Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided should be proportionate to the size and complexity of the scheme proposed. As a guide, we would suggest around 10 to 15 pages including annexes would be appropriate. A separate application form should be completed for each scheme. Applicant Information Local authority name(s)*: Portsmouth City Council Portsmouth City Council Portsmouth City Council Portsmouth City Council *If the bid is a joint proposal, please enter the names of all participating local authorities and specify the lead authority Bid Manager Name and position: Adil Mohammad, Traffic and Network Manager Adil Mohammad, Traffic and Network Manager Adil Mohammad, Traffic and Network Manager Adil Mohammad, Traffic and Network Manager Contact telephone number: T: 023 9284 1608 T: 023 9284 1608 T: 023 9284 1608 T: 023 9284 1608 Email address: [email protected] [email protected] [email protected] [email protected] Postal address: Portsmouth City Council Civic Offices Portsmouth City Council Civic Offices Portsmouth City Council Civic Offices Portsmouth City Council Civic Offices Guildhall Square, Portsmouth, P01 2NE Guildhall Square, Portsmouth, P01 2NE Guildhall Square, Portsmouth, P01 2NE Guildhall Square, Portsmouth, P01 2NE When authorities submit a bid for funding to the Department for Transport, as part of the Government’s commitment to greater openness in the public sector under the Freedom of Information Act 2000 and the Environmental Information Regulations 2004, they must also publish a version excluding any commercially sensitive information on their own website within two working days of submitting the final bid to the Department for Transport. The Department for Transport reserves the right to deem the business case as non-compliant if this is not adhered to. Please specify the web link where this bid will be published: https://www.portsmouth.gov.uk/ext/parking-travel-and-roads/travel/sustainable-transport- funding.aspx

Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

Funding for Innovation: Cooperative Intelligent Transport Systems

Application Form

The level of information provided should be proportionate to the size and complexity of the scheme proposed. As a guide, we would suggest around 10 to 15 pages including annexes would be appropriate.

A separate application form should be completed for each scheme.

Applicant Information

Local authority name(s)*: Portsmouth City CouncilPortsmouth City CouncilPortsmouth City CouncilPortsmouth City Council

*If the bid is a joint proposal, please enter the names of all participating local authorities andspecify the lead authority

Bid Manager Name and position: Adil Mohammad, Traffic and Network ManagerAdil Mohammad, Traffic and Network ManagerAdil Mohammad, Traffic and Network ManagerAdil Mohammad, Traffic and Network Manager

Contact telephone number: T: 023 9284 1608T: 023 9284 1608T: 023 9284 1608T: 023 9284 1608

Email address: [email protected]@portsmouthcc.gov.ukadil.mohammad@[email protected]

Postal address:

Portsmouth City Council Civic OfficesPortsmouth City Council Civic OfficesPortsmouth City Council Civic OfficesPortsmouth City Council Civic Offices Guildhall Square, Portsmouth, P01 2NEGuildhall Square, Portsmouth, P01 2NEGuildhall Square, Portsmouth, P01 2NEGuildhall Square, Portsmouth, P01 2NE

When authorities submit a bid for funding to the Department for Transport, as part of the Government’s commitment to greater openness in the public sector under the Freedom of Information Act 2000 and the Environmental Information Regulations 2004, they must also publish a version excluding any commercially sensitive information on their own website within two working days of submitting the final bid to the Department for Transport. The Department for Transport reserves the right to deem the business case as non-compliant if this is not adhered to.

Please specify the web link where this bid will be published:

https://www.portsmouth.gov.uk/ext/parking-travel-and-roads/travel/sustainable-transport-funding.aspx

Page 2: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

2

SECTION A - Scheme description and funding profile

A1. Scheme name: Portsmouth CITS (Co-operative Intelligent Transport Systems) Platform

A2. Headline description: Aim: Develop an IoT (Internet of Things) and Bigdata platform for Portsmouth's Traffic Management Centre for Information, warning systems and C-ITS applications enabling vehicle to infrastructure and vehicle to vehicle communications.

Objectives:

• Build and adopt IoT and Big Data infrastructure in Portsmouth.

• Demonstrate 'co-operative' vehicle-vehicle and vehicle-infrastructure elements.

• Early adoption and further understanding of the C-ITS technologies.

• Use the findings for more widespread deployment across the city.

• Demonstrate links with other systems, stakeholders, and Research centres with a road map to work with and strengthen relationship with partners and the private sector supply chain.

Figure 1.1 Illustration of C-ITS Applications for IoT & Big Data Platform

Page 3: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

3

A3. Geographical area:

Please provide a short description of area covered by the bid (in no more than 50 words)

The area served is the entire Portsmouth road network, focusing on the strategic network of:

• M275/A3 (Western Corridor) – serving Portsmouth City Centre, Portsmouth International Port, Portsmouth Naval Base and Gunwharf Quays;

• A2030 –serving at Industrial Estates and retail parks, Portsmouth Football Club, Southsea seafront and eastern Portsmouth;

• East-west connections in Portsmouth.

Postcode: PO1 2NE Traffic Management Centre (TMC)

Please append a map showing the location (and route) of the proposed scheme, existing transport infrastructure and other points of particular interest to the bid e.g. development sites, areas of existing employment, constraints etc. Please see; Appendix A Scheme Location

A4. Type of bid (please tick relevant box):

C-ITS: Connected Vehicle ����

C-ITS: Real Time Information

C-ITS: Smart Parking

C-ITS: Vulnerable Road Users

Other (please specify)

A5. Equality Analysis

Has any Equality Analysis been undertaken in line with the Equality Duty? No A preliminary Equality Impact Assessment (EIA) has not been undertaken for this scheme as there is no impact on the protected groups.

SECTION B – The Business Case

B1. The Scheme – Summary/History (Maximum 200 words)

The project will deliver:

• An established and tested Bluetooth sensor network

• Real time database, communication and IT hardware infrastructure

• Real time data analytics platform.

• C-ITS application platform to provide Portsmouth City Council's (PCC) own data services, applying its own data for Predictive Modelling and real time Traffic Management.

• Post deployment monitoring and analysis.

Page 4: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

4

Bluetooth sensors at strategic points along Portsmouth's road network would detect signals transmitted from Bluetooth devices within vehicles anonymously. Multiple sensors along the route would identify devices and measure journey times, queues and origin and destinations in real time.

The data is transferred to the secure data centre. By linking and processing datasets in real time joined up with predictive modelling and a decision support system, the following benefits will be realised:

• Scalable real time traffic and incident management

• Maximum use of the network.

• Improved real time information and support for individuals to make informed travel choices

Portsmouth City Council has recently trialled Bluetooth sensors at five locations with the ability to collect traffic flows, journey times and route choice information. PCC has citywide IP networking and communication infrastructure with a datacentre facility to enable a big data platform with predictive modelling and analytics.

The results provide data accuracy and identify any gaps in the Big Data platform and sensor network enabling the system to be integrated into the PCC's TMC. Figure 1.2 show system overview.

Figure 1.2: IoT and Big Data System Architecture.

Page 5: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

5

B2. The Strategic Case (Maximum 350 words) Appendix B provides additional information. Context A dense island city, with limited road space, Portsmouth has significant potential for severe congestion. In future years this congestion is expected through the city's planned growth unless intervention occurs.

Portsmouth's traffic management challenges are:

• Managing the peak traffic demand.

• Management of planned disruption (events and roadworks)

• Disruption from unforeseen incidents.

• Road traffic emissions.

• Managing planned growth on the constrained network

Existing Infrastructure Portsmouth's network infrastructure is outdated with legacy issues where focus has been on maintenance. This approach will not enable a greater understanding of the network capability, or identify challenges from increasing traffic demands.

Urban traffic management and control techniques1 have been used for decades to reduce delays and congestion. By using these techniques without IoT and Big Data platform any additional capacity provided on the network will be replaced with additional traffic.

Big Data Platform The aim of the proposed scheme is:

To develop an IoT and Bigdata platform for Portsmouth's Traffic Management Centre for real-time information and warning systems and C-ITS applications capable of enabling vehicle to infrastructure and vehicle to vehicle communication.

In 2013/14 PCC upgraded their IT infrastructure and data centre facility which can expand to accommodate a Big Data platform. The new platform will address the city's traffic management challenges by provide insights into traffic patterns to allow an improved, dynamically managed transport network. As well as benefits to the city's network there will be indirect benefits to Highways England strategic road network and neighbouring authorities.

The expected direct and unquantified benefits/outcomes are;

• Real time journey and delay information allowing informed route choices that ultimately distribute traffic and increase operational performance of the network.

• An in-depth understanding of the traffic management measures and the economic impact of various events.

• Identify routes used for shortcuts during congestion and peak times.

• Provides information on Road Investment Strategy (2015-2020) for Highways England.

• Economic growth through improved journey time and reduced congestion.

• Improved connectivity to and within the city.

• Improved air quality through reduced congestion.

• Use the findings for more widespread deployment across the city and share with other authorities.

Work with and strengthen relationship with partners and the private sector supply chain.

1 such as SCOOT, MOVA and VA, traffic cameras and variable-message signs

Page 6: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

6

B3. The Financial Case – Project Costs Before preparing a scheme proposal for submission, bid promoters should ensure they understand the financial implications of developing the scheme (including any implications for future resource spend and ongoing costs relating to maintaining and operating the asset), and the need to secure and underwrite any necessary funding outside the Department for Transport’s maximum contribution. Please complete the following tables. Figures should be entered in £000s (i.e. £10,000 = 10). Table A: Funding profile (Nominal terms)

£000s 2016-17 2017-18 Total

Cost Contingency Total

Notes: (1) Department for Transport funding must not go beyond 2017-18 financial year. (2) A local contribution of 5% (local authority and/or third party) of the project costs is required.

Page 7: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

7

B4. The Financial Case - Local Contribution / Third Party Funding Please provide information on the following points (where applicable): a) The non-DfT contribution may include funding from organisations other than the scheme

promoter. Please provide details of all non-DfT funding contributions to the scheme costs. This should include evidence to show how any third party contributions are being secured, the level of commitment and when they will become available. PCC has allocated £18,000 towards the scheme from capital funds.

b) Where the contribution is from external sources, please provide a letter confirming the

body’s commitment to contribute to the cost of the scheme. The Department for Transport is unlikely to fund any scheme where significant financial contributions from other sources have not been secured or appear to be at risk.

N/A

Have you appended a letter(s) to support this case? N/A c) Please list any other funding applications you have made for this scheme or variants thereof

and the outcome of these applications, including any reasons for rejection. d)

No funding has been applied for this scheme before.

B5. The Financial Case – Affordability and Financial Risk (maximum 300 words) This section should provide a narrative setting out how you will mitigate any financial risks associated with the scheme. Please provide evidence on the following points (where applicable): a) What risk allowance has been applied to the project cost? A 25% contingency allowance has been allocated within the budget. How will cost overruns be dealt with?

• The cost of setting up and delivering the data platform has been budgeted through PCC's Information Services and will be programmed at the agreed costs should PCC be awarded the funding.

• The costs of Bluetooth and other IoT devices are budgeted based on the current procurement costs of these devices. Enquiries have been made with potential suppliers to confirm any variation in the cost.

• With the risk allowance applied to both Bigdata platform and Bluetooth sensors all the infrastructure is delivered to fulfil the objectives of the project. However once the project is sufficiently progressed the 25% contingency can be applied back into the project to add additional functionalities and spreading to the wider network.

• The project manager will provide early warnings and monitoring the costs to prevent overrun of the budget.

Page 8: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

8

What are the main risks to project delivery timescales and what impact this will have on cost?

• Any delays in the project will not impact on spend of DfT funds by the end of the 2017/18 financial year. DfT funds will be prioritised at the start of the project with PCC contribution spend being allocated to the end of the project.

• Risk • Mitigation • Impact on cost

• Lack of resource available from PCC Information Services department.

• Their time resource is being planned for now.

• This risk would not impact on cost but it would delay project start.

• Unanticipated works • Scoping and feasibility planning using PCC Information Services and the current contractor to identify all potential works in advance.

• Additional works may incur additional costs, but these will expected to be within the project contingency as a full scoping and feasibility study should pick up any major works.

• Full procurement process required

• Discussions with procurement team have already begun.

• Additional costs may be incurred but these could be accommodated within the project contingency.

• Delay/issues in constructing new data centre

• Plan in advance with contingency in timescales. PCC currently has a redundant UTMC SERVER that can be reconfigured as a data platform as a contingency plan if necessary.

• No additional costs, just project delays.

B6. The Economic Case – Value for Money If available, promoters may provide an estimate of the Benefit Cost Ratio (BCR) of the scheme (particularly for schemes costing more than £100,000) An assessment of the value for money has been undertaken. Please see Appendix C. Table C – Predicted benefits for different scenarios of reduction in total network-wide delay

Scenario 2013 12 Hr Delay Saving1

2031 12 Hr Delay Saving2

Daily PVB (£)

Annual PVB (£)

Indicative BCR

1% reduction in total delay across the network

293 pcu-hrs 816 pcu-hrs £56,528 £13.3 million 47

0.5% reduction in total delay across the network

147 pcu-hrs 408 pcu-hrs £28,264 £6.65 million 24

IoT Big Data Platform represents excellent value for money: falling within "Very High" VfM category with benefits of £24 for every £1 spent.

Page 9: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

9

B7. The Commercial Case (maximum 300 words) The procurement strategy for this project will be to utilise single supplier frameworks the Council already has with Atkins and TRL until 2020 and 2019 respectively. Both suppliers have range of skills and expertise to provide support on the project. As single supplier frameworks no additional competitive process is required and work can begin immediately with the suppliers to establish contracts. The scale and scope of the framework agreements are: TRL (Transport Research Laboratory):

• £2.5M value

• To provide assistance and support in the analysis of the raw survey data received from the surveyors and provide quality assurance on the data.

• To provide the Authority with guidance to interpret the data.

• To support and advise the Authority on developing a Highways Infrastructure Asset Management plan.

• To assist in developing a robust asset management system and tools to support the Authority in decision making.

Atkins: PCC has a £20M 'Strategic Partner Framework Agreement' with Atkins to provide professional support to the following Service Areas: Transport, Infrastructure, Planning, Environment, Recreation, Major Projects, and General Business functions. Individual tasks can range from single-discipline ad-hoc operational support through to multi-disciplinary support to major long term regeneration projects. The Council may also use this framework outside of its jurisdictional boundaries where it has responsibility for work-streams forming part of wider cross boundary regional projects. For the procurement of all other contracts the following routes are applied:

• Less than £5,000 at least three ‘Informal Quotes’ are required, most likely sought via email.

• £5,000 - £100,000 at least three 'Formal' quotes are required via the Council's e-sourcing system InTend.

• Greater than £100,000 tenders must be advertised via InTend. Tenders in excess of £1M must be approved via the Council's Gateway Board and tenders in excess of EU thresholds must conform to Public Contracts Regulations 2015.

*It is the promoting authority’s responsibility to decide whether or not their scheme proposal is lawful; and the extent of any new legal powers that need to be sought. Scheme promoters should ensure that any project complies with the Public Contracts Regulations as well as European Union State Aid rules, and should be prepared to provide the Department for Transport with confirmation of this, if required. An assurance that a strategy is in place that is legally compliant is likely to achieve the best value for money outcomes are required from your Section 151 Officer below.

Page 10: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

10

B8. Management Case - Delivery (maximum 300 words) Deliverability is one of the essential criteria for this Competition and as such any bid should set out if any statutory procedure is needed before it can be delivered. a) An outline project plan (typically in Gantt chart form) with milestones should be included as

an annex, covering the period from submission of the bid to scheme completion. The definition of the key milestones should be clear and explained. The critical path should be identifiable and any contingency periods, key dependencies (internal or external) should be explained.

Has a project plan been appended to your bid? Yes (Please see Appendix D)

b) A statement of intent to deliver the scheme within this programme from a senior political

representative and/or senior local authority official. Yes, please see Section D1, which demonstrates the intent to deliver of Alan Cufley, Director of Transport, Environment and Business Support.

B9. Management Case – Governance (maximum 300 words) Please name who is responsible for delivering the scheme, the roles (Project Manager, SRO etc.) and set out the responsibilities of those involved and how key decisions are/will be made. An organogram may be useful here. This may be attached as an Annex. A specific Project Manager will be appointed for this scheme. PCC is proposing to set up a Project Board to ensure that tasks are delivered on time and within budget. . The Project Board will be headed by the PCC's Assistant Director of Transport, Environment and Business Support and will include lead specialists from Information Services. The board will review progress on a regular basis and will prepare regular reports showing delivery performance, financial performance and any risks to the project. Full details of governance arrangements and organogram is attached as Appendix E

B10. Management Case - Risk Management Risk management is an important control for all projects but this should be commensurate with cost. For projects where the costs exceed £100,000, a risk register covering the top 5 (maximum) specific risks to this scheme should be attached as an annex. Please ensure that in the risk register cost that you have not included any risks associated with ongoing operational costs and have used the P50 value. Has a risk register been appended to your bid? Yes see Appendix F

Page 11: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

11

SECTION C – Monitoring, Evaluation and Benefits Realisation

C1. Benefits Realisation (maximum 250 words) The IoT and Big Data Platform objectives have been used to develop the ‘desired outputs and Outcomes’ for the scheme. These desired outputs and outcomes are the actual benefits that are expected to be derived from the scheme and are directly linked to the objectives. Profile of Benefits:

• Desired outputs – tangible effects that are funded and produced directly as a result of the scheme; e.g. The Big Data infrastructure, IoT infrastructure, Tools and Services available for dynamic traffic and events management for TMC.

• Desired outcomes – final impacts brought about by the scheme in the short, medium and long term e.g. Journey time benefits, better informed travel choices, mode shift to more sustainable travel, BRT and other public transport provisions.

PCC will have a Benefits Realisation Plan that is owned by the Senior Responsible Owner (SRO), although ownership can be reviewed and delegated as necessary. It is the owner’s responsibility to ensure that the benefits are aligned with the study objectives and that appropriate monitoring processes are adopted. The benefits Realisation management plan will be developed which provides details of how the benefits process will be applied to a program. A combined Benefits Realisation Plan and Monitoring and Evaluation Framework have been produced and are available within Appendix G. It describes the tasks, resources, time frame and approach to each step of the framework. Figure 1.3 shows the process

1.

Reconcile

business

case

benefits

2.

Secure

benefit

ownership

3.

Develop

benefits

activity

plan

4.

Conduct

baseline

measures

5.

Review

business

change

6.

Go live

activities

7.

Benefits

tracking

Page 12: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

12

C2. Monitoring and Evaluation (maximum 250 words) PCC will evaluate measure and report the benefits outcomes and impacts of the scheme during its progress in the following framework: Outcome Monitoring - will measure the progress of the scheme and ensure that the expected Outcomes are realised. The responsible person in the first instance is the scheme manager who will report outcomes to the project board at monthly intervals. Initially the key measures of success will be setting up the Database server, DMZ comms server and Application Server. This will then be used to start building tools necessary for processing the incoming data. The platform will be ready to receive, integrate and publish data. The next stage will be to install and calibrate the IoT devices on the network. Process Monitoring - A systemic process for calibration and validation of sensor data will be provisioned along with data storage. This will measure the efficiency of the system and minimise the risk of data gaps. Tools will be developed to clean and process the data. This will ensure that the expected outputs from the contractors are achieved and that any issues are raised and resolved in a clear and unambiguous manner. Benefits Realisation Monitoring - will ensure that the project delivers the anticipated benefits over the life of the project. The project board is responsible for ensuring the project benefits are realised and if possible enhanced during the life of the project.

Page 13: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

13

SECTION D: Declarations D1. Senior Responsible Owner Declaration As Senior Responsible Owner for [scheme name] I hereby submit this request for approval to DfT on behalf of [name of authority] and confirm that I have the necessary authority to do so. I confirm that [name of authority] will have all the necessary powers in place to ensure the planned timescales in the application can be realised. Name: Alan Cufley

Signed:

Position: Director of Transport, Environment and Business Support

D2. Section 151 Officer Declaration As Section 151 Officer for [name of authority] I declare that the scheme cost estimates quoted in this bid are accurate to the best of my knowledge and that [name of authority] - has allocated sufficient budget to deliver this scheme on the basis of its proposed funding

contribution - will allocate sufficient staff and other necessary resources to deliver this scheme on time and

on budget - accepts responsibility for meeting any costs over and above the DfT contribution requested,

including potential cost overruns and the underwriting of any funding contributions expected from third parties

- accepts responsibility for meeting any ongoing revenue requirements in relation to the scheme

- accepts that no further increase in DfT funding will be considered beyond the maximum contribution requested

- has the necessary governance / assurance arrangements in place - has identified a procurement strategy that is legally compliant and is likely to achieve the

best value for money outcome - will ensure that a robust and effective stakeholder and communications plan is put in place. Name: Chris Ward

Signed:

Submission of bids: The deadline for bid submission is 5pm, 30 September 2016. An electronic copy only of the bid including any supporting material should be submitted to: [email protected]

Page 14: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

WE

STW

AY

S

PENK RIDGE

AURIOL

DRIVE

FORTUNES

PORTSDOWN

CO

LLE

GE

HECTORCL

DE

LP

HI

ATLANTIS

PA

RK

ALMOND

CL

RO

AD

SHEARWATER DR

DENVILLE CL

Falcon Green

A 27

WAY

THE SALTINGS

Osprey Close

WAY

CY

GN

ET

R

D

KE

STR

EL

PL

ACORN CL

OAKAPPLE

GDNS

LODGE

ST A

ND

RE

WS

R

D

A 2030

EA

ST

RECTORY

FARM

SS

WATERMEAD

RD

BIN

OLD

NE

AVENUE

FA

RLIN

GTO

N

AVENUE

BROAD

GDNS

RO

AD

PERCOPBEECH

DR

THE

FAIRWAYS

Sandpipers

ROAD

LO

WE

RSP

UR

RO

AD

SECOND

HA

RD

Y

RD

FIRST

MARSHLANDS

SPUR

MA

RS

HL

AN

DS

RD

WO

FITZHERBERT

WA

TER

RK

S

FIS

HE

RS

GR

KNIGHT

GDNS

ED

ZETLAND R

OAD

T

AV

E

EVELEGH

GRANT

FA

RLIN

GT

ON

UN

UTB

O

S

RIN

VCopsey

RO

AD

RN

E

ES

CR

Pa

th

OLD RESERVOIR RD

BERTFITZ HER

Zetland P

ath

EY

KING ARTHUR'S

CT

Copsey ClEGRO

RO

AD

CO PS

AVENUE

ROAD

RE

CTO

RY

A

VE

BE

VE

RLE

YG

R

RO

AD

WOODFIELD

OLD

ELMTREE

RD

LLM

AN

GI

ROAD

GA

LT

R

OA

D

ROAD

ROAD

HO

RN

ROAD

ASHLEY

LAN

E

CR

OO

K

ALE RD

BLAKE RD

SD

BU RN

AIN

AVE

HILL

RD

AVENUE

PETER

H AM

THER

ISE

DALE

OWN

UN

DE

RDAV

E

PARK

CR

ES

HILLTOP

BROW

TH

E C

RE

ST

THE

CHRISTCHURCH

GDNS

Path

Bro

w

THE

THORNTON

CL

GREENLEA CL

NS

RO

AD

HILLSIDE AVE

GE

OF

FR

EY

L ILY AVE

ME

AD

OW

ED

GE

OAKHURST GD

DELLCLP

ath

C

BOUNDARYWAY

LO

ND

ON

rest

REST

PATH

Dellc

OAKLEA

CL

P

East

Copsey

Path

LEALAND

GR

RO

AD

RO

AD

HIG

HL

AN

DS

RD

H

ROAD

OLL

OW

ROAD

OWNMOO RTAVE

BIR

ROAD

K DALE

GT ON

HAVANT

ST

H

ELLE

NS

R

D

PO

RT

SD

OW

N

DENE

LE

ALA

ND

ROAD

ST

AT

ION

HO

ME

FIE

LD

RD

SO

UT

H

ROAD

UP

LA

ND

SR

OA

D

AV

EN

UE

VIEW

ON

TRO

CR

HOYLAKE

FARLIN

ES

DOWN END ROAD

ALDSWORTH GDNS

Aldsworth Path

RO

AD

ALDSWORTH CL

LA

BU

RN

UM

A

VE

SCHOLARS'

WALK

WA

VE

RLE

Y

RD

LA

NE

SOLENT

DOWN END

SEA

AU

GU

ST

INE

RO

AD

CENTRAL

MANORMEWS

LA

NE

CHILGROVE RD

DR

AY

TO

N

AVENUE

LO

WE

R

GROVE

KIRTON RD

WAY

MA

NO

RC

RE

S

AVEU

RACTON AVE

RNE

SO

UT

HB

O

LO

RD

ING

TO

NC

L

DRAYTON

PORTSDOWN

PENRHYN

PE

NA

RT

H A

VE

AV

EN

UE

AV

EN

UE

ME

RT

HY

R

AB

ER

DA

RE

BR

EC

ON

AV

EN

UE

AV

EN

UE

AV

EN

UE

VE

RG

OR

DO

N

AV

E

BRAEMAR AVE

TR

EG

AR

ON

DYSART

IN

MANOR

AV

EN

UE

CA

RS

HA

LT

ON

AV

E

CA

RM

AR

TH

EN

LAMPETER

AVE

RO

AD

BOUGHTON CT

LA

KE

SLE

Y

LA

BL

A

MAIDFORD

GR

ES

NT

CE

EA

ST

ER

N

HOLC

WILBY LA

LD

OT

DRIVE

LA

UC KB

Y

CR

TH

AL

A 27

WALT

ON

LA

B

ONPT

AM

R

LAON

HOLDENBY CT

DAV

LA

B

TR

Y

N

E

TI

CL

FFIE

ORP

E

YAR

ECT

DL

EY

CL

EVE

O

ON

RD

LA

FO

ELL

DR

DR

E

EY

XL

COT

WEL L RD

N LA

Thornby

Ct

ADSTONE LA

BU R

W

CRE

S

RT

MA

RS

T

SY

CO

RBY

A 27

ON

EA

ST

ER

N

ROAD

CL

OS

E

WAINWRIGHT

CL

RO

AD

JA

CK

SO

N

AV

E

EY

ST

AVE

KIR

TLE

Y

CL

ATI

DL

OU

ST

KAREN

R

AY

DR

LA

NE

TO

N

MARSH

CL

FA

RA

DA

YR

D

ROAD

WALTON

EE

KT

CR

PO

R

WERLO

HIR

ST

RD

STEDOR DR

ME

RZ

CL

TESLAEDISON

SPURFRANKLIN CLOSE

DR

KINROSS CRESCENT

WEM

BLEY

GR

OVE

GROVE

COLLEGE

WA

LK

OLD

CRESCENT

Highbury PathRD

A 27

BIL

TO

N

ROAD

WA

Y

RD

A 2

030

RO

AD

WA

Y

KEEL CLOSE

BIN

SO

NR

O

ROAD

LA

NE

AIRSPEED

PA

INTE

RC

L

HE

HA

C

MIT

LL

PLUMPTONGDNS

PLACE

ALCHORNE

SE

RVIC

E

QU

AR

TR

EM

AIN

E

WAY

BARTON GR

RO

AD

DUNDAS

DU

ND

AS

CLO

SE

SPUR

BOLDE

CL

FIE

LD

MARAZANRD

DUNDAS

PO

RT

ROAD

RO

AD

AIRPO

RT

WIL

LIAM

S

ROAD

NE

VIL

LE

SH

UT

E

GATCOMBE AVENUE

RO

AD

DE

VO

N R

D

ROAD

GROVE

LANE

RD

ALLCOT

LOCARNO ROAD

MONCKTON

ROADA

YLE

N

LATIMER CT

CL

T TO

N

SHARPSCL

SU

ANCHORAGE

RO

AD

ROAD

SE

RV

ICE

AIR

PO

RT

ROAD

ORTH

W

RO

AD

AC

K

WOODPECKER

WAY

SPARROWHAWK

CL

L RD

SP

UR

LIMBERLINE ROAD

ROAD

LIM

BE

RLIN

E

GU

NS

TO

RE

RD

E

KINGFISHER

CT

RK

ES

T

DR

INL

CRE

S

AVEN

CEN

T

UE

COURT CL

MANSVID AVE

COURTMEAD

ROAD

OLD

GOFTON AVE

PANGBOURNEAVE

LANGDALEAVE

Path

LA

NE

CO

UR

T

AVE

AVENUE

AVENUE

AVENUE

Mulberry

WO

OLN

ER

AV

E

LE

ND

OR

BE

R

MULBERRYAVE

RO

AD

DO

VE

RC

OU

RT

BETHE

CLOSE

RR

Y

CL

OS

E

RO

AD

HILARY

BEACONSFIELD

ROAD

LMU

BUR

Y

LONSDALE

KNOWSLEYCRES

ROSEBERY

SA

LIS

F

LIN

DI

S

LANE

ARNE

PA

RK

CRES

ROAD

WID

LE

Y C

TD

R

DE

AN

R

D

PE

RV

IN R

D

ALBERT RD

The Droke

GLENLEIGH

AVE

DALA

TH

E

OR

CH

AR

D

MAG

GR

OL

D M

AR

KE

T R

D

AL

DR

OK

ES

T

Hig

h

EA

ST

EAST

CT

ROAD

CO

SH

AM

ROAD

ROAD

Cliffdale Gardens

Camp Site

LAN

E

DE

L

ROAD

L

CHIDHAM RD

COURTMOUNT GROVE

RO

AD

CHALKRIDGE RD

AV

E

AV

E

LA

NE

LO

DG

E

A

VE

BE

RN

AR

D A

VE

BU

RR

ILL

CRANBORNE RDRO

AD

Courtmount Path

PA

DW

I CK

A

VE

COLVILLE

SOUTHDOWN

CO

LM

AN

SA

VE

JOHNS RD

WA

LB

ER

TO

NA

VE

WID

LE

Y

ST

JURA CL

ROAD

WALK

SHETLAND CL

WID

LE

Y

RO

AD

LO

ND

ON

HAVANT

REGAL CL

ST

RD

ST

M

AT

TH

EW

S

GEORGESROAD

ST

RO

AD

LON

DO

N

GD

NS

RKNEY

SKYE

CL

ISL

AY

T

O

AR

RA

N C

L

KIN

YRE RD

RD

MALLOW

CL

RO

AD

Str

ee

t

RN

SPUR RD

JUDITH WAY

CURIE RD

LISTER RD

HU

NTE

R R

D

NIGHTINGALE

HILL

HA

RV

EY ROAD

HILL

LA

NE

FIR

ST

A

VE

CH

IPS

TE

AD

RD

SE

CO

ND

AV

E

ROAD

SUNDRIDGE CL DAME

DersinghamCl

BO

STO

NR

DR

OA

D

CAVELL DR

RO

AD

ASHFORD

CL

SE

VE

NO

AK

S

PASTE

UR

ROAD

TANKERTON

CLWESTERHAM CL

TH

I RD

AV

E

CRES

PETERBOROUGH RD

MABLETHORPE ROAD

ONE

HolbeachCl

MILL

SOUTHWICK

PORTSDOWN

LAN

E

SQ

UA

RE

FA

I RF

IEL

D

WY

ME

RIN

G

HYTHE RD

WHITSTABLE RD

Path

CHATHAM

CL

WAY

DE

AL

R

D

LA

NE

ROAD

DSTMAI

ROAD

CLA

YB

AN

K

RD

ROAD

KIL

N

CLAYBANKSPUR

RO

AD

RO

AD

VE

RN

ON

TOKIO RD

DA

RT

MO

UT

H

GLE

NT

HO

RN

E

R

D

BURRFIELDS

ROAD

ROAD

ROAD

GREEN

LOVETT

WESLEY

HEATHCOTE RD

AVENUE

WINTON RD

ROAD

CO

PN

OR

ROAD

DOMUM RD

ST SWITHUNS

RD

ROAD

RO

AD

ROAD

ROAD

AVENUE

RO

AD

RO

AD

KE

NY

ON

CH

ELM

SF

OR

D

COPYTHORN

RO

AD

KEARSNEY AVE

ROAD

MADEIRA

TORRINGTON

WIN

DE

RM

ER

E

URG

COMPTON

BATTENB

RO

AD

AVENUE

AMBERLEY

MERRIVALE

RO

AD

RO

AD

ROAD

RO

AD

ROAD

CR

OF

TO

N

RA

ND

OLP

H

WYKEHAM RD

WYKEHAM AVE

FE

AR

ON

R

D

RO

AD

STUBBINGTON

KIRBY

MAYFIELD

INHURST ROAD

HEWETT

ST CHADS

BR

UN

EL

RD

BRIGHAM CL

MAGDALEN ROAD

ROAD

ROAD

ROAD

NE

WD

OW

N

NORWAY

HOBBYCL

MER

CARRONADE

WALK

S

CL

IDE

FA

RM

GD

NS

GR

EE

N F

AR

MG

AR

DE

NS

MARKCL

LARKHILL

ROAD

RO

AD

HO

NE

YW

OO

D

CL

DR

ECH

AMH

B

BRECL

EN

ROAD

SCOTT

RO

AD

FEL

PERONNECL

ONS

PLT

RID

I NG

S

THORNCLIFFE

CL

PADBURY

CL

NEWNEY

CLEGANCL

BAPAUMERD

NNE

PE

RO

RD

CRESFIRGROVE

ES

CU

RC

L

WA

Y

OLD L

ON

DON

RD

DE

LIS

LE

CL

CURTIS MEAD

ST

BA

RB

AR

A

York Terrace

PA

RSO

N S

LO

ND

ON

OLDGATE

GDNS

THE

GATCOMBE DRIVE

WHIT ECROSSGDNS

CAMBRAI

CLOSE

RA

MP

AR

TG

DN

S

ROAD

MILITARY

RO

AD

ARRAS

ROAD

BA

LD

ER

TO

N

C

L

EASTWOODRD

RD

RD

TEMPLETON

CL

AVENUE

ELMWOOD

DOYLE CL

BEECHWOOD

SOUTHWOOD RD

FA

WLE

Y

RD

London Rd Access Rd

PA

RA

DE

RO

AD

CENT

St F

ranci s

Ct

NO

RTH

WO

OD

OAKWOOD

RO

AD

HO

RS

EA

UTH

PO

RT

SW

OO

D R

D

WE

ST

WO

OD

DOYLE

WYLLIE RD

CO

NA

N R

D

PHOENIXSQ

AVERTH

MIDWAYRD

CRES

NO

AVE

HO

WAR

D

E

RO

AD

FA

LK

LA

ND

RD

Ashley Walk

HAWTHORN

CHATSWORTH

RO

AD

ROAD

WINDSOR

PIT

RE

AV

IE

ELGIN

EDGERLYGDNS

JAS

MO

ND

HIGHBURY

OR

RD

RO

AD

ING

RK

DO

KNOWSLEY

COSHAMPARKAVE

PA

RK

HI G

H

LD

TUD

S

ON

RD

RO

AD

A39

7

WO

OT

TO

N S

T

WAYTE ST

ST

RE

ET

NO

RT

HE

FIRESTATIONCL

ROEBUCKCL

RO

AD

HIGHBURY

WAY

TH

E O

LD

TSMOUTH

ELL

OL

WC

RO

AD

VECTISWAY

HE

RN

DONA

PORNO

RT

ROAD

ROAD

ROAD

ROAD

UR

NA

RD

R

D

WATER

M 27

M 27

ROAD

RO

AD

FE

RR

Y

FERR

Y

HO

RSE

SAN

DS

CL

RO

AD

LO

GS

HO

RE

WA

Y

MILTONLO

CKS

N

BROOM

CR

ES

BROOM

CL

SQUARE

RD

LEOFRIC COURT

RO

AD

A WAYSE

SCHOONER

WAY

SOVEREIGN

CLOSE

SOVEREIGN

DRIVE

SANDERLING RD

RO

AD

DU

NLIN

CLO

SE

WH

IMB

RE

L

CLO

SE

SKYLARK

COURT

LAPWING

ROAD

REVENGE

CLOSESEAGULL

CLOSE

ATALANTA

CLOSE

WAY

Wake Lawn

RO AD

RO

REED

DR

ING

AD

TOWPATH MEAD

OA

K

RD

ROAD

SIS

WHITLEY ROW

ROAD

KIN

SW

OR

D

SA

ND

S

RO

AD

A 2030

LONGFIELD CL

MAYFLOWER

DRIVE

WAYFARER

CLOSE

GODWIT

USH ROAD

TID

EW

AY

GD

NSO

NB

RID

GE

TR

EV

IS

RD

ME

RY

LR

D

BERNEY

RD

MAURICE

RD

IR

Coach-

House Mews

LA

NE

REDW

ING

CT

EB

MI LED

E

HAVEN

BRASTED

COURT

IDGENBR

ST JAMES

PLACE

DRIVE

RD

STO

WE

RD

MO

RG

AN

MA

YL

ES

SO

LE

NT

PLE

AS

RD

OLD

CANAL

BE

RT

IE R

D

MELROSE

CL

TR

AN

ME

RE

RD

SH

IRLE

Y A

VE

ROAD

AN

T

AVENUE

OXTED

COURT

MA

R

THE

RS

WK

INE

LA

NG

ST

ON

E

RIVER

RO

AD

RO

AD

CH

EV

EN

ING

CT

ROAD

LACEY ROAD

EA

ST

ER

N

GLASGOW RD

EASTN

EY

PE

RT

H

RD

DUNBAR

KINGSLEY

M

Tern Walk

MOO

HERON C

L

A

LLARD

RD

RO

SE

TT

A R

D

LOCKSWAY

HE

ST

ER

RD

GU

RN

EY

RD

HO

LLA

M

CA

TIS

FIE

LD

SH

ELF

OR

D

CR

OF

TO

N

GISORS

RD

EUS

TO

N R

D

RO

AD

PLO

VER

REA

CH

AVO

CET C

LOS

E

RO

AD

RO

AD

MSD

E

CU

MBE

RLA

ND

N

LU

Vanguard Ct

FORT

RO

AD

GT

RD

GIBRALTAR

FINCH

RD

CE

RO

AD

U

NT

MELVILLE

RION

SEA

BREEZE

GDNS

ESPLANADE

GARDENS

CR

ES

DRIFTWOOD

LLIDAYELL G

DNS

HA

HENDERSON

ESPLANADE

GARDENS

ROAD

CO

TA

MA

RIS

K

CL

SHLE

CK

EASTNEY

FARM RDGRITANWOOD RD

AD

CADNAM

RD

SAUNDERS MEWS

DRYSDALE MEWS

PITCAIRN MEWS

MOUNTBATTEN SQ

DU

NN

CL

MIN

ST

EA

D R

D

HENDERSON

FO

RD

ING

BR

IDG

E R

D

RIN

GW

OO

D

R

D

RO

AD

GUNNERSHopkins Ct

Flinders Ct

ROW

GARDENS

LIDIARD

CLOCKTOWER DR

TEAPOT ROW

Churchill

Square

ROAD

ROAD

ROAD

ROAD

BIL

LIN

G

CL

ROAD

ROAD

ST

RO

YA

L G

AT

E

EASTNEY

ST

KA

SS

AS

SIN

S

T

CR

OM

WE

LL

RD

CRINOLINE

GDNS

ROAD

EASTNEY

WATERLOCK

GARDENS

LA

NE

RRYFE

FU

RZE

TORFRIDA COURT

Lightfoot Lawn

Godiva Lawn

HOLNE COURT

AMYAS COURT

YEO COURT

REDLANDS GROVE

OAKDENE RD

CHERITON RD

CH

AP

EL

VIE

W

FA

IR

WOODLANDS

NELSON DRIVE

OR

CH

AR

D L

AN

E

WA

LK

L

ROBRANSBURY

DR

IVE

WA

YT

HE

HEAD

CL

WAY

RINGS

MIDDLESEX ROAD

ROAD

AVENUE

SUFFOLK ROAD

WESTON

AVENUE

POSBROOKE RD

CR

OM

AR

TYAV

MILTON

PARK

AVENUE

RO

AD

AVENUE

WARR

EN

BONCHURCH

EDGEWARE

MEON

ROAD

ROAD

CHURCH VIEW

AVENUE

WOODMANCOTERDC

LO

VELLY

R

D

TEDDINGTON RD

RO

AD

AV

E

CLAYDONAVE

AL

VE

RS

TO

NE

RD

MA

YA

VE

ENT

PR

IOR

Y

CRERD

LA

ND

S

SC

EVANSRD

ESSEX

WIMBORNE RD

EASTFIELD

Milton Lane

AN

SO

N R

OA

D

RODNEY ROAD

RO

AD

Spe

cks L

ane

FR

OG

MO

RE

RD

CARISBROOKE

RU

SK

IN R

D

AP

SLE

Y R

D

ROAD

ROAD

ROAD

ROAD

ROAD

RO

AD

ROAD

STANLEY AVENUE

ROAD

Sw

ord

Sa

nds

Path

EA

STE

RN

SH

O

AY

EAST

RE

W

CEDAR GROVE

JENKINS GROVE GRO

VE

AVENUE

AVENUE

EBERY

ROAD

AV

E

SHO

RE

EASTERN AVENUE

SA

LTE

RN

S

AVE

RO

MS

EY

AV

E

PE

TW

OR

TH

RD

ALGIERS ROAD

LA

KE

SID

E A

VE

MA

RIN

A G

RO

VE

MY

RT

LE

GR

OV

E

WA

LLIS

DE

AN

AV

E

TAMWORTH ROAD

BE

AS

AN

TC

LO

SE

WE

LL

SC

LO

SE

KIRPAL

CHESLYN RD

ROAD

WALSALL ROAD

ROAD

AS

CO

T R

OA

D

HAYLING

RO

AD

TANGIER

CO

PN

OR

LY

NT

ON

FO

LK

ES

TO

NE

DO

VE

R

CH

ES

TE

RF

IELD

GR

OV

E

Poplar Walk

PRI

LANGSTONE

COTTON

ORSDEANAVE

UN

I ON

CL

SU

NN

ING

DA

LE

LIC

HF

IEL

D

KIM

BO

LT

ON

BA

FF

INS

MIL

TO

N

RO

AD

RO

AD

RO

AD

RO

AD

ROAD

BURRFIELDS

SILCHESTER

ROAD

ROAD

NORTHOVER

ROAD

COLEBROOK

AVENUE

HIG

HG

RO

VE

R

OA

D

COOPER ROAD

STRIDE

CH

ILC

OT

E R

OA

D

NE

VIL

LE

R

OA

D

WE

STO

VE

R

R

OA

D

RIP

LE

Y

IDS

WO

RT

H

R

OA

D

GR

OV

E

AVENUE

SE

AT

ON

AV

E

SID

MO

UT

HA

VE

AVEN

UE

RE

DC

AR

AV

E

SA

LC

OM

BE

A

VE

TEIGNM OUTH RD

NINIAN PARK ROAD

Nin

ian P

ath

RO

AD

RO

AD COBDEN

WH

ITE

CLIF

FE

A

VE

ST

P

I RA

NS

A

VE

NU

E

CH

AS

EW

AT

ER

A

VE

EASTB

MONEYFIELD

LANE

MA

RT

I N

RD

PA

IGN

TO

N A

VE

MONEYFIELD

RO

AD

OURNE RD

CO

NI

TO

NA

VE

KES WICK AVE

S COLLIS RD

MA

NO

R P

AR

KA

VE

KENDAL AVE

ST

AP

LE

TO

N R

D

STA

TIO

N R

OA

D

GROVE

RO

AD

KE

NS

ING

TO

N

EPWORTH RD HIG

HG

AT

E

RDMAYHALL RD

DUDLEY

ROAD

VICTOR

ROAD

DOUGLAS

ROAD

BOWLER

COURT

NORTHGATE

AVENUE

OR

TH

RD

WHI T

ROAD

W

NEW ROAD EAST

ROAD

ROAD

ROAD

WALLINGTON RD

WE

ST

BO

UR

NE

R

D

FU

NT

ING

TO

N

RD

BO

SH

AM

R

D

WA

LLA

CE

R

D

NEW

BY

RO

N R

OA

D

PE

RC

IVA

LR

OA

D

Curl

ew

Pa

th

Teal

Path

Joseph

Court

Alderman

Gardens

William

Court

BLENDWORTH R

D

VELDER

MIL

TO

N

JAM

ES

RO

AD

Richard

Court

WA

RBLIN

GTO

N P

LAC

E

GOLDSMITH

DEVONSHIRE

RO

AD

PR

INC

E

CARPENTERCL

G

CH

I TTY

RD

E'S

R

WORSLEYST

ST

MAR

CT

INE

GE

O

HIG

HLA

ND

ST

PR

IOR

YR

D

MO

RLE

YR

D

TOKAR

RD

AD

AIR

PEDAM

CL

METHUEN

ALM

AT

ER

R

DU

PR

EE

DR

WEST CT

SELSEY AVE

PARADE

GROVE

LINDLEY AVE

CU

LV

ER

R

D

WESTFIELD

MAXWELLRD

AL

BE

RT

LANDGUARD

BLENHEIM CT

REGINALD

HA

TFIE

LD

RD

HIGHLAND

WA

INS

CO

TT

RD

OW

EN

S

T

WA

RD

RO

AD

RD

KI M

BE

RLE

Y

COLLINS

BU

RB

IDG

E

G

R

NETTLESTONE

RD

CO

US

INS

GR

BR

AD

ING

AV

E

ESPLANADE

WIN

TE

R

ROAD

OLIVER RD

ROAD

RD

CL

EG

GR

D

HE

LLY

ER

White

Cloud Place

TOWERRD

ST ANNSRD

HUNTER

ST

ALB

AN

S R

D

Highland

Terrace

ELIZ

GD

NS

BE

TH

A

PE

PY

S

CL

ROCHESTERRD

ASTONRD

CANTERBURYRD

TREDEGAR

BA

TH

WH

I TE

CL

OU

D P

AR

KRO

AD

AU

GU

ST

INE

BR

UC

E R

D

HE

LE

NA

RD

SALISBURY ROAD

SP

EN

CE

R R

D

EASTERN

EX

ET

ER

R

D

BR

IST

OL R

D

AN

DO

VE

R R

D

FESTING

BR

OM

PT

ON

HIGHLAND

RO

AD

HA

SLE

ME

RE

ST

Mew

s

SEAFIELD RD

MAYDMANSQUARE

RO

AD

LY

ND

HU

RS

T

BE

LG

RA

VIA

R

D

PA

DD

ING

TO

N R

D

FA

RL

ING

TO

N

LY

NN

RO

AD

CA

RN

AR

VO

N R

D

AY

LE

SB

UR

Y R

OA

D

PA

ULS

GR

OV

E

RD

PR

ES

TO

N R

D

BE

DH

AM

PT

ON

R

D

VE

RN

ON

ER

GE

LB

JU

BI L

EE

R

OA

D

GARDENS

LIVESAY

ROWAN CT

FR

AT

TO

N

CH

ES

TN

UT

AVE

AVENUE

RO

AD

GRAYSHOTT

BRAMSHOTT

RO

AD

DEVONSHIRE

SQUARE

RO

AD

PRETORIA

MAFEKING

RO

AD

ROAD

WA

Y

DIC

KIN

SO

N R

D

HU

RS

T

AV

EN

UE

FE

RN

HE

ID

RD

FR

EN

SH

AM

RO

AD

EMPSHOTT

LISS

HEYSHOTT

BY

ER

LE

Y

ROAD

PROCTOR LANE

ROAD

ROAD

ROAD

ROAD

FRANC

IS

RO

AD

DURBAN

ROAD

GLE

NC

OE

RD

DA

UL

ST

ON

RD

BEECHAM RD

GEOR

RO

AD

GE

STREET

FO

UR

TH

ST

CR

AN

LE

IGH

RD

FIF

TH

S

TR

EE

T

CRANLEIGH AVE

SH

EA

RE

R

POWER RD

RO

AD

RO

AD

BROOKFIELD

REN

NY

MANCHESTER RD

LIVERPOOL ROAD

ROAD

RO

AD

ROAD

ROAD

ES

SLE

MO

NT

R

OA

D

SU

TH

ER

LA

ND

R

OA

DLO

ND

ES

BO

RO

UG

H R

OA

D

AV

EN

UE

WALMER

GU

ILD

FO

RD

THORNCROFT

RD

LINCOLN

RO

AD

FORT ROAD

SH

AK

ES

PE

AR

E

RO

AD

OLIN

DA

S

TR

E

ET

WO

OD

LA

ND

S

T

TR

AF

ALG

AR

ET

HE

L R

D

BA

RN

ES

RD

CLIVE

SANDRINGHAM ROAD

SHEF

GU

ILD

FO

RD

PLA

CE

TELEPHONE

MANNERS LA

MANNERS

PERCY

JESSIE

RO

AD

TERRACE

ORC

SELBO URNE

HEYWARD RD

FA

W

BRAMBLE RD

FAWCETT

RO

AD

RD

CE

TT

HAMPSHIRE

RO

AD

SO U

MANOR ROAD

BELMORE

CLOSE

TH RD

LITTLE

GEORGE

STREET

INVERNE

S

HALEP

NC

Y R

D

AR

IEL

RD

CL

AR

EM

ON

T

RD

CORNWALL

NA

EN

RO

AD

FR

AT

TO

N

BOWLER

AVENUE

ROAD

MIL

TO

N

CATHERINGTON

PLACE

RO

AD

THE PARKWAY

ALLIANCE

WAYINVINCIBLE

WAY

ANDREW

CLOSE

WH

IT C

OM

BE

GA

RD

EN

S

A

Milton Lane

ILLUSTRIOUS

DRIVE

CHURCH

WAY

GU UN

I ON

RO

AD

AN

S

GU

AR

DIA

NS

CLO

SE

LIME TREE

VIEW

WAY

RD

I

CLA

RK

ES

R

OA

DH

BE

RT

T

CU

MARYS

AV

ON

DA

LE

RO

AD

RO

AD

RO

AD

HARCOURT

RD

BETTESWORTH RD

ER

NE

ST

R

OA

D

COWPER

RD

EW

AR

T

R

D

ST

EW

AR

T

PLA

CE

ROAD

PURBROOK

RD

SANDRINGHAM LA

FIELD ROAD

MO

OR

LA

ND

RO

AD

RO

AD

ST

LO

WE

R B

RO

OK

FIE

LD

RD

ALVER ROAD

NEWCOME

FR

AT

TO

N

ROAD

Longs W

alk

BILL

SARGENT

CRES

RO

AD

GARNIER

COBURG ST

ARUNDEL STREET

CLI

NO

RTH

AM

ST

CROWN

ST

GLIDDEN

CL

HIG

IELDRD

FYNING ST

WA

TTS

RD

LINKLATER

PATH

TURNER

LAKE

DUKE

RT

FO

RD

PLA

CE CRES

HE

MA

LI N

SS

TR

EE

T

TE

NN

YS

ON

RO

AD

STREET

PINK RD

ST S

TE

PH

EN

S R

D

KILPATRICK CLOSE

DUMBARTON CLOSE

LABURNUM

RO

AD

RO

AD

ckland Path

LITTLE ARTHUR ST

BASIN

RO

AD

NORTHBROOK

CL

Kilbride Path

MALTHOUSE

RD

LOMOND

CLe

RD

GR

AN

GE

RO

AD

DERBY

FE

ST

ING

ST H

ELE

NS

CL

PARK

Dolphin Ct

PARADE

ER

THE OCEAN AT THE

END OF THE LANE

CR

AN

ES

WA

T

AN

ES

WA

TE

R

OLD

BRID

GE

SOUTHSEA

CR

AN

ESW

AT

ER

GA

TE

Rostrevo

r

La

ST H

ELE

NS

EL

AVE

NU

E

MARIONRD

CR

RD

IANS

ROAD

ON

NETTLECOMBE AVE

BE

MB

RI D

GE

ROAD

PARKSTONE LANE

W

CR

ESCEN

T

RO

NAN

'S

ONE

RD

WAVERLEY GR

HERBERTRD

PARKST

RD

RD

AD

TALL

S

ALH

AM

BR

A R

DRD M

WHITWELL

GRANADA

HE

WT

ER

CL

S

WIMBLEDON

TA RD

PARK

WE

LL

RT

NG

HI

WAVE

RLEY

ST

ST

RD

BU

RG

OY

NE

R

D

F

ER

VIL

L

EA

AS

N

SS

NE

UR

C

SOMERSET RD

ST SIMONS RD

CLAREND

ON

BEACH RD

ROAD

SOUTH

FL

OR

EN

CE

RO

AD

MA

LV

ST

CATHERINE

ST

RN

RO

AD

E

RO

AD

WO

BR

A

HAM

ILTON RD

ND

ON

RD

SA

M

AD

AM

ES UE

L

RD

LA

NG

FO

RD

R

OA

D

MALTA RD

JERSEY RD

CYPRUS RD

BU

RLE

IGH

R

OA

D

ROAD

LA

NG

LE

Y

RO

AD

BE

RE

SFO

RD

BA

LFO

UR

DR

AY

TO

N

CHICHESTER

EM

SW

OR

TH PORTCHESTER ROAD

WYMERING ROAD

BE

AU

LIE

U R

D

BU

RL

ING

TO

N R

D

WINCHESTER ROAD

RO

AD

BINSTEED ROAD

TORONTO ROAD

BA

LL

IOL

Ratey's

Lane

PLACE

ON

TO

TTE

NH

AM

RD

NEW

S R

D

HA

NW

AY

CLYDEBANK

GA

MB

LE

RD

QUEEN'S

POWERSCOURT

ST

RE

ET

ROAD

KI L

MIS

TO

NC

LO

SE

Buck

in

MA

YO

CL

OS

E

gham

Bu

BUCKLAND ST

Gre

en

SEYMOUR CL

ROAD

CHAPEL

STREET

RO

AD

CLOSE

ARN AUD

Ha

rley

LO

RD

S S

T

RO

AD

Walk

Fitzroy

STAMFO

FT ST

RD

ST

ON

KIN

G A

L

TIM

PS

ON

R

D

NUTELD

FICL

CLARENDON

PL

AR

EN

DO

N S

T

AS

HL

ING

LA RO

AD

LO

ND

ON

HINGTON RD

ING ST

S

KI N

GS

TO

N

RO

AD

HA

VA

NT

CRESCENT

RD

EA

H

Lane

ROAD

PLAC

E

STM

IN

ST

ER

WE

D R

D

Heath

field

Path

Pitc

roft

L

RD

CROFT

RO

AD

TH

FI E

RD

FO

S

HALE

ST N

HA

LE

ST

SO

UT

H

TE

R R

D

STI

RO

AD

RO

AD

WA

RL

AG

I NC

OU

RT

CR

ES

SY

RO

AD

ROAD

ROAD

ROAD

ROAD

ROAD

HE

NLE

Y

RD

Fe

sting

THE LANE

AV

DORRITACL

ENUE

RO

AD

EDMUND

WHEATSTONE

DELAMERE

FR

AN

CIS

ALBERT

WYNDCLIFFERD

NORTHCOTE

ROAD

RO

AD

STRONANS

AVE

NORMAN

DARLINGTON RD

RO

AD

RD

LA

WR

EN

HA

RO

LD

GRAHAM

RD

TR

EV

OR

RD

RO

AD

CE

ALLEN'S RDRD

CH

LE

OP

OLD

ST

BE

AT

RI C

ER

D

GAIN'S

RO

AD

INGLIS RD

RO

AD

GO

OD

ROAD

OX

FO

RD

BO

ULT

ON

WIS

H P

L

WO

OD

SH

IRLE

YR

D

MOULIN AVE

WISBOROUGHRD

RD

ROAD

LO

WC

AY

RO

AD

GR

SO N GROV

E

RO

AD

RO

AD

GR

COLLIN

NA

PIE

R R

OA

D

GWOOD

DU

NC

AN

R

D

ALB

ER

T

ALB

ER

T

EA

CH

ELS

OU

TR

SO

UT

H

VICTORIA

WIL

I

RO

AD

EXM

O

T RDCEN

ST V N

UTH

SHANKLIN RD

VE

NT

NO

R R

D

HARD

GOLDITH

SM

TA

LB

OT

NORLAND RD

CHETWYND RD

ELAND RD

ET

ON

RD

SON ROAD

GRENVILLE RD

ROAD

HOLLAND RD

ROAD

LO

RN

E

RD

ADDISON

VICTORIA RD N

RUGBY RD

Sydenham Terrace

ST

LUCKNOW ST

VIV

AS

HR

D

CUMBERLANDROAD

SOMERS ROAD NORTH

IRESH

BR

ITA

NN

IAR

D N

OR

TH

V

HA

RR

OW

RD

CL

E

WL

A

BE

RT ST

HAVELOCK RD

STED

LIVINGSTONE

RD

CAMPBELL

ANST

NO

RT

HU

MB

ER

-

LA

ND

RO

AD

RO

AD

BERK

CL

E R

D

G

T

ADFORDRD

IE RD

NO

RT

H

DA

VI D

S

RD

ROAD

BR

ITA

NN

IA

RD

FRODDIRD

CARLIS

SO

MER

S

R

OAD

N

L

HO

LB

R

STREET

GOMER

ON

BR

BR

IDG

ES

IDE

CL

OO

K

WALK

H F

ST

VI C

TO

RIA

ROAD

RO

AD

AM

KINGSDOWN PL

WIMPOLE

STREET

LITTLE

COBURG ST

MUREFIELD

RD

Walk

UN

ION

PL

AC

E

CHURCH

NORTHAM

MEWS

OM

EGA

ST

PORT ROYAL ST

ROAD

RAGLAN STREET

BAILEY'S

AVENUE

MONT

ALDWELL ST

HO

LB

RO

OK

CENTRAL ST

CHURCH

RD

DR

UM

MO

ND

RD

LWR FORBURY RD

RD

RO

ADIR RD

FRASER

COMMON ST

PERCY CHANDLER ST

CO

TTA

GE

VIE

WM

ILFO

RD

RD

VIEW

NAL

ROAD

CH

AR

L

BOARHUNT

CLOSE

ST

BU

RI

LA

ND

PO

RT S

T

ST

MAXSTOKE

CLOSE

FORBU

RY RD

RD

BLA

C

ROAD

KFRIA

RS

STREET

APRIL

SQ

PLACE

ALE

XA

ND

RA

RD

ES

S

T

BLACKFRIARS CL

QUINTON

CL

ROAD

CROSS ST

RIVER

'S ST

SE

DG

L

EY

PLAYFA

WACR

ES

LLISN

NOR

THST

CA

ARUNDEL

RAILWAY

PARADE

KENILWORTH

RD

BEAUFORT RD

RO

KKIR

ONSLOW RD

RD Theatre

Mews

Kings

Mews

ESPLANADE

TH

ED

ELL

Garden

Terrace

RIC

HM

ON

D

R

D

FONTWELLRD

Rave

nsw

oo

dG

ard

en

s

VIC

TOR

IA

Yves MARMION

AVE

ROAD

ROAD

ROAD

W

ON

LE

NN

OX

RD

SO

UT

H

LE

ROAD

ROAD

PARADE

JACK

COCKERILL

WAY

CLA

RE

NC

E

ST

BARTHOLOMEWS

GDNS

HIL

LB

OR

OU

GH

CR

ES

HEREFORDRD

CAVENDISHRD

AFFORDRD

ROAD

AN

DR

EW

S

RD

ROAD

ST P

ET

ER

SG

R

STURSULA

GR

GROVE

ST

GROVE

STKET

RD

AL

B

SON

AN

Y

WIN

D

CH

IVE

RS

CL

GATE

SORLA

HENDY

CL

THE CT

HI

MILVE

RTON CL

HUD

SONSOM

ERSW

I CK

MAR

PAINS

RD

GR

OV

E

NO

RT

H

CHESTER PL

FR

IAR

Y

CL

Mew

s

WILTON TERR

ORMSBY

RD

LTON PL

MERT

THE

CIRCLE

MA

PL

E

RDAUCKLAND RD EAST

VILLIERS

VA

FREESTONE RD

LA

LE

NN

OX

RD

N

CLARENDON

STANLEY ST

STANLEY

TH

E

CLARENCE

AV

EN

UE

D

E

C

AE

NB

rian K

ydd

Wa

y

Pa

lmers

ton

Ro

ad

I

GR

OV

ER

ICH

MO

ND

PL

ON

MARM

I

TO

NB

RID

GE

ST

ROAD

PO

RT

LA

ND

R

D

QUEEN'SWAY

PA

LM

ER

ST

ON

RO

AD

CLARENCE

AS

HB

Y

KLAND RD WEST

PL

AC

E

NE

TL

ROAD

EL

PH

I NS

TO

AS

HB

UR

TO

N R

D

SERPEN

TINE

RD

SH

AF

TE

SB

UR

Y

RD

QU

E

NE

RD

A

NETLEY

TERR

Richmond

Terr

UC

CLIFTON

RD

CLIFTON

TERR

RD

EY

RNEOSBO

Serp

entine

ESPLANADE

AUSTRALIA CL

TO

N

CLAXTON

ST

RASSWELL

CHURCH

PATH

NORTH

CORNMILL

ST

LAKE

SPICER STREET

ALL

ST

CO

R

ST

BUCKINGHAM

PLACE

AM

H

SETTLERS

CLOSE

ST

FA

ITH

S R

D

COMMERCIAL

TE

MP

LE

ST

C

ED

EN S

TS

E S

T

JA

CO

B'S

ST

CO

MM

ER

CI A

L

PY

E S

T

EAST

SURREY ST

LOWERCHURCH

PATH

SLI N

DO

NS

T

NG

BUCRoa

d

K

I

Street

PARADI

Arundel

FR

ED

ER

ICK

ST

MARKET WAY

AN

DR

EW

BE

LL S

T

PR

OV

IDE

NC

E

CL

AR

EN

CE

ST

TOBY ST

BREWER

ST

PAN ST

LANDPORT

VIEW

STREET

RLOTTE

YAPTONST

CIA

L

CO

MM

ER

EDINBURGH

RO

AD

SPR

ING

ST

FO

UN

TA

IN S

TK

ING

SW

ELL S

T

CAS

CAD

ES

APP

ROACH

MA

RKE

T

CHA

WAY

WIL

L

RDST

AN

BISHOP CRISPIAN

WAY

Gladstone

Pl

u ll Lan

BAKERST

LA

ND

ST

SP

EN

LO

W

CL

STE

ER

FO

RT

HC

L

A NUEL ST

DIC

KE

NS

CL

BROWNLOW

CLLO

WER

WING

FIELD STSTR

EET

WINGFIELD

MAI

ST

RO

AD

T

yi

Flying Bull

Cl

Flng B

ST

RE

ET

Walk

CA

IRO

TE

RR

BAYTHORN CL

EM

SULTAN

SAIN

T'S

RO

AD

NELS

ON

PRINCE'SPrince's

Place

VICTORIA ST

Jar

ndy

ce

Brompton

Pass

C

RCH

H

U

ALL

SAINS'

T

STAUN

TON

ST

GRAFT

HAVISHAM

RD

ON

RO

AD

PL

OLD

COMMERCIAL

ROAD

STR

RO

AD

EET

FITZHERBERT

ST

MILL

LA

HERBERT

ST

PROSPECTRD

KETTERINGTERRACE

MIL

E

EN

D

ROADHO

PE

PRINCESS

ROYAL WAY

MILITARY

CIRCULAR

RO

AD

ROA

D

FL

AT

HO

US

E R

OA

D

WA

Y

GU

AR

DH

OU

SE

ROAD

UN

TB

A

RD

TT

EN

MO

ST JUDES

CL

CRES

RETREAT

NEL

RO

AD

MOSAICLA

COTTAGE

BELMONT STREET

WO

OD

PA

TH

BELMONT PL

ELM

PE

LH

AM

R

D

PelhamRoadPass

SO

UT

H

QU

EE

N'S

GR

THE

QU

EE

N'S

PL

OCKENDON

CL

GLOUCESTER VIEW

ST

BROUGHAMRD

STREET

WAR

RO

AD

ROAD

EN

S

SUSSEXTERR

RD

WORSLEY RDGARDEN LA

EDW AR DS

WIL

BE

RFO

RC

E

R

D

YA

RB

OR

OU

GH

RD

CASTLECL

GloucesterMews

PEELPL

ELD

ON

ST

GLO

UC

ES

TER

TE

RR

GLOUCESTER PL

RF

OL

GREEN

HYDE ST

WI

LLE ST

CK

ST

K S

T

SU

SS

ST

NO

CHAPEL ST

BUSH

ST W

LT

SO

UT

HS

EA

ST

ELMST

GR

T S

OU

TH

SE

A

S

T

BUSH EAST

RO

AD

ST

WE

STE

RN

PA

RA

DE

NIG

HTI N

GA

LE

R

D

KENT

LITTLEHAMBROOK ST

CAS

TLE SUSSEXPL

EX

KING

STPAULS

BR

SACKVI

YORKE ST

SQ

UNS

SO

UT

HS

T

K INGS ROAD

PLYMOUTH

ST

TY

S

EL EY

PARK

CHURCHILL

CL

DENNING

MEWS

BR

IDP

OR

T

UP

PER

AR

UN

DE

L

ST

STST

WORCESTER

CLOSE

CRABBECT

ST

CRES

GREETHAM

HYDE

UR

HAM

DSTRT

EE

ST

CHARLES

DICKENS ST

THE

MARY

ROSE ST

DRUMMOND

LANE

BR

UN

EL

RO

AD

BE

DF

OR

D S

T

JA

ME

S'S

R

D

WELLING

ST

WATERLOO

TON

RADNOR

ST

DUNSMORE

CL

GR

OS

VE

NO

R S

T

DUGALD

ISAMBARD

STA

ST

EY

SUR R

TION

ue

en' s

WINSTON

DOROTHY

DYMOND ST

RO

SE

The Q

Mal l

RD

Guildhall

Square

S R

DI

HO

PE

ST VINCENT ST

ALEC

Walk

MID

Ath

ers

tone

Caldecote

URNE PL

EA

RLS

DO

N

ST

MELBO

DL

E

ST

RE

ET

Walk

EXCHANGE

RD

SP

RIN

GG

DN

S

ILD

HA

LL W

ALK

NRY I ST

SWAN RD

GU

TONGS

BEVIS

BEVIS RD NORTH

HERCULES

STREET

NE

S

ROAD

S ST

PIT

SEA

CROFT

EGROV

GARFIELD

ST

CE

NT

S

U

AU

R

KIN

OR

D

MIL

LS

RD

TW

YF

STAM

SHA

W

RD

SIMPSON RD

STANLEY RD

LOWER DERBY

RO

AD

EN

D

MI L

E

ES

TE

LL

A R

D

WHARF RO

AD

A3

R

WA

Y

OAD

M 2

75

GEORGE BYNGWAY

RUDMO

RE

RUDMORESQUARE

ISLA

ND

QUARTERDECK

AVE

CORNWELL

CL

EVANS

CL

EA

ST

ER

N

RO

AD

ROAD

ISLAND VIEW

TERR

ROAD

SHED

RD

WHALE

Jellicoe

DOMVILLES

APPROACH

DRILL

SLATER

APP

ROAC

H

FOUNTAIN

PIER

HEAD

GUARD ROOM

Wa

y

STO

NE

ST

STEEL ST

WILTSHIRE

MERIDEN

RD

PARK ST

ST

ME

AD

OW

ST

CO

LP

OY

ST

ST

AS

TLE

Y S

T

WA

LT

HA

MS

T

WAY

GO

MO

NT

TE

RR

GOLD ST

COPPER ST

HAMBROOK ST

DARTMOUTH

MEWS

REGENT

PL

CEC

ILG

R

CEC

IL P

L

SEA TERR

SILVERST

DIA

MO

ND

ST

KIN

G'S

TE

RR

FLIN

T

S

T

DUIS

BURG

WAY

HA

MP

SH

IRE

PA

ULS

LA

NS

DO

WN

E S

T

LA

ND

PO

RT

TE

RR

AC

E

LANDPORTST

OU

NT

JU

BIL

EE

TE

RR

WO

OD

VIL

LE

DR

NICKEL ST

VICTORIA AVE

BL

SLINGSBY

CL

GDNS

MUSEUM ROAD

CHADDERTON

RD

CLARENCE PIER ROAD

BELLEVUE

TERR

PI E

R

RO

AD SOUTH

ROAD

CA

MB

RID

GE

VICTORIA SPUR

CROXTON RD

GORDON RD

TH

POYNINGS

PLACE

AM

DR

CHA

ROAD

HALFPENNY

LANE

CLAREN

CE

LONG

TAIN

CUR

RO

AD

A'Beck

et C

t

MARTELLS

CT

ON S

T

LINGT

RO

AD

NO

BB

S

LA

STREET

PEMBROKE CL

PEAC

OCK

LA

ST N

ICHOLAS

ST

St T

hom

as's C

t

STREE

T

ST

ST

WYNDHAM

MEWS

LA

PEM

BR

FARTH

ING

OKE

GR

AY

S

CT

BEEHIVE

WALK

GEO

RG

ES

O

NE

RY

LA

ST

South

Normandy

WARB

AR

M

MAS'S

HIG

HBU

RY

THO

LOR

D

MERY

KINGRICHARD IRD

MIC

HA

EL

S

KING H

AN

GL

ES

EA

WHITE

RO

AD

E

ST RD

RO

AD

ALFRED

CIRCULAR

FLEET WAY

UN

ICO

RN

STREET

RD

BU

RN

AB

YR

OA

D

Richmond

Pl

ROAD

LION ST

ST

JA

S'S

ST

ME

BECKST

LIO

N T

ER

R

WAY

Montague

Wallis Ct

Robert

Mack Ct

PORTL ST

ES

ND

A

GEORG

RO

AD

GATE

NORTH

PLA

CE

YO

RK

Frank

Judd

Ct

STREET

DEAN

Joseph

Nye CtTed Kelly

Ct

ST

Sea Mill

Gdns

ST

PRINCE

Blossom

Square

KING WILLIAM ST

RE

ET

CUMBERLAND ST

LENNOX

ROW

Davidson

Ct

SQ

ORGES

AY

LW

AR

D S

T

BIS

HO

P

S

T

SUN

ST

ST

TAI N

ST

I

PARK

Sou

tham

pto

n R

ow

Kin

gs

CU

RZ

ON

H

GEORGE ST

OW

E R

D

Be

nch

Alley

CL

THREE

TUN

BR

KENT

NA

VY

RD

ALD

RIC

H R

D

ROAD

FRIGATE RD

AN

CH

ORL

AN

E

BU

TC

HER

GE

ST

ROW

NANCE

ST

UNION

ST

MA

RG

ER

Y'S

CT

BE

NE

FIC

IAL

ST

RE

ET

HA

NO

VE

R

ST

AD

MIR

ALT

Y R

D

CR

OS

S

BONFIR

E

CORNER

QUEEN

ST

RE

ET

D

HARD

COLLEGE ST

IVY

LANE

SH

OR

T

RO

W

GL

OU

CE

ST

ER

RD

MARLB

RO

UG

H R

OW

O

Mar

lboro

ugh

Ave

The

Canalside

OR

Cean

Marches

VIC

TO

RY

RD

WALK

LANE

CO

LL

EG

E

BENBOW

PL

TH

E

HA

VA

NT

S

T

WIC

KH

AM

ST

HA

WK

E

ST

SH

IP

LE

OP

AR

D

ROSEMARY LA

RO

AD

SO

UT

H

TE

RR

COLLEGE LA

OLD STAR

PL

RO

AD

ST

Mer

cat

orA

ve

Cent

ral

Sq

Ver

non

Ave

SiriusAve

TogoAvePhi

lipA

ve

The

Waterf ro

nt

SUNNY

CLOCK ST

ANCHOR

HALF MOON STREET

HERTHA AYRTON WAY

MB

AR

D

Han

over C

t

ST

KING

CHARLES

S

T

Lom

bard

Ct

LO

HIGH

ST

PENNY

New Hampshire B'vard

ROAD

GU

NW

HA

RF

GR

AN

D

PARA

WHITE O

YS

TE

RS

T

CAPTAINSROW H

AR

T

RD

FRENCH ST

OYSTER

MEWSQUAY

TOWN

STREET

CT

TRIMMER'S

EAST

Minerva Crescent

Jupiter Court

The Vulcan

Neptune Court

Lysander Court

BR

OA

D

BA

TH

SQ

BATTERY ROW

Spice Quay

CAMBER PLACE

Feltham Row

CAMBER QUAY

TOWER ALLEY

STREET

SEAGER'S COURT

TOWER STREET

BATHING LANE

Spinnaker Quay

WE

ST

ST

MA

IN

NORTHERN WAY

LIO

N R

OA

D

WE

ST

ER

N W

AY

RD

TIGER RD

BLAKE RD

BO

ILE

R R

OA

D

SH

IPB

UIL

DIN

G

VICTORIA

SCOTT RD

SAMPSON

RD

MURRAY'S

LA

JAGO RD

ADMIRAL'S

WALK

RO

AD

QUEEN'S

RD

STONY

TH

E

MA

IN

PA

RA

DE

The

Espla

nade

TRINITY GRN

TRINITY GRN

SAND

Path

LAND

FRESH

TOT

OWN

G

FIF

TH

A

VE

FO

UR

TH

A

VE

SIX

TH

AV

E

ASHURST

WYMERING

MANOR CL

LOWERFARM DR

BR

I GH

ST

ON

E

R

D

LA

NE

ROAD HERNERD

Hockley

Brighstone

CO

W

WE

ST

ER

N

ROAD

GR

EE

NW GL

EB

EFIE

LD

GD

NS

OLD

W

YM

ER

I NG

L

A

D AVEO

O

ROAD

HADLEIGHRD

ROAD

ROAD

RO

AD

WALSINGHAMCL

SHERINGHAM RD

CROMERRD

COLCHESTERRD

HOCKLEYCL

PEBMARSH RD

ROAD

MEADOWSWEET

RO

AD

HARLESTON

LOWESTOFT

HARWICHRD

TU

NS

TA

LL

NORWICHRD

BRAINTREE

WHIPPINGHAM

CLOSE

MEDINA

WIN

TE

RH

ILL

RD

HALSTEAD

BELL RD

SERVICE

ROAD

O RD

MELLOR CL

ROCHFORD

CLACTON

KI N

G R

I CH

AR

D C

L

MALDONRD

WA

SH

BR

OO

K

SUDBURY

OUSE

ROAD

PIGE

DRIVE

SOUTHWICK

ONH

CUNNINGHAM

AVE

HORSEA

SO

MATAPAN RD

RD

LANE

HIL

SE

A

IACHINO AVE

N

DI

CRES

O ROAD

PPE

NA

RV

IKR

D

NORMANDY

ER

SA L

CUNNINGHAM

CL

AKER DRIVE

WA

RS

PIT

E C

L

N

BARHAM WAY

VALIANTGDNS

SP

IN

M 2

75

M 2

75

M 2

75

RDMONTAGUE

RO

AD

RO

AD

THURBERN

RD

ROAD

LO

ND

ON

ROAD

ROAD

AVENUE

KIPLING

AlexW

ay

VITA

MEREDITH

TE

LF

OR

DR

DRD

CONNAUGHTRD

RD

ORIEL

SHADWELL

HARTLEY

OPHIR

AV

EN

UE

END

MUNSTER

AVENUE

WADHAM

GLA

DY

S

CA

RD

IFF

ST

MARKS

RD

RD

ANGERSTEIN

BU

CK

LE

RS

CT

RD

NO

RTH

RO

AD

LOND ON

WE

YM

OU

TH

RD

TW

YF

OR

D

NE

LS

ON

NO

RT

H E

ND

G

RO

VE

AV

EN

UE

KING

EDWARDS

CRES

NORTHERNAV

EN

UE

RD

RD

RD

MO

NM

OU

TH

R

D

ROAD

WALKERRD

ROAD

ROAD

ROAD

PENROSE CL

SMEATON ST

WILSON RD

ROAD

Weste

rn

NEWCOM

RANELAGH RD

WINSTANLEY

KNOX

MEYRICK

EN

GRUNEISEN

Terr

ace

STRODE

WALDEN

WID

LE

Y

R

OA

D

TIPNER

TIPNER

GRNGRN

RANGE

M 2

75

TIPNER

HIL

LD

OW

NS

AV

E

OS

IER

TA

RG

ET

R

D

CL

LA

NE

JERVIS

CHILDE

SQUARE

HARBOUR

WAY

ROAD

NORTHARBOUR

BLACKWATER

CLOSE

NO

RTH

AR

BO

UR

SPU

R

BR

YS

ON

RD

PA

RR

RD

CRY

ROAD

STANFCL

ES

CR

E

DORSTONE

RD

CR

ES

SC

EN

T

AVENUE

FITZPATRICK

CT

CR

ES

BR

MOORCOT CLOSE

OMYARD

WILLERSLEY

BREDENBURY

RS

AM PTON

TE

WK

ES

BU

RY

C

L

DU

LE

LY

DN

EY

C

L

ROAD

STOCKTON

CL

BLAKEMERE

RO

AD

CL

CR

RAPSON CL

ROAD

KENCHESTER

CL

RD

ED

EN

HIL

L

CL

KINGSLAND

RD

M 2

7

WESTER

N

SOUR

OAD

TH

CHELTENHAM

PA

INS

WIC

K

CL

ST

RA

TT

ON

C

L

M 27

DORE

AL

FO

RD

EYABB

W

RD

LUDLOW

RD

DORMINGTON

RCH

TIPNER

TE

IN

AN GESOMERVILLE

PL

M 2

75

VICTORY

GREEN

NORTH

BATHURST WAY

MANTLE SQUARE

FRASER RD

WARDROOM ROAD

WE

ST

BA

TT

ER

Y R

OA

D

WHALEY ROAD

Walk

BATTERY

RD

CINDERFORD CL

WESTBURY

CL

LEDBURY

MO

RT

IME

R

RD

AR

TIL

LE

RY

C

L

CRES

St

Michaels

Ct

ROAD

MA

RS

DE

N R

D

HEMPSTEDRD

Hem

pst e

d

P

ath

RO

AD

EDWARDS

CL

CLEEVE CL

HUNTLEY

CL

Ra

ceco

urs

e

RO

AD

BINNACLE WAY

CO

MP

AS

S

Lane

SOUTHAMPTON

NA

ALLAWAY

DALCL

BOURNE

WORTH R

D

RD

ILS

RY

WITHINGTON

CL

BIRDLIPRD

CT

Close

DELLF

IELD

CL

ROAD

DEERHURST

ROTHWELL

CL

OF

FE

RT

ON

WO

RO

AD

BEVER

STON

AD

M 27

RO

AVENUE

WATERSEDGE RD

LEA

Paddock Walk

BODMIN RD

FARM

M 27

OYS

TE

R

WA

YQ

UA

YW

AY

CKCO

HOLYWELL DR

VE RA

CADGWITH PL

MULLION CL

WAY

AY

E

EW

KEEP

PORT

The Board

walk

MC

LE

NT

E

ATTL

GELWAY

TIN

T

A

BR

YH

ER

BR

ERIS

LAND

WAY

CARBIS

CL

BRYH

NE

W

LYN

KE

PL

ROAD

PORT

LO

CK

V

IEW

NE

CA

R HEAD

EYLS

SE

NN

EN

PL

LO

CK

A

PP

OA

CH

MARINA

WE

ST

BU

ND

RD

SEVER

N

C

L

WIN

CHCOM

BE R

D

RD

TAR

LLINGTONCO

LE

TO

N

DRIVE

GROVE

CH

ALK

PIT

RD LIME

CALLAGHAN

T

COLESBOURNE

LEOMINSTER

ELK

STO

NE

S

IN

cross

HAT

H

AU

Cam

CRESCENT

CHED

WORTH

Desborough

Cl

E RLEY RD

Nase

by

Cl

OUD

BraunstonC

l

Bri xw

o rthCl

ROCKROSEWAY

BUT TE

RS

T

CL

RFLY

CRESCENT

RO

AD

ROAD

HELS

TON

RD

RO

AD

LONGDEAN

CL

TINTERNCL

ROAD

WINTERBOURNE RD

SBURY

BUDE

CLP

EN

DE

NN

I S R

D

FALM

OUTH

HAYLERD

RIDGEWAY

CL

KINGSCOTERD A

HILLSLEY

L MOND

ALLAWAY

MOUSEHOLE RD

TR

UR

O R

D

AVENUE

COLERIDGE RD

HILLSIDE CRES

PA

ME

LA

AV

E

MA

CA

ULA

Y A

VE

MA

SE

FIE

LD

A

VE

BR

IDG

ES

AV

E

AVENUE

KEATS AVE

JAMES

CHAUCER AVE

WO

RD

SW

OR

TH

A

VE

SHELLEY AVE

DRYDEN AVE

LA

NE

NEWBOLT

ROAD

ROWLAND RD

GR

OV

E

JUBILEE

RO

AD

AVENUE

RAYMOND

M 27

ROAD

GROVE

NI

NG

ED

WA

RD

BR

OW

BEACH DRSH

EN

EV

AH

R

O

THE EDGE

COLTSMEADCL

SE

PARRY

DG

EF

IEL

D C

L

CL

ELGAR

CL

RD

CO

NN

AU

GH

T

LITTLEFIELD

WESTFIELD

RD

DELANE

SI

SAXON SHORE RD

RALPH RD

SOTHCOTT

RD

NEELANDS GR

AMPTON

SULLIVAN

SOUTH

HOPKINS CL

WATE

R

STR

HO

SP

ITA

L L

AN

E

EET

HA

MIL

TO

N

CASTLE

RO

AD

PO

RT

SD

OW

NROAD

Based or reproduced from Ordnance Survey 1:1250 Base Map with the permission of HMSO © Crown copyright reserved.Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. Licence No. 100019671

Prepared for:

Prepared by:

Title: Drg No:

Date:

Scale:

N

Highways Geographic Information Service

Appendix A IoT Sensor Locations

Department for Transport28/09/2016

1:1,000 @ A4

Plan

Page 15: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

Network Management Team - September 2016

1 | P a g e

Appendix B: The Strategic Case:

B2.1 Demographic of the area and unquantified benefits to the local community

1. Portsmouth has a significant role in the sub-regional economy as an employment, education,

tourist, retail, and transport hub. Portsmouth International Port (PIP) gateway with 3.5 million

people passing through the ferry port each year. As a transport hub over 5 million people use

Portsmouth as a gateway to the Isle of Wight and approximately 3 million passengers cross

Portsmouth Harbour to Gosport each year.

2. Portsmouth Naval Base (PNB) is the home of the Royal Navy and BAE Systems and a

significant player in the marine and maritime sector, providing 19,775 jobs (directly and

indirectly) across the wider sub-region and contributes over £1.68 billion of output per

annum. Every £1 million directly generated by the Naval Base stimulates an additional

£750,000 of spending in the Solent economy. From 2017 PNB will have around 2,000

additional staff due to the arrival of the new air-craft carriers.

3. The city's economy has strong roots in tourism, leisure and retail. Tourism in Portsmouth

accounts for 7.6 million visitors per year spending £373 million and supporting over 7,000

jobs. The city focusses on Gunwharf Quays as a retail location which attracts approximately

8 million visitors a year. The city is developing its retail offer through the creation of a new

city centre and city centre road development.

4. High levels of deprivation, widespread obesity, low levels wellbeing, and, low levels of physical

activity

• Portsmouth is ranked 63rd of 326 English local authorities on the index of multiple deprivation score, where one is the most deprived. All Portsmouth residents live in the most deprived 40% of English Lower Super Output Areas (LSOAs) in terms of the outdoor living environment (considering air quality and traffic accidents); and 46% of Portsmouth LSOAs are in top 10% most deprived in England.

• 64% of avoidable deaths are caused by lifestyle behaviours including low levels of physical activity.

• 65% of Portsmouth adults do less than 30 minutes of physical activity per week including walking and cycling

• Levels of child obesity in Portsmouth are higher than average for England. In 2014/15, 33% of children were overweight or obese on leaving primary school.

• Portsmouth has high child pedestrian casualties, averaging 39 per year (50% more than the national average by population). Despite continuous improvements to the infrastructure, behaviour remains the biggest contributory factor, particularly at Key Stages 1 and 2.

• Portsmouth provides 15.5% of the total jobs in the South Hampshire sub-region

• Portsmouth has a higher proportion of 16-18 year olds not in education, employment or training (NEET) than regionally and nationally. For example, 5.2% of the population

Page 16: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

Network Management Team - September 2016

2 | P a g e

in Portsmouth are classified as NEETs, compared with 4.1% in the South East and 4.6% in England.

5. Works are underway to continue the regeneration of the city with major investment in Tipner,

Horsea Island and Port Solent (all served by the western gateway) for residential,

employment and leisure.

6. The University of Portsmouth is one of the leading ‘new’ universities, with over 20,000

students in attendance.

7. A highway network with C ITS infrastructure with a dynamically managed transport network is

essential for delivering the ambitious growth agenda and expanding employment

opportunities across Portsmouth.

Page 17: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

Network Management Team - September 2016

3 | P a g e

FigureB1.1 Portsmouth Ward boundaries.

Page 18: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

Network Management Team - September 2016

4 | P a g e

B2.2 The Strategic Case: The identified problem(s), with timescales and the key drivers

SRTM summary for Portsmouth

• Partnership for Urban South Hampshire (PUSH) authorities which includes Portsmouth have

commissioned a study to undertake a Solent Transport’s Sub Regional Transport Modelling

(SRTM) study covering SOLENT region.

• The study provides a high-level understanding of the impacts of the latest growth projections

through to 2034 in the SOLENT region. This note summarise the impacts that were

examined using two scenarios with different transport provisions and the key facts of the

study relevant to Portsmouth.

• The SRTM model has a base year of 2010 with five forecast years; 2014, 2019, 2026 and

2036. An update of the SRTM model to rebase to 2015 is ongoing to be available towards

end of 2016. The starting point of the model is a 2014 reference case.

• The development information is used in the modelling study, this included for both residential

and employment land uses. The employment land uses included office, industrial and

warehousing. All other non-residential land use inputs were left unchanged from the current

SRTM Reference Case scenario.

• The summary of increase in residential land use by local authority between 2014 to 2034 is

shown in Fugure1 and increase in employment land use for the same period is shown in

Figure 2. It can be seen that Portsmouth has Approximately 13,890 which is a 16% increase,

one of highest demand for housing in the region. It was estimated that there is an 8%

increase in the jobs i.e. 8081 by 2036.

Figure1.1 Housing demand 2014 to 2036.

1,845

15,051

9,818

2,994

8,130

4,649 4,177

8,736

13,890

17,984

13,996

02,0004,0006,0008,000

10,00012,00014,00016,00018,00020,000

Demand for Housing

Page 19: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

Network Management Team - September 2016

5 | P a g e

Figure1.2 Employment demand 2014 to 2036.

• The impacts are examined using two scenarios. The Do Minimum (DM) scenario was

specified to include those transport schemes that are already committed and also a number

of schemes that are vital to committed development sites although the schemes themselves

may not yet be committed

• Reference Case (2014) + developments up to 2014/15.

• Do Minimum (2036): com + dev.

• Do something (2036): com + dev + schemes.

• The Do Something (DS) test included additional transport interventions, as specified by the

Solent Transport and the PUSH Authorities, with the aim of helping to mitigate the impact of

the quantum and spatial distribution of the proposed developments on the transport network.

There were a number of both highway and public transport schemes included in the DS test.

• The results are analysed in terms five key indicators.

a. Modal Share

b. Flows

c. Delays

d. Volume vs. Capacity

e. Public Transport Flow (Passenger).

• The Do Something (DS) test included additional transport interventions, as specified by the

Solent Transport and the PUSH Authorities, with the aim of helping to mitigate the impact of

the quantum and spatial distribution of the proposed developments on the transport network.

There were a number of both highway and public transport schemes included in the DS test.

199

5991 6085

4459 4660 48873764

10481

8081

4762

2453

0

2000

4000

6000

8000

10000

12000

Growth in number of Jobs

Page 20: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

Network Management Team - September 2016

6 | P a g e

• Figure 1.3 shows the mode share in both 2014 and 2034. The results from the modelling

study shows that the highway mode share has increased by 0.58%, public transport mode

share has increased marginally by 0.9% and a decrease in active modes by -1.5%.

Figure 1.3 Modal Share 2014 to 2036.

• The study results shows that the network wide trips are increased by 21%, the travel distance

is increased by 36% and the travel time is also increased by 37.2% there is no or marginal

difference in speed.

Table 1.1. Growth in Traffic Flow 2014 - 2036

2014 PUSH DS 2036 Diff % Diff

Total Travel Time pcu hrs 945205 1296620 351415 37.20%

Travel Distance pcu kms 52860599 72216376 19355777 36.60% Overall Average Speed kph 55.9 55.7 -0.2 -0.40%

Total trips loaded 2456971 2980368 523397 21.30%

Car 2165531 2548314 382783 17.70%

LGV 181833 296133 114300 62.90%

HGV 109606 135921 26315 24.00%

• The study has analysed the boardings (rail, bus and ferry), number of services, and travel

time, travel distance and speed for both the vehicles (supply side) and the passengers

(demand side). An approximate 37% increase in PT boardings is forecast for 2036 compared

to 2014. However the increase in bus users is low.

HIGHWAY PUBLIC TRANSPORTACTIVE MODES

(Walking and Cycling)

2014 65.70% 5.40% 28.90%

2034 66.20% 6.30% 27.40%

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

70.00%Modeshare

Page 21: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

Network Management Team - September 2016

7 | P a g e

• The flow difference plots show an increase in flows in Red approximately 500 to 900 PCUs.

Please see Figures 1.4 and Figure 1.5 and 2 below. For Portsmouth the increase in flows will

have significant impact on key corridors and junctions.

Page 22: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

Network Management Team - September 2016

8 | P a g e

Figure 1.4 : AM Peak: Increase in flows over 500.

Figure 1.5: PM Peak: Increase in flows over 500.

Page 23: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

Network Management Team - September 2016

9 | P a g e

Figure 1.6: Junction delays

Figure 1.7: Junction delays PM Peak

Page 24: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

Network Management Team - September 2016

IoT BigData Platform Project

1 | P a g e

Appendix C: B6. The Economic Case – Value for Money evidence

Separate Annex – Co-operative Intelligent Transport Systems (C-ITS) Challenge Fund – Value for Money Evidence (Big Data Platform)

Scheme description

This proposal is for the development of a Big Data Platform, using information from bluetooth sensors and radar on the network, to provide real time and historic information on journey times and trip movements, which can then be used in a range of applications.

Benefits include:

• More efficient management of the network, on a day-to-day basis, during special events and periods of roadworks, and in response to unexpected incidents on the network.

• Enabling users to make more informed decision about their travel choices

• Reduced delay and increased journey time reliability on the network.

• Improved network resilience.

• More comprehensive and reliable data to inform modelling, analysis, and monitoring activities.

Monetary estimate of journey time benefits:

The primary benefits relate to journey time savings on a day-to-day basis, during special events and periods of roadworks, and in response to unexpected incidents on the network.

With only three roads linking the island to the mainland (M275, A3 and A2030) there is significant potential for severe congestion at peak times. This includes

• M275/M27A3 – into Portsmouth City Centre, Portsmouth International Port Continental Ferry Port, Naval Base and Gunwharf Quays;

• A2030 – from the M27 and A3(M) to employment locations in Airport Industrial Estate/Anchorage Park, Portsmouth City Centre and eastern Portsmouth;

• East west connections in Portsmouth.

Day-to-day delay savings

Table 1 shows that total delay on the Portsmouth city-wide network is estimated at 29,313 pcu hours in 2013, resulting in an average delay per vehicle (passenger car unit) of 3.25 mins across a 12 hour period and an average speed of 48kph. This is expected to increase almost three-fold by 2031 to 81,556, equating to an average delay per vehicle of 6.92 mins and an average speed of 37kph.

Page 25: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

Network Management Team - September 2016

IoT BigData Platform Project

2 | P a g e

Table 1 – Do Minimum Network Statistics (2013 and 2031) – Portsmouth City Only1

COMMENTS Do-Minimum Do-Minimum

AM Peak (1hr) 2013BDM 2031BDM

Total Trips Loaded (pcus) 54,968 69,774

Link Cruise Time (pcu-hrs)

7,193 9,796

Total Travel Time (pcu-hrs)

10,475 20,190

Total Delay (pcu-hrs) 3,282 10,395

Total Delay (mins/pcus) 3.58 8.94

Travel Distance (pcu-kms) 456,644 587,916

Average Speed (kph) 44 29

IP (1hr) 2013BDM 2031BDM

Total Trips Loaded (pcus) 39,183 53,353

Link Cruise Time (pcu-hrs)

4,924 7015

Total Travel Time (pcu-hrs)

6,282 9815

Total Delay (pcu-hrs) 1,357 2801

Total Delay (mins/pcus) 2.08 3.15

Travel Distance (pcu-kms) 332,779 444937

Average Speed (kph) 53 45

PM Peak (1hr) 2013BDM 2031BDM

Total Trips Loaded (pcus) 55,097 69,736

Link Cruise Time (pcu-hrs)

7,472 10,074

Total Travel Time (pcu-hrs)

11,809 22,991

Total Delay (pcu-hrs) 4,337 12,917

Total Delay (mins/pcus) 4.72 11.11

Travel Distance (pcu-kms) 467,976 597,829

Average Speed (kph) 40 26

All Day (12hr)3 2013BDM 2031BDM

Total Trips Loaded (pcus) 540,536 707,259

Link Cruise Time (pcu-hrs)

70,248 97,233

Total Travel Time (pcu-hrs)

99,561 178,789

Total Delay (pcu-hrs)2 29,313 81,556

Total Delay (mins/pcus) 3.25 6.92

Average Speed (kph) 48 37

Page 26: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

Network Management Team - September 2016

IoT BigData Platform Project

3 | P a g e

Notes: 1. Network Statistics taken from Portsmouth Western Corridor Model (2013BDM and 2031 BDM). 2. Total Delay (pcu-hrs) is calculated as the difference between Link Cruise Time (travel time based on speed limit only) and Link Cruise Time (travel time including signals, queues, turns, etc.). 3. The following Peak Hour to Period Factors have been used to convert Peak Hour figures to 12 Hour period, based on local observed demand. AM Peak = 2.75; Inter-Peak = 6.00; PM Peak = 2.80).

The Data Platform will enable the network to be managed more efficiently on a day-to-day basis, reducing the amount of delay on the network and resulting in journey time benefits for all vehicles. Table 2 shows the predicted journey time savings and benefits for different scenarios, representing different reductions in % delay across the network in 2013 and 2031. These values have then been used to estimate a Present Value of Benefits, based on the following assumptions and calculations:

• Values of time for car, LGVs, and HGVs have been taken from WebTAG Data Book (V1.5) (Table A1.3.6).

• A 5 year appraisal period has been assumed. This is considered to be conservative. No renewal costs are expected to be needed over this time period.

• Journey time benefits have been calculated for two forecast years of 2013 and 2031 as used in the Portsmouth Western Corridor Model. Benefits for intervening years have then been estimated on the basis of a steady annual rate of growth of benefits to allow the estimates for 2018 to 2027 to be calculated.

• Benefits have been discounted to 2010 values and prices, using an annual discount rate of 3.5% per annum in line with WebTAG.

• Daily benefits have been converted to an annual benefit using an annualisation factor of 235.29.

The indicative BCRs are based on an outturn cost of £300,000, which in appraisal terms equates to a Present Value Cost (PVC) of £282,000, in 2010 market prices and values and accounting for 200% optimism bias (as recommended for IT system deployment, in WebTAG Unit A1.2, Table 8). PCC is confident that costs can be managed within a budget of £300,000: Data Platform:

• PCC have upgraded their IT infrastructure and data centre facility with appx £1.2m in 2013/14 which has capacity to expand to accommodate the Data platform without having to build a data centre infrastructure from the start.

Page 27: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

Network Management Team - September 2016

IoT BigData Platform Project

4 | P a g e

• The feasibility of the project was reviewed by PCC's IT specialists and estimated costs and resources to enable this and can be programmed immediately.

• In addition PCC currently hosting and maintaining UTMC data and IT infrastructure, this will be made redundant as part of the Traffic Management Centre upgrade. As a contingency PCC will consider reducing the costs by making use of this.

• Therefore the data platform can be made fully operational within the budget and time scales.

Bluetooth Sensors:

• PCC have experience in installing and maintaining the Bluetooth sensors on the street. Currently 5 Bluetooth sensors are installed on street for monitoring Journey times across the city.

• As part of the C-ITS funding network is expanded and integrates the data to data centre.

• The costs of installing and procuring the sensors are based on the current supplier and variation of prices is unlikely to be high in the short term.

A 25% as contingency cost which will be put back in to expanding the network and application services if no contingencies.

Table 2 – Predicted benefits for different scenarios of reduction in total network-wide delay

Scenario 2013 12 Hr Delay Saving1

2031 12 Hr Delay Saving2

Daily PVB (£)

Annual PVB (£)

Indicative BCR

1% reduction in total delay across the network

293 pcu-hrs 816 pcu-hrs £56,528 £13.3 million

47

0.5% reduction in total delay across the network

147 pcu-hrs 408 pcu-hrs £28,264 £6.65 million

24

1. Delay!AA8:AAB.

The results show that achieving even a very small reduction in average delay across the Portsmouth city-wide network (-1%) will deliver very high value for money. This assumes no other improvements are made to the network. In practice, reduction in delay is as a result of traffic management and behaviour change interventions driven by information from the Data Platform, is likely to be focused on particular areas of the network. These locations are likely to experience a higher level of reduction, while other areas experience minimal change. The above scenarios represent an average reduction across the network and are considered to represent realistic scenarios for the purpose of illustrating the potential value for money of the proposed investment.

Page 28: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

Network Management Team - September 2016

IoT BigData Platform Project

5 | P a g e

Other benefits

Other expected benefits are summarised below:

• More efficient management of the network during special events and periods of roadworks, and in response to unexpected incidents on the network (Large beneficial) – based on analysis of information from the Data Platform from historic events (and potentially use of real time information in the long term). With only three roads linking the island to the mainland (M275, A3 and A2030) the network in Portsmouth can approach gridlock if an unexpected incident occurs on the network, particularly during a period of high demand (e.g. summer holidays, during the Victorious Festival, etc.). On these occasions, the level of delay on the network significantly exceeds the 12-hr delay figures shown in Table 1, for several hours.

Assuming the information provided by the Data Platform enables a reduction in average delay across the network equivalent to 10% of the level of delay in the 12-hr Do Minimum scenario, this will deliver a daily Present Value of Benefits (2010 values and prices) of £548,000 - based on one day per year. This alone gives an indicative BCR of 2:1, representing strong value for money.

• Improved reliability (Moderate beneficial) – As a result of reduced delay, more efficient operation of the network, and more accurate information for network users about expected journey times.

• Improved network resilience (Moderate beneficial).

Air Quality (Moderate beneficial) – Due to reduced delay and emissions in Portsmouth’s five Air Quality Management Areas.

• Accidents (Slight beneficial) – Reduced delay and better information about expected journey times will reduce the number of accidents resulting from driver frustration or distraction.

• Other – More comprehensive and reliable data to inform modelling, analysis, and monitoring activities.

Page 29: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

B8. Management Case - Delivery : IoT BigData Platform Project - Outline PlanB8. Management Case - Delivery : IoT BigData Platform Project - Outline PlanB8. Management Case - Delivery : IoT BigData Platform Project - Outline PlanB8. Management Case - Delivery : IoT BigData Platform Project - Outline Plan

Scoping Meeting Milestone X

Technical workshop 1 day

Prepare technical and pricing proposals 6 weeks

Submission of proposals to Portsmouth Milestone X X

Evaluation of proposal and raise contract up to 12 weeks

Project Board Review of the Proposal Milestone X X

Implementation Planning 9 weeks

Contract signed & approval obtained to proceed Milestone X X

System Design, Infrastructure Planning, Software Development of Data and Modelling Tools Ongoing

Completion of the detailed Software,Tools, Hardware, Data analytics, design and specs Milestone X

Order Hardware and delivery lead time 9 weeks

Testing and Development period 14 Weeks

Install and commission Bluetoothe sensors,Calibration, IP Networking 10 weeks

Data Integration, Setting up the Development, Testing, Pre-Prod and Go Live Environments 12 weeks

C-ITS Applications, Data Analytics testing and Demonstration 8 weeks

Window for Monitoring and Evaluation 3 weeks

Window for snagging, Monitoring and Evaluation 4 weeks

Review of Objectives and benefits realisation 3 Days

Project Closure Milestone X X

Contingency Period

Project

ConsiderationsCity Events and Major Works, Resource restrictions and other potential constraints

Mar-18 Apr-18 May-18

Initiation

Delivery

Review & Close

Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17Project Stage Activity Duration Dec-16 Jan-17 Feb-17

Page 30: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

Network Management Team - September 2016

1 | P a g e

Project Board

Project Executive

Pam Turton

Senior User

Adil Mohammed

Senior Supplier

Graham Fairbrother

Project Manager

Darren Thirlwell

Project Team

Adil Mohammed Lee Gilbert Steve Flynn

Rob Williams Jack Donohoe

Simon Whitworth Derek Kane Barni Fry

Business Assurance

Paul Darlow (When required)

Senior Stakeholder

Michael Robinson

Other Key Stakeholders /

Interested Parties

Alan Cufley Cllr Fleming

Rachael Dalby David Armstrong Anthony Hadley

Rob Rimmer

Financial Assurance

Christine Mansley

Page 31: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

Network Management Team - September 2016

2 | P a g e

Role Descriptions/Responsibilities

Role Responsibilities Project Executive Pam Turton

• Maintain ultimate responsibility for the project

• Monitor and control progress of the project

• Review the business case

• Hold senior supplier and senior users to account

• Ensure overall business assurance Senior User(s) Adil Mohammed Michael Robinson

• Advises the executive on user issues

• Provide customer quality expectations

• Ensure desired outcome of the project is specified

• Ensure expected benefits of the project are realised

• Ensure availability and commitment of user resources Senior Supplier Graham Fairbrother

• Advises the executive on supplier issues

• Assess and confirm viability of project approach

• Ensure proposals for development of the products are realistic

• Ensure availability and commitment of supplier resources Project Board

• Direction of the project

• Project assurance

• Publicity/dissemination of information about the project

• Approval of major plans

• Approval of changes

• Commitment of resources Project Manager Darren Thirlwell

• Responsible for delivering the project on behalf of the Board

• Plan and monitor the project

• Direct and motivate the project team

• Manage or delegate the management of project resources

• Report to Project Board

• Manage configuration and change control

• Manage risks

• Manage production of required products Team Managers Adil Mohammed Graham Fairbrother

• Manage production of specific products as defined by Project Manager

• Prepare team plan

• Manage team

• Report progress on team’s work

• Identify risks associated with team’s work

• Ensure that quality controls for the team’s work are planned and performed correctly

The Project Team will consist of:- IS & Finance TE&BS & Other Darren Thirlwell - IS Project Manager Adil Mohammed - Traffic & Network Manager Paul Darlow - IS Business Partner Lee Gilbert - Assistant Traffic Engineer Rob Williams - IS Applications Architect Steve Flynn - Assistant Traffic Engineer Jack Donohoe - IS BSA Barni Fry - Contracts Administrator Simon Whitworth - IS Network Architect Claire Bartlett - Communications

Christine Mansley - Financial Assurance

Page 32: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

Risk

Number

Risk Title

(insert name of the identified risk)

Risk Owner

(insert initials of

the person

responsible for the

risk - in most

cases it will be the

project manager,

however for larger

scale projects the

risks maybe split

amongst a project

team)

Probability

(insert a score of 1-

4, using the

descriptions at the

bottom of the log -

based on the

likelihood of this

risk occurring)

Impact

(insert a score of

1-4 using the

descriptions at the

bottom of the log -

based on the impact

this risk could have on

the project)

Net Risk Score

(there is a

formula set up

to multiply the

probability score

by the impact

score and

it will be

automatically

inserted in this

column - this

score will

dictate the

colour the risk

should be, again

using the table

at the foot of the

log)

Control Measures

(describe how the risk will

be mitigated against)

1 Full procurement process required (Delaying project start,

and incurring small additional costs)

Adil Mohammad 1 1 1 The procurement process

has already been discussed

with the procurement team

who are happy with the

proposed procurement

route.

2 Project costs increase (outside funding availability) Adil Mohammad 2 3 6 Indicative costings have

been obtained from

suppliers and as such we

are happy the costings are

accurate. If costs were to

increase the number of

junctions could be reduced.

3 Unanticipated works discovered (delays to programme,

increase in costs)

Adil Mohammad 1 2 2 Initial scoping and feasibility

has indicated the works

required and no further

works are anticipated. Any

additional works are likely

to be small and can be met

through the cost and

timescale contongencys.

4 Lack of resource available to deliver works (delays in

programme)

Adil Mohammad 2 3 6 Resources are being

planned in to deliver the

works and we have

frameworks in place to

obtain additional resource if

required.

Probability

Rating:

Impact Rating:Net Risk scores:

Very unlikely -

score 1

Minor - score 1 12-16 HIGH (Red) Very

Serious weakness

Unlikely - score 2 Significant - score 2 6-9 MEDIUM (Amber)

Serious weakness

Likely - score 3 Serious - score 3 3-4 LOW (Yellow) - Minor

weakness

Very likely - score

4

Major - score 4 1-2 VERY LOW (Green)

Satisfactory (effective)

CLOSED

Risk Log Review Dates:(Insert date each time risk

log is reveiwed)

RISK LOG

PROJECT NAME: IoT and BigData Platform

PROJECT MANAGER: Adil Mohammad

SENIOR PROJECT MANGER: Pam Turton

Page 33: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

1

Purpose of this document The benefits realisation management plan supports section C1 of the application form providing details of how the benefits process will be applied to a program. It describes the tasks, resources, time frame and approach to each step of the framework. The executive summary is a brief overview of the program, key benefits and how they will be tracked.

IoT and Big Data Platform

Monitoring, Evaluation and Benefits Realisation

Appendix G - BENEFITS REALISATION

Page 34: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

2

Version Name Details of changes / comments Distribution Date

1.0 Adil Mohammad Preliminary draft 26/09/2016

Page 35: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

3

1. Executive Summary

The benefits realisation management plan provides details of how the benefits process will be applied to a program. It describes the tasks, resources, time frame and approach to each step of the framework. The executive summary is a brief overview of the program, key benefits and how they will be tracked.

2. Benefits Management Phases

Describe how this program links to the standard phases

3. Business Case Benefits Reconciliation

Consider the following point for inclusion in this section:

• Participation in business case benefits development

• Economic appraisal calculations

• Current Project scope/direction: Benefits Change Form

• Analysis of Business Case Benefits

4. Benefits Ownership

Consider the following point for inclusion in this section:

• Benefits Owners Engagement

• Roles and benefit accountabilities

• Business problems to be resolved

• Operational obstacles and risks: Benefits Risk Register

• Benefits Measures and Targets: Benefits Realisation Register

1.

Reconcile

business

case

benefits

2.

Secure

benefit

ownership

3.

Develop

benefits

activity

plan

4.

Conduct

baseline

measures

5.

Review

business

change

6.

Go live

activities

7.

Benefits

tracking

Page 36: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

4

5. Benefits Activity Plan

Consider the following point for inclusion in this section:

• Business, Technology, Organisational, Processes and People tasks

• Benefits Realisation Pathway map

• Benefits Result Chain

• Review project plan for benefit and change management tasks

• Benefits Realisation Activity Plan

• Communication materials – benefits at each level and “What’s in it for me”

6. Baseline Measures

Consider the following point for inclusion in this section:

• Describe how measures will be collected

• Detail the effort and time frames

• Detail any tools to be used such as satisfaction surveys

• The sign-off process for the measures

7. Benefits and Organisational Change

Consider the following point for inclusion in this section:

• This section should detail the process changes and initiatives required to produce each benefit. Benefits and change work together.

• The Change Management group typically develop “Stop, Start and Continue” process lists.

• The details will be used to create the Benefits Pathway and The Benefits Realisation Results Chain.

• Go Live

Consider the following point for inclusion in this section:

Page 37: Funding for Innovation: Cooperative Intelligent Transport ... · Funding for Innovation: Cooperative Intelligent Transport Systems Application Form The level of information provided

5

• Describe how the quick wins will be identified and communicated.

• List the key processes to stop and those which will improve.

8. Post Go Live Benefits Tracking

Consider the following point for inclusion in this section:

• Describe how the benefits data collection and reporting process will be conducted post implementation.

• Indicate the groups and stakeholders who will receive the information.

• Some benefits will not meet target and it will be necessary to implement new initiatives to correct this.

• Describe the expected duration, possible two years post implementation.