of
nuclear power
Expected Role
of LNG
Current
Market Trends
Increasing
supply
flexibility
Lowering
procurement
costs
Main fuel
for
Power generation
& city gas
Abundant and
stable supply
Increased supply of
renewables
Market
liberalization
Increased liquidity
of LNG
Low oil prices
Balancing Fuel
for
Power generation
Relaxed S/D balance
of LNG
Challenges
Introducing
new
LNG pricing
Government-led
support for
new supplies
Promoting
investment in
LNG industry
Ensuring
Japan’s
Energy Security
Role of LNG in Evolving Energy Market
Ishikari LNG/Hokkaido Gas
Kushiro LNG/JX Nippon Oil & Energy
Hachinohe LNG/ JX Nippon Oil & Energy
Shinsendai /
Tohoku Electric Power
Gas Bureau City of Sendai /
Sendai City
Soma/JAPEX
Hitachi/Tokyo Gas
Kagoshima/Nihon Gas
Nagasaki/Seibu Gas
Fukuoka/Seibu Gas
Hibiki/Hibiki
Tobata/Kitakyusyu
Riquid Natural Gas
Yanai /
The Chugoku Electric Power Hatsukaichi/Hiroshima Gas
Mizushima/Mizushima-LNG-Group
Hijeji/The Kansai Electric Power
Himeji/Osaka Gas
Senboku Ⅰ/Osaka Gas
Senboku Ⅱ/Osaka Gas
Sakai/Sakai LNG
Yokkaichi/Chubu Electric Power
Yokkaichi Center/Chubu Electric Power
Kawagoe/Chibu Electric Power
Toyama Shinminato/Hokuriku Electric Power
Oita/Oita Liquid Natural Gas
Matsuyama/Shikoku Gas
Sakaide/Sakaide LNG
Wakayama/The Kansai
Electric Power
Shimizu Sodeshi/Shimizu LNG
Yoshinoura/Okinawa Electric Power
Sodegaura/TEPCO, Tokyo Gas
Futtsu/TEPCO
Minami Yokohama/TEPCO, Tokyo Gas
Ohgishima/Tokyo Gas
Higashi Ohgishima/TEPCO
Joetsu/Chubu Electric Power
Naoetsu/INPEX
Yufutsu/JAPEX
Hakodate Minato LNG/Hokkaido Gas
Tobu Gas Akita/Tobu Gas
Nihonkai Nigata/Nihonkai LNG
Okayama/Okayama Gas
Takamatsu/Shikoku-gas
Chita Joint/Chubu Electric Power, Toho Gas
Chita/Chita LNG
Chita Midorihama/ Toho Gas
Start Before 2013
Start After 2014
16