Test Report of Generator Protection Relay (G60-A) for
Engro Powergen Project
EPESOL
(PVT)
LTD
Partner GE Energy
SHT
1
OF
14
1
Customer Engro Powergen
Relay Type Numerical Generator Management Relay
Panel Identification Generator Protection Panel GPP
Relay Identification Generator Protection
Relay Make GENERAL ELECTRIC
Model G60-G01-HCH-F8F-H67-M8F-P6D-U6D-W6C
Serial No. AALC07000443
Firmware Revision 5.4
Auxiliary Voltage 125V DC
Test Starting Date 16-04-2015
Test Set Used Freja 300
Tested ByMr.Mubasher Ahmed, Testing/Commissioning Engineer.Contact Number: +92 333 408 30 86
Witnessed By Mr.Ijlal, Engro Powergen
General Data
Generator Genout Voltage 11.0 kV
Connection Type WYE
CT Ratio Genout Side (CT-6) 8000/1
CT Ratio Neutral Side (CT-1) 8000/1
VT Ratio (VT-G) 13.8kV/100V
Aux. Neutral VT(NET) 13.8kV/200V
Testing Procedure
1.
Verify that the relay rear connection/wiring is according to referred drawings.2. Power up relay at its rated voltage mentioned on face plate of relay.
3.
Verify that “ In Service” green LED on face plate is lit up.
4. Verify that different protection units inside the relay are configured on desired
settings.
5.
Isolate the relay from field side wiring as per referred drawing.
6. Inject different voltage & current values (according to relay trip settings) to
relay and check its functionality and behavior.
7.
Note down all test results in tables given below.
8/16/2019 Functional Testing of G60-A Test Results Engro
2/14
Test Report of Generator Protection Relay (G60-A) for
Engro Powergen Project
EPESOL
(PVT)
LTD
Partner GE Energy
SHT
2
OF
14
2
1. Measuring / Metering Accuracy
SourcePhase
InvolvedRatio
Applied Analog
Signals (Secondary)
Measured Value
(Primary)
Source 2,Line Side Ia1 8000/1 1.00 0A 7.994-0
kA
Source 2, Line Side Ia2 8000/1 1.00 240A 8.002-119
kA
Source 2, Line Side Ia3 8000/1 1.00 120A 7.994-240
kA
Source 1, Neutral Side Ib1 8000/1 1.00 0A 7.995-0
kA
Source 1, Neutral Side Ib2 8000/1 1.00 240A 8.002-119
kA
Source 1, Neutral Side Ib3 8000/1 1.00 120A 7.994-240
kA
Main PTs (VTG-P) V1 13.8kV/100V (57.70)100V 13.796-330
kV
Main PTs (VTG-P) V2 13.8kV/100V (57.7240)100V 13.794-90
kV
Main PTs (VTG-P) V3 13.8kV/100V (57.7120)100V 13.808-210
kV
NET VT 13.8kV/220V 1000 V 6.27-0
kV
2.
Stator Differential Protection (87G)
Pickup = 0.083 P.U
Slope 1 = 10 %
Break 1 = 1.00 P.U
Break 2 = 3.07 P.U
Slope 2 = 60 %
2.1 Pickup Accuracy
Sr.I Applied at Gen out Side( (Amp) I Applied at Neutral Side (Amp)
StatusIa1 Φ Ia2 Φ Ia3 Φ Ib1 Φ Ib2 Φ Ib3 Φ
1 1.00 0 1.00 240 1.00 120 1.00 0 1.00 240 1.00 120 Stable
2 0.90 0 0.90 240 0.90 120 0.810 0 0.810 240 0.810 120 No Pickup
3 0.90 0 0.90 240 0.90 120 0.809 0 0.809 240 0.809 120 Pickup
4 3.50 0 3.50 240 3.50 120 1.41 0 1.41 240 1.41 120 No Pickup5 3.50 0 3.50 240 3.50 120 1.40 0 1.40 240 1.40 120 Pickup
8/16/2019 Functional Testing of G60-A Test Results Engro
3/14
Test Report of Generator Protection Relay (G60-A) for
Engro Powergen Project
EPESOL
(PVT)
LTD
Partner GE Energy
SHT
3
OF
14
3
2.2 Operating Time Accuracy
Sr.I Applied at Genout Side( (Amp) I Applied at Neutral Side (Amp) Measured
Time
(msec)
StatusIa1 Φ Ia2 Φ Ia3 Φ Ib1 Φ Ib2 Φ Ib3 Φ
1 1.00 0 1.00 240 1.00 120 0.00 0 0.00 240 0.00 120 13.00 Trip
3. Negative Phase Sequence (Generator Unbalance Alarm 46A)
3.1 Pickup Accuracy
Inom. = 0.830 P.U.
Stage 2 Pickup = 10.00%
Time Delay = 6.0 sec
Sr.Applied Current Gen out Source 2 (Amp)
StatusIa1 Ia2 Ia3 IΦ1 IΦ2 IΦ3
1 0.050 0.050 0.050 0 120 240 No Pickup
2 0.051 0.051 0.051 0 120 240 Pickup
: Phase T
OC and Stator Diff. Settings should be switched off to test this function.
4. Negative Phase Sequence ( Generator Unbalance Trip 46T)
4.1 Pickup Accuracy
Stage 1 Pickup = 10.00 %
Stage 1 K Value = 6.40
Stage 1 min. = 0.250 Sec
Stage 1 max. = 640.0 Sec
Stage 1 K Reset = 256.0 Sec
Sr.Applied Current Gen Out Source 2 (Amp) Status
Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ31 0.084 0.084 0.084 0 120 240 No Pickup
2 0.085 0.085 0.085 0 120 240 Pickup
8/16/2019 Functional Testing of G60-A Test Results Engro
4/14
Test Report of Generator Protection Relay (G60-A) for
Engro Powergen Project
EPESOL
(PVT)
LTD
Partner GE Energy
SHT
4
OF
14
4
4.2 Operating Time Accuracy
Sr.Applied Current Neutral Source 2 (Amp) Measured Time
( Sec )Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3
1 1.00 1.00 1.00 0 120 240 4.434
2 1.50 1.50 1.50 0 120 240 1.994
3 2.50 2.50 2.50 0 120 240 0.733
5. Sensitive Directional Power Stage 1(32 N. Stop)
5.1 Pickup Accuracy
Directional Power RCA = 180
Stage 1 SMIN = 0.035 P.U
Stage 1 Delay = 3.0 Sec
Sr.Applied Voltage (Volts) Applied Current Source 2 (Amp)
StatusV1 V2 V3 VΦ1 VΦ2 VΦ3 Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3
1 57.70 57.70 57.70 0 240 120 0.035 0.035 0.035 180 60 300 No
Pickup
2 57.70 57.70 57.70 0 240 120 0.036 0.036 0.036 180 60 300 Pickup
5.2 Operating Time Accuracy
Sr.
Applied Voltage (Volts) Applied Current Source 2 (Amp) Measured
Time (mSec)
V1 V2 V3 VΦ1 VΦ2 VΦ3 Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3
1 57.70 57.70 57.70 0 240 120 0.2 0.2 0.2 180 60 300 3.074
6. Sensitive Directional Power Stage 2 (32-2)
6.1 Pickup Accuracy
Directional Power RCA = 180
Stage 2 SMIN = -0.007
Stage 2 Delay = 0.50 Sec
Sr.Applied Voltage (Volts) Applied Current Source 2 (Amp)
StatusV1 V2 V3 VΦ1 VΦ2 VΦ3 Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3
1 57.70 57.70 57.70 0 240 120 0.007 0.007 0.007 180 60 300 No
Pickup
2 57.70 57.70 57.70 0 240 120 0.008 0.008 0.008 180 60 300 Pickup
8/16/2019 Functional Testing of G60-A Test Results Engro
5/14
Test Report of Generator Protection Relay (G60-A) for
Engro Powergen Project
EPESOL
(PVT)
LTD
Partner GE Energy
SHT
5
OF
14
5
6.2 Operating Time Accuracy
Sr.
Applied Voltage (Volts) Applied Current Source 2 (Amp) Measured
Time
(mSec)V1 V2 V3 VΦ1 VΦ2 VΦ3 Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3
1 57.70 57.70 57.70 0 240 120 0.005 0.005 0.005 180 60 300 579
7. Loss of Field Stage 1 (40):
7.1 Pickup Accuracy
Center = 44.14 ohm
Radius = 34.76 ohm
Time Delay = 1.000 sec
Off Set = 9.38 ohm
Sr.Applied Voltage (Volts) Applied Current Sorce 2 (Amp) Z
ohmPickup
V1 V2 V3 VΦ1 VΦ2 VΦ3 Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3
1 20 20 20 0 240 120 0.254 0.254 0.254 90 330 210 78.74 No
2 20 20 20 0 240 120 0.255 0.255 0.255 90 330 210 78.41 Yes
7.2 Operating Time Accuracy
Sr.
Applied Voltage (Volts) Applied Current Sorce 2 (Amp) Measured
Time
(sec)V1 V2 V3 VΦ1 VΦ2 VΦ3 Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3
1 20 20 20 0 240 120 0.51 0.51 0.51 90 330 210 1.024
8. Loss of Field Stage 2 (40):
8.1 Pickup Accuracy
Center = 80.98 ohm
Radius = 71.60 ohm
Time Delay = 1.00 sec
Off Set = 9.38
Sr.Applied Voltage (Volts) Applied Current Sorce 2 (Amp) Z
ohmStatus
V1 V2 V3 VΦ1 VΦ2 VΦ3 Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3
1 20 20 20 0 240 120 0.132 0.132 0.132 90 330 210 151.52 No
Pickup
2 20 20 20 0 240 120 0.133 0.133 0.133 90 330 210 150.38 Yes
8/16/2019 Functional Testing of G60-A Test Results Engro
6/14
Test Report of Generator Protection Relay (G60-A) for
Engro Powergen Project
EPESOL
(PVT)
LTD
Partner GE Energy
SHT
6
OF
14
6
8.2 Operating Time Accuracy (at 36.0 ohm)
Sr.Applied Voltage (Volts) Applied Current Source 2 (Amp) Measured
Time (sec)V1 V2 V3 VΦ1 VΦ2 VΦ3 Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3
1 20 20 20 0 240 120 0.17 0.17 0.17 90 330 210 1.034
9.
Phase Over Voltage Element (59P1):
9.1
Pickup Accuracy
Pickup = 1.200 P.U.
Time Delay = 0.50 Sec
Sr.Applied Voltage (Volts)
StatusV1 V2 V3 VΦ1 VΦ2 VΦ3
1 69.18 69.18 69.18 0 240 120 No Pickup
2 69.19 69.19 69.19 0 240 120 Pickup
9.2
Operating Time Accuracy
Sr.Applied Voltage (Volts) Measured Time
(Sec)V1 V2 V3 VΦ1 VΦ2 VΦ3
1 75.00 75.00 75.00 0 240 120 0.554
10. Under Frequency (81-1U):
10.1 Pickup Accuracy
Pickup Level = 49.00 Hz
Sr.Voltage Applied
(Volts)
Applied Frequency
(Hz)Status
1 63.50 49.01 No Pickup
2 63.50 49.00 Pickup
8/16/2019 Functional Testing of G60-A Test Results Engro
7/14
Test Report of Generator Protection Relay (G60-A) for
Engro Powergen Project
EPESOL
(PVT)
LTD
Partner GE Energy
SHT
7
OF
14
7
11. Under Frequency (81-2U):
11.1 Pickup Accuracy
Pickup Level = 47.50 Hz
Time Delay = 3.00 Sec
Sr.Voltage Applied
(Volts)
Applied Frequency
(Hz)Status
1 63.50 47.50 No Pickup
2 63.50 47.49 Pickup
11.2 Operating Time Accuracy
Sr.Voltage Applied
(Volts)
Applied Frequency
(Hz)
Measured Time
( Sec)
1 63.50 47.00 3.10 Sec
12. Over-Frequency (81-1O):
12.1 Pickup Accuracy
Pickup Level = 51.00 Hz
Sr.Voltage Applied
(Volts)
Applied Frequency
(Hz)Status
1 63.50 50.98 No Pickup2 63.50 50.99 Pickup
13. Over-Frequency (81-2O):
13.1 Pickup Accuracy
Pickup Level = 52.50 Hz
Time Delay = 3.00Sec
Sr.Voltage Applied
(Volts)
Applied Frequency
(Hz)Status
1 63.50 52.49 No Pickup
2 63.50 52.50 Pickup
8/16/2019 Functional Testing of G60-A Test Results Engro
8/14
Test Report of Generator Protection Relay (G60-A) for
Engro Powergen Project
EPESOL
(PVT)
LTD
Partner GE Energy
SHT
8
OF
14
8
13.2 Operating Time Accuracy
Sr.Voltage Applied
(Volts)
Applied Frequency
(Hz)
Measured Time
( Sec)
1 63.50 53.00 3.10
14. Over-Frequency (81-3O):
14.1 Pickup Accuracy
Pickup Level = 52.50 Hz
Time Delay = 30.00 Sec
Sr.Voltage Applied
(Volts)
Applied Frequency
(Hz)Status
1 63.50 52.49 No Pickup2 63.50 52.50 Pickup
14.2 Operating Time Accuracy
Sr.Voltage Applied
(Volts)
Applied Frequency
(Hz)
Measured Time
( Sec)
1 63.50 53.00 30.10
Note: Overfrequency Stage 2 & Stage 3 has same pickups
15. Phase Under Voltage (27-U1):
15.1 Pickup Accuracy
Pickup = 0.90 P.U (Phase to Ground)
Curve = Definite Time
Time Delay = 10.00 Sec
Sr.Applied Voltage (Volts)
StatusV1 V2 V3 VΦ1 VΦ2 VΦ3
1 51.94 51.94 51.94 0 240 120 No Pickup
2 51.93 51.93 51.93 0 240 120 Pickup
8/16/2019 Functional Testing of G60-A Test Results Engro
9/14
Test Report of Generator Protection Relay (G60-A) for
Engro Powergen Project
EPESOL
(PVT)
LTD
Partner GE Energy
SHT
9
OF
14
9
16. Phase Under Voltage (27-U2):
16.1 Pickup Accuracy
Pickup = 0.90 P.U (Phase to Ground)
Curve = Definite Time
Time Delay = 3.00Sec
Sr.Applied Voltage (Volts)
StatusV1 V2 V3 VΦ1 VΦ2 VΦ3
1 40.41 40.41 40.41 0 240 120 No Pickup
2 40.40 40.40 40.40 0 240 120 Pickup
16.2 Operating Time Accuracy
Sr.Applied Voltage (Volts) Measured Time
(Sec)V1 V2 V3 VΦ1 VΦ2 VΦ3
1 30.0 30.0 30.0 0 240 120 3.034
17. Phase Time Over Current with Voltage Restraint (51V)
17.1 Pickup Accuracy
Pickup Level = 0.997 P.U
Curve = IEEE Mod Inv
TD Multiplier = 2.00
Voltage Restrained = Enabled
Sr.Applied Voltage (Volts) Applied Current Source 2 (Amp)
Status
V1 V2 V3 VΦ1 VΦ2 VΦ3 Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3
1 57.70 57.70 57.70 0 240 120 0.997 0.997 0.997 0 240 120 No
Pickup
2 57.70 57.70 57.70 0 240 120 0.998 0.998 0.998 0 240 120 Pickup
3 0.00 0.00 0.00 0 240 120 0.100 0.100 0.100 0 240 120 No
Pickup
4 0.00 0.00 0.00 0 240 120 0.101 0.101 0.101 0 240 120 Pickup
8/16/2019 Functional Testing of G60-A Test Results Engro
10/14
Test Report of Generator Protection Relay (G60-A) for
Engro Powergen Project
EPESOL
(PVT)
LTD
Partner GE Energy
SHT
10
OF
14
10
17.2 Operating Time Accuracy
Sr. Applied Voltage (Volts) Applied Current Source 2 (Amp) Measured
Time(Sec)V1 V2 V3 VΦ1 VΦ2 VΦ3 Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3
1 57.70 57.70 57.70 0 240 120 2.00 2.00 2.00 0 240 120 7.574
2 50.00 50.00 50.00 0 240 120 2.00 2.00 2.00 0 240 120 6.334
3 40.00 40.00 40.00 0 240 120 2.00 2.00 2.00 0 240 120 5.044
4 30.00 30.00 30.00 0 240 120 2.00 2.00 2.00 0 240 120 4.004
5 10.00 10.00 10.00 0 240 120 2.00 2.00 2.00 0 240 120 2.294
6 0.00 0.00 0.00 0 240 120 2.00 2.00 2.00 0 240 120 1.915
18. Phase Instantaneous Time Over Current-1 for (50 P)
18.1 Pickup Accuracy
Pickup Level = 3.076 P.U
Time Delay = 0.01Sec
Sr.Applied Current Source 2 (Amp) Status
Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ31 3.077 3.077 3.077 0 240 120 No Pickup
2 3.078 3.078 3.078 0 240 120 Pickup
18.2 Operating Time Accuracy
Sr.Applied Current Neutral Source 1 (Amp) Measured Time
( Sec )Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3
1 4.00 4.00 4.00 0 240 120 0.041
8/16/2019 Functional Testing of G60-A Test Results Engro
11/14
Test Report of Generator Protection Relay (G60-A) for
Engro Powergen Project
EPESOL
(PVT)
LTD
Partner GE Energy
SHT
11
OF
14
11
19. Phase Instantaneous Time Over Current-1 for (50BF)
19.1 Operating Time Accuracy
Pickup Level = 0.200 P.U
Time Delay = 0.250 Sec (in logic)
Sr.Applied Current Source 2 (Amp) Measured Time
(mSec)Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3
1 1.39 1.39 1.39 0 240 120 268.9
20. Over Excitation Protection Stage 1(24):
20.1 Pickup Accuracy
Pickup = 1.12 P.U.
Curve = Definite Time
T.D = 5.00
Sr.Applied Voltage (Volts) Applied Freq Status
V1 V2 V3 VΦ1 VΦ2 VΦ3 Hz
1 64.59 64.59 64.59 0 240 120 50 No Pickup
2 64.60 64.60 64.60 0 240 120 50 Pickup
20. Over Excitation Protection Stage 2(24 T):
20.1 Pickup Accuracy
Pickup = 1.15 pu
Curve = Definite Time
T.D = 3.00
Sr.Applied Voltage (Volts) Applied Freq Status
V1 V2 V3 VΦ1 VΦ2 VΦ3 Hz
1. 66.30 66.30 66.30 0 240 120 50 No Pickup
2. 66.32 66.32 66.32 0 240 120 50 Pickup
8/16/2019 Functional Testing of G60-A Test Results Engro
12/14
Test Report of Generator Protection Relay (G60-A) for
Engro Powergen Project
EPESOL
(PVT)
LTD
Partner GE Energy
SHT
12
OF
14
12
20.2 Operating Time Accuracy
Sr.Applied Voltage (Volts) Applied Freq Measured Time
( Sec )V1 V2 V3 VΦ1 VΦ2 VΦ3 Hz
1. 72.0 72.0 72.0 0 240 120 50 3.114
21. 3rd
Harmonic Neutral Under Voltage Protection (27TN)
21.1 Pickup Accuracy
Pickup Level = 0.0087 pu
Time Delay = 5.00 sec
Sr. Voltage Applied Neutral Source 1 Aux VT (Volts) Status1 2.00 No Pickup
2 1.90 Pickup
23. Accidental Energization(AE)
23.1 Pickup Accuracy
AE Armed = UV & OFFLINE
Under Voltage = 0.7 PUOver Current = 0.3 PU
Sr.Applied Voltage (Volts) Applied Current Source 2 (Amp)
Status
V1 V2 V3 VΦ1 VΦ2 VΦ3 Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3
1 0.00 0.00 0.00 0 240 120 0.301 0.301 0.301 0 240 120 No
Pickup
2 0.00 0.00 0.00 0 240 120 0.300 0.300 0.300 0 240 120 Pickup
3 41.50 41.50 41.50 0 240 120 0.301 0.301 0.301 0 240 120 Normal
4 41.60 41.60 41.60 0 240 120 0.300 0.300 0.300 0 240 120De-
latched
8/16/2019 Functional Testing of G60-A Test Results Engro
13/14
Test Report of Generator Protection Relay (G60-A) for
Engro Powergen Project
EPESOL
(PVT)
LTD
Partner GE Energy
SHT
13
OF
14
13
23.2 Operating Time Accuracy
Sr.Applied Voltage (Volts) Applied Current Source 2 (Amp) Measured
Time(msec)V1 V2 V3 VΦ1 VΦ2 VΦ3 Ia1 Ia2 Ia3 IΦ1 IΦ2 IΦ3
1 0.00 0.00 0.00 0 240 120 0.80 0.80 0.80 0 240 120 23.50
hase TOC and Stator Diff.
Settings should
be switched off to test this function.
24. Ground Time Over Current-1 (51G)
24.1 Pickup Accuracy
Pickup Level = 0.065 P.U
Time Delay = 1.00 Sec
Sr.Applied Ground Current (Amp) Status
Ig IΦ1
1 0.066 0 No Pickup
2 0.067 0 Pickup
24.2 Operating Time Accuracy
Sr.Applied Ground Current (Amp) Measured Time
(Sec)Ig IΦ1
1 0.100 0 1.02
8/16/2019 Functional Testing of G60-A Test Results Engro
14/14
Test Report of Generator Protection Relay (G60-A) for
Engro Powergen Project
EPESOL
(PVT)
LTD
14
25. Verification of LED’s
Sr. Configuration Remarks
1 Stator differential Functional
2 Phase TOC Functional3 Phase IOC Functional
4 Ground TOC Functional
5 Generator Unbalance Functional
6 Phase UV 1 Functional
7 Phase UV 2 Functional
8 Phase OV 1 Functional
9 Volts Per Hz 1 Functional
10 Volts Per Hz 2 Functional
11 Loss of excitation Functional
12 Accidental Energization Functional
13 3rd
harmonic under voltage Functional
14 Sensitive directional Power stage 1 Functional
15 Sensitive directional Power stage 2 Functional
Tested By Witnessed By
Mr.Mubasher Ahmed Mr.Ijlal
EPESOL PVT LTD Engro Powergen