19
Future Innovation in Energy Planning A Special Session to Advise on Ontario's Long-term Energy Future Emerging Generation Technologies: A 20-Year Prognosis Alexander McIsaac September 26 th , 2013

Future Innovation in Energy Planning › mowatcentre › wp-content › ... · 2018-06-18 · Future Innovation in Energy Planning A Special Session to Advise on Ontario's Long-term

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Future Innovation in Energy Planning › mowatcentre › wp-content › ... · 2018-06-18 · Future Innovation in Energy Planning A Special Session to Advise on Ontario's Long-term

Future Innovation in Energy PlanningA Special Session to Advise on Ontario's Long-term Energy Future

Emerging Generation Technologies: A 20-Year Prognosis

Alexander McIsaacSeptember 26th, 2013

Page 2: Future Innovation in Energy Planning › mowatcentre › wp-content › ... · 2018-06-18 · Future Innovation in Energy Planning A Special Session to Advise on Ontario's Long-term

2

Table of Contents

© 2013 NRStor Inc.

1. Who is NRStor2. What is Energy Storage3. Energy Storage as Flexible Generation4. Energy Storage Technologies Available Today5. Different Generation Profiles For Different Services6. Hurdles Facing Energy Storage in Ontario7. Policy Change Happening Internationally8. Examples of Successful Projects9. What Can Government, Business and Academia do?

Page 3: Future Innovation in Energy Planning › mowatcentre › wp-content › ... · 2018-06-18 · Future Innovation in Energy Planning A Special Session to Advise on Ontario's Long-term

3

NRStor Company Background

• Flywheels; CAES; Batteries

Our mission is to accelerate the commercialization of energy storage technologies

Company Information

Operations

Business Lines

Technology Suppliers

• Founded in 2012; Headquartered in Toronto

• Educating stakeholders; Modeling

• Project development; Financing

• Opportunity Assessment

• Financing options

Projects • 2MW IESO Contract; Assessing future opportunities

© 2013 NRStor Inc.

Page 4: Future Innovation in Energy Planning › mowatcentre › wp-content › ... · 2018-06-18 · Future Innovation in Energy Planning A Special Session to Advise on Ontario's Long-term

4

What is Energy Storage?

Charge Discharge

Capacity (kW)

Duration(kWh)

Load Generation

© 2013 NRStor Inc.

Page 5: Future Innovation in Energy Planning › mowatcentre › wp-content › ... · 2018-06-18 · Future Innovation in Energy Planning A Special Session to Advise on Ontario's Long-term

5

2X the Resource on 1X the Interconnection

Flexible Range

0Set

Point

Flexible Range

200MW Flexible Range

100 MW Conventional Generation

100 MW Demand Response100 MW Bulk

Energy Storage

Unc

erta

inty

Dis

patc

habl

e R

ange

© 2013 NRStor Inc.

Page 6: Future Innovation in Energy Planning › mowatcentre › wp-content › ... · 2018-06-18 · Future Innovation in Energy Planning A Special Session to Advise on Ontario's Long-term

6

Technologies Available Today

© 2013 NRStor Inc.

Page 7: Future Innovation in Energy Planning › mowatcentre › wp-content › ... · 2018-06-18 · Future Innovation in Energy Planning A Special Session to Advise on Ontario's Long-term

Temporal Power: Flywheel Overview

7

Technologies Have Many Applications on the Grid

Generation

Low utilizationInflexible

Rising costsReliability

Aging assetsCongestion

Power QualitySecurity

Transmission Distribution Consumers

CA

ES

FLY

WH

EE

LS

FL

YW

HE

EL

SB

AT

TE

RIE

S

BA

TT

ER

IES

Ch

alle

nge

s

BA

TT

ER

IES

© 2013 NRStor Inc.

Page 8: Future Innovation in Energy Planning › mowatcentre › wp-content › ... · 2018-06-18 · Future Innovation in Energy Planning A Special Session to Advise on Ontario's Long-term

Temporal Power: Flywheel Overview

8

Different Generation Profiles For Different Services

Service:Fast peaking generationStoring surplus energyWind integrationFrequency regulationVoltage supportEfficient gas generationUPS

© 2013 NRStor Inc.

Optimizing Ontario’s Assets:

Technology:CAES

FlywheelsBatteries:

Lithium-ionSodium-Sulfur

Lead-Acid

Pumped Hydro

Page 9: Future Innovation in Energy Planning › mowatcentre › wp-content › ... · 2018-06-18 · Future Innovation in Energy Planning A Special Session to Advise on Ontario's Long-term

Temporal Power: Flywheel Overview

9

Hurdles Facing Energy Storage in Ontario

• Developing the business case

i. Diffused benefits across multiple stakeholders

ii. Quantifying benefits and avoided costs

• Educating stakeholders

i. Current state of the energy storage readiness

ii. Understanding the business case

• Regulatory and procurement environment

i. No set targets for storage capacity

ii. Not currently included in the DSC, TSC and related licenses

iii. Not treated as a wholesale load

© 2013 NRStor Inc.

Page 10: Future Innovation in Energy Planning › mowatcentre › wp-content › ... · 2018-06-18 · Future Innovation in Energy Planning A Special Session to Advise on Ontario's Long-term

Temporal Power: Flywheel Overview

10

© 2013 NRStor Inc.

Policy Change Happening Internationally

1. United States• FERC Orders 755 & 784• California

i. Proposed procurement targets

ii. Proposed procurement structure (reverse auction mechanism)

iii. Mandated market growth

• Texasi. Wholesale Storage Load (WSL) treatment

2. Germany• World-leader in renewable generation• Energy storage subsidy

Page 11: Future Innovation in Energy Planning › mowatcentre › wp-content › ... · 2018-06-18 · Future Innovation in Energy Planning A Special Session to Advise on Ontario's Long-term

Temporal Power: Flywheel Overview

11

Energy Storage Business Cases for Ontario

Business Case Technology Where is the value?

LDC Smart Grid Flywheel/Battery T&D asset deferral; Improved power quality/reliability; Enable higher penetration of green energy and EVs

Regulation services Flywheel Faster response frequency regulation; Let traditional gens operate more efficiently

Centralized bulk storage

CAES; Pumped Hydro

New combustion turbine deferral; optimizes grid assets (ie. wind integration)

Industrial & Commercial Customer

Battery Avoid business interruption (equipment damage, product loss; productivity)

Island & Remote Microgrids

Flywheel/Battery Reduced diesel fuel & maintenance costs; T&D asset deferral; Renewable integration

© 2013 NRStor Inc.

Page 12: Future Innovation in Energy Planning › mowatcentre › wp-content › ... · 2018-06-18 · Future Innovation in Energy Planning A Special Session to Advise on Ontario's Long-term

Temporal Power: Flywheel Overview

12

Field Battery Energy Storage Project

Business Case Where is the value?

LDC Smart Grid T&D asset deferral; Improved power quality/reliability; Enable higher penetration of green energy and EVs

© 2013 NRStor Inc.

Project Specifications

Technology Battery

Size 2 MW; 12MWh

Operational Date 2013

Function(s) Backup Power

Location Field, British Columbia

Owner BC Hydro

Page 13: Future Innovation in Energy Planning › mowatcentre › wp-content › ... · 2018-06-18 · Future Innovation in Energy Planning A Special Session to Advise on Ontario's Long-term

Temporal Power: Flywheel Overview

13

NRStor Inc. 2MW Flywheel Project

Business Case Where is the value?

Ancillary services Faster response frequency regulation; Let traditional gens operate more efficiently

© 2013 NRStor Inc.

Project Specifications

Technology Flywheel

Size 2MW; 500kWh

Operational Date 2014

Function(s) Frequency Regulation

Location Minto, Ontario

Owner NRStor Inc.

Page 14: Future Innovation in Energy Planning › mowatcentre › wp-content › ... · 2018-06-18 · Future Innovation in Energy Planning A Special Session to Advise on Ontario's Long-term

Temporal Power: Flywheel Overview

14

General Compression GCAESTM Demonstration

Business Case Where is the value?

Centralized bulk storage

New combustion turbine deferral; optimizes grid assets (ie. wind integration)

© 2013 NRStor Inc.

Project Specifications

Technology General CompressionAdvanced Energy Storage (GCAESTM)

Size 2MW; 500MWh

Operational Date 2012

Function(s) Wind Integration (Advanced Prototype)

Location Gaines, Texas

Owner General Compression

Page 15: Future Innovation in Energy Planning › mowatcentre › wp-content › ... · 2018-06-18 · Future Innovation in Energy Planning A Special Session to Advise on Ontario's Long-term

Temporal Power: Flywheel Overview

15

Bath County Pumped Storage Station

Business Case Where is the value?

Centralized bulk storage

New combustion turbine deferral; optimizes grid assets (ie. wind integration)

© 2013 NRStor Inc.

Project Specifications

Technology Pumped Hydro Storage

Size 3GW; 30 GWh

Operational Date 1985

Function(s) Long duration storage

Location Bath County, Virginia

Owner Dominion Virginia Power & AllegenyPower

Page 16: Future Innovation in Energy Planning › mowatcentre › wp-content › ... · 2018-06-18 · Future Innovation in Energy Planning A Special Session to Advise on Ontario's Long-term

Temporal Power: Flywheel Overview

16

UPS for Industrial Customers

Business Case Where is the value?

Industrial & Commercial Customer

Avoid business interruption (equipment damage, product loss; productivity)

© 2013 NRStor Inc.

Project Specifications

Technology Battery

Size 4MW(60 sec. duration)

Operational Date 2010

Function(s) UPS

Location Phoenix, Arizona

Owner Phoenix NAP Data Center

Page 17: Future Innovation in Energy Planning › mowatcentre › wp-content › ... · 2018-06-18 · Future Innovation in Energy Planning A Special Session to Advise on Ontario's Long-term

Temporal Power: Flywheel Overview

17

Maldives Off-grid Microgrid

Business Case Technology Where is the value?

Island & Remote Microgrids

Flywheel/Battery Reduced diesel fuel & maintenance costs; T&D asset deferral; Renewable integration

© 2013 NRStor Inc.

Project Specifications

Technology Battery

Size 1MW; 1.2MWh

Operational Date 2013

Function(s) RE Integration

Location Gasfinolhu Island Resort, Maldives

Owner T&D Water Technologies and Development

Page 18: Future Innovation in Energy Planning › mowatcentre › wp-content › ... · 2018-06-18 · Future Innovation in Energy Planning A Special Session to Advise on Ontario's Long-term

Temporal Power: Flywheel Overview

18

What Can Government, Business and Academia do?

1. Define targets

2. Procurement programs

3. Regulatory policy inclusion:

1. LTEP and regional planning

2. Appropriate storage rate class

3. OEB’s renewed regulatory framework for electricity proceedings

4. Continuous improvement of research and modeling

© 2013 NRStor Inc.

Page 19: Future Innovation in Energy Planning › mowatcentre › wp-content › ... · 2018-06-18 · Future Innovation in Energy Planning A Special Session to Advise on Ontario's Long-term

Thank You

Alexander McIsaac

Associate

Tel: (416) 360 2089

E-mail: [email protected]

19