    NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    1 EPCC OF NGDS TO NIBONG TEBAL FL1 DL1, NIBONG TEBAL, PENANG

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 12 STEEL PIPE LINE

    CONSTRUCTION OF ODORIZER BUILDING AND

    ODORIZER SYSTEM - 32 KM

    4,800,000.00

    MASMIRIN CORPORATION

    SDN BHD / GAS MALAYSIA

    SDN BHD

    2004/2005

    2 EPCC OF NGDS TO PRAI FL DL STAGE 1/03, PRAI IND. AREA, PENANG

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 12 STEEL PIPES -

    8KM

    3,200,000.00

    MASMIRIN CORPORATION

    SDN BHD / GAS MALAYSIA

    SDN BHD

    2005

    3 EPCC OF NGDS TO PRAI FL DL (LOOPING) STAGE 1/03, PRAI IND. AREA, PENANG

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 8 STEEL PIPES -

    4.5KM

    2,800,000.00

    MASMIRIN CORPORATION

    SDN BHD / GAS MALAYSIA

    SDN BHD

    2005

    4EPCC OF THE NGDS TO TAMAN MAKMUR FL STAGE 1/08, KULIM, KEDAH DARUL

    AMAN

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 8 STEEL PIPES - 4KM1,200,000.00 GAS MALAYSIA BERHAD 2009

    5EPCC OF THE NGDS TO SUNGAI PETANI FL STAGE 1/09, SUNGAI PETANI, KEDAH

    DARUL AMAN

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 8 STEEL PIPES -

    0.4KM

    145,000.00 GAS MALAYSIA BERHAD 2009

    6EPCC OF THE NGDS TO KUNDANG FL STAGE 1/10, KUNDANG INDUSTRIAL AREA,

    RAWANG, SELANGOR DARUL EHSAN

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 6 STEEL PIPES -

    0.7KM

    418,455.00 GAS MALAYSIA BERHAD 2009

    7 EPCC OF GPRW AT PUTRA INTERCHANGE, PUTRAJAYA

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 16 STEEL PIPES -

    720M

    1,111,000.00 GAS MALAYSIA BERHAD 2009

    8

    EPCC OF GPRW AT CADANGAN MEMBINA JLN PINTAS DARI SENGKANG (J104) KE

    FELDA INAS BANDAR TENGGARA, JALAN JOHOR BAHRU-AIR HITAM, KULAI, JOHOR

    DARUL TAKZIM

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 8, NPS 4 STEEL PIPES

    - 230M

    600,000.00 GAS MALAYSIA BERHAD Aug 2009 to Jan 2010

    9 EPCC OF THE NGDS TO TEBRAU FL STAGE 1/10, TEBRAU, JOHOR DARUL TAKZIM

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 6, NPS 4 STEEL PIPES

    - 226M

    695,000.00 GAS MALAYSIA BERHADDec 2009 to June

    2010

  • NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    10EPCC OF THE NGDS TO PANDAMAR FL STAGE 1/10, PANDAMAR, KLANG, SELANGOR

    DARUL EHSAN

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 6, NPS 4 STEEL PIPES

    - 1416M

    595,000.00 GAS MALAYSIA BERHAD Dec 2009 to Oct 2010

    11EPCC OF THE NGDS TO GAMBANG FL STAGE 1/10, GAMBANG, PAHANG DARUL

    MAKMUR

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 8, NPS 6, NPS 4

    STEEL PIPES - 2292M

    865,500.00 GAS MALAYSIA BERHAD 2010

    12THE EPCC OF NGDS TO STX PRECISION SDN BHD IN NIBONG TEBAL, PULAU PINANG

    INCLUSIVE OF THE STATION CIVIL WORK

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF 63MM PE SERVICE LINE. -

    600M

    88,000.00 GAS MALAYSIA BERHADMarch 2010 to June

    2010

    13 EPCC OF THE NGDS TO PRAI DL STAGE 1/10, PRAI, PULAU PINANG

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF 125MM AND 63MM PE

    PIPES. - 500M

    202,610.00 GAS MALAYSIA BERHADApril 2010 to August

    2010

    14EPCC AND COMMISSIONING OF THE NGDS TO CHENG FL STAGE 1/10, CHENG

    INDUSTRIAL AREA, MELAKA

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 4 STEEL PIPES -

    200M

    83,000.00 GAS MALAYSIA BERHADApril 2010 to July

    2010

    15EPCC OF THE NGDS TO KAMUNTING FL STAGE 3/10, KAMUNTING, PERAK DARUL

    RIDZUAN

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 6 & NPS 4 STEEL

    PIPES - 300M

    169,873.00 GAS MALAYSIA BERHADJune 2010 to October

    2010

    16EPCC OF NGDS TO LATEXX, PLANT 1 IN KAMUNTING, PERAK DARUL RIDZUAN

    INCLUSIVE OF STATION CIVIL WORKS

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 4 STEEL SERVICE

    LINE - 600M

    94,923.00 GAS MALAYSIA BERHADApril 2010 to July

    2010

    17EPCC OF THE NGDS TO SHAH ALAM DL STAGE 1/10, SHAH ALAM, SELANGOR DARUL

    EHSAN

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF PE 125MM - 25M281,500.00 GAS MALAYSIA BERHAD 2010

    18EPCC OF THE NGDS TO GEBENG FL STAGE 1/10, GEBENG INDUSTRIAL AREA, PAHANG

    DARUL MAKMUR

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL

    SERVICE LINE - 2904M

    1,085,000.00 GAS MALAYSIA BERHADJune 2010 to March

    2011

  • NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    19EPCC OF THE NGDS TO SHAH ALAM FL DL STAGE 1/10, SHAH ALAM, SELANGOR DARUL

    EHSAN

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL

    SERVICE LINE - 540M

    445,000.00 GAS MALAYSIA BERHADJune 2010 to Oct

    2011

    20EPCC OF THE NGDS TO NORTH PORT DL STAGE 1/10, NORTH PORT, SELANGOR DARUL

    EHSAN

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF PE 125MM, PE 90MM

    AND PE 63MM - 300M

    195,000.00 GAS MALAYSIA BERHAD 2010

    21 EPCC OF THE NGDS TO PUTRAJAYA FL STAGE 1/10, PRECINCT 18, PUTRAJAYA

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 4 STEEL SERVICE

    LINE - 60M

    59,500.00 GAS MALAYSIA BERHAD 2010

    22EPCC OF THE NGDS TO SERI KEMBANGAN FL STAGE 2/10, SERI KEMBANGAN,

    SELANGOR DARUL EHSAN

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL

    PIPES - 3800M

    1,038,364.25 GAS MALAYSIA BERHADAugust 2010 to

    February 2011

    23 EPCC OF THE NGDS TO NIBONG TEBAL FL STAGE 1/10, NIBONG TEBAL, PULAU PINANG

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL

    PIPES - 800M

    130,280.00 GAS MALAYSIA BERHADSeptember 2010 to

    January 2011

    24EPCC OF THE GPRW AT KERJA-KERJA MENGGANTIKAN JAMBATAN DI LALUAN A125,

    JALAN AYER TAWAR-SIMPANG LIMA, DAERAH MANJUNG, PERAK DARUL RIDZUAN

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 12 STEEL PIPES

    WITH 2 NOS HOT TAPPING STOPPLE OF 12" X 12" -

    200M

    454,410.00 GAS MALAYSIA BERHAD 2010

    25EPCC OF THE NGDS TO KUALA KETIL FL STAGE 1/10, KUALA KETIL, KEDAH DARUL

    AMAN

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL

    PIPES - 1100M

    495,000.00 GAS MALAYSIA BERHAD Dec 2010

    26GENTING PURA KENCANA, BATU PAHAT PROPOSED STREET LIGHTING INSTALLATION

    FOR PHASE 1A AND PHASE 1BCIVIL AND FIBER PULLING 381,820.00

    KOMASI

    COMMUNICATIONS SDN

    BHD / GPROPERTY

    CONSTRUCTION SDN. BHD.

    2010

    27GENTING INDAHPURA, KULAI PROPOSED STREET LIGHTING INSTALLATION FOR 82

    UNIT SEMI-DETACHED HOUSE, PACKAGE 3A AT ZONE 33CIVIL AND FIBER PULLING 106,070.00

    KOMASI

    COMMUNICATIONS SDN

    BHD / GPROPERTY

    CONSTRUCTION SDN. BHD.

    2010

  • NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    28 INFRA-DIGI AT PARIT RAJA INDUSTRIAL PARK, BATU PAHAT CIVIL AND FIBER PULLING 2,116,161.80

    KOMASI

    COMMUNICATIONS SDN

    BHD / TIME DOTCOM

    BERHAD

    2010

    29 PROPOSED OSP CIVIL TO DIGI CABIN AT BANDAR PUTRA, SEGAMAT JOHOR CIVIL AND FIBER PULLING 1,67,059.45

    KOMASI

    COMMUNICATIONS SDN

    BHD / TIME DOTCOM

    BERHAD

    2010

    30 FIBER PULLING TO DIGI AT SEGAMAT, JOHOR CIVIL AND FIBER PULLING 151,786.02

    KOMASI

    COMMUNICATIONS SDN

    BHD / TIME DOTCOM

    BERHAD

    2010

    31 INFRA & FIBER PULL -(DIGI MSC PRO KEPONG IND PARK) CIVIL AND FIBER PULLING 491,298.19

    KOMASI

    COMMUNICATIONS SDN

    BHD / TIME DOTCOM

    BERHAD

    2010

    32 INFRA & FIBER - DIGI CABIN AT MIMALAND TO MH AT UIA GOMBAK (1 ROUTE) CIVIL AND FIBER PULLING 581,327.20

    KOMASI

    COMMUNICATIONS SDN

    BHD / TIME DOTCOM

    BERHAD

    2010

    33 INFRA-PROPOSED OSP CIVIL TO DIGI CABIN AT GEMERAH, SEGAMAT, JOHOR CIVIL AND FIBER PULLING 131,729.24

    KOMASI

    COMMUNICATIONS SDN

    BHD / TIME DOTCOM

    BERHAD

    2010

    34 FIBER PULLING (IB 48C)- DIGI PROJECT AT MIMALAND (ROUTE 2) CIVIL AND FIBER PULLING 1,072,413.02

    KOMASI

    COMMUNICATIONS SDN

    BHD / TIME DOTCOM

    BERHAD

    2010

    35

    ELECTRIFIED DOUBLE TRACK PROJECT -SEREMBAN TO GEMAS PACKAGE

    1–CONSTRUCTION AND COMPLETION OF FIBER OPTIC CABLES RELOCATION WORK

    (ENGINEERING SERVICES) SECTION 7 (CH482.410-CH486.070 & CH488.450-CH490.300

    )

    CIVIL AND FIBER PULLING 209,960.00

    KOMASI

    COMMUNICATIONS SDN

    BHD / FIBERAIL SDN BHD

    2010

    36

    ELECTRIFIED DOUBLE TRACK PROJECT -SEREMBAN TO GEMAS PACKAGE

    2–CONSTRUCTION AND COMPLETION OF FIBER OPTIC CABLES RELOCATION WORK

    (ENGINEERING SERVICES) SECTION 2A (CH500.775-CH504.141 & CH505.150-

    CH506.990)

    CIVIL AND FIBER PULLING 210,478.10

    KOMASI

    COMMUNICATIONS SDN

    BHD / FIBERAIL SDN BHD

    2010

  • NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    37

    ELECTRIFIED DOUBLE TRACK PROJECT -SEREMBAN TO GEMAS PACKAGE 2

    –HORIZONTAL DIRECT DRILLING (HDD) INSTALLATION WORKS SECTION 2A

    (CH500.775-CH504.141 & CH505.150-CH506.990)

    CIVIL AND FIBER PULLING 513,916.00

    KOMASI

    COMMUNICATIONS SDN

    BHD / FIBERAIL SDN BHD

    2010

    38PERLAKSANAAN PROJEK RANGKAIAN TEMPATAN TELEKOM MALAYSIA BERHAD

    SECARA JADUAL KADAR HARGACIVIL AND FIBER PULLING 10,000,000.00

    KOMASI

    COMMUNICATIONS SDN

    BHD / TM BERHAD

    2010

    39

    SUPPLY & INSTALL OF 7 WAY 100MM DIA HDPE DUCTING BY HDD METHOD AND

    TELEPHONE MANHOLE AND DUCTING FOR CADANGAN PEMBANGUNAN KAMPUS

    BARU UNIVERSITI KUALA LUMPUR (UNIKL) CAWANGAN JOHOR DI PASIR GUDANG,

    JOHOR

    CIVIL AND FIBER PULLING 245,310.00

    KOMASI

    COMMUNICATIONS SDN

    BHD / TRC SDN. BHD.

    2010

    40PERLAKSANAAN PROJEK RANGKAIAN TEMPATAN TELEKOM MALAYSIA BERHAD

    SECARA JADUAL KADAR HARGACIVIL AND FIBER PULLING 5,000,000.00

    KOMASI

    COMMUNICATIONS SDN

    BHD / TM BERHAD

    2010

    41RELOCATION OF FIBER OPTIC CABLE AT SEREMBAN – TABOH NANING BETWEEN

    KP119.000 – KP 121.000CIVIL AND FIBER PULLING 205,089.72

    KOMASI

    COMMUNICATIONS SDN

    BHD / FIBERAIL SDN BHD

    2010

    42ELECTRIFIED DOUBLE TRACK PROJECT - SEREMBAN TO GEMAS PACKAGE 1

    –HORIZONTAL DIRECT DRILLING (HDD) INSTALLATION WORKS–ADDITIONAL NO 7ELECTRIFIED DOUBLE TRACK 244,140.40

    KOMASI

    COMMUNICATIONS SDN

    BHD / FIBERAIL SDN BHD

    2010

    43PROPOSED STREET LISTING INSTALLATION FOR 82 UNITS SEMI-DETACHED HOUSES,

    PACKAGE 3A AT ZONE 33.STREET LISTING INSTALLATION 106,070.00

    KOMASI

    COMMUNICATIONS SDN

    BHD / GPROPERTY

    CONSTRUCTION SDN. BHD.

    2010

    44PROPOSED ELECTRICAL LV INFRASTRUCTURE WORKS AT ZONE 33A PACKAGE 3A FOR

    SEMI-DETACHED HOUSESELECTRICAL LV INFRASTRUCTURE WORKS 219,912.00

    KOMASI

    COMMUNICATIONS SDN

    BHD / GPROPERTY

    CONSTRUCTION SDN. BHD.

    2010

    45 PROPOSED STREET LIGHTING INSTALLATION FOR PHASE 1A AND PHASE 1B STREET LIGHTING INSTALLATION 38,180.00

    KOMASI

    COMMUNICATIONS SDN

    BHD / ALD CONSTRUCTION

    2010

  • NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    46

    DIVING SERVICES TO CONDUCT UNDERWATER INSPECTION OF ANODES AND PIPELINE

    AT WEST MOORING DOLPHIN, JIMAH POWER PLANT, PORT DICKSON, NEGERI

    SEMBILAN DARUL KHUSUS

    MARINE & SALVAGE WORKS 177,000.00

    MACH 3 ENGINEERING

    CONSULTANTS SDN

    BHD/EXCALIBER

    RESOURCES SDN BHD

    March 2011

    47TO REPAIR ANODES FEEDER CABLE AT JIMAH POWER PLANT PORT DICKSON, NEGERI

    SEMBILAN DARUL KHUSUSMARINE & SALVAGE WORKS 160,000.00

    MACH 3 ENGINEERING

    CONSULTANTS SDN

    BHD/EXCALIBER

    RESOURCES SDN BHD

    March 2011

    48 TO PROVIDE MANPOWER (DIVERS) AT TURKMENISTAN CABLE LAYING PROJECT MARINE & SALVAGE WORKS 550,000.00

    IFACTORS SDN

    BHD/EXCALIBER

    RESOURCES SDN BHD

    April 2011 to May

    2011

    49

    TO CONDUCT UNDERWATER SURVEY, HACKING, REPAIR RE-BAR, INSTALL FOAM

    WORK AND GROUTING AT INNER JETTY SHELL BAGAN LUAR, BUTTERWORTH,

    PENANG

    MARINE & SALVAGE WORKS 160,000.00

    RNC TECHNOLOGY (M) SDN

    BHD/EXCALIBER

    RESOURCES SDN BHD

    May 2011

    50TO REPAIR ANODES FEEDER CABLE AT JIMAH POWER PLANT PORT DICKSON, NEGERI

    SEMBILAN DARUL KHUSUSMARINE & SALVAGE WORKS 230,000.00

    MACH 3 ENGINEERING

    CONSULTANTS SDN

    BHD/EXCALIBER

    RESOURCES SDN BHD

    August 2011

    51 EPCC OF THE NGDS TO SITIAWAN, FL STAGE 1/11, SITIAWAN, PERAK DARUL RIDZUAN

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 8, NPS 6 AND NPS 4

    STEEL PIPES

    249,400.00 GAS MALAYSIA BERHAD 2011

    52EPCC OF THE NGDS TO MERU FL STAGE 1/11, MERU, KLANG, SELANGOR DARUL

    EHSAN

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL

    PIPES

    530,000.00 GAS MALAYSIA BERHAD 2011

    53

    SUPPLY MATERIALS, MANPOWERS WITH NECESSARY HANDLING TOOLS &

    EQUIPMENT FOR INSTALLATION, TESTING AND COMMISSIONING OF NATURAL GAS

    PIPELINE WORK FOR BAHRU STAINLESS PROJECT, TANJUNG LANGSAT, JOHOR

    PIPELINE TESTING AND COMMISSIONING 1,070,000.00TRACTOR-LINE INDUSTRIES

    SDN BHD2011

    54 EPCC OF THE NGDS TO SENAWANG FL STAGE 1/10, SENAWANG, NEGERI SEMBILANENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 4 STEEL PIPES -24M 175,000.00 GAS MALAYSIA BERHAD 2011

    55EPCC OF THE NGDS TO AYER HITAM FL STAGE 1/11, AYER HITAM, JOHOR DARUL

    TAKZIM

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 4 STEEL PIPES -

    144M

    235,000.00 GAS MALAYSIA BERHAD 2011

  • NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    56 HERCULES PROJECT: FTK MAN CIVIL & FIBER INFRASTRUCTURE AT SACC SHAH ALAM CIVIL AND FIBER PULLING 2,875,146.74

    KOMASI

    COMMUNICATIONS SDN

    BHD / TIME DOTCOM

    BERHAD

    2011

    57

    SUPPLY AND ENGINEERING WORKS FOR MAXIS PROJECT ~ RAILWAY CROSSING AT

    ALOR SETAR, KUBANG SEMANG, MAMBANG DIAWAN, TANJUNG MALIM, KUALA

    KUBU BARU, KEPONG CENTRAL AND KAJANG

    CIVIL AND FIBER PULLING 748,102.30

    KOMASI

    COMMUNICATIONS SDN

    BHD / FIBERAIL SDN BHD

    2011

    58 RELOCATION FOR NETWORK JALAN MUTIARA RINI – GELANG PATAH CIVIL AND FIBER PULLING 213,000.00

    KOMASI

    COMMUNICATIONS SDN

    BHD / CELCOM (M) BERHAD

    2011

    59

    THE SUPPLY AND PROVISION OF UNDERGROUND INFRASTRUCTURE, 48 CORES

    OPTICAL FIBRE CABLE AND ACCESSORIES FROM TNBD SEREMBAN TO KILAT FOR

    TELEKOM MALAYSIA REQUIREMENT

    CIVIL AND FIBER PULLING 433,645.50

    KOMASI

    COMMUNICATIONS SDN

    BHD / FIBRECOMM

    NETWORK (M) SDN BHD

    2011

    60 MAXIS NGBB PROJECT SAUJANA VILLA- CIVIL WORK CIVIL AND FIBER PULLING 280,341.87

    KOMASI

    COMMUNICATIONS SDN

    BHD / HUAWEI

    TECHNOLOGIES (M) SDN

    BHD

    2011

    61 MAXIS NGBB PROJECT HP DESIGN (JY33) CIVIL AND FIBER PULLING 130,328.04

    KOMASI

    COMMUNICATIONS SDN

    BHD / HUAWEI

    TECHNOLOGIES (M) SDN

    BHD

    2011

    62 CIVIL WORK (HDD) (DSH2 FDC1)CIVIL AND HORIZONTAL DIRECTIONAL DRILLING

    (HDD)324,296.95

    KOMASI

    COMMUNICATIONS SDN

    BHD / HUAWEI

    TECHNOLOGIES (M) SDN

    BHD

    2011

    63 MAXIS NGBB PROJECT DAMANSARA HEIGHT WSEM FDC6 - MICROTRENCHING CIVIL AND FIBER PULLING 208,981.34

    KOMASI

    COMMUNICATIONS SDN

    BHD / HUAWEI

    TECHNOLOGIES (M) SDN

    BHD

    2011

    64 MAXIS NGBB PROJECT DAMANSARA HEIGHT WSEM FDC6 - MICROTRENCHING CIVIL AND FIBER PULLING 216,343.13

    KOMASI

    COMMUNICATIONS SDN

    BHD / HUAWEI

    TECHNOLOGIES (M) SDN

    BHD

    2011

  • NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    65 CIVIL WORK (BANGSAR PERMAI) CIVIL WORK 213,441.86

    KOMASI

    COMMUNICATIONS SDN

    BHD / HUAWEI

    TECHNOLOGIES (M) SDN

    BHD

    2011

    66 MAXIS NGBB PROJECT DAMANSARA HEIGHT WSEM FDC9 (DSH1 FDC9) CIVIL AND FIBER PULLING 303,446.00

    KOMASI

    COMMUNICATIONS SDN

    BHD / HUAWEI

    TECHNOLOGIES (M) SDN

    BHD

    2011

    67SUPPLY, INSTALL, COMMUNICATION OF CIVIL INFRASTRUCTURE AND FIBRE OPTIC

    CABLE WORKS FOR EASTERN AND SOUTHERN REGIONSCIVIL AND FIBER PULLING 440,205.00

    KOMASI

    COMMUNICATIONS SDN

    BHD / CELCOM (M) BERHAD

    2011

    68SUPPLY AND ENGINEERING WORKS FOR LINE MAXIS TP TANAH MERAH, PASIR MAS,

    MENTAKAB, WAKAF BARU, GUA MUSANG AND KUALA KRAICIVIL AND FIBER PULLING 526,961.00

    KOMASI

    COMMUNICATIONS SDN

    BHD / FIBERAIL SDN BHD

    2011

    69 ENGINEERING WORKS FROM MAXIS TOWER TO ML409 AYER TAWAR , PERAK CIVIL AND FIBER PULLING 950,758.39

    KOMASI

    COMMUNICATIONS SDN

    BHD / FIBERAIL SDN BHD

    2011

    70 EPCC OF THE NGDS TO PLENTONG FL STAGE 1/11, PLENTONG, JOHOR DARUL TAKZIMENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 4 STEEL PIPES - 60M225,000.00 GAS MALAYSIA BERHAD

    March 2011 to Sept

    2012

    71EPCC OF THE NGDS TO BANTING FL STAGE 1/11, BANTING,OLAK LEMPIT, BANTING,

    SELANGOR

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 8, NPS 6 AND NPS 4

    STEEL PIPES - 1512M

    4,745,000.00 GAS MALAYSIA BERHADJune 2011 to April

    2012

    72EPCC OF THE NGDS TO PADANG TERAP FL STAGE 1/11 & 2/11, PADANG TERAP,

    KEDAH DARUL AMAN

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 8 STEEL PIPES AND

    CONSTRUCTION OF ODORIZER BUILDING AND

    ODORIZER SYSTEM - 17000M

    6,887,783.00 GAS MALAYSIA BERHAD 2011 to 2012

    73TO INSTALL CP ANODES (410 UNIT) BY UNDERWATER WELDING METHOD AT LOADING

    JETTY TG. BIN POWER PLANT, KUKUP, PONTIAN, JOHOR DARUL TAKZIMMARINE & SALVAGE WORKS 350,000.00

    SBN INDUSTRIES SDN

    BHD/EXCALIBER

    RESOURCES SDN BHD

    March 2012 to April

    2012

  • NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    74DIVING SERVICES FOR DECOMMISIONING WORK OF PCSB AT SM-4 AND SM-V

    PLATFORM, LABUAN FTMARINE & SALVAGE WORKS 980,000.00

    IEV ENGINEERING SDN

    BHD/EXCALIBER

    RESOURCES SDN BHD

    April 2012 to May

    2012

    75 DIVING SERVICES AT FERRY TERMINAL, PRAI, PENANG MARINE & SALVAGE WORKS 215,000.00DSTS SDN BHD/EXCALIBER

    RESOURCES SDN BHD

    September 2012 to

    October 2012

    76UNDERWATER INSPECTION AND REPAIR (WELDING & JACKETING) OF JETTY PILES AT

    KARAMUNTING BULK OIL TERMINAL, SANDAKAN, SABAHMARINE & SALVAGE WORKS 320,000.00

    RNC TECHNOLOGY (M) SDN

    BHD/EXCALIBER

    RESOURCES SDN BHD

    November 2012 to

    December 2012

    77 EPCC OF THE NGDS TO KAPAR FL STAGE 1/12, (REINFORCEMENT), KAPAR, SELANGORENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 8 STEEL PIPES - 36M990,060.00 GAS MALAYSIA BERHAD 2012

    78 EPCC OF THE NGDS TO NILAI FL STAGE 1/12, NILAI, NEGERI SEMBILAN DARUL KHUSUS

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL

    PIPES - 240M

    284,795.00 GAS MALAYSIA BERHAD 2012

    79 MENSA : KELANA BREM TOWER 1 (KEB1B)ENGINEERING, PROCUREMENT, CONSTRUCTION &

    COMMISSIONING22,000.00 TIME DOT COM BERHAD 2012

    80 MENSA : KELANA BREM 2 (KEBTB)ENGINEERING, PROCUREMENT, CONSTRUCTION &

    COMMISSIONING22,000.00 TIME DOT COM BERHAD 2012

    81 HTK CARINA COVERAGE (GPON): DAMANSARA UPTOWN 3 (DUPBB)ENGINEERING, PROCUREMENT, CONSTRUCTION &

    COMMISSIONING22,000.00 TIME DOT COM BERHAD 2012

    82SO-12F FIBER PULLING FROM TDC M/H W-18-01-03 TO CKHBW RISER LEVEL 5 (UOB

    KL)

    ENGINEERING, PROCUREMENT, CONSTRUCTION &

    COMMISSIONING3,942.20 TIME DOT COM BERHAD 2012

    83 SO-48F FIBER PULLING FROM BMPTW (MDF) TO CKHBW RISER LEVEL 5 (MUAMALAT)ENGINEERING, PROCUREMENT, CONSTRUCTION &

    COMMISSIONING19,398.26 TIME DOT COM BERHAD 2012

    84 MENSA : FTK FOR MENSA WISMA GOOD YEARENGINEERING, PROCUREMENT, CONSTRUCTION &

    COMMISSIONING22,000.00 TIME DOT COM BERHAD 2012

  • NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    85SO : 48 FIBER PULLING & SPLICING FROM BANK RAKYAT SERVER ROOM TO MANHOLE

    W-12-00-01CIVIL AND FIBER PULLING 9,795.71 TIME DOT COM BERHAD 2012

    86 CARINA : FTK FOR DAMANSARA UPTOWN 1ENGINEERING, PROCUREMENT, CONSTRUCTION &

    COMMISSIONING22,000.00 TIME DOT COM BERHAD 2012

    87 CARINA : FTK FOR DAMANSARA UPTOWN 2ENGINEERING, PROCUREMENT, CONSTRUCTION &

    COMMISSIONING22,000.00 TIME DOT COM BERHAD 2012

    88FTK - CARINA COVERAGE (GPON) : FIBER PULLING AT DAMANSARA UPTOWN 5

    (DAUPB)

    ENGINEERING, PROCUREMENT, CONSTRUCTION &

    COMMISSIONING22,000.00 TIME DOT COM BERHAD 2012

    89 FTK WORK - JALAN DAMANSARA - JALAN 19/13ENGINEERING, PROCUREMENT, CONSTRUCTION &

    COMMISSIONING84,126.18 TIME DOT COM BERHAD 2012

    90 REPAIR DUCT - S/O BGN BANK RAKYAT ENGINEERING, PROCUREMENT, CONSTRUCTION &

    COMMISSIONING11,000.00 TIME DOT COM BERHAD 2012

    91 FIBER PULLING 48F FROM ROCHE TO MH B19-00-06ENGINEERING, PROCUREMENT, CONSTRUCTION &

    COMMISSIONING4,229.06 TIME DOT COM BERHAD 2012

    92 COVERAGE : OVERTIME CHARGERS AND CABLE TRAY FOR UPTOWN 5ENGINEERING, PROCUREMENT, CONSTRUCTION &

    COMMISSIONING25,185.56 TIME DOT COM BERHAD 2012

    93 NETWORK UPGRADE : VIRGO - FIBER 48F FOR ROYAL DOMAIN (RDSPW)ENGINEERING, PROCUREMENT, CONSTRUCTION &

    COMMISSIONING19,165.06 TIME DOT COM BERHAD 2012

  • NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    94NETWORK UPGRADE : VIRGO FIBER PULLING AND TERMINATION 48F FOR MONT

    KIARA DAMAI (MKDCW)

    ENGINEERING, PROCUREMENT, CONSTRUCTION &

    COMMISSIONING6,287.96 TIME DOT COM BERHAD 2012

    95NETWORK UPGRADE : VIRGO FIBER PULLING AND TERMINATION 48F FOR MONT

    KIARA ASTANA, CROWN(MKCTW) & TIARA (MKTTW)

    ENGINEERING, PROCUREMENT, CONSTRUCTION &

    COMMISSIONING8,594.84 TIME DOT COM BERHAD 2012

    96NETWORK UPGRADE : VIRGO FIBER PULLING AND TERMINATION 48F FOR MONT

    KIARA AMAN (MKACW)

    ENGINEERING, PROCUREMENT, CONSTRUCTION &

    COMMISSIONING6,287.96 TIME DOT COM BERHAD 2012

    97 TRANSFORMER ADSL TO GPON : VISTA COM B. - PULLING AND TERMINATIONENGINEERING, PROCUREMENT, CONSTRUCTION &

    COMMISSIONING27,531.38 TIME DOT COM BERHAD 2012

    98SUPPLY AND ENGINEERING WORKS FOR SITES SG PETANI (TWSW), PADANG SERAI

    (PSERFH), JERANTUT (JERA) AND LAHAT (JTSK)

    ENGINEERING, PROCUREMENT, CONSTRUCTION &

    COMMISSIONING448,155.93

    KOMASI

    COMMUNICATIONS SDN

    BHD / FIBERAIL SDN BHD

    2012

    99RELOCATION OF UTILITIES TELEKOM & TNB WORKS (PROJECT MEMBINA JALAN

    LINGKARAN TENGAH SEREMBAN, NEGERI SEMBILAN - FASA 2B

    ENGINEERING, PROCUREMENT, CONSTRUCTION &

    COMMISSIONING689,440.00

    KOMASI

    COMMUNICATIONS SDN

    BHD / KONSORTIUM

    TEMOKIN VILLA JELAS JV

    SDN BHD

    2012

    100

    (OSP) 48F FIBER PULLING FROM KLANG PROTECH TO RINGCUT EXTS TIME MANHOLE

    (B-50-01-83) (96C MAN GLMRB- I-CITY) & SO-(OSP)48F FIBER PULLING FROM KLANG

    PROTECH INTAN MELLINIUM MDF ROOM

    CIVIL AND FIBER PULLING 371,406.88

    KOMASI

    COMMUNICATIONS SDN

    BHD / TIME DOTCOM

    BERHAD

    2012

    101ELECTRIFIED DOUBLE TRACK PROJECT BETWEEN SEREMBAN TO GEMAS PACK 1-

    SEREMBAN TO TABOH NANING. (CH464.00-CH466.275)ELECTRIFIED DOUBLE TRACK 117,678.80

    KOMASI

    COMMUNICATIONS SDN

    BHD / FIBERAIL SDN BHD

    2012

    102MICRO TRENCHING AND 12C ABF FIBER OPTIC WORKS FROM HP TOWER TO MENARA

    SHELL, BUKIT DAMANSARA.CIVIL AND FIBER PULLING 161,878.84

    KOMASI

    COMMUNICATIONS SDN

    BHD / FIBERAIL SDN BHD

    2012

  • NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    103

    THE SUPPLY AND PROVISION OF ENGINEERING SERVICES FOR CIVIL INFRASTRUCTURE,

    OPTICAL FIBRE CABLE AND ACCESSORIES FROM STULANG DARAT TO MENARA

    CYBERPOT.

    CIVIL AND FIBER PULLING 372,000.00

    KOMASI

    COMMUNICATIONS SDN

    BHD / FIBRECOMM

    NETWORK (M) SDN BHD

    2012

    104THE CIVIL WORK AND INSTALLATION FIBRE OPTIC CABLE FROM FIBRECOMM-MAXIS

    R5 TO TM PUTRAJAYA VIA TM DUCTINGCIVIL AND FIBER PULLING 389,037.20

    KOMASI

    COMMUNICATIONS SDN

    BHD / FIBRECOMM

    NETWORK (M) SDN BHD

    2012

    105NEW CIVIL INFRASTRUCTURE OPTICAL FIBRE CABLE AND ACCESSORIES SEMANTAN

    (LEVEL 7) –FCN HP TOWER CABIN (ROOFTOP) USING MICRO TRENCHING METHODCIVIL AND FIBER PULLING 369,518.00

    KOMASI

    COMMUNICATIONS SDN

    BHD / FIBRECOMM

    NETWORK (M) SDN BHD

    2012

    106PROPOSED CIVIL, HORIZONTAL DIRECTIONAL DRILLING AND MICRO TRENCHING

    WORKS FROM NTT CYBERJAYA TO PATIMAS TO MENARA AIK HUA

    CIVIL, HORIZONTAL DIRECTIONAL DRILLING AND

    MICRO TRENCHING WORKS3,139,120.30

    KOMASI

    COMMUNICATIONS SDN

    BHD / NTT MSC SDN BHD

    2012

    107 MENSA PROJECT : FTK MAN CIVIL & FIBER INFRASTRUCTURE AT KELANA JAYA CIVIL AND FIBER PULLING 1,547,393.21

    KOMASI

    COMMUNICATIONS SDN

    BHD / TIME DOTCOM

    BERHAD

    2012

    - SUPPLY & INSTALL 2 WAY GI PIPE FOR ROAD CROSSING

    - SUPPLY & INSTALL 100MM CORRUGATED DUCT

    - INSTALL 19 CORE P/S/P CABLE

    - INSTALL 2 CORE P/S/P CABLE

    - INSTALL CABLE PIT DETECTOR PIT

    - INSTALL POLES, ASPECTS AND TRAFFIC LIGHT CONTROLLER

    - SUPPLY & INSTALL DETECTOR LOOP SENSOR

    - SUPPLY & INSTALL TRAFFIC LIGHT CONTROLLER PLINTH

    108 SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 850,000.00

    ITRAMAS TECHNOLOGY

    SDN BHD / WCT (TRAFFIC

    SIGNAL SYSTEM FOR

    MEDINI, BANDAR

    ISKANDAR, JOHOR) /

    INTEGRATED DYNASTY (M)

    SDN BHD

    2012

  • NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    - SUPPLY & INSTALL 100MM CORRUGATED DUCT

    - INSTALL 19 CORE P/S/P CABLE

    - INSTALL 2 CORE P/S/P CABLE

    - INSTALL / REPAIR CABLE PIT

    - SUPPLY & INSTALL DETECTOR LOOP SENSOR

    - INSTALL TRAFFIC LIGHT POLE, ASPECTS C/W TERMINATION

    110 TRAFFIC LIGHT JUNCTION WORK AT NEGERI SEMBILAN (GEMAS AND GEMENCHEH) SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 90,800.00

    TYCO FIRE, SECURITY &

    SERVICES MALAYSIA SDN

    BHD / INTEGRATED

    DYNASTY (M) SDN BHD

    2013

    111EPCC OF THE NGDS TO PULAU INDAH, FL STAGE 2/12 KLANG, SELANGOR DARUL

    EHSAN

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 8, NPS 6 AND NPS 4

    STEEL PIPES - 200M

    250,000.00 GAS MALAYSIA BERHAD 2013

    112EPCC OF THE NGDS TO BUKIT RAMBAI, FL STAGE 1/12 BUKIT RAMBAI INDUSTRIAL

    AREA IV, MELAKA

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL

    PIPES - 700M

    489,000.00 GAS MALAYSIA BERHAD 2013

    113

    RELOCATION OF GAS PIPELINE WORKS RELATED TO THE CONSTRUCTION AND

    COMPLETION OF VIADUCT GUIDEWAY AND OTHER ASSOCIATED WORKS FROM

    DATARAN SUNWAY STATION TO SECTION 17

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 8 STEEL PIPES

    RELOCATION WITH 6 NOS OF HOT TAPPING

    STOPPLES OF 8" X 8" - 3200M

    4,200,000.00

    MUDAJAYA CORPORATION

    BERHAD / MRT

    CORPORATION BHD

    2013

    114EPCC OF THE NGDS TO KAPAR MERU FL STAGE 1/12, KAPAR & MERU, KLANG,

    SELANGOR DARUL EHSAN

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 4 STEEL PIPES - 66M382,350.00 GAS MALAYSIA BERHAD July 2012 to Jan 2013

    115TO CONDUCT DIVING INSPECTION AT JETTY PILES QUAY 2 & 3 MMHE PASIR GUDANG,

    JOHORMARINE & SALVAGE WORKS 270,000.00

    RNC TECHNOLOGY (M) SDN

    BHD/EXCALIBER

    RESOURCES SDN BHD

    May 2013

    116 TO INSTALL ANODES AT TANJUNG LANGSAT JETTY, JOHOR DARUL TAKZIM MARINE & SALVAGE WORKS 325,000.00

    SBN INDUSTRIES SDN

    BHD/EXCALIBER

    RESOURCES SDN BHD

    June 2013

    109 SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 356,500.00

    ITRAMAS TECHNOLOGY

    SDN BHD / WCT (TRAFFIC

    SIGNAL SYSTEM FOR

    MEDINI, BANDAR

    ISKANDAR, JOHOR) /

    INTEGRATED DYNASTY (M)

    SDN BHD

    2013

  • NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    117EPCC OF THE NGDS TO SENAI FL STAGE 1/13, SENAI INDUSTRIAL AREA, JOHOR DARUL

    TAKZIM

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 4 STEEL PIPES -

    600M

    199,998.00 GAS MALAYSIA BERHAD 2013

    118EPCC OF THE NGDS TO KULAI FL STAGE 1/12, JALAN AIR HITAM, KULAIJAYA, JOHOR

    DARUL TAKZIM

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 4 STEEL PIPES -

    120M

    256,265.00 GAS MALAYSIA BERHAD 2013

    119 EPCC OF THE NGDS TO CHUPING FL STAGE 1/12, CHUPING,PERLIS INDERA KAYANGAN

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 8, NPS 6, AND NPS 4

    STEEL PIPES - 9864M

    2,335,700.00 GAS MALAYSIA BERHAD 2013

    120EPCC OF THE NGDS TO TANJUNG LANGSAT FL STAGE 3/12, TANJUNG LANGSAT,

    JOHOR DARUL TAKZIM

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 8, AND NPS 4 STEEL

    PIPES - 900M

    435,000.00 GAS MALAYSIA BERHAD 2013

    121EPCC OF THE NGDS TO SEPANG FL STAGE 1/13 (REINFORCEMENT), SALAK TINGGI,

    SEPANG, SELANGOR DARUL EHSAN

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 8 STEEL PIPES -

    3198M

    3,603,188.00 GAS MALAYSIA BERHAD 2013

    122PROJEK MENAIKTARAF LEBUHRAYA JOHOR BAHRU- PASIR GUDANG DARI 4 LORONG

    KE 6 LORONG, JOHOR (THE''PROJECT")ROAD MAINTENANCE WORKS 555,647.80

    KOMASI

    COMMUNICATIONS SDN

    BHD / IDX MULTI

    RESOURCES SDN BHD

    2013

    123

    THE SUPPLY AND THE PROVISION OF ENGINEERING SERVICES OF OPTICAL FIBRE

    CALBLE INFRASTRUCTURE AND INSTALLATION FOR JOHOR FIBRE ROLL-OUT MENARA

    ANSAR TO DANGA BAY (8.5 KM)

    CIVIL AND FIBER PULLING 2,245,568.50

    KOMASI

    COMMUNICATIONS SDN

    BHD / PUNCAK SEMANGAT

    SDN BHD

    2013

    124

    THE ROAD NAMELY UTILITY MAPPING , HDD, MILLING & PAVING & PIER CABLE

    BRIDGE FOR TNB'S CABLE LAYING FROM 33KV PMU TTJ TO TNB SSU AT ON SEMI-SITE

    1

    CIVIL AND FIBER PULLING 2,820,635.00

    KOMASI

    COMMUNICATIONS SDN

    BHD / SCG INDUSTRIES

    MALAYSIA SDN BHD

    2013

    125 PSND10948: NWK: CIVIL & FIBER FOR MUADZAM SHAH (MAXIS) CIVIL AND FIBER PULLING 499,905.30

    KOMASI

    COMMUNICATIONS SDN

    BHD / TIME DOTCOM

    BERHAD

    2013

  • NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    126 PSND10936: NWK: CIVIL & FIBER FOR DIGI SOUTH OF RAUB (AS) CIVIL AND FIBER PULLING 1,463,299.63

    KOMASI

    COMMUNICATIONS SDN

    BHD / TIME DOTCOM

    BERHAD

    2013

    127 PSND10949: NWK: CIVIL & FIBER FOR DIGI DONG , PAHANG CIVIL AND FIBER PULLING 1,914,462.41

    KOMASI

    COMMUNICATIONS SDN

    BHD / TIME DOTCOM

    BERHAD

    2013

    128SUPPLY AND ENGINEERING WORKS FROM TH PROPERTIES DATA CENTRE TO EXISTING

    MANHOLE (ROUTE 1 AND ROUTE 2) AT BANDAR ENSTEKCIVIL WORKS 564,304.21

    KOMASI

    COMMUNICATIONS SDN

    BHD / FIBERAIL SDN BHD

    2013

    129UNDERWATER INSPECTION TO JETTY STRUCTURE AT FELDA SAHABAT, LAHAD DATU,

    SABAHMARINE & SALVAGE WORKS 185,000.00

    3R SYSTEMS SDN

    BHD/EXCALIBER

    RESOURCES SDN BHD

    March 2014

    130 UNDERWATER INSPECTION AT BOUSTEAD NAVAL DOCK YARD, LUMUT, PERAK MARINE & SALVAGE WORKS 155,000.00

    RNC TECHNOLOGY (M) SDN

    BHD/EXCALIBER

    RESOURCES SDN BHD

    March 2014 to April

    2014

    131REHABILITATION OF CATHODIC PROTECTION AT KPC, KUANTAN, PAHANG DARUL

    MAKMURMARINE & SALVAGE WORKS 510,000.00

    SBN INDUSTRIES (M) SDN

    BHD/EXCALIBER

    RESOURCES SDN BHD

    March 2014 to May

    2014

    132 INSTALL ANODES (WELDING) AT KBOT JETTY PILES, SANDAKAN, SABAH MARINE & SALVAGE WORKS 280,000.00

    SBN INDUSTRIES (M) SDN

    BHD/EXCALIBER

    RESOURCES SDN BHD

    June 2014 to July

    2014

    133 DIVING SERVICES FOR DEWATERING AT CENDOR MOPU (OFFSHORE) MARINE & SALVAGE WORKS 1,250,000.00

    CENDOR MOPU PRODUCER

    LTD/EXCALIBER RESOURCES

    SDN BHD

    October 2014

    134CONDITION ASSESSMENT AND ENGINEERING WORKS AT BOUSTEAD NAVAL

    DOCKYARD, LUMUT, PERAKMARINE & SALVAGE WORKS 220,000.00

    RNC TECHNOLOGY (M) SDN

    BHD/EXCALIBER

    RESOURCES SDN BHD

    Nov 2014 to Dec

    2014

  • NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    135 EPCC OF THE NGDS TO LUMUT FL STAGE 1/13, SITIAWAN, PERAK DARUL RIDZUAN

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL

    PIPES - 456M

    330,000.00 GAS MALAYSIA BERHAD 2014

    136EPCC OF THE NGDS TO KULAI FL STAGE 1/13, KAWASAN PERINDUSTRIAN I-PARK,

    KULAIJAYA, JOHOR BAHRU, JOHOR DARUL TAKZIM

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL

    PIPES - 2388M

    1,238,000.00GAS MALAYSIA BERHAD 2014

    137

    CADANGAN PEMBANGUNAN KILANG BERKEMBAR 3 ½ TINGKAT JENIS A (6 UNIT),

    JENIS B (10 UNIT) DAN KILANG SESEBUAH 3 1/2 TINGKAT (1 UNIT) DI ATAS LOT PT

    1260 (HSD) 176557, JALAN PUCHONG, MUKIM PETALING, DAERAH PETALING,

    SELANGOR DARUL EHSAN UNTUK TETUAN BROADWAY MERGER SDN BHD

    SUB-CONTRACT OF GAS PIPE PROTECTION AND

    MDPE PIPE RELOCATION - 150M

    200,000.00 BROADWAY MERGER SDN

    BHD2014

    138EPCC OF THE NGDS TO MAK MANDIN & PRAI FL DL STAGE 1/14, MAK MANDIN &

    PRAI, PULAU PINANG

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 8, NPS 6 AND NPS 4

    STEEL PIPES - 1380M

    1,298,000.00GAS MALAYSIA BERHAD 2014

    139EPCC OF THE NGDS TO TANJUNG LANGSAT FL STAGE 2/14, TANJUNG LANGSAT,

    JOHOR DARUL TAKZIM

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 8, NPS 6 AND NPS 4

    STEEL PIPES - 984M

    530,000.00GAS MALAYSIA BERHAD 2014

    140EPCC OF THE NGDS TO TANJUNG LANGSAT FL STAGE 3/14, TANJUNG LANGSAT,

    JOHOR DARUL TAKZIM

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL

    PIPES - 822M

    850,000.00GAS MALAYSIA BERHAD 2014

    141MENAIKTARAF JALAN MUAR - TANGKAK-SEGAMAT JOHOR (FASA 1: SEGAMAT -

    TANGKAK) PAKEJ 2ROAD MAINTENANCE WORKS 4,847,006.50

    KOMASI

    COMMUNICATIONS SDN

    BHD / BINA MEKAR SDN

    BHD

    2014

    142FULL TURNKEY OF CIVIL AND FIBER INFRASTRUCTURE OF CELCOM PROJECT - PHASE 2 :

    CELCOM SKUDAI TAMAN UNIVERSITICIVIL AND FIBER PULLING 234,000.00

    KOMASI

    COMMUNICATIONS SDN

    BHD / TIME DOTCOM

    BERHAD

    2014

    143

    MASS RAPID TRANSIT LEMBAH KLANG: JAJARAN SUNGAI BULOH KAJANG PACKAGE V8

    : CONSTRUCTION AND COMPLETION OF VIADUCT GUIDEWAY AND OTHER WORKS

    FROM TAMAN MESRA KAJANG STATION RELOCATION OF EXISTING DIGI & MAXIS

    SERVICES

    ENGINEERING, PROCUREMENT, CONSTRUCTION &

    COMMISSIONING FOR CIVIL AND FIBER PULLING237,123.88

    KOMASI

    COMMUNICATIONS SDN

    BHD / FIBERAIL SDN BHD

    2014

    144SUPPLY AND ES FOR NEW CIVIL INFRASTRUCTURE, OPTICAL FIBRE CABLE AND

    ACCESSORIES FOR 48 CORES FROM CABIN PMU SKUDAI TO TAMAN SRI SKUDAICIVIL AND FIBER PULLING 216,608.80

    KOMASI

    COMMUNICATIONS SDN

    BHD / FIBRECOMM

    NETWORK (M) SDN BHD

    2014

  • NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    145 CABLE MIGRATION WORKS TO JB SENTRAL CABLE MIGRATION WORKS 278,970.52

    KOMASI

    COMMUNICATIONS SDN

    BHD /FIBERAIL SDN BHD

    2014

    146 BUTTERFLY PROJECT AIR HITAM SKUDAI LINKENGINEERING, PROCUREMENT, CONSTRUCTION &

    COMMISSIONING468,538.00

    KOMASI

    COMMUNICATIONS SDN

    BHD / TIME DOTCOM

    BERHAD

    2014

    147 HDD WORKS FOR SITE "JPELFH01" KTMB CROSSING JOHOR BAHRU HORIZONTAL DIRECTIONAL DRILLING WORKS 123,860.97

    KOMASI

    COMMUNICATIONS SDN

    BHD /FIBERAIL SDN BHD

    2014

    148RELOCATION OF MICRO TRENCHING WORKS FROM MH NO 3 (ISTANA HOTEL)TO

    EXISTING MANHOLE AT MAJU EXPRESSWAY (BULATAN KG PANDAN)CIVIL AND FIBER PULLING 916,280.52

    KOMASI

    COMMUNICATIONS SDN

    BHD /FIBERAIL SDN BHD

    2014

    149CIVIL AND PULLING WORK FOR MALAYSIA MARINE HEAVY ENGINEERING

    (MMHE)(THE 'WORK)CIVIL AND FIBER PULLING 234,115.00

    KOMASI

    COMMUNICATIONS SDN

    BHD / TIME DOTCOM

    BERHAD

    2014

    150 TRAFFIC LIGHT JUNCTION WORK AT MEDINI JUNCTION, BANDAR ISKANDAR, JOHOR SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 61,000.00

    TYCO FIRE, SECURITY &

    SERVICES MALAYSIA SDN

    BHD / INTEGRATED

    DYNASTY (M) SDN BHD

    2014

    151 TRAFFIC LIGHT JUNCTION WORK AT TAMAN SELASIH, KULIM SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 75,000.00

    TYCO FIRE, SECURITY &

    SERVICES MALAYSIA SDN

    BHD / INTEGRATED

    DYNASTY (M) SDN BHD

    2014

    152 TRAFFIC LIGHT JUNCTION WORK AT LABU, NEGERI SEMBILAN SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 43,000.00

    TYCO FIRE, SECURITY &

    SERVICES MALAYSIA SDN

    BHD / INTEGRATED

    DYNASTY (M) SDN BHD

    2014

  • NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    153 TRAFFIC LIGHT JUNCTION WORK AT TANJUNG TOKONG, PENANG SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 95,000.00

    TYCO FIRE, SECURITY &

    SERVICES MALAYSIA SDN

    BHD / E & O / INTEGRATED

    DYNASTY (M) SDN BHD

    2014

    154 TO RELOCATE TRAFFIC SIGNAL SYSTEM AT CENTRAL MARKET SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 57,000.00

    TYCO FIRE, SECURITY &

    SERVICES MALAYSIA SDN

    BHD / E & O / INTEGRATED

    DYNASTY (M) SDN BHD

    2014

    155 PMU 132KV TASEK GELUGOR SWITCHING STATION

    2 X 13KV AIS OHL FEEDER BAYS, 2X 132KV UGC

    FEEDER BAYS, 1X132 BUS COUPLER BAY, NEW

    TRANSMISSION RTU, CONTROL & RELAY PANEL,

    LVAC, GENSET, EARTHING SYSTEMS AND ALL

    OTHER ASSOCIATE ANCILLARY EQUIPMENT, NEW

    132KV BUILDING, ACCESS ROAD AND ASSOCIATED

    CIVIL WORK , ALL RELATED TESTING

    &COMMISIONING WORKS BY OEM'S TESTER

    505,520.00 TRANSPRO SDN BHD 2014

    156 TRAFFIC LIGHT JUNCTION WORK AT JELUTONG EXPRESSWAY, PENANG SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 125,000.00

    TYCO FIRE, SECURITY &

    SERVICES MALAYSIA SDN

    BHD / IJM / INTEGRATED

    DYNASTY (M) SDN BHD

    2014

    157EPCC OF THE NGDS TO BUKIT KEMUNING DL STAGE 1/13 (LOOPING) BUKIT

    KEMUNING, SHAH ALAM, SELANGOR DARUL EHSAN

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF PE 125 MM, PE PIPES -

    750M

    517,337.50 GAS MALAYSIA BERHAD Aug 2013 to Jan 2014

    158EPCC OF THE NGDS TO SEPANG FL STAGE 3/13, TANJUNG INDUSTRIAL PARK, SEPANG,

    SELANGOR DARUL EHSAN

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 16, NPS 8 AND NPS

    6 STEEL PIPES - 9260M

    6,494,600.00 GAS MALAYSIA BERHADDec 2013 to Nov

    2014

    159TO SUPPLY APC SOLUTIONS FOR JPKN NEW BUILDING DATA CENTER IN KK AND DRC

    IN TAWAU

    TO SUPPLY APC SOLUTIONS FOR JPKN NEW

    BUILDING DATA CENTER IN KK AND DRC IN TAWAU6,000,000.00 SRI KOMPUTER SDN BHD July 2014 to Jan 2015

    160SUPPLY MANPOWER AND DIVING EQUIPMENT FOR SALVAGE WORK (KD PERANTAU)

    AT LUMUT PERAKMARINE & SALVAGE WORKS 1,600,000.00

    BOUSTEAD NAVAL

    DOCKYARD/EXCALIBER

    RESOURCES SDN BHD

    Dec 2014 to Jan 2015

    161PRESERVATION SERVICES FOR TREATMENT OF WATER DAMAGED MACHINERY OF

    PARTIALLY SUNKEN KD PERANTAU.

    CARRY OUT PRESERVATION OF MACHINERY AND

    EQUIPMENT DAMAGE PREVENTION AND

    CLEANING AFTER SALVAGE OF KD PERANTAU.

    3,100,000.00BOUSTEAD NAVAL

    SHIPYARD SDN BHDDec 2014 Feb 2015

  • NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    162 SALVAGE OPERATION KD PERANTAUTO CONTINUE AND TAKE OVER SALVAGE

    OPERATION1,594,232.50

    BOUSTEAD NAVAL

    SHIPYARD SDN BHDJan-15

    163 EXTENSION - SALVAGE OPERATION KD PERANTAUEXTENSION OF SALVAGE OPERATION KD

    PERANTAU (UPRIGHT AND REAFLOAT)2,441,886.00

    BOUSTEAD NAVAL

    SHIPYARD SDN BHDJan-15

    164 NAVAL ARCHITECTURE - SALVAGE KD PERANTAU

    TO PROVIDE ENGANGE SERVICE OF NAVAL

    ARCHITECT TO CONDUCT DOCKING ANALYSIS AND

    SHIP STABILITY ANALYSIS OF KD PERANTAU AND TO

    PROVIDE FULL ANALYSIS REPORT.

    92,400.00BOUSTEAD NAVAL

    SHIPYARD SDN BHDJan-15

    165REPAIR, REHABILITATION AND REVIVAL OF SHIP LIFT PLATFORM AT TLDM LUMUT FOR

    BOUSTEAD NAVAL SHIPYARD, LUMUT, PERAK D.RMARINE & SALVAGE WORKS 215,000.00

    RNC TECHNOLOGY (M) SDN

    BHD/EXCALIBER

    RESOURCES SDN BHD

    Mar 2015 to June

    2015

    166 TO SUPPLY APC SOLUTIONS FOR MATRADE BUILDING DATA CENTER UPGRADING JOBTO SUPPLY APC SOLUTIONS FOR MATRADE

    BUILDING DATA CENTER UPGRADING JOB1,800,000.00 BIT GROUP SDN BHD

    Mar 2015 to Sept

    2015

    167 UNDERWATER SALVAGE OF TUG BOAT AT PENANG PORT CONSORTIUM PENANG MARINE & SALVAGE WORKS 250,000.00EXCALIBER RESOURCES SDN

    BHD

    Nov 2015 to Dec

    2015

    168 UNDERWATER SALVAGE OF TUG BOAT AT PENANG PORT CONSORTIUM PENANG MARINE & SALVAGE WORKS 250,000.00EXCALIBER RESOURCES SDN

    BHD

    Nov 2015 to Dec

    2015

    169 EPCC OF THE NGDS TO TEBRAU FL STAGE 1/14, TEBRAU, JOHOR DARUL TAKZIM

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL

    PIPES -1296M

    1,213,852.00 GAS MALAYSIA BERHAD 2015

    170EPCC OF THE NGDS TO WEST PORT FL STAGE 2/14, WEST PORT, KLANG, SELANGOR

    DARUL EHSAN

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 4 STEEL PIPES -48M218,000.00 GAS MALAYSIA BERHAD 2015

    171EPCC OF THE NGDS TO BANTING FL STAGE 1/14, OLAK LEMPIT INDUSTRIAL AREA,

    BANTING, SELANGOR DARUL EHSAN

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 8, NPS 6 AND NPS 4

    STEEL PIPES

    2,460,080.00GAS MALAYSIA BERHAD 2015

    172EPCC OF THE NGDS TO MERU FL STAGE 3/15, MERU, KLANG, SELANGOR DARUL

    EHSAN

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 4 STEEL PIPES176,278.00 GAS MALAYSIA BERHAD 2015

  • NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    173

    MSVT-TUKAR KABEL VOLTAN TINGGI 22KV PILC UNTUK TUJUAN PENUKARAN PILC

    SEDIA ADA SEPANJANG 2KM KAWASAN PASIR GUDANG INDUSTRI FASA 8 (KERJA -

    KERJA MERENTANG 1 LITAR KABEL 240MMP XLPE 22KV IC BARU ANTARA PE TIONG

    NAM KE PCOC DAN BYPASS PE KOMERSIAL MINERAL BAGI MENGGANTIKAN KABEL

    LAMA) -KERJA HDD

    CIVIL AND FIBER PULLING 197,067.00

    KOMASI

    COMMUNICATIONS SDN

    BHD / TENAGA NASIONAL

    BERHAD

    2015

    174

    MSVT-MERENTANG KABEL VOLTAN TINGGI 11KV XLPE UNTUK TUJUAN RE-

    CONFIGURE SISTEM SEDIADA KAWASAN JOHOR JAYA FASA 10 (MSVT NEW INJECTION

    MERENTANG 1 LITAR KABEL VOLTAN TINGGI 1C 240MMP 22KV DARI PMU TEBRAU KE

    TEMPAT CADANGAN POTONG & SAMBUNG KE S/S GIANT SEPANJANG 1746M) (KERJA

    KONTRAK HDD)

    CIVIL AND FIBER PULLING 249,294.40

    KOMASI

    COMMUNICATIONS SDN

    BHD / TENAGA NASIONAL

    BERHAD

    2015

    175RECTIFICATION WORK FOR INTERMARK CABLE AT JUNCTION OF JALAN AMPANG -

    JALAN TUN RAZAKCIVIL AND FIBER PULLING 102,591.31

    KOMASI

    COMMUNICATIONS SDN

    BHD / FIBERAIL SDN BHD

    2015

    176

    MSVT- TUKAR KABEL VOLTAN TINGGI 11KV UNTUK TUJUAN RE-CONFIGURE SISTEM

    SEDIADA DI KAWASAN JOHOR JAYA FASA 8 (MSVT NEW INJECTION 3C 240MMP 11KV

    PE TMN MOLEK NO 3 KE PE TMN MOLEK NO 14 SEPANJANG 1229 METER ) (KERJA

    KONTRAK HDD)

    CIVIL AND FIBER PULLING 103,000.00

    KOMASI

    COMMUNICATIONS SDN

    BHD / TENAGA NASIONAL

    BERHAD

    2015

    177CONTRACT FOR NETWORK DEVELOPMENT PROJECT VIA SCHEDULE OF RATE (JKH) FOR

    TELEKOM MALAYSIA BERHAD ™CIVIL AND FIBER PULLING 34,773,000.00

    KOMASI

    COMMUNICATIONS SDN

    BHD / TM BERHAD

    2015

    178

    THE SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF THE

    TELEPHONE INFRASTRUCTURE WORKS FOR TOTAL 80 UNITS OF MIXED RESIDENTIAL

    UNITS ( STAGE 1-39 UNITS & STAGE 2-41 UNITS) DI ATAS SEBAHAGIAN LOT PTD

    104940, INDAHPURA ZONE 33B, MUKIM KULAI, DAERAH KULAIJAYA, NEGERI JOHOR

    DARUL TAKZIM

    ENGINEERING, PROCUREMENT, CONSTRUCTION &

    COMMISSIONING418,730.00

    KOMASI

    COMMUNICATIONS SDN

    BHD / GPROPERTY

    CONSTRUCTION SDN BHD

    2015

    179

    THE SUPPLY, DELIVERY , INSTALLATION , TESTING & COMMISSIONING OF TELEPHONE

    INFRASTRUCTURE WORKS FOR PROPOSED DEVELOPMENT AT PHASE 1 FOR ECO

    BUSINESS PARK 1 ON PART OF LOT PTD 117036, 117040 & 117041, MUKIM TEBRAU ,

    DAERAH JOHOR BHARU, JOHOR

    ENGINEERING, PROCUREMENT, CONSTRUCTION &

    COMMISSIONING819,705.00

    KOMASI

    COMMUNICATIONS SDN

    BHD / ECO BUSINESS PARK

    1 DEVELOPMENT SDN BHD

    2015

    180 TRAFFIC LIGHT JUNCTION WORK AT NILAI, NEGERI SEMBILAN SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 145,000.00

    TYCO FIRE, SECURITY &

    SERVICES MALAYSIA SDN

    BHD / IJM / INTEGRATED

    DYNASTY (M) SDN BHD

    2015

  • NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    181 TRAFFIC LIGHT JUNCTION WORK AT LUKUT, NEGERI SEMBILAN SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 30,000.00

    TYCO FIRE, SECURITY &

    SERVICES MALAYSIA SDN

    BHD / INTEGRATED

    DYNASTY (M) SDN BHD

    2015

    182 TRAFFIC LIGHT JUNCTION WORK AT KEPONG SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 95,000.00

    TYCO FIRE, SECURITY &

    SERVICES MALAYSIA SDN

    BHD / INTEGRATED

    DYNASTY (M) SDN BHD

    2015

    183 LOI FOR P&D : COVERAGE: WISMA UOA DAMANSARA 2 CIVIL AND FIBER PULLING 1,060.00 TIME DOT COM BERHAD 07.07.2015 to

    07.07.2015

    184SERVICE ORDER : FIBER PULLING WORK TO MDF ROOM MENARA PNB JALAN TUN

    RAZAK, KL CIVIL AND FIBER PULLING 2,333.56 TIME DOT COM BERHAD

    13.08.2015 to

    13.08.2015

    185 THE ASCENT @ PARADIGM MALL PETALING JAYA, SELANGOR DARUL EHSAN CIVIL AND FIBER PULLING 1,537.78 TIME DOT COM BERHAD 09.09.2015 TO

    09.09.2015

    186 RAISE UP MANHOLE – MENARA PNB CIVIL AND FIBER PULLING 1,060.00 TIME DOT COM BERHAD 28.10.2015 TO

    28.10.2015

    187 LOI FOR P&D : NTT CYBERJAYA CIVIL AND FIBER PULLING 1,060.00 TIME DOT COM BERHAD 2015

    188 FIBER PULLING FOR NTT CYBERJAYA CIVIL AND FIBER PULLING 4,348.21 TIME DOT COM BERHAD 15.09.2015 TO

    28.09.2015

    189EPCC OF THE NGDS TO LIPAT KAJANG FL STAGE 2/13 AND STAGE 3/13, LIPAT KAJANG

    INDUSTRIAL AREA, MUKIM JASIN, MELAKA

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 12, NPS 8 AND NPS

    6 STEEL PIPES -29262M

    9,988,772.00 GAS MALAYSIA BERHAD 2015

  • NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    190 EPCC OF THE NGDS TO KL FL STAGE 1/15, JALAN PEEL, KUALA LUMPUR

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 8, NPS 6 AND NPS 4

    STEEL PIPES -1056M

    2,731,471.60 GAS MALAYSIA BERHAD 2015

    191EPCC OF GPRW AT JALAN GUDANG, JOHOR PORT INDUSTRIAL AREA, PASIR GUDANG,

    JOHOR DARUL TAKZIM

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 6 STEEL PIPES -

    204M

    494,998.80 GAS MALAYSIA BERHAD 2015

    192 EPCC OF THE NGDS TO KULAI FL STAGE 1/15, KULAIJAYA, JOHOR DARUL TAKZIM

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL

    PIPES -1506M

    868,924.40 GAS MALAYSIA BERHAD 2016

    193COVERAGE : PROPOSED CIVIL & FIBER PULLING 48 FROM BANGSAR HEIGHT TOWER

    TO TIME EXISTING M/H CIVIL AND FIBER PULLING 26,624.18 TIME DOT COM BERHAD 2016

    194COVERAGE : PROPOSED CIVIL & FIBER PULLING FROM PURI AYU CONDO TO TIME

    EXISTING M/H CIVIL AND FIBER PULLING 49,425.24 TIME DOT COM BERHAD 2016

    195EPCC OF NGDS TO PEGOH FL STAGE 2/15, HICOM INDUSTRIAL PARK PEGOH, ALOR

    GAJAH, MELAKA (HONDA MALAYSIA SDN BHD)

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 4 & NPS 61,898,000.00 GAS MALAYSIA BERHAD 2016

    196TO DESIGN AND BUILD TRAFFIC LIGHT SIGNALLING JUNCTION AT MACHANG BUBUK,

    PENANGSUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 212,265.00

    TF LAND SDN BHD /

    INTEGRATED DYNASTY (M)

    SDN BHD

    2016

    197 TO RELOCATE EXISTING TRAFFIC LIGHTS JUNCTION @ MEDINI, JOHOR SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 109,230.00

    NURI MERDU SDN BHD /

    INTEGRATED DYNASTY (M)

    SDN BHD

    2016

    198 SALVAGE WORKS AT PENANG PORT SDN BHD MARINE & SALVAGE WORKS 670,000.00EXCALIBER RESOURCES SDN

    BHD

    Feb 2016 to March

    2016

    199PROPOSED CONTAINER TERMINAL ASSOCIATED INFRASTRUCTURE WORKS AT POIC,

    LAHAD DATU, SABAHMARINE & SALVAGE WORKS 250,000.00

    SCORR TECHNOLOGY SDN

    BHD/EXCALIBER

    RESOURCES SDN BHD

    March 2016 to May

    2016

  • NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    200 COVERAGE : CIVIL AND FIBER PULLING AT BUKIT PANDAN 1 CIVIL AND FIBER PULLING 25,440.00 TIME DOT COM BERHAD 2016

    201SUASANA BUKIT CEYLON - CIVIL (60MTR) AND PULLING (200MTR) FOR SUASANA

    BUKIT CEYLON AT PERSIARAN RAJA CHULAN, KUALA LUMPURCIVIL AND FIBER PULLING 19,480.40 TIME DOT COM BERHAD 2016

    202SO DRIVEN (DIGI) : OVERHEAD INFRA (2000M) AND FIBER PULLING (2300M) FOR DIGI

    DONG RESILIENCY TOWN AREACIVIL AND FIBER PULLING 46,662.37 TIME DOT COM BERHAD 2016

    203 CIVIL AND FIBER PULLING AT MAXIS KUANTAN CIVIL AND FIBER PULLING 163,800.00 TIME DOT COM BERHAD 2016

    204 SO : FIBER INFRA WORKS AT CELCOM SITE - JALAN KIA PENG, KUALA LUMPUR CIVIL AND FIBER PULLING 38,941.78 TIME DOT COM BERHAD 2016

    205 SO : CIVIL AND FIBER PULLING AT SUCCESS ELECTRONIC CIVIL AND FIBER PULLING 17,713.46 TIME DOT COM BERHAD 2016

    206 SO : CIVIL AND FIBER FOR VISI CENDERAWASIH @ PTTC IPOH, PERAK CIVIL AND FIBER PULLING 33,541.49 TIME DOT COM BERHAD 2016

    207FTK FOR PROPOSED NEW INFRASTRUCTURE OF CIVIL AND FIBER PULLING FROM

    JALAN TAMAN BUKIT MALURI TO KIARA 5CIVIL AND FIBER PULLING 209,880.00 TIME DOT COM BERHAD 2017

    208PROPOSED FIBER INFRASTRUCTURE WORK AT SOUTHVIEW SERVICES APARTMENT

    BANGSAR, KUALA LUMPURCIVIL AND FIBER PULLING 77,829.52 TIME DOT COM BERHAD 2017

    209SO : PROPOSED NEW FIBER INFRA TO GRAND WEIL HOTEL, JALAN SULTAN IDRIS,

    IPOH, PERAKCIVIL AND FIBER PULLING 105,292.10 TIME DOT COM BERHAD 2017

  • NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    210 PMU 132KV BUKIT TENGAH REHAB (STAGE 3 ), PULAU PINANG INSTALLATION OF 132KV SUBSTATION INCLUDING

    CABLING, TESTING & COMMISIONING 1,100,000.00

    PEMBINAAN TERAS MAJU

    SDN BHD 2017

    2112W CIVIL AND 48F PULLING WORK FOR MAISSON ARA DAMANSARA TO EXISTING

    TIME M/HOLECIVIL AND FIBER PULLING 176,893.85 TIME DOT COM BERHAD 2017

    212

    PROJEK MASS RAPID TRANSIT LEMBAH KELANG JAJARAN SUNGAI BULOH - KAJANG

    PACKAGE V3 : CONSTRUCTION AND COMPLETION OF VIADUCT GUIDEWAY AND

    OTHER ASSOCIATED WORKS FROM DATARAN SUNWAY STATION TO SECTION 17

    SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 1,283,310.20MUDAJAYA CORPORATION

    BERHAD2017

    213EPCC OF NGDS TO PULAU INDAH FL STAGE 1/16, SELANGOR HALAL HUB, PULAU

    INDAH, SELANGOR DARUL EHSAN (LONGSON FOOD PRODUCTS SDN BHD)

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 8 AND NPS 4 STEEL

    PIPES - 324M

    485,290.00 GAS MALAYSIA BERHAD 2017

    214

    EPCC OF NGDS TO SENDAYAN FL STAGE 2/16, SENDAYAN TECH VALLEY, SEREMBAN 2,

    NEGERI SEMBILAN DARUL KHUSUS (VIO STAR INTERNATIONAL (M) SDN BHD AND

    DAIHATSU ENGINE MANUFACTURING SDN BHD)

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL

    PIPES -1290M

    662,700.00 GAS MALAYSIA BERHAD 2017

    215EPCC OF THE NGDS TO TANJUNG LANGSAT FL STAGE 3/16, TANJUNG LANGSAT,

    JOHOR DARUL TAKZIM (KIRAN GLOBAL ALKALI SDN BHD)

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 8, NPS 6 AND NPS 4

    STEEL PIPES -1688M

    692,700.00 GAS MALAYSIA BERHAD 2017

    216EPCC OF THE NGDS TO TANJUNG LANGSAT FL STAGE 4/16, TANJUNG LANGSAT,

    JOHOR DARUL TAKZIM (POLYNT COMPOSITE MALAYSIA SDN BHD)

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 8 AND NPS 4 STEEL

    PIPES -264M

    228,600.00 GAS MALAYSIA BERHAD 2017

    217EPCC OF THE NGDS TO TANJUNG LANGSAT FL STAGE 5/16, TANJUNG LANGSAT,

    JOHOR DARUL TAKZIM (NORMAN PROCESS OILS MALAYSIA PLANT SDN BHD)

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 4 STEEL PIPES -60M223,900.00 GAS MALAYSIA BERHAD 2017

    218

    PROJEK MASS RAPID TRANSIT LALUAN 2: SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP)

    UNDERGROUND WORKS PACKAGE: DESIGN, CONSTRUCTION AND COMPLETION OF

    TUNNELS, STATION AND ASSOCIATED STRUCTURES FROM JALAN IPOH NORTH ESCAPE

    SHAFT TO DESA WATERPARK SOUTH PORTAL

    END CAPPING WORK AT PETRONAS KG. BARU 58,000.00MMC GAMUDA KVMRT (T)

    SDN BHD2017

    219EPCC OF THE NGDS TO KAPAR FL STAGE 5/16, KAPAR, KLANG, SELANGOR DARUL

    EHSAN (SUNWAY VCP SDN BHD)

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 4 STEEL PIPES -48M289,000.00 GAS MALAYSIA BERHAD 2017

    220EPCC OF THE NGDS TO MERU FL STAGE 2/16, KLANG, SELANGOR DARUL EHSAN

    (IDEAL QUALITY SDN BHD)

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 4 STEEL PIPES -36M250,000.00 GAS MALAYSIA BERHAD 2017

  • NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    221EPCC OF THE NGDS TO PASIR GUDANG FL STAGE 3/16, PASIR GUDANG, JOHOR DARUL

    TAKZIM (ALMER MALAYSIA SDN BHD)

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 4 STEEL PIPES -60M298,000.00 GAS MALAYSIA BERHAD 2017

    222EPCC OF THE NGDS TO YONG PENG FL STAGE 1/17, YONG PENG, JOHOR DARUL

    TAKZIM (TEO SENG FEEDMILLS SDN BHD)

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 4 STEEL PIPES -84M268,000.00 GAS MALAYSIA BERHAD 2017

    223FULL TURNKEY FOR PROPOSED NEW INFRASTRUCTURE OF CIVIL AND FIBER PULLING

    FROM JALAN TAMAN BUKIT MALURI TO KIARA 5CIVIL AND FIBER PULLING 2,099,880.00 TIME DOT COM BERHAD 2017

    224FULL TURNKEY TO BUILD CIVIL AND FIBER INFRASTRUCTURE WORK AT SRI

    KEMBANGANCIVIL AND FIBER PULLING 495,180.00 TIME DOT COM BERHAD 2017

    225FULL TURNKEY TO BUILD CIVIL AND FIBER INFRASTRUCTURE WORK FOR DESA PARK

    CITY MAN PROJECTCIVIL AND FIBER PULLING 282,108.92 TIME DOT COM BERHAD 2017

    226 COVERAGE: AS-BUILD : FIBER AND CIVIL INFRASTRUCTURE WORK FOR KIPARK MAN CIVIL AND FIBER PULLING 171,592.80 TIME DOT COM BERHAD 2017

    227SO DRIVEN (DIGI): OVERHEAD INFRA AND FIBER PULLING FOR DIGI DONG RESILIENCY

    TOWN AREACIVIL AND FIBER PULLING 56,474.02 TIME DOT COM BERHAD 2017

    228SERVICE ORDER: PROPOSED FIBER INFRASTRUCTURE FOR TNB PMU PROJECT RAUB

    SITE-PERMANENT SOLUTIONCIVIL AND FIBER PULLING 98,985.61 TIME DOT COM BERHAD 2017

    229SERVICE ORDER: PROPOSED FIBER INFRASTRUCTURE WORK AT TNB PMU BENTONG,

    PAHANGCIVIL AND FIBER PULLING 54,504.59 TIME DOT COM BERHAD 2017

    230EPCC OF NGDS TO BUKIT RAJA FL STAGE 1/16, BUKIT RAJA PRIME INDUSTRIAL PARK

    KLANG.

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 4 STEEL PIPES -36M240,000.00 GAS MALAYSIA BERHAD 2017

    231EPCC OF NGDS TO SITIAWAN FL STAGE 1/16, KAMPUNG ACHEH INDUSTRIAL ESTATE,

    SITIAWAN, PERAK.

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 8 - 192M, NPS 6 -

    408M AND NPS 4 - 48M STEEL PIPES

    428,000.00 GAS MALAYSIA BERHAD 2017

  • NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    232EPCC OF NGDS TO GEBENG FL STAGE 2/17 GEBENG INDUSTRIAL AREA, KUANTAN,

    PAHANG DARUL MAKMUR.

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 12 - 300M, NPS 8 -

    2,688M AND NPS 6 - 12M STEEL PIPES

    1,830,000.00 GAS MALAYSIA BERHAD 2017

    233 KERJA- KERJA PMU 132/33KV BERANANG ICT (2x90MVA) SELANGOR TO SUPPLY, DELIVER, INSTALL, TEST AND

    COMMISIONNING 201,135.00

    PEMBINAAN TERASMAJU

    SDN BHD 2017

    234 KERJA- KERJA PMU 132/33KV NEW TELUK INTAN PERAK TO SUPPLY, DELIVER, INSTALL, TEST AND

    COMMISIONNING 420,555.00

    PEMBINAAN TERASMAJU

    SDN BHD 2017

    235SUPPLY AND DELIVERY OF SHUNT CAPACITOR BANK DAMPING REACTOR TO ASSET

    MAINTENANCE DEPARTMENT, TNB TRANSMISSIO AS STRATEGIC SPARES

    SUPPLY OF THREE (3) UNITS OF 132kV 30MVAR

    SHUNT CAPACITOR BANK DAMPING REACTOR

    (0.5%) , THREE UNITS OF 132kV 30MVAR SHUNT

    CAPACITOR BANK DAMPING REACTOR (6.0%),

    THREE (3) UNITS OF 132kV 60 MVAR SHUNT

    CAPACITOR BANK DAMPING REACTOR (0.5%),

    THREE (3) UNITS OF 132kV 60MVAR SHUNT

    CAPACITOR DAMPING REACTOR (6.0%) TO ASSET

    MAINTENANCE DEPARTMENT, TNB TRANSMISSION

    AS STRATEGIC SPARES

    1,220,000.00 TRANSPRO SDN BHD 2017

    236SUPPLY OF 275kV SURGE ARRESTER FOR ASSET MAINTENANCE, TRANSMISSION

    DIVISION, TNB

    SUPPLY AND DELIVERY OF 90 UNITS 275kV SURGE

    ARRESTER 910,000.00 TRANSPRO SDN BHD 2017

    237 EPCC OF NGDS TO KAMUNTING FL STAGE 2/17, TAIPING, PERAK DARUL RIDZUAN

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 8 - 240M, NPS 6 -

    24M STEEL PIPES

    347,000.00 GAS MALAYSIA BERHAD 2018

    238EPCC OF NGDS TO PULAU INDAH FL STAGE 3/17, PULAUN INDAH INDUSTRIAL PARK

    (PHASE 2A), KLANG, SELANGOR DARUL EHSAN.

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 8 - 228M, NPS 4 -

    24M STEEL PIPES

    286,000.00 GAS MALAYSIA BERHAD 2018

    239 KERJA- KERJA PMU 132/33KV BATU RAKIT EXTENSION (1x45MVA)TO SUPPLY, DELIVER, INSTALL, TEST AND

    COMMISIONNING 182,850.00

    PEMBINAAN TERASMAJU

    SDN BHD 2018

    240EPCC OF NGDS TO SENAWANG FL STAGE 1/17, SENAWANG INDUSTRIAL AREA,

    SENAWANG, NEGERI SEMBILAN DARUL KHUSUS.

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 4 - 24M STEEL PIPES239,000.00 GAS MALAYSIA BERHAD 2018

    241EPCC OF NGDS TO BUKIT RAJA FL STAGE 1/17, BUKIT RAJA PRIME INDUSTRIAL PARK,

    BUKIT RAJA, SELANGOR DARUL EHSAN.

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 6 - 504M,NPS 4 -

    36M STEEL PIPES

    319,500.00 GAS MALAYSIA BERHAD 2018

    242CIVIL AND PULLING FOR UMOBILE HUTAN MELINTANG (MELI), TAMAN DESA

    MELINTANG BARU FASA LI, PERAKCIVIL AND FIBER PULLING 29,518.08 TIME DOT COM BERHAD 2018

    243 CIVIL AND PULLING FOR UMOBILEPULAU JUAR, PERAK CIVIL AND FIBER PULLING 13,713.82 TIME DOT COM BERHAD 2018

  • NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    244 CIVIL AND PULLING FOR UMOBILE SLIM RIVER EXIT (PBNS) CIVIL AND FIBER PULLING 170,053.25 TIME DOT COM BERHAD 2018

    245 CIVIL AND PULLING FOR UMOBILE KOTA SETIA (KTST)) CIVIL AND FIBER PULLING 81,911.31 TIME DOT COM BERHAD 2018

    246 CIVIL AND PULLING FOR UMOBILE KEM PLKN SUNGKAI (KPSK) SUNGKAI, PERAK. CIVIL AND FIBER PULLING 33,829.74 TIME DOT COM BERHAD 2018

    247FIBER PULLING (550M) FOR ATELIER CONSTRUCTION SDN BHD AT SHELL STATION,

    HENTIAN RTC GOPENG MUKIM SIMPANG PULAI, PERAKCIVIL AND FIBER PULLING 13,148.17 TIME DOT COM BERHAD 2019

    248FIBER PULLING (260M) FOR ATELIER CONSTRUCTION SDN BHD AT SHELL STATION,

    HENTIAN ALOR PONGSU PERAK.CIVIL AND FIBER PULLING 10,277.17 TIME DOT COM BERHAD 2019

    249(BBB 90964) CADANGAN MSVT BAGI MENGATASI ISU FEEDER PANJANG & NTL

    ELEMENT PADA PMU SSWW (F05) SEBANYAK 0.6mw (PMU SSW 11kV, TNB BANGI)

    TO LAY 2 WAY AND 3 WAY 160MM HDPE PN10 BY

    HDD METHOD 700,000.00 MUTU NUSANTARA / TNB 2019

    250

    INSTALLATION, TESTING AND COMMISIONING OF 33KV ALUMINIUM XLPE SINGLE

    CORE UNDERGROUND CABLES, UNDERGROUND AND ACCESSORIES FROM PMU KOTA

    DAMANSARA TO PPU TROPICANA 2 FOR TNB DISTRIBUTION SELANGOR

    TO SUPPLY HDD MACHINE, PILOTING, REAMING

    AND PULLING 4 WAY HDPE 6" AND WAY 4"1,200,000.00 MUTU NUSANTARA / TNB 2019

    251

    KERJA-KERJA MEMBAIKPULIH, MENGUJI DAN MEMULATUGAS PENGECAS MODEL 110

    TPR 50 BUATAN SAFT NIFE DI PENCAWANG MASUK UTAMA BATU GAJAH (BGJH)

    275kV DIBAWAH JAGAAN UNIT PERLINDUNGAN DAN AUTOMASI JABATAN

    SENGARAAN GRID UTARA (SUBZONE - IPOH)

    REFURBISH CHARGER 55,000.00TENAGA NASIONAL

    BERHAD2019

    252PEMBEKALAN PERALATAN PENCAWANG DI PMU 75/132KV NATIONAL UNIVERSITY

    (NUNI) DAN PMU 275KV SERDANG (SRDG)MATERIAL SUPPLY 128,220.00

    TENAGA NASIONAL

    BERHAD2019

    253

    KERJA-KERJA MEMBAIKPULIH, MENGUJI DAN MEMULATUGAS PENGECAS BATERI

    BANK DI PENCAWANG MASUK UTAMA BINTANG (BTNG) 132kV DIBAWAH JAGAAN

    UNIT PERLINDUNGAN DAN AUTOMASI JABATAN SENGARAAN GRID UTARA (SUBZONE

    - IPOH)

    REFURBISH DC CHARGER 48,000.00TENAGA NASIONAL

    BERHAD2019

    254 KERJA- KERJA PMU 132/33KV BERANANG ICT (2x90MVA) SELANGOR TO SUPPLY, DELIVER, INSTALL, TEST AND

    COMMISIONNING 201,135.00

    PEMBINAAN TERASMAJU

    SDN BHD 2019

    255MENAIKTARAF LALUAN FT60 DARI DAMAR LAUT KE CHANGKAT JERING (PAKAEJ 2A),

    PERAK CIVIL AND FIBER PULLING 220,682.37 TUMPUAN BINA SDN BHD 2019

    256DISTRIBUTION CABLE (D/SIDE) FROM FXC OUTDOOR CABINET TO OUTDOOR

    PEDESTAL TROPICANA AMAN CHERIA, SLEANGOR.CIVIL AND FIBER PULLING 148,000.00 TIME DOT COM BERHAD 2019

  • NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    257MENAIKTARAF LALUAN FT60 DARI DAMAR LAUT KE CHANGKAT JERING (PAKEJ 1:

    CH0-CH10400)CIVIL AND FIBER PULLING 340,579.97 MEGA SASA SDN BHD ON GOING

    258

    MEREKA BENTUK DAN MEMBANGUN INFRASTRUKTUR PUSAT DATA SERTA

    MEMBEKAL, MEMASANG, MENGUJI, MENTAULIAH DAN MENYELENGGARA

    PERALATAN INFRASTRUKTUR PUSAT DATA DI BANGUNAN BUSINESS CENTRE II,

    KULIM HI-TECH PARK, KEDAH

    MEREKA BENTUK DAN MEMBANGUN

    INFRASTRUKTUR PUSAT DATA44,838,000.00

    UNIT PERMODENAN

    TADBIRAN DAN

    PERANCANGAN

    PENGURUSAN MALAYSIA

    (MAMPU)

    ONGOING

    (MAINTENANCE UP

    TO 2020

    259EPCC OF NGDS TO BESTARI JAYA FL STAGE 1/17 (REINFORCEMENT), BESTARI JAYA,

    SELANGOR DARUL EHSAN

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 16 - 8,400M, NPS 8 -

    240M STEEL PIPES

    4,470,000.00 GAS MALAYSIA BERHAD ON GOING

    260EPCC OF NGDS TO KLUANG FL STAGE 2/17 (REINFORCEMENT), KLUANG, JOHOR

    DARUL TAKZIM

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 12 - 15,480M, NPS

    8 - 24M, NPS 6 - 60M STEEL PIPES

    8,298,000.00 GAS MALAYSIA BERHAD ON GOING

    261FULL TURNKEY FOR UNDERGROUND CIVIL & FIBRE INFRASTRUCTURE WORK FROM

    BUKIT KERAYONG TO SIMPANG ASSAM JAWA CIVIL AND FIBER PULLING 2,330,000.00 TIME DOT COM BERHAD ON GOING

    262FULLY TURNKEY FOR NEW CIVIL & FIBER INFRASTRUCTURE FOR RAWANG MAN PH3

    AND PANGSAURI SERI CEMPAKA (USP CLAWBACK PROJECT 2017)CIVIL AND FIBER PULLING 1,052,000.00 TIME DOT COM BERHAD

    AWARDED,

    ENGINEERING STAGE

    263PROJECT MASS RAPID TRANSIT LALUAN 2: SUNGAI BULOH-SERDANG-PUTRAJAYA

    (SPP) REINSTATEMENT OF GAS PIPELINES FOR KAMPUNG BARU NORTH STATION REINSTATEMENT OF GAS PIPELINES 1,898,000.00

    MMC GAMUDA KVMRT (T)

    SDN BHD

    AWARDED,

    ENGINEERING STAGE

    264

    NEW FIBER PULLING AT PLUS HIGHWAY (AYER KEROH TO SEREMBAN)

    1. AYER KEROH - PEDAS LINGGI (MULTIPLE LOCATIONS)

    2.PEDAS LINGGI - SENAWANG (END TO END)

    FIBER PULLING 245,000.00 TIME DOT COM BERHAD ON GOING

    265

    ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF

    NATURAL GAS DISTRIBUTION SYSTEM TO BANDAR SULTAN SULAIMAN FL STAGE

    1/20, BANDAR SULTAN SULAIMAN INDUSTRIAL AREA, KLANG SELANGOR DARUL

    EHSAN

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 6 STEEL PIPES -

    396M AND NPS 4 STEEL PIPES - 24M

    297,500.00 GAS MALAYSIA BERHAD AWARDED,

    ENGINEERING STAGE

    266EPCC OF NGDS TO NILAI DL STAGE 1/20, NILAI INDUSTRIAL AREA, NILAI, NEGERI

    SEMBILAN DARUL KHUSUS

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 4 STEEL PIPES -80M

    PE 63MM

    137,500.00 GAS MALAYSIA BERHAD AWARDED,

    ENGINEERING STAGE

    267EPCC OF NGDS TO TONGKANG PECHAH FL STAGE 1/20, TONGKANG PECHAH

    INDUSTRIAL ESTATE JOHOR DARUL TAKZIM

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 4 STEEL PIPES -12M

    AND NPS 6 STEEL PIPES 228M

    277,500.00 GAS MALAYSIA BERHAD AWARDED,

    ENGINEERING STAGE

    268EPCC OF NGDS TO TANGJUNG LANGSAT FL STAGE 2/20, TANJUNG LANGSAT

    INDUSTRIAL COMPLEX, JOHOR DARUL TAKZIM

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 4 STEEL PIPES 84M137,000.00 GAS MALAYSIA BERHAD

    AWARDED, PENDING

    LETTER OF AWARD

    269 MANAGE SERVICES (IT OUTSOURCING) IT OUTSOURCING FOR TOUCH 'N GO SDN BHD 2,247,000.00 TOUCH 'N GO SDN BHD

    SHORTLISTED,

    PENDING BOARD

    COMMITTEE FOR

    AWARD

  • NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

    270MEREKABENTUK, MEMBANGUN, MEMBEKAL, MEMASANG, MENGKONFIGURASI,

    MENGUJI DAN MENTAULIAH PUSAT DATA BERSEPADU KEMENTERIAN PERTAHANANICT AND MAINTENANCE FOR MINDEF 37,800,000.00

    KEMENTERIAN

    PERTAHANAN MALAYSIA

    SHORTLISTED,

    PENDING BOARD

    COMMITTEE FOR

    AWARD

    271

    MEREKA BENTUK , MEMBEKAL, MENGHANTAR, MEMASANG, MENGKONFIGURASI,

    MENGUJI DAN MENTAULIAH PUSAT DATA MELIBATKAN SISTEM RANGKAIAN SERTA

    KESELAMATAN, PERALATAN DAN PERISIAN TEKNOLOGI MAKLUMAT DAN

    KOMUNIKASI (ICT) SERTA KHIDMAT SOKONGAN BAGI PENGGANTIAN PERALATAN

    ICT DAN PUSAT PEMULIHAN BENCANA (DRC) APLIKASI KRITIKAL AGENSI

    ICT FOR MAMPU CLOUD 41,300,000.13

    UNIT PERMODENAN

    TADBIRAN DAN

    PERANCANGAN

    PENGURUSAN MALAYSIA

    (MAMPU)

    SHORTLISTED,

    PENDING BOARD

    COMMITTEE FOR

    AWARD

    272

    DESIGN, SUPPLY, INSTALL, TESTING, COMMISSIONING AND IMPLEMENTATION OF

    AIRPORT

    COLLABORATIVE DECISION MAKING (A-CDM) INCLUDING COMPREHENSIVE

    MAINTENANCE FOR

    MALAYSIA AIRPORTS (SEPANG) SDN. BHD.

    DESIGN, SUPPLY, INSTALL, TESTING,

    COMMISSIONING,

    IMPLEMENTATION AND MAINTENANCE

    20,600,000.00MALAYSIA AIRPORTS

    (SEPANG) SDN BHD

    SHORTLISTED,

    PENDING BOARD

    COMMITTEE FOR

    AWARD

    273CONTRACT FOR THE SUPPLY AND DELIVERY OF 3 LAYER PE COATED (3 LPE) STEEL

    LINE PIPE TO GMB

    SUPPLY AND DELIVERY OF 3 LAYER PE COATED (3

    LPE) STEEL LINE PIPE TO GMB42,000,000.00 GAS MALAYSIA BERHAD

    PRE- QUALIFICATION

    STAGE

    274CONTRCT FOR ENTENDED UNINTERRUPTABLE POWER SUPPLY (UPS) AND

    IMPLEMENTATION OF SMART RACK SOLUTION FOR GAS MALAYSIA EXTENDED UPS AND SUPPLY SMART RACK 1,229,430.40 GAS MALAYSIA BERHAD TENDERING STAGE

    275EPCC OF NGDS TO ENSTEK FL STAGE 1/20, TECHPARK 2 @ ENSTEK, NEGERI

    SEMBILAN DARUL KHUSUS

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 4 STEEL PIPES -

    132M AND NPS 6 STEEL PIPES- 324M

    406,440.00 GAS MALAYSIA BERHAD TENDERING STAGE

    276EPCC OF NGDS TO PASIR GUDANG FL STAGE 1/20, PASIR GUDANG INDUSTRIAL

    AREA, PASIR GUDANG JOHOR DARUL TAKZIM

    ENGINEERING, PROCUREMENT, CONSTRUCTION

    AND COMMISSIONING OF NPS 4 STEEL PIPES -12M 296,000.00 GAS MALAYSIA BERHAD TENDERING STAGE