Fusion Transmutation Reactor -Feasible early use of fusion fast neutron
Jung-Hoon HAN, CARFRE, SNUOctober 2, 2009Fusion-Fission Hybrid workshop, Gaithersburg, MD
1Fusion-Fission hybrid workshop, Sep 09, Gaithersburg
contents
1. prologue, atmosphere and motivation2. characteristics of FTR3. implementation consideration and plan4. epilogue
2Fusion-Fission hybrid workshop, Sep 09, Gaithersburg
climate change- regional to global- speedy
3Fusion-Fission hybrid workshop, Sep 09, Gaithersburg
World Electricity Generation by Fuel, World Electricity Generation by Fuel, World Electricity Generation by Fuel, World Electricity Generation by Fuel, 2005200520052005
4Fusion-Fission hybrid workshop, Sep 09, Gaithersburg
Some observation made :
1. Propagation of the modern industrialization in northern hemisphere going west with time flow ... Europe + Russia -> N-America->Japan->Korea->China (+South East Asia) -> India -> Middle East
2. We created speedy CO2 production system using high speed computers, could not stop or slow down due to Globally linked economy
3. And this system is also growing rapidly in volume (IN, CN, SE Asia)
mostly based on a mix of Carbon Fuel + IT Economy
results
the Speedy ice melting, ocean temperature and sea level rise, climate change
For our sustainability speedy deployment of counter measure is required
High density non-carbon energy resource -> Nuclear Energy
5Fusion-Fission hybrid workshop, Sep 09, Gaithersburg
atmosphere for FTR
6Fusion-Fission hybrid workshop, Sep 09, Gaithersburg
ITER Project launched ITER is a joint international research and development project (7BUSD const in 10yrs + 20yrs ops + 5yrs decommissioning)that aims to demonstrate the scientific and technical feasibility of fusion power. Q > 5-10, 400-1000sec to steady-state operation
The partners in the project - the ITER Parties - are EU(represented by EURATOM), Japan, China, India, Korea, Russia and US ITER construction started in 2007
7
Fusion Power Production
8
Global expansion of nuclear energy
9
Status of SNF storage capacity in KO
4000
5000
6000 5282
5900
저장실적 저장능력
Unit : Ton - U
10
2008년 8월 22일 매일경제
0
1000
2000
3000
고리 영광 울진 월성
1671 15431214
22532686
1642
FTR characteristics
11Fusion-Fission hybrid workshop, Sep 09, Gaithersburg
Noble idea-Fusion-Fission Hybrid Reactorfrom 60’s till NOW continued recommendation from world nuclear, fusion leader s
• Originator and successors
– 79’ Hans Albrecht Bethe (1906-2005)
• 1967 Nobel Prizer
– Jeff Freidberg
• author of “Ideal MHD” • author of “Ideal MHD”
– 08’ Paul-Henri Rebut
• JET (Joint European Torus) Director
• ITER CDA Director
12Fusion-Fission hybrid workshop, Sep 09, Gaithersburg
Selection of Materials for Nuclear Reactor Structures
Fusion-Fission hybrid workshop, Sep 09, Gaithersburg 13
Humbleness maintained!
FTR does use Existing or Near-term developed Technology and Material inFission and Fusion
- Structure material, divertor heat load, TBR maintained from fission- Proven plasma operation mode- Q < 5, low thermal fusion power- Q < 5, low thermal fusion power- pulsed mode operation, less cost for heating, diagnostics, power supply- subcritical fission reaction- passive safety- use established fission and fusion nuclear technology
Bridging commercially available fission technology to remote fusion energycommercialization
14Fusion-Fission hybrid workshop, Sep 09, Gaithersburg
CDA -> EDA• Plasma volume• Blanket volume • Magnet volume (cold mass volume)• Fuel cycle (fusion + fission)• Material (structural, PFC)• Ancillary system• Interface volume• Assembly + Maintenance system• Assembly + Maintenance system• Safety + containment• Duty cycle + availability• Pumping + vacuum volume• Heat removal + cooling system• BOP• Costing
* blue: for Hybrid, black: via ITER r&d activity
15Fusion-Fission hybrid workshop, Sep 09, Gaithersburg
SNF burner and Electricity Generation
PWRPWR
SFs (20t/y-plant)
The Fusion-Fission Energy Park
HP Burner Complex
Spent Fuel Crush &
MixPWRPWR
16
FusionBurner
Breeding Pu-239
PHWRPHWR
PHWRPHWR
Fuel Supply ForBurning
Power Grid
Burning Pu-239,U-238, TRU,MA
Li
FTR with PWR, PHWR
Blanket Fab
FTRPHWR
PWRAtomic Energy Park
17
Tritium supply
FTR
implementation consideration and plan
18Fusion-Fission hybrid workshop, Sep 09, Gaithersburg
Consideration for FTR implementation
1. Technically feasible? Can be built to an industrial grade?What quantitative advantage over other technical competitor?R&D -> Engr. -> manufacturing within time, A system is ready?
2. Who will use? Who will buy?
3. How urgent? When it could/should be done? Any priority setting is made?3. How urgent? When it could/should be done? Any priority setting is made?
4. How much does it cost? Use public money or private?How financing could be done?
5. Who will approve? Any implementation law available/international Framework available? Under what framework could it be implemented?
19Fusion-Fission hybrid workshop, Sep 09, Gaithersburg
2010CDA to EDA starts
2030Full commercialGrade FTR operationFusion UsefulnessDEMO completion
2020ITER in operationDEATH valley start
Timing consideration
FTR pilot plant in operationAnd verification start
2017US Obama Administrationended
20Fusion-Fission hybrid workshop, Sep 09, Gaithersburg
Time to check a readiness for FTR implementation
•Check fusion side details/readiness
•Check fission side/readiness•Check fission side/readiness
•Check interface development/readiness
•Check for detailed planning
•Establish step by step process
21Fusion-Fission hybrid workshop, Sep 09, Gaithersburg
FTR development schedule
FTRBurner
Burner BlanketFabrication Factory
0 5 10 15 year
Concept definition
Conceptual design
engr. design
Mfg. design
Bldg consr. & TOKAMAK assembly
construction
test operation
Concept def. Conce
pt dep.
Engr. design
Mfg. design
test
operation
installation
licensingoperation
Bldg. const.
TOKAMAK assembly
Initial plasmaITER
RAFM
Material
Preparation
KSTARSC TokamakOperation Technology
Steady-state Operation
High-beta, AT Operation
verification
Blanket materials verification
SNF Re-fabrication
dep. design
preparation
t
verification
Steady –state
AT
License licensing*ITAAC
realization
22
A foundation for propulsion need to be structured
CN
KO
RF
US
?
Hybrid ALLIANCE
23Fusion-Fission hybrid workshop, Sep 09, Gaithersburg
epilogue
Wolf do practice communication!We need to learn the same skill!
Mongolian Warrior…The NEW Way vs. The OLD Fort
24Fusion-Fission hybrid workshop, Sep 09, Gaithersburg
Genghis Khan1167-1227