Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Funding for Innovation: Cooperative Intelligent Transport Systems
Application Form
The level of information provided should be proportionate to the size and complexity of the scheme proposed. As a guide, we would suggest around 10 to 15 pages including annexes would be appropriate.
A separate application form should be completed for each scheme.
Applicant Information
Local authority name(s)*: Portsmouth City CouncilPortsmouth City CouncilPortsmouth City CouncilPortsmouth City Council
*If the bid is a joint proposal, please enter the names of all participating local authorities andspecify the lead authority
Bid Manager Name and position: Adil Mohammad, Traffic and Network ManagerAdil Mohammad, Traffic and Network ManagerAdil Mohammad, Traffic and Network ManagerAdil Mohammad, Traffic and Network Manager
Contact telephone number: T: 023 9284 1608T: 023 9284 1608T: 023 9284 1608T: 023 9284 1608
Email address: [email protected]@portsmouthcc.gov.ukadil.mohammad@[email protected]
Postal address:
Portsmouth City Council Civic OfficesPortsmouth City Council Civic OfficesPortsmouth City Council Civic OfficesPortsmouth City Council Civic Offices Guildhall Square, Portsmouth, P01 2NEGuildhall Square, Portsmouth, P01 2NEGuildhall Square, Portsmouth, P01 2NEGuildhall Square, Portsmouth, P01 2NE
When authorities submit a bid for funding to the Department for Transport, as part of the Government’s commitment to greater openness in the public sector under the Freedom of Information Act 2000 and the Environmental Information Regulations 2004, they must also publish a version excluding any commercially sensitive information on their own website within two working days of submitting the final bid to the Department for Transport. The Department for Transport reserves the right to deem the business case as non-compliant if this is not adhered to.
Please specify the web link where this bid will be published:
https://www.portsmouth.gov.uk/ext/parking-travel-and-roads/travel/sustainable-transport-funding.aspx
2
SECTION A - Scheme description and funding profile
A1. Scheme name: Portsmouth CITS (Co-operative Intelligent Transport Systems) Platform
A2. Headline description: Aim: Develop an IoT (Internet of Things) and Bigdata platform for Portsmouth's Traffic Management Centre for Information, warning systems and C-ITS applications enabling vehicle to infrastructure and vehicle to vehicle communications.
Objectives:
• Build and adopt IoT and Big Data infrastructure in Portsmouth.
• Demonstrate 'co-operative' vehicle-vehicle and vehicle-infrastructure elements.
• Early adoption and further understanding of the C-ITS technologies.
• Use the findings for more widespread deployment across the city.
• Demonstrate links with other systems, stakeholders, and Research centres with a road map to work with and strengthen relationship with partners and the private sector supply chain.
Figure 1.1 Illustration of C-ITS Applications for IoT & Big Data Platform
3
A3. Geographical area:
Please provide a short description of area covered by the bid (in no more than 50 words)
The area served is the entire Portsmouth road network, focusing on the strategic network of:
• M275/A3 (Western Corridor) – serving Portsmouth City Centre, Portsmouth International Port, Portsmouth Naval Base and Gunwharf Quays;
• A2030 –serving at Industrial Estates and retail parks, Portsmouth Football Club, Southsea seafront and eastern Portsmouth;
• East-west connections in Portsmouth.
Postcode: PO1 2NE Traffic Management Centre (TMC)
Please append a map showing the location (and route) of the proposed scheme, existing transport infrastructure and other points of particular interest to the bid e.g. development sites, areas of existing employment, constraints etc. Please see; Appendix A Scheme Location
A4. Type of bid (please tick relevant box):
C-ITS: Connected Vehicle ����
C-ITS: Real Time Information
C-ITS: Smart Parking
C-ITS: Vulnerable Road Users
Other (please specify)
A5. Equality Analysis
Has any Equality Analysis been undertaken in line with the Equality Duty? No A preliminary Equality Impact Assessment (EIA) has not been undertaken for this scheme as there is no impact on the protected groups.
SECTION B – The Business Case
B1. The Scheme – Summary/History (Maximum 200 words)
The project will deliver:
• An established and tested Bluetooth sensor network
• Real time database, communication and IT hardware infrastructure
• Real time data analytics platform.
• C-ITS application platform to provide Portsmouth City Council's (PCC) own data services, applying its own data for Predictive Modelling and real time Traffic Management.
• Post deployment monitoring and analysis.
4
Bluetooth sensors at strategic points along Portsmouth's road network would detect signals transmitted from Bluetooth devices within vehicles anonymously. Multiple sensors along the route would identify devices and measure journey times, queues and origin and destinations in real time.
The data is transferred to the secure data centre. By linking and processing datasets in real time joined up with predictive modelling and a decision support system, the following benefits will be realised:
• Scalable real time traffic and incident management
• Maximum use of the network.
• Improved real time information and support for individuals to make informed travel choices
Portsmouth City Council has recently trialled Bluetooth sensors at five locations with the ability to collect traffic flows, journey times and route choice information. PCC has citywide IP networking and communication infrastructure with a datacentre facility to enable a big data platform with predictive modelling and analytics.
The results provide data accuracy and identify any gaps in the Big Data platform and sensor network enabling the system to be integrated into the PCC's TMC. Figure 1.2 show system overview.
Figure 1.2: IoT and Big Data System Architecture.
5
B2. The Strategic Case (Maximum 350 words) Appendix B provides additional information. Context A dense island city, with limited road space, Portsmouth has significant potential for severe congestion. In future years this congestion is expected through the city's planned growth unless intervention occurs.
Portsmouth's traffic management challenges are:
• Managing the peak traffic demand.
• Management of planned disruption (events and roadworks)
• Disruption from unforeseen incidents.
• Road traffic emissions.
• Managing planned growth on the constrained network
Existing Infrastructure Portsmouth's network infrastructure is outdated with legacy issues where focus has been on maintenance. This approach will not enable a greater understanding of the network capability, or identify challenges from increasing traffic demands.
Urban traffic management and control techniques1 have been used for decades to reduce delays and congestion. By using these techniques without IoT and Big Data platform any additional capacity provided on the network will be replaced with additional traffic.
Big Data Platform The aim of the proposed scheme is:
To develop an IoT and Bigdata platform for Portsmouth's Traffic Management Centre for real-time information and warning systems and C-ITS applications capable of enabling vehicle to infrastructure and vehicle to vehicle communication.
In 2013/14 PCC upgraded their IT infrastructure and data centre facility which can expand to accommodate a Big Data platform. The new platform will address the city's traffic management challenges by provide insights into traffic patterns to allow an improved, dynamically managed transport network. As well as benefits to the city's network there will be indirect benefits to Highways England strategic road network and neighbouring authorities.
The expected direct and unquantified benefits/outcomes are;
• Real time journey and delay information allowing informed route choices that ultimately distribute traffic and increase operational performance of the network.
• An in-depth understanding of the traffic management measures and the economic impact of various events.
• Identify routes used for shortcuts during congestion and peak times.
• Provides information on Road Investment Strategy (2015-2020) for Highways England.
• Economic growth through improved journey time and reduced congestion.
• Improved connectivity to and within the city.
• Improved air quality through reduced congestion.
• Use the findings for more widespread deployment across the city and share with other authorities.
Work with and strengthen relationship with partners and the private sector supply chain.
1 such as SCOOT, MOVA and VA, traffic cameras and variable-message signs
6
B3. The Financial Case – Project Costs Before preparing a scheme proposal for submission, bid promoters should ensure they understand the financial implications of developing the scheme (including any implications for future resource spend and ongoing costs relating to maintaining and operating the asset), and the need to secure and underwrite any necessary funding outside the Department for Transport’s maximum contribution. Please complete the following tables. Figures should be entered in £000s (i.e. £10,000 = 10). Table A: Funding profile (Nominal terms)
£000s 2016-17 2017-18 Total
Cost Contingency Total
Notes: (1) Department for Transport funding must not go beyond 2017-18 financial year. (2) A local contribution of 5% (local authority and/or third party) of the project costs is required.
7
B4. The Financial Case - Local Contribution / Third Party Funding Please provide information on the following points (where applicable): a) The non-DfT contribution may include funding from organisations other than the scheme
promoter. Please provide details of all non-DfT funding contributions to the scheme costs. This should include evidence to show how any third party contributions are being secured, the level of commitment and when they will become available. PCC has allocated £18,000 towards the scheme from capital funds.
b) Where the contribution is from external sources, please provide a letter confirming the
body’s commitment to contribute to the cost of the scheme. The Department for Transport is unlikely to fund any scheme where significant financial contributions from other sources have not been secured or appear to be at risk.
N/A
Have you appended a letter(s) to support this case? N/A c) Please list any other funding applications you have made for this scheme or variants thereof
and the outcome of these applications, including any reasons for rejection. d)
No funding has been applied for this scheme before.
B5. The Financial Case – Affordability and Financial Risk (maximum 300 words) This section should provide a narrative setting out how you will mitigate any financial risks associated with the scheme. Please provide evidence on the following points (where applicable): a) What risk allowance has been applied to the project cost? A 25% contingency allowance has been allocated within the budget. How will cost overruns be dealt with?
• The cost of setting up and delivering the data platform has been budgeted through PCC's Information Services and will be programmed at the agreed costs should PCC be awarded the funding.
• The costs of Bluetooth and other IoT devices are budgeted based on the current procurement costs of these devices. Enquiries have been made with potential suppliers to confirm any variation in the cost.
• With the risk allowance applied to both Bigdata platform and Bluetooth sensors all the infrastructure is delivered to fulfil the objectives of the project. However once the project is sufficiently progressed the 25% contingency can be applied back into the project to add additional functionalities and spreading to the wider network.
• The project manager will provide early warnings and monitoring the costs to prevent overrun of the budget.
8
What are the main risks to project delivery timescales and what impact this will have on cost?
• Any delays in the project will not impact on spend of DfT funds by the end of the 2017/18 financial year. DfT funds will be prioritised at the start of the project with PCC contribution spend being allocated to the end of the project.
• Risk • Mitigation • Impact on cost
• Lack of resource available from PCC Information Services department.
• Their time resource is being planned for now.
• This risk would not impact on cost but it would delay project start.
• Unanticipated works • Scoping and feasibility planning using PCC Information Services and the current contractor to identify all potential works in advance.
• Additional works may incur additional costs, but these will expected to be within the project contingency as a full scoping and feasibility study should pick up any major works.
• Full procurement process required
• Discussions with procurement team have already begun.
• Additional costs may be incurred but these could be accommodated within the project contingency.
• Delay/issues in constructing new data centre
• Plan in advance with contingency in timescales. PCC currently has a redundant UTMC SERVER that can be reconfigured as a data platform as a contingency plan if necessary.
• No additional costs, just project delays.
B6. The Economic Case – Value for Money If available, promoters may provide an estimate of the Benefit Cost Ratio (BCR) of the scheme (particularly for schemes costing more than £100,000) An assessment of the value for money has been undertaken. Please see Appendix C. Table C – Predicted benefits for different scenarios of reduction in total network-wide delay
Scenario 2013 12 Hr Delay Saving1
2031 12 Hr Delay Saving2
Daily PVB (£)
Annual PVB (£)
Indicative BCR
1% reduction in total delay across the network
293 pcu-hrs 816 pcu-hrs £56,528 £13.3 million 47
0.5% reduction in total delay across the network
147 pcu-hrs 408 pcu-hrs £28,264 £6.65 million 24
IoT Big Data Platform represents excellent value for money: falling within "Very High" VfM category with benefits of £24 for every £1 spent.
9
B7. The Commercial Case (maximum 300 words) The procurement strategy for this project will be to utilise single supplier frameworks the Council already has with Atkins and TRL until 2020 and 2019 respectively. Both suppliers have range of skills and expertise to provide support on the project. As single supplier frameworks no additional competitive process is required and work can begin immediately with the suppliers to establish contracts. The scale and scope of the framework agreements are: TRL (Transport Research Laboratory):
• £2.5M value
• To provide assistance and support in the analysis of the raw survey data received from the surveyors and provide quality assurance on the data.
• To provide the Authority with guidance to interpret the data.
• To support and advise the Authority on developing a Highways Infrastructure Asset Management plan.
• To assist in developing a robust asset management system and tools to support the Authority in decision making.
Atkins: PCC has a £20M 'Strategic Partner Framework Agreement' with Atkins to provide professional support to the following Service Areas: Transport, Infrastructure, Planning, Environment, Recreation, Major Projects, and General Business functions. Individual tasks can range from single-discipline ad-hoc operational support through to multi-disciplinary support to major long term regeneration projects. The Council may also use this framework outside of its jurisdictional boundaries where it has responsibility for work-streams forming part of wider cross boundary regional projects. For the procurement of all other contracts the following routes are applied:
• Less than £5,000 at least three ‘Informal Quotes’ are required, most likely sought via email.
• £5,000 - £100,000 at least three 'Formal' quotes are required via the Council's e-sourcing system InTend.
• Greater than £100,000 tenders must be advertised via InTend. Tenders in excess of £1M must be approved via the Council's Gateway Board and tenders in excess of EU thresholds must conform to Public Contracts Regulations 2015.
*It is the promoting authority’s responsibility to decide whether or not their scheme proposal is lawful; and the extent of any new legal powers that need to be sought. Scheme promoters should ensure that any project complies with the Public Contracts Regulations as well as European Union State Aid rules, and should be prepared to provide the Department for Transport with confirmation of this, if required. An assurance that a strategy is in place that is legally compliant is likely to achieve the best value for money outcomes are required from your Section 151 Officer below.
10
B8. Management Case - Delivery (maximum 300 words) Deliverability is one of the essential criteria for this Competition and as such any bid should set out if any statutory procedure is needed before it can be delivered. a) An outline project plan (typically in Gantt chart form) with milestones should be included as
an annex, covering the period from submission of the bid to scheme completion. The definition of the key milestones should be clear and explained. The critical path should be identifiable and any contingency periods, key dependencies (internal or external) should be explained.
Has a project plan been appended to your bid? Yes (Please see Appendix D)
b) A statement of intent to deliver the scheme within this programme from a senior political
representative and/or senior local authority official. Yes, please see Section D1, which demonstrates the intent to deliver of Alan Cufley, Director of Transport, Environment and Business Support.
B9. Management Case – Governance (maximum 300 words) Please name who is responsible for delivering the scheme, the roles (Project Manager, SRO etc.) and set out the responsibilities of those involved and how key decisions are/will be made. An organogram may be useful here. This may be attached as an Annex. A specific Project Manager will be appointed for this scheme. PCC is proposing to set up a Project Board to ensure that tasks are delivered on time and within budget. . The Project Board will be headed by the PCC's Assistant Director of Transport, Environment and Business Support and will include lead specialists from Information Services. The board will review progress on a regular basis and will prepare regular reports showing delivery performance, financial performance and any risks to the project. Full details of governance arrangements and organogram is attached as Appendix E
B10. Management Case - Risk Management Risk management is an important control for all projects but this should be commensurate with cost. For projects where the costs exceed £100,000, a risk register covering the top 5 (maximum) specific risks to this scheme should be attached as an annex. Please ensure that in the risk register cost that you have not included any risks associated with ongoing operational costs and have used the P50 value. Has a risk register been appended to your bid? Yes see Appendix F
11
SECTION C – Monitoring, Evaluation and Benefits Realisation
C1. Benefits Realisation (maximum 250 words) The IoT and Big Data Platform objectives have been used to develop the ‘desired outputs and Outcomes’ for the scheme. These desired outputs and outcomes are the actual benefits that are expected to be derived from the scheme and are directly linked to the objectives. Profile of Benefits:
• Desired outputs – tangible effects that are funded and produced directly as a result of the scheme; e.g. The Big Data infrastructure, IoT infrastructure, Tools and Services available for dynamic traffic and events management for TMC.
• Desired outcomes – final impacts brought about by the scheme in the short, medium and long term e.g. Journey time benefits, better informed travel choices, mode shift to more sustainable travel, BRT and other public transport provisions.
PCC will have a Benefits Realisation Plan that is owned by the Senior Responsible Owner (SRO), although ownership can be reviewed and delegated as necessary. It is the owner’s responsibility to ensure that the benefits are aligned with the study objectives and that appropriate monitoring processes are adopted. The benefits Realisation management plan will be developed which provides details of how the benefits process will be applied to a program. A combined Benefits Realisation Plan and Monitoring and Evaluation Framework have been produced and are available within Appendix G. It describes the tasks, resources, time frame and approach to each step of the framework. Figure 1.3 shows the process
1.
Reconcile
business
case
benefits
2.
Secure
benefit
ownership
3.
Develop
benefits
activity
plan
4.
Conduct
baseline
measures
5.
Review
business
change
6.
Go live
activities
7.
Benefits
tracking
12
C2. Monitoring and Evaluation (maximum 250 words) PCC will evaluate measure and report the benefits outcomes and impacts of the scheme during its progress in the following framework: Outcome Monitoring - will measure the progress of the scheme and ensure that the expected Outcomes are realised. The responsible person in the first instance is the scheme manager who will report outcomes to the project board at monthly intervals. Initially the key measures of success will be setting up the Database server, DMZ comms server and Application Server. This will then be used to start building tools necessary for processing the incoming data. The platform will be ready to receive, integrate and publish data. The next stage will be to install and calibrate the IoT devices on the network. Process Monitoring - A systemic process for calibration and validation of sensor data will be provisioned along with data storage. This will measure the efficiency of the system and minimise the risk of data gaps. Tools will be developed to clean and process the data. This will ensure that the expected outputs from the contractors are achieved and that any issues are raised and resolved in a clear and unambiguous manner. Benefits Realisation Monitoring - will ensure that the project delivers the anticipated benefits over the life of the project. The project board is responsible for ensuring the project benefits are realised and if possible enhanced during the life of the project.
13
SECTION D: Declarations D1. Senior Responsible Owner Declaration As Senior Responsible Owner for [scheme name] I hereby submit this request for approval to DfT on behalf of [name of authority] and confirm that I have the necessary authority to do so. I confirm that [name of authority] will have all the necessary powers in place to ensure the planned timescales in the application can be realised. Name: Alan Cufley
Signed:
Position: Director of Transport, Environment and Business Support
D2. Section 151 Officer Declaration As Section 151 Officer for [name of authority] I declare that the scheme cost estimates quoted in this bid are accurate to the best of my knowledge and that [name of authority] - has allocated sufficient budget to deliver this scheme on the basis of its proposed funding
contribution - will allocate sufficient staff and other necessary resources to deliver this scheme on time and
on budget - accepts responsibility for meeting any costs over and above the DfT contribution requested,
including potential cost overruns and the underwriting of any funding contributions expected from third parties
- accepts responsibility for meeting any ongoing revenue requirements in relation to the scheme
- accepts that no further increase in DfT funding will be considered beyond the maximum contribution requested
- has the necessary governance / assurance arrangements in place - has identified a procurement strategy that is legally compliant and is likely to achieve the
best value for money outcome - will ensure that a robust and effective stakeholder and communications plan is put in place. Name: Chris Ward
Signed:
Submission of bids: The deadline for bid submission is 5pm, 30 September 2016. An electronic copy only of the bid including any supporting material should be submitted to: [email protected]
WE
STW
AY
S
PENK RIDGE
AURIOL
DRIVE
FORTUNES
PORTSDOWN
CO
LLE
GE
HECTORCL
DE
LP
HI
ATLANTIS
PA
RK
ALMOND
CL
RO
AD
SHEARWATER DR
DENVILLE CL
Falcon Green
A 27
WAY
THE SALTINGS
Osprey Close
WAY
CY
GN
ET
R
D
KE
STR
EL
PL
ACORN CL
OAKAPPLE
GDNS
LODGE
ST A
ND
RE
WS
R
D
A 2030
EA
ST
RECTORY
FARM
SS
WATERMEAD
RD
BIN
OLD
NE
AVENUE
FA
RLIN
GTO
N
AVENUE
BROAD
GDNS
RO
AD
PERCOPBEECH
DR
THE
FAIRWAYS
Sandpipers
ROAD
LO
WE
RSP
UR
RO
AD
SECOND
HA
RD
Y
RD
FIRST
MARSHLANDS
SPUR
MA
RS
HL
AN
DS
RD
WO
FITZHERBERT
WA
TER
RK
S
FIS
HE
RS
GR
KNIGHT
GDNS
ED
ZETLAND R
OAD
T
AV
E
EVELEGH
GRANT
FA
RLIN
GT
ON
UN
UTB
O
S
RIN
VCopsey
RO
AD
RN
E
ES
CR
Pa
th
OLD RESERVOIR RD
BERTFITZ HER
Zetland P
ath
EY
KING ARTHUR'S
CT
Copsey ClEGRO
RO
AD
CO PS
AVENUE
ROAD
RE
CTO
RY
A
VE
BE
VE
RLE
YG
R
RO
AD
WOODFIELD
OLD
ELMTREE
RD
LLM
AN
GI
ROAD
GA
LT
R
OA
D
ROAD
ROAD
HO
RN
ROAD
ASHLEY
LAN
E
CR
OO
K
ALE RD
BLAKE RD
SD
BU RN
AIN
AVE
HILL
RD
AVENUE
PETER
H AM
THER
ISE
DALE
OWN
UN
DE
RDAV
E
PARK
CR
ES
HILLTOP
BROW
TH
E C
RE
ST
THE
CHRISTCHURCH
GDNS
Path
Bro
w
THE
THORNTON
CL
GREENLEA CL
NS
RO
AD
HILLSIDE AVE
GE
OF
FR
EY
L ILY AVE
ME
AD
OW
ED
GE
OAKHURST GD
DELLCLP
ath
C
BOUNDARYWAY
LO
ND
ON
rest
REST
PATH
Dellc
OAKLEA
CL
P
East
Copsey
Path
LEALAND
GR
RO
AD
RO
AD
HIG
HL
AN
DS
RD
H
ROAD
OLL
OW
ROAD
OWNMOO RTAVE
BIR
ROAD
K DALE
GT ON
HAVANT
ST
H
ELLE
NS
R
D
PO
RT
SD
OW
N
DENE
LE
ALA
ND
ROAD
ST
AT
ION
HO
ME
FIE
LD
RD
SO
UT
H
ROAD
UP
LA
ND
SR
OA
D
AV
EN
UE
VIEW
ON
TRO
CR
HOYLAKE
FARLIN
ES
DOWN END ROAD
ALDSWORTH GDNS
Aldsworth Path
RO
AD
ALDSWORTH CL
LA
BU
RN
UM
A
VE
SCHOLARS'
WALK
WA
VE
RLE
Y
RD
LA
NE
SOLENT
DOWN END
SEA
AU
GU
ST
INE
RO
AD
CENTRAL
MANORMEWS
LA
NE
CHILGROVE RD
DR
AY
TO
N
AVENUE
LO
WE
R
GROVE
KIRTON RD
WAY
MA
NO
RC
RE
S
AVEU
RACTON AVE
RNE
SO
UT
HB
O
LO
RD
ING
TO
NC
L
DRAYTON
PORTSDOWN
PENRHYN
PE
NA
RT
H A
VE
AV
EN
UE
AV
EN
UE
ME
RT
HY
R
AB
ER
DA
RE
BR
EC
ON
AV
EN
UE
AV
EN
UE
AV
EN
UE
VE
RG
OR
DO
N
AV
E
BRAEMAR AVE
TR
EG
AR
ON
DYSART
IN
MANOR
AV
EN
UE
CA
RS
HA
LT
ON
AV
E
CA
RM
AR
TH
EN
LAMPETER
AVE
RO
AD
BOUGHTON CT
LA
KE
SLE
Y
LA
BL
A
MAIDFORD
GR
ES
NT
CE
EA
ST
ER
N
HOLC
WILBY LA
LD
OT
DRIVE
LA
UC KB
Y
CR
TH
AL
A 27
WALT
ON
LA
B
ONPT
AM
R
LAON
HOLDENBY CT
DAV
LA
B
TR
Y
N
E
TI
CL
FFIE
ORP
E
YAR
ECT
DL
EY
CL
EVE
O
ON
RD
LA
FO
ELL
DR
DR
E
EY
XL
COT
WEL L RD
N LA
Thornby
Ct
ADSTONE LA
BU R
W
CRE
S
RT
MA
RS
T
SY
CO
RBY
A 27
ON
EA
ST
ER
N
ROAD
CL
OS
E
WAINWRIGHT
CL
RO
AD
JA
CK
SO
N
AV
E
EY
ST
AVE
KIR
TLE
Y
CL
ATI
DL
OU
ST
KAREN
R
AY
DR
LA
NE
TO
N
MARSH
CL
FA
RA
DA
YR
D
ROAD
WALTON
EE
KT
CR
PO
R
WERLO
HIR
ST
RD
STEDOR DR
ME
RZ
CL
TESLAEDISON
SPURFRANKLIN CLOSE
DR
KINROSS CRESCENT
WEM
BLEY
GR
OVE
GROVE
COLLEGE
WA
LK
OLD
CRESCENT
Highbury PathRD
A 27
BIL
TO
N
ROAD
WA
Y
RD
A 2
030
RO
AD
WA
Y
KEEL CLOSE
BIN
SO
NR
O
ROAD
LA
NE
AIRSPEED
PA
INTE
RC
L
HE
HA
C
MIT
LL
PLUMPTONGDNS
PLACE
ALCHORNE
SE
RVIC
E
QU
AR
TR
EM
AIN
E
WAY
BARTON GR
RO
AD
DUNDAS
DU
ND
AS
CLO
SE
SPUR
BOLDE
CL
FIE
LD
MARAZANRD
DUNDAS
PO
RT
ROAD
RO
AD
AIRPO
RT
WIL
LIAM
S
ROAD
NE
VIL
LE
SH
UT
E
GATCOMBE AVENUE
RO
AD
DE
VO
N R
D
ROAD
GROVE
LANE
RD
ALLCOT
LOCARNO ROAD
MONCKTON
ROADA
YLE
N
LATIMER CT
CL
T TO
N
SHARPSCL
SU
ANCHORAGE
RO
AD
ROAD
SE
RV
ICE
AIR
PO
RT
ROAD
ORTH
W
RO
AD
AC
K
WOODPECKER
WAY
SPARROWHAWK
CL
L RD
SP
UR
LIMBERLINE ROAD
ROAD
LIM
BE
RLIN
E
GU
NS
TO
RE
RD
E
KINGFISHER
CT
RK
ES
T
DR
INL
CRE
S
AVEN
CEN
T
UE
COURT CL
MANSVID AVE
COURTMEAD
ROAD
OLD
GOFTON AVE
PANGBOURNEAVE
LANGDALEAVE
Path
LA
NE
CO
UR
T
AVE
AVENUE
AVENUE
AVENUE
Mulberry
WO
OLN
ER
AV
E
LE
ND
OR
BE
R
MULBERRYAVE
RO
AD
DO
VE
RC
OU
RT
BETHE
CLOSE
RR
Y
CL
OS
E
RO
AD
HILARY
BEACONSFIELD
ROAD
LMU
BUR
Y
LONSDALE
KNOWSLEYCRES
ROSEBERY
SA
LIS
F
LIN
DI
S
LANE
ARNE
PA
RK
CRES
ROAD
WID
LE
Y C
TD
R
DE
AN
R
D
PE
RV
IN R
D
ALBERT RD
The Droke
GLENLEIGH
AVE
DALA
TH
E
OR
CH
AR
D
MAG
GR
OL
D M
AR
KE
T R
D
AL
DR
OK
ES
T
Hig
h
EA
ST
EAST
CT
ROAD
CO
SH
AM
ROAD
ROAD
Cliffdale Gardens
Camp Site
LAN
E
DE
L
ROAD
L
CHIDHAM RD
COURTMOUNT GROVE
RO
AD
CHALKRIDGE RD
AV
E
AV
E
LA
NE
LO
DG
E
A
VE
BE
RN
AR
D A
VE
BU
RR
ILL
CRANBORNE RDRO
AD
Courtmount Path
PA
DW
I CK
A
VE
COLVILLE
SOUTHDOWN
CO
LM
AN
SA
VE
JOHNS RD
WA
LB
ER
TO
NA
VE
WID
LE
Y
ST
JURA CL
ROAD
WALK
SHETLAND CL
WID
LE
Y
RO
AD
LO
ND
ON
HAVANT
REGAL CL
ST
RD
ST
M
AT
TH
EW
S
GEORGESROAD
ST
RO
AD
LON
DO
N
GD
NS
RKNEY
SKYE
CL
ISL
AY
T
O
AR
RA
N C
L
KIN
YRE RD
RD
MALLOW
CL
RO
AD
Str
ee
t
RN
SPUR RD
JUDITH WAY
CURIE RD
LISTER RD
HU
NTE
R R
D
NIGHTINGALE
HILL
HA
RV
EY ROAD
HILL
LA
NE
FIR
ST
A
VE
CH
IPS
TE
AD
RD
SE
CO
ND
AV
E
ROAD
SUNDRIDGE CL DAME
DersinghamCl
BO
STO
NR
DR
OA
D
CAVELL DR
RO
AD
ASHFORD
CL
SE
VE
NO
AK
S
PASTE
UR
ROAD
TANKERTON
CLWESTERHAM CL
TH
I RD
AV
E
CRES
PETERBOROUGH RD
MABLETHORPE ROAD
ONE
HolbeachCl
MILL
SOUTHWICK
PORTSDOWN
LAN
E
SQ
UA
RE
FA
I RF
IEL
D
WY
ME
RIN
G
HYTHE RD
WHITSTABLE RD
Path
CHATHAM
CL
WAY
DE
AL
R
D
LA
NE
ROAD
DSTMAI
ROAD
CLA
YB
AN
K
RD
ROAD
KIL
N
CLAYBANKSPUR
RO
AD
RO
AD
VE
RN
ON
TOKIO RD
DA
RT
MO
UT
H
GLE
NT
HO
RN
E
R
D
BURRFIELDS
ROAD
ROAD
ROAD
GREEN
LOVETT
WESLEY
HEATHCOTE RD
AVENUE
WINTON RD
ROAD
CO
PN
OR
ROAD
DOMUM RD
ST SWITHUNS
RD
ROAD
RO
AD
ROAD
ROAD
AVENUE
RO
AD
RO
AD
KE
NY
ON
CH
ELM
SF
OR
D
COPYTHORN
RO
AD
KEARSNEY AVE
ROAD
MADEIRA
TORRINGTON
WIN
DE
RM
ER
E
URG
COMPTON
BATTENB
RO
AD
AVENUE
AMBERLEY
MERRIVALE
RO
AD
RO
AD
ROAD
RO
AD
ROAD
CR
OF
TO
N
RA
ND
OLP
H
WYKEHAM RD
WYKEHAM AVE
FE
AR
ON
R
D
RO
AD
STUBBINGTON
KIRBY
MAYFIELD
INHURST ROAD
HEWETT
ST CHADS
BR
UN
EL
RD
BRIGHAM CL
MAGDALEN ROAD
ROAD
ROAD
ROAD
NE
WD
OW
N
NORWAY
HOBBYCL
MER
CARRONADE
WALK
S
CL
IDE
FA
RM
GD
NS
GR
EE
N F
AR
MG
AR
DE
NS
MARKCL
LARKHILL
ROAD
RO
AD
HO
NE
YW
OO
D
CL
DR
ECH
AMH
B
BRECL
EN
ROAD
SCOTT
RO
AD
FEL
PERONNECL
ONS
PLT
RID
I NG
S
THORNCLIFFE
CL
PADBURY
CL
NEWNEY
CLEGANCL
BAPAUMERD
NNE
PE
RO
RD
CRESFIRGROVE
ES
CU
RC
L
WA
Y
OLD L
ON
DON
RD
DE
LIS
LE
CL
CURTIS MEAD
ST
BA
RB
AR
A
York Terrace
PA
RSO
N S
LO
ND
ON
OLDGATE
GDNS
THE
GATCOMBE DRIVE
WHIT ECROSSGDNS
CAMBRAI
CLOSE
RA
MP
AR
TG
DN
S
ROAD
MILITARY
RO
AD
ARRAS
ROAD
BA
LD
ER
TO
N
C
L
EASTWOODRD
RD
RD
TEMPLETON
CL
AVENUE
ELMWOOD
DOYLE CL
BEECHWOOD
SOUTHWOOD RD
FA
WLE
Y
RD
London Rd Access Rd
PA
RA
DE
RO
AD
CENT
St F
ranci s
Ct
NO
RTH
WO
OD
OAKWOOD
RO
AD
HO
RS
EA
UTH
PO
RT
SW
OO
D R
D
WE
ST
WO
OD
DOYLE
WYLLIE RD
CO
NA
N R
D
PHOENIXSQ
AVERTH
MIDWAYRD
CRES
NO
AVE
HO
WAR
D
E
RO
AD
FA
LK
LA
ND
RD
Ashley Walk
HAWTHORN
CHATSWORTH
RO
AD
ROAD
WINDSOR
PIT
RE
AV
IE
ELGIN
EDGERLYGDNS
JAS
MO
ND
HIGHBURY
OR
RD
RO
AD
ING
RK
DO
KNOWSLEY
COSHAMPARKAVE
PA
RK
HI G
H
LD
TUD
S
ON
RD
RO
AD
A39
7
WO
OT
TO
N S
T
WAYTE ST
ST
RE
ET
NO
RT
HE
FIRESTATIONCL
ROEBUCKCL
RO
AD
HIGHBURY
WAY
TH
E O
LD
TSMOUTH
ELL
OL
WC
RO
AD
VECTISWAY
HE
RN
DONA
PORNO
RT
ROAD
ROAD
ROAD
ROAD
UR
NA
RD
R
D
WATER
M 27
M 27
ROAD
RO
AD
FE
RR
Y
FERR
Y
HO
RSE
SAN
DS
CL
RO
AD
LO
GS
HO
RE
WA
Y
MILTONLO
CKS
N
BROOM
CR
ES
BROOM
CL
SQUARE
RD
LEOFRIC COURT
RO
AD
A WAYSE
SCHOONER
WAY
SOVEREIGN
CLOSE
SOVEREIGN
DRIVE
SANDERLING RD
RO
AD
DU
NLIN
CLO
SE
WH
IMB
RE
L
CLO
SE
SKYLARK
COURT
LAPWING
ROAD
REVENGE
CLOSESEAGULL
CLOSE
ATALANTA
CLOSE
WAY
Wake Lawn
RO AD
RO
REED
DR
ING
AD
TOWPATH MEAD
OA
K
RD
ROAD
SIS
WHITLEY ROW
ROAD
KIN
SW
OR
D
SA
ND
S
RO
AD
A 2030
LONGFIELD CL
MAYFLOWER
DRIVE
WAYFARER
CLOSE
GODWIT
USH ROAD
TID
EW
AY
GD
NSO
NB
RID
GE
TR
EV
IS
RD
ME
RY
LR
D
BERNEY
RD
MAURICE
RD
IR
Coach-
House Mews
LA
NE
REDW
ING
CT
EB
MI LED
E
HAVEN
BRASTED
COURT
IDGENBR
ST JAMES
PLACE
DRIVE
RD
STO
WE
RD
MO
RG
AN
MA
YL
ES
SO
LE
NT
PLE
AS
RD
OLD
CANAL
BE
RT
IE R
D
MELROSE
CL
TR
AN
ME
RE
RD
SH
IRLE
Y A
VE
ROAD
AN
T
AVENUE
OXTED
COURT
MA
R
THE
RS
WK
INE
LA
NG
ST
ON
E
RIVER
RO
AD
RO
AD
CH
EV
EN
ING
CT
ROAD
LACEY ROAD
EA
ST
ER
N
GLASGOW RD
EASTN
EY
PE
RT
H
RD
DUNBAR
KINGSLEY
M
Tern Walk
MOO
HERON C
L
A
LLARD
RD
RO
SE
TT
A R
D
LOCKSWAY
HE
ST
ER
RD
GU
RN
EY
RD
HO
LLA
M
CA
TIS
FIE
LD
SH
ELF
OR
D
CR
OF
TO
N
GISORS
RD
EUS
TO
N R
D
RO
AD
PLO
VER
REA
CH
AVO
CET C
LOS
E
RO
AD
RO
AD
MSD
E
CU
MBE
RLA
ND
N
LU
Vanguard Ct
FORT
RO
AD
GT
RD
GIBRALTAR
FINCH
RD
CE
RO
AD
U
NT
MELVILLE
RION
SEA
BREEZE
GDNS
ESPLANADE
GARDENS
CR
ES
DRIFTWOOD
LLIDAYELL G
DNS
HA
HENDERSON
ESPLANADE
GARDENS
ROAD
CO
TA
MA
RIS
K
CL
SHLE
CK
EASTNEY
FARM RDGRITANWOOD RD
AD
CADNAM
RD
SAUNDERS MEWS
DRYSDALE MEWS
PITCAIRN MEWS
MOUNTBATTEN SQ
DU
NN
CL
MIN
ST
EA
D R
D
HENDERSON
FO
RD
ING
BR
IDG
E R
D
RIN
GW
OO
D
R
D
RO
AD
GUNNERSHopkins Ct
Flinders Ct
ROW
GARDENS
LIDIARD
CLOCKTOWER DR
TEAPOT ROW
Churchill
Square
ROAD
ROAD
ROAD
ROAD
BIL
LIN
G
CL
ROAD
ROAD
ST
RO
YA
L G
AT
E
EASTNEY
ST
KA
SS
AS
SIN
S
T
CR
OM
WE
LL
RD
CRINOLINE
GDNS
ROAD
EASTNEY
WATERLOCK
GARDENS
LA
NE
RRYFE
FU
RZE
TORFRIDA COURT
Lightfoot Lawn
Godiva Lawn
HOLNE COURT
AMYAS COURT
YEO COURT
REDLANDS GROVE
OAKDENE RD
CHERITON RD
CH
AP
EL
VIE
W
FA
IR
WOODLANDS
NELSON DRIVE
OR
CH
AR
D L
AN
E
WA
LK
L
ROBRANSBURY
DR
IVE
WA
YT
HE
HEAD
CL
WAY
RINGS
MIDDLESEX ROAD
ROAD
AVENUE
SUFFOLK ROAD
WESTON
AVENUE
POSBROOKE RD
CR
OM
AR
TYAV
MILTON
PARK
AVENUE
RO
AD
AVENUE
WARR
EN
BONCHURCH
EDGEWARE
MEON
ROAD
ROAD
CHURCH VIEW
AVENUE
WOODMANCOTERDC
LO
VELLY
R
D
TEDDINGTON RD
RO
AD
AV
E
CLAYDONAVE
AL
VE
RS
TO
NE
RD
MA
YA
VE
ENT
PR
IOR
Y
CRERD
LA
ND
S
SC
EVANSRD
ESSEX
WIMBORNE RD
EASTFIELD
Milton Lane
AN
SO
N R
OA
D
RODNEY ROAD
RO
AD
Spe
cks L
ane
FR
OG
MO
RE
RD
CARISBROOKE
RU
SK
IN R
D
AP
SLE
Y R
D
ROAD
ROAD
ROAD
ROAD
ROAD
RO
AD
ROAD
STANLEY AVENUE
ROAD
Sw
ord
Sa
nds
Path
EA
STE
RN
SH
O
AY
EAST
RE
W
CEDAR GROVE
JENKINS GROVE GRO
VE
AVENUE
AVENUE
EBERY
ROAD
AV
E
SHO
RE
EASTERN AVENUE
SA
LTE
RN
S
AVE
RO
MS
EY
AV
E
PE
TW
OR
TH
RD
ALGIERS ROAD
LA
KE
SID
E A
VE
MA
RIN
A G
RO
VE
MY
RT
LE
GR
OV
E
WA
LLIS
DE
AN
AV
E
TAMWORTH ROAD
BE
AS
AN
TC
LO
SE
WE
LL
SC
LO
SE
KIRPAL
CHESLYN RD
ROAD
WALSALL ROAD
ROAD
AS
CO
T R
OA
D
HAYLING
RO
AD
TANGIER
CO
PN
OR
LY
NT
ON
FO
LK
ES
TO
NE
DO
VE
R
CH
ES
TE
RF
IELD
GR
OV
E
Poplar Walk
PRI
LANGSTONE
COTTON
ORSDEANAVE
UN
I ON
CL
SU
NN
ING
DA
LE
LIC
HF
IEL
D
KIM
BO
LT
ON
BA
FF
INS
MIL
TO
N
RO
AD
RO
AD
RO
AD
RO
AD
ROAD
BURRFIELDS
SILCHESTER
ROAD
ROAD
NORTHOVER
ROAD
COLEBROOK
AVENUE
HIG
HG
RO
VE
R
OA
D
COOPER ROAD
STRIDE
CH
ILC
OT
E R
OA
D
NE
VIL
LE
R
OA
D
WE
STO
VE
R
R
OA
D
RIP
LE
Y
IDS
WO
RT
H
R
OA
D
GR
OV
E
AVENUE
SE
AT
ON
AV
E
SID
MO
UT
HA
VE
AVEN
UE
RE
DC
AR
AV
E
SA
LC
OM
BE
A
VE
TEIGNM OUTH RD
NINIAN PARK ROAD
Nin
ian P
ath
RO
AD
RO
AD COBDEN
WH
ITE
CLIF
FE
A
VE
ST
P
I RA
NS
A
VE
NU
E
CH
AS
EW
AT
ER
A
VE
EASTB
MONEYFIELD
LANE
MA
RT
I N
RD
PA
IGN
TO
N A
VE
MONEYFIELD
RO
AD
OURNE RD
CO
NI
TO
NA
VE
KES WICK AVE
S COLLIS RD
MA
NO
R P
AR
KA
VE
KENDAL AVE
ST
AP
LE
TO
N R
D
STA
TIO
N R
OA
D
GROVE
RO
AD
KE
NS
ING
TO
N
EPWORTH RD HIG
HG
AT
E
RDMAYHALL RD
DUDLEY
ROAD
VICTOR
ROAD
DOUGLAS
ROAD
BOWLER
COURT
NORTHGATE
AVENUE
OR
TH
RD
WHI T
ROAD
W
NEW ROAD EAST
ROAD
ROAD
ROAD
WALLINGTON RD
WE
ST
BO
UR
NE
R
D
FU
NT
ING
TO
N
RD
BO
SH
AM
R
D
WA
LLA
CE
R
D
NEW
BY
RO
N R
OA
D
PE
RC
IVA
LR
OA
D
Curl
ew
Pa
th
Teal
Path
Joseph
Court
Alderman
Gardens
William
Court
BLENDWORTH R
D
VELDER
MIL
TO
N
JAM
ES
RO
AD
Richard
Court
WA
RBLIN
GTO
N P
LAC
E
GOLDSMITH
DEVONSHIRE
RO
AD
PR
INC
E
CARPENTERCL
G
CH
I TTY
RD
E'S
R
WORSLEYST
ST
MAR
CT
INE
GE
O
HIG
HLA
ND
ST
PR
IOR
YR
D
MO
RLE
YR
D
TOKAR
RD
AD
AIR
PEDAM
CL
METHUEN
ALM
AT
ER
R
DU
PR
EE
DR
WEST CT
SELSEY AVE
PARADE
GROVE
LINDLEY AVE
CU
LV
ER
R
D
WESTFIELD
MAXWELLRD
AL
BE
RT
LANDGUARD
BLENHEIM CT
REGINALD
HA
TFIE
LD
RD
HIGHLAND
WA
INS
CO
TT
RD
OW
EN
S
T
WA
RD
RO
AD
RD
KI M
BE
RLE
Y
COLLINS
BU
RB
IDG
E
G
R
NETTLESTONE
RD
CO
US
INS
GR
BR
AD
ING
AV
E
ESPLANADE
WIN
TE
R
ROAD
OLIVER RD
ROAD
RD
CL
EG
GR
D
HE
LLY
ER
White
Cloud Place
TOWERRD
ST ANNSRD
HUNTER
ST
ALB
AN
S R
D
Highland
Terrace
ELIZ
GD
NS
BE
TH
A
PE
PY
S
CL
ROCHESTERRD
ASTONRD
CANTERBURYRD
TREDEGAR
BA
TH
WH
I TE
CL
OU
D P
AR
KRO
AD
AU
GU
ST
INE
BR
UC
E R
D
HE
LE
NA
RD
SALISBURY ROAD
SP
EN
CE
R R
D
EASTERN
EX
ET
ER
R
D
BR
IST
OL R
D
AN
DO
VE
R R
D
FESTING
BR
OM
PT
ON
HIGHLAND
RO
AD
HA
SLE
ME
RE
ST
Mew
s
SEAFIELD RD
MAYDMANSQUARE
RO
AD
LY
ND
HU
RS
T
BE
LG
RA
VIA
R
D
PA
DD
ING
TO
N R
D
FA
RL
ING
TO
N
LY
NN
RO
AD
CA
RN
AR
VO
N R
D
AY
LE
SB
UR
Y R
OA
D
PA
ULS
GR
OV
E
RD
PR
ES
TO
N R
D
BE
DH
AM
PT
ON
R
D
VE
RN
ON
ER
GE
LB
JU
BI L
EE
R
OA
D
GARDENS
LIVESAY
ROWAN CT
FR
AT
TO
N
CH
ES
TN
UT
AVE
AVENUE
RO
AD
GRAYSHOTT
BRAMSHOTT
RO
AD
DEVONSHIRE
SQUARE
RO
AD
PRETORIA
MAFEKING
RO
AD
ROAD
WA
Y
DIC
KIN
SO
N R
D
HU
RS
T
AV
EN
UE
FE
RN
HE
ID
RD
FR
EN
SH
AM
RO
AD
EMPSHOTT
LISS
HEYSHOTT
BY
ER
LE
Y
ROAD
PROCTOR LANE
ROAD
ROAD
ROAD
ROAD
FRANC
IS
RO
AD
DURBAN
ROAD
GLE
NC
OE
RD
DA
UL
ST
ON
RD
BEECHAM RD
GEOR
RO
AD
GE
STREET
FO
UR
TH
ST
CR
AN
LE
IGH
RD
FIF
TH
S
TR
EE
T
CRANLEIGH AVE
SH
EA
RE
R
POWER RD
RO
AD
RO
AD
BROOKFIELD
REN
NY
MANCHESTER RD
LIVERPOOL ROAD
ROAD
RO
AD
ROAD
ROAD
ES
SLE
MO
NT
R
OA
D
SU
TH
ER
LA
ND
R
OA
DLO
ND
ES
BO
RO
UG
H R
OA
D
AV
EN
UE
WALMER
GU
ILD
FO
RD
THORNCROFT
RD
LINCOLN
RO
AD
FORT ROAD
SH
AK
ES
PE
AR
E
RO
AD
OLIN
DA
S
TR
E
ET
WO
OD
LA
ND
S
T
TR
AF
ALG
AR
ET
HE
L R
D
BA
RN
ES
RD
CLIVE
SANDRINGHAM ROAD
SHEF
GU
ILD
FO
RD
PLA
CE
TELEPHONE
MANNERS LA
MANNERS
PERCY
JESSIE
RO
AD
TERRACE
ORC
SELBO URNE
HEYWARD RD
FA
W
BRAMBLE RD
FAWCETT
RO
AD
RD
CE
TT
HAMPSHIRE
RO
AD
SO U
MANOR ROAD
BELMORE
CLOSE
TH RD
LITTLE
GEORGE
STREET
INVERNE
S
HALEP
NC
Y R
D
AR
IEL
RD
CL
AR
EM
ON
T
RD
CORNWALL
NA
EN
RO
AD
FR
AT
TO
N
BOWLER
AVENUE
ROAD
MIL
TO
N
CATHERINGTON
PLACE
RO
AD
THE PARKWAY
ALLIANCE
WAYINVINCIBLE
WAY
ANDREW
CLOSE
WH
IT C
OM
BE
GA
RD
EN
S
A
Milton Lane
ILLUSTRIOUS
DRIVE
CHURCH
WAY
GU UN
I ON
RO
AD
AN
S
GU
AR
DIA
NS
CLO
SE
LIME TREE
VIEW
WAY
RD
I
CLA
RK
ES
R
OA
DH
BE
RT
T
CU
MARYS
AV
ON
DA
LE
RO
AD
RO
AD
RO
AD
HARCOURT
RD
BETTESWORTH RD
ER
NE
ST
R
OA
D
COWPER
RD
EW
AR
T
R
D
ST
EW
AR
T
PLA
CE
ROAD
PURBROOK
RD
SANDRINGHAM LA
FIELD ROAD
MO
OR
LA
ND
RO
AD
RO
AD
ST
LO
WE
R B
RO
OK
FIE
LD
RD
ALVER ROAD
NEWCOME
FR
AT
TO
N
ROAD
Longs W
alk
BILL
SARGENT
CRES
RO
AD
GARNIER
COBURG ST
ARUNDEL STREET
CLI
NO
RTH
AM
ST
CROWN
ST
GLIDDEN
CL
HIG
IELDRD
FYNING ST
WA
TTS
RD
LINKLATER
PATH
TURNER
LAKE
DUKE
RT
FO
RD
PLA
CE CRES
HE
MA
LI N
SS
TR
EE
T
TE
NN
YS
ON
RO
AD
STREET
PINK RD
ST S
TE
PH
EN
S R
D
KILPATRICK CLOSE
DUMBARTON CLOSE
LABURNUM
RO
AD
RO
AD
ckland Path
LITTLE ARTHUR ST
BASIN
RO
AD
NORTHBROOK
CL
Kilbride Path
MALTHOUSE
RD
LOMOND
CLe
RD
GR
AN
GE
RO
AD
DERBY
FE
ST
ING
ST H
ELE
NS
CL
PARK
Dolphin Ct
PARADE
ER
THE OCEAN AT THE
END OF THE LANE
CR
AN
ES
WA
T
AN
ES
WA
TE
R
OLD
BRID
GE
SOUTHSEA
CR
AN
ESW
AT
ER
GA
TE
Rostrevo
r
La
ST H
ELE
NS
EL
AVE
NU
E
MARIONRD
CR
RD
IANS
ROAD
ON
NETTLECOMBE AVE
BE
MB
RI D
GE
ROAD
PARKSTONE LANE
W
CR
ESCEN
T
RO
NAN
'S
ONE
RD
WAVERLEY GR
HERBERTRD
PARKST
RD
RD
AD
TALL
S
ALH
AM
BR
A R
DRD M
WHITWELL
GRANADA
HE
WT
ER
CL
S
WIMBLEDON
TA RD
PARK
WE
LL
RT
NG
HI
WAVE
RLEY
ST
ST
RD
BU
RG
OY
NE
R
D
F
ER
VIL
L
EA
AS
N
SS
NE
UR
C
SOMERSET RD
ST SIMONS RD
CLAREND
ON
BEACH RD
ROAD
SOUTH
FL
OR
EN
CE
RO
AD
MA
LV
ST
CATHERINE
ST
RN
RO
AD
E
RO
AD
WO
BR
A
HAM
ILTON RD
ND
ON
RD
SA
M
AD
AM
ES UE
L
RD
LA
NG
FO
RD
R
OA
D
MALTA RD
JERSEY RD
CYPRUS RD
BU
RLE
IGH
R
OA
D
ROAD
LA
NG
LE
Y
RO
AD
BE
RE
SFO
RD
BA
LFO
UR
DR
AY
TO
N
CHICHESTER
EM
SW
OR
TH PORTCHESTER ROAD
WYMERING ROAD
BE
AU
LIE
U R
D
BU
RL
ING
TO
N R
D
WINCHESTER ROAD
RO
AD
BINSTEED ROAD
TORONTO ROAD
BA
LL
IOL
Ratey's
Lane
PLACE
ON
TO
TTE
NH
AM
RD
NEW
S R
D
HA
NW
AY
CLYDEBANK
GA
MB
LE
RD
QUEEN'S
POWERSCOURT
ST
RE
ET
ROAD
KI L
MIS
TO
NC
LO
SE
Buck
in
MA
YO
CL
OS
E
gham
Bu
BUCKLAND ST
Gre
en
SEYMOUR CL
ROAD
CHAPEL
STREET
RO
AD
CLOSE
ARN AUD
Ha
rley
LO
RD
S S
T
RO
AD
Walk
Fitzroy
STAMFO
FT ST
RD
ST
ON
KIN
G A
L
TIM
PS
ON
R
D
NUTELD
FICL
CLARENDON
PL
AR
EN
DO
N S
T
AS
HL
ING
LA RO
AD
LO
ND
ON
HINGTON RD
ING ST
S
KI N
GS
TO
N
RO
AD
HA
VA
NT
CRESCENT
RD
EA
H
Lane
ROAD
PLAC
E
STM
IN
ST
ER
WE
D R
D
Heath
field
Path
Pitc
roft
L
RD
CROFT
RO
AD
TH
FI E
RD
FO
S
HALE
ST N
HA
LE
ST
SO
UT
H
TE
R R
D
STI
RO
AD
RO
AD
WA
RL
AG
I NC
OU
RT
CR
ES
SY
RO
AD
ROAD
ROAD
ROAD
ROAD
ROAD
HE
NLE
Y
RD
Fe
sting
THE LANE
AV
DORRITACL
ENUE
RO
AD
EDMUND
WHEATSTONE
DELAMERE
FR
AN
CIS
ALBERT
WYNDCLIFFERD
NORTHCOTE
ROAD
RO
AD
STRONANS
AVE
NORMAN
DARLINGTON RD
RO
AD
RD
LA
WR
EN
HA
RO
LD
GRAHAM
RD
TR
EV
OR
RD
RO
AD
CE
ALLEN'S RDRD
CH
LE
OP
OLD
ST
BE
AT
RI C
ER
D
GAIN'S
RO
AD
INGLIS RD
RO
AD
GO
OD
ROAD
OX
FO
RD
BO
ULT
ON
WIS
H P
L
WO
OD
SH
IRLE
YR
D
MOULIN AVE
WISBOROUGHRD
RD
ROAD
LO
WC
AY
RO
AD
GR
SO N GROV
E
RO
AD
RO
AD
GR
COLLIN
NA
PIE
R R
OA
D
GWOOD
DU
NC
AN
R
D
ALB
ER
T
ALB
ER
T
EA
CH
ELS
OU
TR
SO
UT
H
VICTORIA
WIL
I
RO
AD
EXM
O
T RDCEN
ST V N
UTH
SHANKLIN RD
VE
NT
NO
R R
D
HARD
GOLDITH
SM
TA
LB
OT
NORLAND RD
CHETWYND RD
ELAND RD
ET
ON
RD
SON ROAD
GRENVILLE RD
ROAD
HOLLAND RD
ROAD
LO
RN
E
RD
ADDISON
VICTORIA RD N
RUGBY RD
Sydenham Terrace
ST
LUCKNOW ST
VIV
AS
HR
D
CUMBERLANDROAD
SOMERS ROAD NORTH
IRESH
BR
ITA
NN
IAR
D N
OR
TH
V
HA
RR
OW
RD
CL
E
WL
A
BE
RT ST
HAVELOCK RD
STED
LIVINGSTONE
RD
CAMPBELL
ANST
NO
RT
HU
MB
ER
-
LA
ND
RO
AD
RO
AD
BERK
CL
E R
D
G
T
ADFORDRD
IE RD
NO
RT
H
DA
VI D
S
RD
ROAD
BR
ITA
NN
IA
RD
FRODDIRD
CARLIS
SO
MER
S
R
OAD
N
L
HO
LB
R
STREET
GOMER
ON
BR
BR
IDG
ES
IDE
CL
OO
K
WALK
H F
ST
VI C
TO
RIA
ROAD
RO
AD
AM
KINGSDOWN PL
WIMPOLE
STREET
LITTLE
COBURG ST
MUREFIELD
RD
Walk
UN
ION
PL
AC
E
CHURCH
NORTHAM
MEWS
OM
EGA
ST
PORT ROYAL ST
ROAD
RAGLAN STREET
BAILEY'S
AVENUE
MONT
ALDWELL ST
HO
LB
RO
OK
CENTRAL ST
CHURCH
RD
DR
UM
MO
ND
RD
LWR FORBURY RD
RD
RO
ADIR RD
FRASER
COMMON ST
PERCY CHANDLER ST
CO
TTA
GE
VIE
WM
ILFO
RD
RD
VIEW
NAL
ROAD
CH
AR
L
BOARHUNT
CLOSE
ST
BU
RI
LA
ND
PO
RT S
T
ST
MAXSTOKE
CLOSE
FORBU
RY RD
RD
BLA
C
ROAD
KFRIA
RS
STREET
APRIL
SQ
PLACE
ALE
XA
ND
RA
RD
ES
S
T
BLACKFRIARS CL
QUINTON
CL
ROAD
CROSS ST
RIVER
'S ST
SE
DG
L
EY
PLAYFA
WACR
ES
LLISN
NOR
THST
CA
ARUNDEL
RAILWAY
PARADE
KENILWORTH
RD
BEAUFORT RD
RO
KKIR
ONSLOW RD
RD Theatre
Mews
Kings
Mews
ESPLANADE
TH
ED
ELL
Garden
Terrace
RIC
HM
ON
D
R
D
FONTWELLRD
Rave
nsw
oo
dG
ard
en
s
VIC
TOR
IA
Yves MARMION
AVE
ROAD
ROAD
ROAD
W
ON
LE
NN
OX
RD
SO
UT
H
LE
ROAD
ROAD
PARADE
JACK
COCKERILL
WAY
CLA
RE
NC
E
ST
BARTHOLOMEWS
GDNS
HIL
LB
OR
OU
GH
CR
ES
HEREFORDRD
CAVENDISHRD
AFFORDRD
ROAD
AN
DR
EW
S
RD
ROAD
ST P
ET
ER
SG
R
STURSULA
GR
GROVE
ST
GROVE
STKET
RD
AL
B
SON
AN
Y
WIN
D
CH
IVE
RS
CL
GATE
SORLA
HENDY
CL
THE CT
HI
MILVE
RTON CL
HUD
SONSOM
ERSW
I CK
MAR
PAINS
RD
GR
OV
E
NO
RT
H
CHESTER PL
FR
IAR
Y
CL
Mew
s
WILTON TERR
ORMSBY
RD
LTON PL
MERT
THE
CIRCLE
MA
PL
E
RDAUCKLAND RD EAST
VILLIERS
VA
FREESTONE RD
LA
LE
NN
OX
RD
N
CLARENDON
STANLEY ST
STANLEY
TH
E
CLARENCE
AV
EN
UE
D
E
C
AE
NB
rian K
ydd
Wa
y
Pa
lmers
ton
Ro
ad
I
GR
OV
ER
ICH
MO
ND
PL
ON
MARM
I
TO
NB
RID
GE
ST
ROAD
PO
RT
LA
ND
R
D
QUEEN'SWAY
PA
LM
ER
ST
ON
RO
AD
CLARENCE
AS
HB
Y
KLAND RD WEST
PL
AC
E
NE
TL
ROAD
EL
PH
I NS
TO
AS
HB
UR
TO
N R
D
SERPEN
TINE
RD
SH
AF
TE
SB
UR
Y
RD
QU
E
NE
RD
A
NETLEY
TERR
Richmond
Terr
UC
CLIFTON
RD
CLIFTON
TERR
RD
EY
RNEOSBO
Serp
entine
ESPLANADE
AUSTRALIA CL
TO
N
CLAXTON
ST
RASSWELL
CHURCH
PATH
NORTH
CORNMILL
ST
LAKE
SPICER STREET
ALL
ST
CO
R
ST
BUCKINGHAM
PLACE
AM
H
SETTLERS
CLOSE
ST
FA
ITH
S R
D
COMMERCIAL
TE
MP
LE
ST
C
ED
EN S
TS
E S
T
JA
CO
B'S
ST
CO
MM
ER
CI A
L
PY
E S
T
EAST
SURREY ST
LOWERCHURCH
PATH
SLI N
DO
NS
T
NG
BUCRoa
d
K
I
Street
PARADI
Arundel
FR
ED
ER
ICK
ST
MARKET WAY
AN
DR
EW
BE
LL S
T
PR
OV
IDE
NC
E
CL
AR
EN
CE
ST
TOBY ST
BREWER
ST
PAN ST
LANDPORT
VIEW
STREET
RLOTTE
YAPTONST
CIA
L
CO
MM
ER
EDINBURGH
RO
AD
SPR
ING
ST
FO
UN
TA
IN S
TK
ING
SW
ELL S
T
CAS
CAD
ES
APP
ROACH
MA
RKE
T
CHA
WAY
WIL
L
RDST
AN
BISHOP CRISPIAN
WAY
Gladstone
Pl
u ll Lan
BAKERST
LA
ND
ST
SP
EN
LO
W
CL
STE
ER
FO
RT
HC
L
A NUEL ST
DIC
KE
NS
CL
BROWNLOW
CLLO
WER
WING
FIELD STSTR
EET
WINGFIELD
MAI
ST
RO
AD
T
yi
Flying Bull
Cl
Flng B
ST
RE
ET
Walk
CA
IRO
TE
RR
BAYTHORN CL
EM
SULTAN
SAIN
T'S
RO
AD
NELS
ON
PRINCE'SPrince's
Place
VICTORIA ST
Jar
ndy
ce
Brompton
Pass
C
RCH
H
U
ALL
SAINS'
T
STAUN
TON
ST
GRAFT
HAVISHAM
RD
ON
RO
AD
PL
OLD
COMMERCIAL
ROAD
STR
RO
AD
EET
FITZHERBERT
ST
MILL
LA
HERBERT
ST
PROSPECTRD
KETTERINGTERRACE
MIL
E
EN
D
ROADHO
PE
PRINCESS
ROYAL WAY
MILITARY
CIRCULAR
RO
AD
ROA
D
FL
AT
HO
US
E R
OA
D
WA
Y
GU
AR
DH
OU
SE
ROAD
UN
TB
A
RD
TT
EN
MO
ST JUDES
CL
CRES
RETREAT
NEL
RO
AD
MOSAICLA
COTTAGE
BELMONT STREET
WO
OD
PA
TH
BELMONT PL
ELM
PE
LH
AM
R
D
PelhamRoadPass
SO
UT
H
QU
EE
N'S
GR
THE
QU
EE
N'S
PL
OCKENDON
CL
GLOUCESTER VIEW
ST
BROUGHAMRD
STREET
WAR
RO
AD
ROAD
EN
S
SUSSEXTERR
RD
WORSLEY RDGARDEN LA
EDW AR DS
WIL
BE
RFO
RC
E
R
D
YA
RB
OR
OU
GH
RD
CASTLECL
GloucesterMews
PEELPL
ELD
ON
ST
GLO
UC
ES
TER
TE
RR
GLOUCESTER PL
RF
OL
GREEN
HYDE ST
WI
LLE ST
CK
ST
K S
T
SU
SS
ST
NO
CHAPEL ST
BUSH
ST W
LT
SO
UT
HS
EA
ST
ELMST
GR
T S
OU
TH
SE
A
S
T
BUSH EAST
RO
AD
ST
WE
STE
RN
PA
RA
DE
NIG
HTI N
GA
LE
R
D
KENT
LITTLEHAMBROOK ST
CAS
TLE SUSSEXPL
EX
KING
STPAULS
BR
SACKVI
YORKE ST
SQ
UNS
SO
UT
HS
T
K INGS ROAD
PLYMOUTH
ST
TY
S
EL EY
PARK
CHURCHILL
CL
DENNING
MEWS
BR
IDP
OR
T
UP
PER
AR
UN
DE
L
ST
STST
WORCESTER
CLOSE
CRABBECT
ST
CRES
GREETHAM
HYDE
UR
HAM
DSTRT
EE
ST
CHARLES
DICKENS ST
THE
MARY
ROSE ST
DRUMMOND
LANE
BR
UN
EL
RO
AD
BE
DF
OR
D S
T
JA
ME
S'S
R
D
WELLING
ST
WATERLOO
TON
RADNOR
ST
DUNSMORE
CL
GR
OS
VE
NO
R S
T
DUGALD
ISAMBARD
STA
ST
EY
SUR R
TION
ue
en' s
WINSTON
DOROTHY
DYMOND ST
RO
SE
The Q
Mal l
RD
Guildhall
Square
S R
DI
HO
PE
ST VINCENT ST
ALEC
Walk
MID
Ath
ers
tone
Caldecote
URNE PL
EA
RLS
DO
N
ST
MELBO
DL
E
ST
RE
ET
Walk
EXCHANGE
RD
SP
RIN
GG
DN
S
ILD
HA
LL W
ALK
NRY I ST
SWAN RD
GU
TONGS
BEVIS
BEVIS RD NORTH
HERCULES
STREET
NE
S
ROAD
S ST
PIT
SEA
CROFT
EGROV
GARFIELD
ST
CE
NT
S
U
AU
R
KIN
OR
D
MIL
LS
RD
TW
YF
STAM
SHA
W
RD
SIMPSON RD
STANLEY RD
LOWER DERBY
RO
AD
EN
D
MI L
E
ES
TE
LL
A R
D
WHARF RO
AD
A3
R
WA
Y
OAD
M 2
75
GEORGE BYNGWAY
RUDMO
RE
RUDMORESQUARE
ISLA
ND
QUARTERDECK
AVE
CORNWELL
CL
EVANS
CL
EA
ST
ER
N
RO
AD
ROAD
ISLAND VIEW
TERR
ROAD
SHED
RD
WHALE
Jellicoe
DOMVILLES
APPROACH
DRILL
SLATER
APP
ROAC
H
FOUNTAIN
PIER
HEAD
GUARD ROOM
Wa
y
STO
NE
ST
STEEL ST
WILTSHIRE
MERIDEN
RD
PARK ST
ST
ME
AD
OW
ST
CO
LP
OY
ST
ST
AS
TLE
Y S
T
WA
LT
HA
MS
T
WAY
GO
MO
NT
TE
RR
GOLD ST
COPPER ST
HAMBROOK ST
DARTMOUTH
MEWS
REGENT
PL
CEC
ILG
R
CEC
IL P
L
SEA TERR
SILVERST
DIA
MO
ND
ST
KIN
G'S
TE
RR
FLIN
T
S
T
DUIS
BURG
WAY
HA
MP
SH
IRE
PA
ULS
LA
NS
DO
WN
E S
T
LA
ND
PO
RT
TE
RR
AC
E
LANDPORTST
OU
NT
JU
BIL
EE
TE
RR
WO
OD
VIL
LE
DR
NICKEL ST
VICTORIA AVE
BL
SLINGSBY
CL
GDNS
MUSEUM ROAD
CHADDERTON
RD
CLARENCE PIER ROAD
BELLEVUE
TERR
PI E
R
RO
AD SOUTH
ROAD
CA
MB
RID
GE
VICTORIA SPUR
CROXTON RD
GORDON RD
TH
POYNINGS
PLACE
AM
DR
CHA
ROAD
HALFPENNY
LANE
CLAREN
CE
LONG
TAIN
CUR
RO
AD
A'Beck
et C
t
MARTELLS
CT
ON S
T
LINGT
RO
AD
NO
BB
S
LA
STREET
PEMBROKE CL
PEAC
OCK
LA
ST N
ICHOLAS
ST
St T
hom
as's C
t
STREE
T
ST
ST
WYNDHAM
MEWS
LA
PEM
BR
FARTH
ING
OKE
GR
AY
S
CT
BEEHIVE
WALK
GEO
RG
ES
O
NE
RY
LA
ST
South
Normandy
WARB
AR
M
MAS'S
HIG
HBU
RY
THO
LOR
D
MERY
KINGRICHARD IRD
MIC
HA
EL
S
KING H
AN
GL
ES
EA
WHITE
RO
AD
E
ST RD
RO
AD
ALFRED
CIRCULAR
FLEET WAY
UN
ICO
RN
STREET
RD
BU
RN
AB
YR
OA
D
Richmond
Pl
ROAD
LION ST
ST
JA
S'S
ST
ME
BECKST
LIO
N T
ER
R
WAY
Montague
Wallis Ct
Robert
Mack Ct
PORTL ST
ES
ND
A
GEORG
RO
AD
GATE
NORTH
PLA
CE
YO
RK
Frank
Judd
Ct
STREET
DEAN
Joseph
Nye CtTed Kelly
Ct
ST
Sea Mill
Gdns
ST
PRINCE
Blossom
Square
KING WILLIAM ST
RE
ET
CUMBERLAND ST
LENNOX
ROW
Davidson
Ct
SQ
ORGES
AY
LW
AR
D S
T
BIS
HO
P
S
T
SUN
ST
ST
TAI N
ST
I
PARK
Sou
tham
pto
n R
ow
Kin
gs
CU
RZ
ON
H
GEORGE ST
OW
E R
D
Be
nch
Alley
CL
THREE
TUN
BR
KENT
NA
VY
RD
ALD
RIC
H R
D
ROAD
FRIGATE RD
AN
CH
ORL
AN
E
BU
TC
HER
GE
ST
ROW
NANCE
ST
UNION
ST
MA
RG
ER
Y'S
CT
BE
NE
FIC
IAL
ST
RE
ET
HA
NO
VE
R
ST
AD
MIR
ALT
Y R
D
CR
OS
S
BONFIR
E
CORNER
QUEEN
ST
RE
ET
D
HARD
COLLEGE ST
IVY
LANE
SH
OR
T
RO
W
GL
OU
CE
ST
ER
RD
MARLB
RO
UG
H R
OW
O
Mar
lboro
ugh
Ave
The
Canalside
OR
Cean
Marches
VIC
TO
RY
RD
WALK
LANE
CO
LL
EG
E
BENBOW
PL
TH
E
HA
VA
NT
S
T
WIC
KH
AM
ST
HA
WK
E
ST
SH
IP
LE
OP
AR
D
ROSEMARY LA
RO
AD
SO
UT
H
TE
RR
COLLEGE LA
OLD STAR
PL
RO
AD
ST
Mer
cat
orA
ve
Cent
ral
Sq
Ver
non
Ave
SiriusAve
TogoAvePhi
lipA
ve
The
Waterf ro
nt
SUNNY
CLOCK ST
ANCHOR
HALF MOON STREET
HERTHA AYRTON WAY
MB
AR
D
Han
over C
t
ST
KING
CHARLES
S
T
Lom
bard
Ct
LO
HIGH
ST
PENNY
New Hampshire B'vard
ROAD
GU
NW
HA
RF
GR
AN
D
PARA
WHITE O
YS
TE
RS
T
CAPTAINSROW H
AR
T
RD
FRENCH ST
OYSTER
MEWSQUAY
TOWN
STREET
CT
TRIMMER'S
EAST
Minerva Crescent
Jupiter Court
The Vulcan
Neptune Court
Lysander Court
BR
OA
D
BA
TH
SQ
BATTERY ROW
Spice Quay
CAMBER PLACE
Feltham Row
CAMBER QUAY
TOWER ALLEY
STREET
SEAGER'S COURT
TOWER STREET
BATHING LANE
Spinnaker Quay
WE
ST
ST
MA
IN
NORTHERN WAY
LIO
N R
OA
D
WE
ST
ER
N W
AY
RD
TIGER RD
BLAKE RD
BO
ILE
R R
OA
D
SH
IPB
UIL
DIN
G
VICTORIA
SCOTT RD
SAMPSON
RD
MURRAY'S
LA
JAGO RD
ADMIRAL'S
WALK
RO
AD
QUEEN'S
RD
STONY
TH
E
MA
IN
PA
RA
DE
The
Espla
nade
TRINITY GRN
TRINITY GRN
SAND
Path
LAND
FRESH
TOT
OWN
G
FIF
TH
A
VE
FO
UR
TH
A
VE
SIX
TH
AV
E
ASHURST
WYMERING
MANOR CL
LOWERFARM DR
BR
I GH
ST
ON
E
R
D
LA
NE
ROAD HERNERD
Hockley
Brighstone
CO
W
WE
ST
ER
N
ROAD
GR
EE
NW GL
EB
EFIE
LD
GD
NS
OLD
W
YM
ER
I NG
L
A
D AVEO
O
ROAD
HADLEIGHRD
ROAD
ROAD
RO
AD
WALSINGHAMCL
SHERINGHAM RD
CROMERRD
COLCHESTERRD
HOCKLEYCL
PEBMARSH RD
ROAD
MEADOWSWEET
RO
AD
HARLESTON
LOWESTOFT
HARWICHRD
TU
NS
TA
LL
NORWICHRD
BRAINTREE
WHIPPINGHAM
CLOSE
MEDINA
WIN
TE
RH
ILL
RD
HALSTEAD
BELL RD
SERVICE
ROAD
O RD
MELLOR CL
ROCHFORD
CLACTON
KI N
G R
I CH
AR
D C
L
MALDONRD
WA
SH
BR
OO
K
SUDBURY
OUSE
ROAD
PIGE
DRIVE
SOUTHWICK
ONH
CUNNINGHAM
AVE
HORSEA
SO
MATAPAN RD
RD
LANE
HIL
SE
A
IACHINO AVE
N
DI
CRES
O ROAD
PPE
NA
RV
IKR
D
NORMANDY
ER
SA L
CUNNINGHAM
CL
AKER DRIVE
WA
RS
PIT
E C
L
N
BARHAM WAY
VALIANTGDNS
SP
IN
M 2
75
M 2
75
M 2
75
RDMONTAGUE
RO
AD
RO
AD
THURBERN
RD
ROAD
LO
ND
ON
ROAD
ROAD
AVENUE
KIPLING
AlexW
ay
VITA
MEREDITH
TE
LF
OR
DR
DRD
CONNAUGHTRD
RD
ORIEL
SHADWELL
HARTLEY
OPHIR
AV
EN
UE
END
MUNSTER
AVENUE
WADHAM
GLA
DY
S
CA
RD
IFF
ST
MARKS
RD
RD
ANGERSTEIN
BU
CK
LE
RS
CT
RD
NO
RTH
RO
AD
LOND ON
WE
YM
OU
TH
RD
TW
YF
OR
D
NE
LS
ON
NO
RT
H E
ND
G
RO
VE
AV
EN
UE
KING
EDWARDS
CRES
NORTHERNAV
EN
UE
RD
RD
RD
MO
NM
OU
TH
R
D
ROAD
WALKERRD
ROAD
ROAD
ROAD
PENROSE CL
SMEATON ST
WILSON RD
ROAD
Weste
rn
NEWCOM
RANELAGH RD
WINSTANLEY
KNOX
MEYRICK
EN
GRUNEISEN
Terr
ace
STRODE
WALDEN
WID
LE
Y
R
OA
D
TIPNER
TIPNER
GRNGRN
RANGE
M 2
75
TIPNER
HIL
LD
OW
NS
AV
E
OS
IER
TA
RG
ET
R
D
CL
LA
NE
JERVIS
CHILDE
SQUARE
HARBOUR
WAY
ROAD
NORTHARBOUR
BLACKWATER
CLOSE
NO
RTH
AR
BO
UR
SPU
R
BR
YS
ON
RD
PA
RR
RD
CRY
ROAD
STANFCL
ES
CR
E
DORSTONE
RD
CR
ES
SC
EN
T
AVENUE
FITZPATRICK
CT
CR
ES
BR
MOORCOT CLOSE
OMYARD
WILLERSLEY
BREDENBURY
RS
AM PTON
TE
WK
ES
BU
RY
C
L
DU
LE
LY
DN
EY
C
L
ROAD
STOCKTON
CL
BLAKEMERE
RO
AD
CL
CR
RAPSON CL
ROAD
KENCHESTER
CL
RD
ED
EN
HIL
L
CL
KINGSLAND
RD
M 2
7
WESTER
N
SOUR
OAD
TH
CHELTENHAM
PA
INS
WIC
K
CL
ST
RA
TT
ON
C
L
M 27
DORE
AL
FO
RD
EYABB
W
RD
LUDLOW
RD
DORMINGTON
RCH
TIPNER
TE
IN
AN GESOMERVILLE
PL
M 2
75
VICTORY
GREEN
NORTH
BATHURST WAY
MANTLE SQUARE
FRASER RD
WARDROOM ROAD
WE
ST
BA
TT
ER
Y R
OA
D
WHALEY ROAD
Walk
BATTERY
RD
CINDERFORD CL
WESTBURY
CL
LEDBURY
MO
RT
IME
R
RD
AR
TIL
LE
RY
C
L
CRES
St
Michaels
Ct
ROAD
MA
RS
DE
N R
D
HEMPSTEDRD
Hem
pst e
d
P
ath
RO
AD
EDWARDS
CL
CLEEVE CL
HUNTLEY
CL
Ra
ceco
urs
e
RO
AD
BINNACLE WAY
CO
MP
AS
S
Lane
SOUTHAMPTON
NA
ALLAWAY
DALCL
BOURNE
WORTH R
D
RD
ILS
RY
WITHINGTON
CL
BIRDLIPRD
CT
Close
DELLF
IELD
CL
ROAD
DEERHURST
ROTHWELL
CL
OF
FE
RT
ON
WO
RO
AD
BEVER
STON
AD
M 27
RO
AVENUE
WATERSEDGE RD
LEA
Paddock Walk
BODMIN RD
FARM
M 27
OYS
TE
R
WA
YQ
UA
YW
AY
CKCO
HOLYWELL DR
VE RA
CADGWITH PL
MULLION CL
WAY
AY
E
EW
KEEP
PORT
The Board
walk
MC
LE
NT
E
ATTL
GELWAY
TIN
T
A
BR
YH
ER
BR
ERIS
LAND
WAY
CARBIS
CL
BRYH
NE
W
LYN
KE
PL
ROAD
PORT
LO
CK
V
IEW
NE
CA
R HEAD
EYLS
SE
NN
EN
PL
LO
CK
A
PP
OA
CH
MARINA
WE
ST
BU
ND
RD
SEVER
N
C
L
WIN
CHCOM
BE R
D
RD
TAR
LLINGTONCO
LE
TO
N
DRIVE
GROVE
CH
ALK
PIT
RD LIME
CALLAGHAN
T
COLESBOURNE
LEOMINSTER
ELK
STO
NE
S
IN
cross
HAT
H
AU
Cam
CRESCENT
CHED
WORTH
Desborough
Cl
E RLEY RD
Nase
by
Cl
OUD
BraunstonC
l
Bri xw
o rthCl
ROCKROSEWAY
BUT TE
RS
T
CL
RFLY
CRESCENT
RO
AD
ROAD
HELS
TON
RD
RO
AD
LONGDEAN
CL
TINTERNCL
ROAD
WINTERBOURNE RD
SBURY
BUDE
CLP
EN
DE
NN
I S R
D
FALM
OUTH
HAYLERD
RIDGEWAY
CL
KINGSCOTERD A
HILLSLEY
L MOND
ALLAWAY
MOUSEHOLE RD
TR
UR
O R
D
AVENUE
COLERIDGE RD
HILLSIDE CRES
PA
ME
LA
AV
E
MA
CA
ULA
Y A
VE
MA
SE
FIE
LD
A
VE
BR
IDG
ES
AV
E
AVENUE
KEATS AVE
JAMES
CHAUCER AVE
WO
RD
SW
OR
TH
A
VE
SHELLEY AVE
DRYDEN AVE
LA
NE
NEWBOLT
ROAD
ROWLAND RD
GR
OV
E
JUBILEE
RO
AD
AVENUE
RAYMOND
M 27
ROAD
GROVE
NI
NG
ED
WA
RD
BR
OW
BEACH DRSH
EN
EV
AH
R
O
THE EDGE
COLTSMEADCL
SE
PARRY
DG
EF
IEL
D C
L
CL
ELGAR
CL
RD
CO
NN
AU
GH
T
LITTLEFIELD
WESTFIELD
RD
DELANE
SI
SAXON SHORE RD
RALPH RD
SOTHCOTT
RD
NEELANDS GR
AMPTON
SULLIVAN
SOUTH
HOPKINS CL
WATE
R
STR
HO
SP
ITA
L L
AN
E
EET
HA
MIL
TO
N
CASTLE
RO
AD
PO
RT
SD
OW
NROAD
Based or reproduced from Ordnance Survey 1:1250 Base Map with the permission of HMSO © Crown copyright reserved.Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. Licence No. 100019671
Prepared for:
Prepared by:
Title: Drg No:
Date:
Scale:
N
Highways Geographic Information Service
Appendix A IoT Sensor Locations
Department for Transport28/09/2016
1:1,000 @ A4
Plan
Network Management Team - September 2016
1 | P a g e
Appendix B: The Strategic Case:
B2.1 Demographic of the area and unquantified benefits to the local community
1. Portsmouth has a significant role in the sub-regional economy as an employment, education,
tourist, retail, and transport hub. Portsmouth International Port (PIP) gateway with 3.5 million
people passing through the ferry port each year. As a transport hub over 5 million people use
Portsmouth as a gateway to the Isle of Wight and approximately 3 million passengers cross
Portsmouth Harbour to Gosport each year.
2. Portsmouth Naval Base (PNB) is the home of the Royal Navy and BAE Systems and a
significant player in the marine and maritime sector, providing 19,775 jobs (directly and
indirectly) across the wider sub-region and contributes over £1.68 billion of output per
annum. Every £1 million directly generated by the Naval Base stimulates an additional
£750,000 of spending in the Solent economy. From 2017 PNB will have around 2,000
additional staff due to the arrival of the new air-craft carriers.
3. The city's economy has strong roots in tourism, leisure and retail. Tourism in Portsmouth
accounts for 7.6 million visitors per year spending £373 million and supporting over 7,000
jobs. The city focusses on Gunwharf Quays as a retail location which attracts approximately
8 million visitors a year. The city is developing its retail offer through the creation of a new
city centre and city centre road development.
4. High levels of deprivation, widespread obesity, low levels wellbeing, and, low levels of physical
activity
• Portsmouth is ranked 63rd of 326 English local authorities on the index of multiple deprivation score, where one is the most deprived. All Portsmouth residents live in the most deprived 40% of English Lower Super Output Areas (LSOAs) in terms of the outdoor living environment (considering air quality and traffic accidents); and 46% of Portsmouth LSOAs are in top 10% most deprived in England.
• 64% of avoidable deaths are caused by lifestyle behaviours including low levels of physical activity.
• 65% of Portsmouth adults do less than 30 minutes of physical activity per week including walking and cycling
• Levels of child obesity in Portsmouth are higher than average for England. In 2014/15, 33% of children were overweight or obese on leaving primary school.
• Portsmouth has high child pedestrian casualties, averaging 39 per year (50% more than the national average by population). Despite continuous improvements to the infrastructure, behaviour remains the biggest contributory factor, particularly at Key Stages 1 and 2.
• Portsmouth provides 15.5% of the total jobs in the South Hampshire sub-region
• Portsmouth has a higher proportion of 16-18 year olds not in education, employment or training (NEET) than regionally and nationally. For example, 5.2% of the population
Network Management Team - September 2016
2 | P a g e
in Portsmouth are classified as NEETs, compared with 4.1% in the South East and 4.6% in England.
5. Works are underway to continue the regeneration of the city with major investment in Tipner,
Horsea Island and Port Solent (all served by the western gateway) for residential,
employment and leisure.
6. The University of Portsmouth is one of the leading ‘new’ universities, with over 20,000
students in attendance.
7. A highway network with C ITS infrastructure with a dynamically managed transport network is
essential for delivering the ambitious growth agenda and expanding employment
opportunities across Portsmouth.
Network Management Team - September 2016
3 | P a g e
FigureB1.1 Portsmouth Ward boundaries.
Network Management Team - September 2016
4 | P a g e
B2.2 The Strategic Case: The identified problem(s), with timescales and the key drivers
SRTM summary for Portsmouth
• Partnership for Urban South Hampshire (PUSH) authorities which includes Portsmouth have
commissioned a study to undertake a Solent Transport’s Sub Regional Transport Modelling
(SRTM) study covering SOLENT region.
• The study provides a high-level understanding of the impacts of the latest growth projections
through to 2034 in the SOLENT region. This note summarise the impacts that were
examined using two scenarios with different transport provisions and the key facts of the
study relevant to Portsmouth.
• The SRTM model has a base year of 2010 with five forecast years; 2014, 2019, 2026 and
2036. An update of the SRTM model to rebase to 2015 is ongoing to be available towards
end of 2016. The starting point of the model is a 2014 reference case.
• The development information is used in the modelling study, this included for both residential
and employment land uses. The employment land uses included office, industrial and
warehousing. All other non-residential land use inputs were left unchanged from the current
SRTM Reference Case scenario.
• The summary of increase in residential land use by local authority between 2014 to 2034 is
shown in Fugure1 and increase in employment land use for the same period is shown in
Figure 2. It can be seen that Portsmouth has Approximately 13,890 which is a 16% increase,
one of highest demand for housing in the region. It was estimated that there is an 8%
increase in the jobs i.e. 8081 by 2036.
Figure1.1 Housing demand 2014 to 2036.
1,845
15,051
9,818
2,994
8,130
4,649 4,177
8,736
13,890
17,984
13,996
02,0004,0006,0008,000
10,00012,00014,00016,00018,00020,000
Demand for Housing
Network Management Team - September 2016
5 | P a g e
Figure1.2 Employment demand 2014 to 2036.
• The impacts are examined using two scenarios. The Do Minimum (DM) scenario was
specified to include those transport schemes that are already committed and also a number
of schemes that are vital to committed development sites although the schemes themselves
may not yet be committed
• Reference Case (2014) + developments up to 2014/15.
• Do Minimum (2036): com + dev.
• Do something (2036): com + dev + schemes.
• The Do Something (DS) test included additional transport interventions, as specified by the
Solent Transport and the PUSH Authorities, with the aim of helping to mitigate the impact of
the quantum and spatial distribution of the proposed developments on the transport network.
There were a number of both highway and public transport schemes included in the DS test.
• The results are analysed in terms five key indicators.
a. Modal Share
b. Flows
c. Delays
d. Volume vs. Capacity
e. Public Transport Flow (Passenger).
• The Do Something (DS) test included additional transport interventions, as specified by the
Solent Transport and the PUSH Authorities, with the aim of helping to mitigate the impact of
the quantum and spatial distribution of the proposed developments on the transport network.
There were a number of both highway and public transport schemes included in the DS test.
199
5991 6085
4459 4660 48873764
10481
8081
4762
2453
0
2000
4000
6000
8000
10000
12000
Growth in number of Jobs
Network Management Team - September 2016
6 | P a g e
• Figure 1.3 shows the mode share in both 2014 and 2034. The results from the modelling
study shows that the highway mode share has increased by 0.58%, public transport mode
share has increased marginally by 0.9% and a decrease in active modes by -1.5%.
Figure 1.3 Modal Share 2014 to 2036.
• The study results shows that the network wide trips are increased by 21%, the travel distance
is increased by 36% and the travel time is also increased by 37.2% there is no or marginal
difference in speed.
Table 1.1. Growth in Traffic Flow 2014 - 2036
2014 PUSH DS 2036 Diff % Diff
Total Travel Time pcu hrs 945205 1296620 351415 37.20%
Travel Distance pcu kms 52860599 72216376 19355777 36.60% Overall Average Speed kph 55.9 55.7 -0.2 -0.40%
Total trips loaded 2456971 2980368 523397 21.30%
Car 2165531 2548314 382783 17.70%
LGV 181833 296133 114300 62.90%
HGV 109606 135921 26315 24.00%
• The study has analysed the boardings (rail, bus and ferry), number of services, and travel
time, travel distance and speed for both the vehicles (supply side) and the passengers
(demand side). An approximate 37% increase in PT boardings is forecast for 2036 compared
to 2014. However the increase in bus users is low.
HIGHWAY PUBLIC TRANSPORTACTIVE MODES
(Walking and Cycling)
2014 65.70% 5.40% 28.90%
2034 66.20% 6.30% 27.40%
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%Modeshare
Network Management Team - September 2016
7 | P a g e
• The flow difference plots show an increase in flows in Red approximately 500 to 900 PCUs.
Please see Figures 1.4 and Figure 1.5 and 2 below. For Portsmouth the increase in flows will
have significant impact on key corridors and junctions.
Network Management Team - September 2016
8 | P a g e
Figure 1.4 : AM Peak: Increase in flows over 500.
Figure 1.5: PM Peak: Increase in flows over 500.
Network Management Team - September 2016
9 | P a g e
Figure 1.6: Junction delays
Figure 1.7: Junction delays PM Peak
Network Management Team - September 2016
IoT BigData Platform Project
1 | P a g e
Appendix C: B6. The Economic Case – Value for Money evidence
Separate Annex – Co-operative Intelligent Transport Systems (C-ITS) Challenge Fund – Value for Money Evidence (Big Data Platform)
Scheme description
This proposal is for the development of a Big Data Platform, using information from bluetooth sensors and radar on the network, to provide real time and historic information on journey times and trip movements, which can then be used in a range of applications.
Benefits include:
• More efficient management of the network, on a day-to-day basis, during special events and periods of roadworks, and in response to unexpected incidents on the network.
• Enabling users to make more informed decision about their travel choices
• Reduced delay and increased journey time reliability on the network.
• Improved network resilience.
• More comprehensive and reliable data to inform modelling, analysis, and monitoring activities.
Monetary estimate of journey time benefits:
The primary benefits relate to journey time savings on a day-to-day basis, during special events and periods of roadworks, and in response to unexpected incidents on the network.
With only three roads linking the island to the mainland (M275, A3 and A2030) there is significant potential for severe congestion at peak times. This includes
• M275/M27A3 – into Portsmouth City Centre, Portsmouth International Port Continental Ferry Port, Naval Base and Gunwharf Quays;
• A2030 – from the M27 and A3(M) to employment locations in Airport Industrial Estate/Anchorage Park, Portsmouth City Centre and eastern Portsmouth;
• East west connections in Portsmouth.
Day-to-day delay savings
Table 1 shows that total delay on the Portsmouth city-wide network is estimated at 29,313 pcu hours in 2013, resulting in an average delay per vehicle (passenger car unit) of 3.25 mins across a 12 hour period and an average speed of 48kph. This is expected to increase almost three-fold by 2031 to 81,556, equating to an average delay per vehicle of 6.92 mins and an average speed of 37kph.
Network Management Team - September 2016
IoT BigData Platform Project
2 | P a g e
Table 1 – Do Minimum Network Statistics (2013 and 2031) – Portsmouth City Only1
COMMENTS Do-Minimum Do-Minimum
AM Peak (1hr) 2013BDM 2031BDM
Total Trips Loaded (pcus) 54,968 69,774
Link Cruise Time (pcu-hrs)
7,193 9,796
Total Travel Time (pcu-hrs)
10,475 20,190
Total Delay (pcu-hrs) 3,282 10,395
Total Delay (mins/pcus) 3.58 8.94
Travel Distance (pcu-kms) 456,644 587,916
Average Speed (kph) 44 29
IP (1hr) 2013BDM 2031BDM
Total Trips Loaded (pcus) 39,183 53,353
Link Cruise Time (pcu-hrs)
4,924 7015
Total Travel Time (pcu-hrs)
6,282 9815
Total Delay (pcu-hrs) 1,357 2801
Total Delay (mins/pcus) 2.08 3.15
Travel Distance (pcu-kms) 332,779 444937
Average Speed (kph) 53 45
PM Peak (1hr) 2013BDM 2031BDM
Total Trips Loaded (pcus) 55,097 69,736
Link Cruise Time (pcu-hrs)
7,472 10,074
Total Travel Time (pcu-hrs)
11,809 22,991
Total Delay (pcu-hrs) 4,337 12,917
Total Delay (mins/pcus) 4.72 11.11
Travel Distance (pcu-kms) 467,976 597,829
Average Speed (kph) 40 26
All Day (12hr)3 2013BDM 2031BDM
Total Trips Loaded (pcus) 540,536 707,259
Link Cruise Time (pcu-hrs)
70,248 97,233
Total Travel Time (pcu-hrs)
99,561 178,789
Total Delay (pcu-hrs)2 29,313 81,556
Total Delay (mins/pcus) 3.25 6.92
Average Speed (kph) 48 37
Network Management Team - September 2016
IoT BigData Platform Project
3 | P a g e
Notes: 1. Network Statistics taken from Portsmouth Western Corridor Model (2013BDM and 2031 BDM). 2. Total Delay (pcu-hrs) is calculated as the difference between Link Cruise Time (travel time based on speed limit only) and Link Cruise Time (travel time including signals, queues, turns, etc.). 3. The following Peak Hour to Period Factors have been used to convert Peak Hour figures to 12 Hour period, based on local observed demand. AM Peak = 2.75; Inter-Peak = 6.00; PM Peak = 2.80).
The Data Platform will enable the network to be managed more efficiently on a day-to-day basis, reducing the amount of delay on the network and resulting in journey time benefits for all vehicles. Table 2 shows the predicted journey time savings and benefits for different scenarios, representing different reductions in % delay across the network in 2013 and 2031. These values have then been used to estimate a Present Value of Benefits, based on the following assumptions and calculations:
• Values of time for car, LGVs, and HGVs have been taken from WebTAG Data Book (V1.5) (Table A1.3.6).
• A 5 year appraisal period has been assumed. This is considered to be conservative. No renewal costs are expected to be needed over this time period.
• Journey time benefits have been calculated for two forecast years of 2013 and 2031 as used in the Portsmouth Western Corridor Model. Benefits for intervening years have then been estimated on the basis of a steady annual rate of growth of benefits to allow the estimates for 2018 to 2027 to be calculated.
• Benefits have been discounted to 2010 values and prices, using an annual discount rate of 3.5% per annum in line with WebTAG.
• Daily benefits have been converted to an annual benefit using an annualisation factor of 235.29.
The indicative BCRs are based on an outturn cost of £300,000, which in appraisal terms equates to a Present Value Cost (PVC) of £282,000, in 2010 market prices and values and accounting for 200% optimism bias (as recommended for IT system deployment, in WebTAG Unit A1.2, Table 8). PCC is confident that costs can be managed within a budget of £300,000: Data Platform:
• PCC have upgraded their IT infrastructure and data centre facility with appx £1.2m in 2013/14 which has capacity to expand to accommodate the Data platform without having to build a data centre infrastructure from the start.
Network Management Team - September 2016
IoT BigData Platform Project
4 | P a g e
• The feasibility of the project was reviewed by PCC's IT specialists and estimated costs and resources to enable this and can be programmed immediately.
• In addition PCC currently hosting and maintaining UTMC data and IT infrastructure, this will be made redundant as part of the Traffic Management Centre upgrade. As a contingency PCC will consider reducing the costs by making use of this.
• Therefore the data platform can be made fully operational within the budget and time scales.
Bluetooth Sensors:
• PCC have experience in installing and maintaining the Bluetooth sensors on the street. Currently 5 Bluetooth sensors are installed on street for monitoring Journey times across the city.
• As part of the C-ITS funding network is expanded and integrates the data to data centre.
• The costs of installing and procuring the sensors are based on the current supplier and variation of prices is unlikely to be high in the short term.
A 25% as contingency cost which will be put back in to expanding the network and application services if no contingencies.
Table 2 – Predicted benefits for different scenarios of reduction in total network-wide delay
Scenario 2013 12 Hr Delay Saving1
2031 12 Hr Delay Saving2
Daily PVB (£)
Annual PVB (£)
Indicative BCR
1% reduction in total delay across the network
293 pcu-hrs 816 pcu-hrs £56,528 £13.3 million
47
0.5% reduction in total delay across the network
147 pcu-hrs 408 pcu-hrs £28,264 £6.65 million
24
1. Delay!AA8:AAB.
The results show that achieving even a very small reduction in average delay across the Portsmouth city-wide network (-1%) will deliver very high value for money. This assumes no other improvements are made to the network. In practice, reduction in delay is as a result of traffic management and behaviour change interventions driven by information from the Data Platform, is likely to be focused on particular areas of the network. These locations are likely to experience a higher level of reduction, while other areas experience minimal change. The above scenarios represent an average reduction across the network and are considered to represent realistic scenarios for the purpose of illustrating the potential value for money of the proposed investment.
Network Management Team - September 2016
IoT BigData Platform Project
5 | P a g e
Other benefits
Other expected benefits are summarised below:
• More efficient management of the network during special events and periods of roadworks, and in response to unexpected incidents on the network (Large beneficial) – based on analysis of information from the Data Platform from historic events (and potentially use of real time information in the long term). With only three roads linking the island to the mainland (M275, A3 and A2030) the network in Portsmouth can approach gridlock if an unexpected incident occurs on the network, particularly during a period of high demand (e.g. summer holidays, during the Victorious Festival, etc.). On these occasions, the level of delay on the network significantly exceeds the 12-hr delay figures shown in Table 1, for several hours.
Assuming the information provided by the Data Platform enables a reduction in average delay across the network equivalent to 10% of the level of delay in the 12-hr Do Minimum scenario, this will deliver a daily Present Value of Benefits (2010 values and prices) of £548,000 - based on one day per year. This alone gives an indicative BCR of 2:1, representing strong value for money.
• Improved reliability (Moderate beneficial) – As a result of reduced delay, more efficient operation of the network, and more accurate information for network users about expected journey times.
• Improved network resilience (Moderate beneficial).
Air Quality (Moderate beneficial) – Due to reduced delay and emissions in Portsmouth’s five Air Quality Management Areas.
• Accidents (Slight beneficial) – Reduced delay and better information about expected journey times will reduce the number of accidents resulting from driver frustration or distraction.
• Other – More comprehensive and reliable data to inform modelling, analysis, and monitoring activities.
B8. Management Case - Delivery : IoT BigData Platform Project - Outline PlanB8. Management Case - Delivery : IoT BigData Platform Project - Outline PlanB8. Management Case - Delivery : IoT BigData Platform Project - Outline PlanB8. Management Case - Delivery : IoT BigData Platform Project - Outline Plan
Scoping Meeting Milestone X
Technical workshop 1 day
Prepare technical and pricing proposals 6 weeks
Submission of proposals to Portsmouth Milestone X X
Evaluation of proposal and raise contract up to 12 weeks
Project Board Review of the Proposal Milestone X X
Implementation Planning 9 weeks
Contract signed & approval obtained to proceed Milestone X X
System Design, Infrastructure Planning, Software Development of Data and Modelling Tools Ongoing
Completion of the detailed Software,Tools, Hardware, Data analytics, design and specs Milestone X
Order Hardware and delivery lead time 9 weeks
Testing and Development period 14 Weeks
Install and commission Bluetoothe sensors,Calibration, IP Networking 10 weeks
Data Integration, Setting up the Development, Testing, Pre-Prod and Go Live Environments 12 weeks
C-ITS Applications, Data Analytics testing and Demonstration 8 weeks
Window for Monitoring and Evaluation 3 weeks
Window for snagging, Monitoring and Evaluation 4 weeks
Review of Objectives and benefits realisation 3 Days
Project Closure Milestone X X
Contingency Period
Project
ConsiderationsCity Events and Major Works, Resource restrictions and other potential constraints
Mar-18 Apr-18 May-18
Initiation
Delivery
Review & Close
Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17Project Stage Activity Duration Dec-16 Jan-17 Feb-17
Network Management Team - September 2016
1 | P a g e
Project Board
Project Executive
Pam Turton
Senior User
Adil Mohammed
Senior Supplier
Graham Fairbrother
Project Manager
Darren Thirlwell
Project Team
Adil Mohammed Lee Gilbert Steve Flynn
Rob Williams Jack Donohoe
Simon Whitworth Derek Kane Barni Fry
Business Assurance
Paul Darlow (When required)
Senior Stakeholder
Michael Robinson
Other Key Stakeholders /
Interested Parties
Alan Cufley Cllr Fleming
Rachael Dalby David Armstrong Anthony Hadley
Rob Rimmer
Financial Assurance
Christine Mansley
Network Management Team - September 2016
2 | P a g e
Role Descriptions/Responsibilities
Role Responsibilities Project Executive Pam Turton
• Maintain ultimate responsibility for the project
• Monitor and control progress of the project
• Review the business case
• Hold senior supplier and senior users to account
• Ensure overall business assurance Senior User(s) Adil Mohammed Michael Robinson
• Advises the executive on user issues
• Provide customer quality expectations
• Ensure desired outcome of the project is specified
• Ensure expected benefits of the project are realised
• Ensure availability and commitment of user resources Senior Supplier Graham Fairbrother
• Advises the executive on supplier issues
• Assess and confirm viability of project approach
• Ensure proposals for development of the products are realistic
• Ensure availability and commitment of supplier resources Project Board
• Direction of the project
• Project assurance
• Publicity/dissemination of information about the project
• Approval of major plans
• Approval of changes
• Commitment of resources Project Manager Darren Thirlwell
• Responsible for delivering the project on behalf of the Board
• Plan and monitor the project
• Direct and motivate the project team
• Manage or delegate the management of project resources
• Report to Project Board
• Manage configuration and change control
• Manage risks
• Manage production of required products Team Managers Adil Mohammed Graham Fairbrother
• Manage production of specific products as defined by Project Manager
• Prepare team plan
• Manage team
• Report progress on team’s work
• Identify risks associated with team’s work
• Ensure that quality controls for the team’s work are planned and performed correctly
The Project Team will consist of:- IS & Finance TE&BS & Other Darren Thirlwell - IS Project Manager Adil Mohammed - Traffic & Network Manager Paul Darlow - IS Business Partner Lee Gilbert - Assistant Traffic Engineer Rob Williams - IS Applications Architect Steve Flynn - Assistant Traffic Engineer Jack Donohoe - IS BSA Barni Fry - Contracts Administrator Simon Whitworth - IS Network Architect Claire Bartlett - Communications
Christine Mansley - Financial Assurance
Risk
Number
Risk Title
(insert name of the identified risk)
Risk Owner
(insert initials of
the person
responsible for the
risk - in most
cases it will be the
project manager,
however for larger
scale projects the
risks maybe split
amongst a project
team)
Probability
(insert a score of 1-
4, using the
descriptions at the
bottom of the log -
based on the
likelihood of this
risk occurring)
Impact
(insert a score of
1-4 using the
descriptions at the
bottom of the log -
based on the impact
this risk could have on
the project)
Net Risk Score
(there is a
formula set up
to multiply the
probability score
by the impact
score and
it will be
automatically
inserted in this
column - this
score will
dictate the
colour the risk
should be, again
using the table
at the foot of the
log)
Control Measures
(describe how the risk will
be mitigated against)
1 Full procurement process required (Delaying project start,
and incurring small additional costs)
Adil Mohammad 1 1 1 The procurement process
has already been discussed
with the procurement team
who are happy with the
proposed procurement
route.
2 Project costs increase (outside funding availability) Adil Mohammad 2 3 6 Indicative costings have
been obtained from
suppliers and as such we
are happy the costings are
accurate. If costs were to
increase the number of
junctions could be reduced.
3 Unanticipated works discovered (delays to programme,
increase in costs)
Adil Mohammad 1 2 2 Initial scoping and feasibility
has indicated the works
required and no further
works are anticipated. Any
additional works are likely
to be small and can be met
through the cost and
timescale contongencys.
4 Lack of resource available to deliver works (delays in
programme)
Adil Mohammad 2 3 6 Resources are being
planned in to deliver the
works and we have
frameworks in place to
obtain additional resource if
required.
Probability
Rating:
Impact Rating:Net Risk scores:
Very unlikely -
score 1
Minor - score 1 12-16 HIGH (Red) Very
Serious weakness
Unlikely - score 2 Significant - score 2 6-9 MEDIUM (Amber)
Serious weakness
Likely - score 3 Serious - score 3 3-4 LOW (Yellow) - Minor
weakness
Very likely - score
4
Major - score 4 1-2 VERY LOW (Green)
Satisfactory (effective)
CLOSED
Risk Log Review Dates:(Insert date each time risk
log is reveiwed)
RISK LOG
PROJECT NAME: IoT and BigData Platform
PROJECT MANAGER: Adil Mohammad
SENIOR PROJECT MANGER: Pam Turton
1
Purpose of this document The benefits realisation management plan supports section C1 of the application form providing details of how the benefits process will be applied to a program. It describes the tasks, resources, time frame and approach to each step of the framework. The executive summary is a brief overview of the program, key benefits and how they will be tracked.
IoT and Big Data Platform
Monitoring, Evaluation and Benefits Realisation
Appendix G - BENEFITS REALISATION
2
Version Name Details of changes / comments Distribution Date
1.0 Adil Mohammad Preliminary draft 26/09/2016
3
1. Executive Summary
The benefits realisation management plan provides details of how the benefits process will be applied to a program. It describes the tasks, resources, time frame and approach to each step of the framework. The executive summary is a brief overview of the program, key benefits and how they will be tracked.
2. Benefits Management Phases
Describe how this program links to the standard phases
3. Business Case Benefits Reconciliation
Consider the following point for inclusion in this section:
• Participation in business case benefits development
• Economic appraisal calculations
• Current Project scope/direction: Benefits Change Form
• Analysis of Business Case Benefits
4. Benefits Ownership
Consider the following point for inclusion in this section:
• Benefits Owners Engagement
• Roles and benefit accountabilities
• Business problems to be resolved
• Operational obstacles and risks: Benefits Risk Register
• Benefits Measures and Targets: Benefits Realisation Register
1.
Reconcile
business
case
benefits
2.
Secure
benefit
ownership
3.
Develop
benefits
activity
plan
4.
Conduct
baseline
measures
5.
Review
business
change
6.
Go live
activities
7.
Benefits
tracking
4
5. Benefits Activity Plan
Consider the following point for inclusion in this section:
• Business, Technology, Organisational, Processes and People tasks
• Benefits Realisation Pathway map
• Benefits Result Chain
• Review project plan for benefit and change management tasks
• Benefits Realisation Activity Plan
• Communication materials – benefits at each level and “What’s in it for me”
6. Baseline Measures
Consider the following point for inclusion in this section:
• Describe how measures will be collected
• Detail the effort and time frames
• Detail any tools to be used such as satisfaction surveys
• The sign-off process for the measures
7. Benefits and Organisational Change
Consider the following point for inclusion in this section:
• This section should detail the process changes and initiatives required to produce each benefit. Benefits and change work together.
• The Change Management group typically develop “Stop, Start and Continue” process lists.
• The details will be used to create the Benefits Pathway and The Benefits Realisation Results Chain.
• Go Live
Consider the following point for inclusion in this section:
5
• Describe how the quick wins will be identified and communicated.
• List the key processes to stop and those which will improve.
8. Post Go Live Benefits Tracking
Consider the following point for inclusion in this section:
• Describe how the benefits data collection and reporting process will be conducted post implementation.
• Indicate the groups and stakeholders who will receive the information.
• Some benefits will not meet target and it will be necessary to implement new initiatives to correct this.
• Describe the expected duration, possible two years post implementation.