35
Full Scale and Demonstration Primary Filter Projects Demonstrate Great Promise Presented at North Texas Section WEAT Seminar| February 13, 2018 Presented by Onder Caliskaner, Ph.D., P.E. Co-authors George Tchobanoglous, Ph.D., P.E., Terry Reid, P.E., Brian Davis, P.E., Zoe Wu, Ryan Young, P.E., Eassie Miller, P.E., Ryan Atterbury, P.E., Catrina Paez

Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

Full Scale and Demonstration Primary Filter Projects Demonstrate Great Promise

Presented atNorth Texas Section WEAT Seminar| February 13, 2018

Presented byOnder Caliskaner, Ph.D., P.E.

Co-authorsGeorge Tchobanoglous, Ph.D., P.E., Terry Reid, P.E., Brian Davis, P.E. , Zoe Wu, Ryan Young, P.E., Eassie Miller, P.E., Ryan Atterbury, P.E., Catrina Paez

Page 2: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

Acknowledgements

• California Energy Commission

• Full scale installation - Linda County Water District

• Pilot / Demonstration Sites - Los Angeles County Sanitation District, City and County of Honolulu, Rockford (IL), Oak Hill (WV)

• Peer Review - Prof. Emeritus George Tchobanoglous / UC Davis

• Primary Filter System: Aqua Aerobics Systems, Inc.

• Thickening System: Process Wastewater Technologies, Inc.

• Third party verification - Base Energy

• Kennedy Jenks CA and HI offices

2

Page 3: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

Topics

• Primary Filtration for Carbon Diversion • Background

• Objectives

• Pilot and Demonstration Projects

• First Full Scale Installation

• Conclusions

• Questions / Discussion

3

Page 4: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

Conventional and Modified Wastewater Treatment Flow Diagrams - Primary Filtration

4

Modified Wastewater Treatment Flow Diagrams

Conventional Wastewater Treatment Flow Diagrams

Tertiary Effluent Filter

FilteredPrimary Effluent

Primary Filter

Aerated Activated

Sludge Basin (Reduced Size)

Smaller Blower (Reduced Air Demand)

Increased Digester Gas

Tertiary Effluent Filter

Page 5: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

5

Primary Filtration

Primary filtration is another emerging technology based on successful demonstration of primary effluent filtration for 2 years

• Similar objectives (as PEF) for energy savings and plant capacity increase

• Replaces primary clarifiers with primary filters• 50 – 60% higher TSS/VSS removal efficiency

• 40 – 50% higher BOD/COD removal efficiency

• 70 – 80% reduction in footprint

Page 6: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

Primary Filter Comparison

6

Tertiary Filter Primary Filter

Page 7: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

7

Page 8: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

Operational simplicity / flexibility

Treatment performance

Footprint

Capital and operational costs

Carbon management / diversion

What is the most important criteria for design and operation of a primary

treatment system?

8

Page 9: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

Primary Filtration Main Objectives and Advantages✓Higher removal of organic load (BOD):

Secondary treatment capacity

Aeration power consumption

Secondary treatment volume requirement

✓Reduction in primary treatment area

✓Higher removal of volatile suspended solids (VSS)

Digester biogas energy production

✓Particle size modification: biological treatment efficiency

9

Page 10: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

City and County of HonoluluSand Island Primary Filtration Testing (August 2016 – May 2017)

10

Average Flow Design Capacity: 90 MGD

Testing of Filtration for 3 MGD Sidestream Treatment System

Testing of Primary Filtration

Page 11: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

City and County of Honolulu Sand Island Sidestream Filtration Testing Results

11

Combined Sidestream Filtration System Concentration Ranges and Average Removal Performances

Constituent

Sidestream, mg/L

Filtered Sidestream, mg/L

Typical Average Removal Efficiency

Range Average Range Average Percent

VSS 100-510 223 10-140 75 66%

TSS 240-590 325 81-170 123 62%

COD 400-820 557 130-500 300 46%

BOD5 142-360 213 89-210 122 43%

CBOD5 170 170 99 99 42%

Soluble BOD5 81 81 71 71 13%

Ammonia 49-81 66 28-83 62 6%

TKN 64-110 91 35-91 71 21%

Page 12: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

City and County of Honolulu Sand Island Primary Filtration Testing Results

12

Primary Influent Filtration System Concentration Ranges and Average Removal Performances

Constituent Primary Filter Influent, mg/L Primary Filter Effluent, mg/LConstituent Average Removal Efficiency

Range Average Range Average Percent

VSS 110-190 155 17-40 27 82%

TSS 120-260 188 24-62 41 78%

COD 230-1000 389 67-270 178 54%

BOD5 110-210 154 55-86 73 53%

Soluble BOD5 47-63 55 38-56 47 15%

Soluble COD 100 100 96 96 4%

TKN 22-27 24 20-26 22 8%

Page 13: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

City and County of Honolulu - Sand Island Primary Filtration Particle Size Distribution Results

13

Percentage of particles smaller than the indicated size

Particle size

Date Sample Type 2 µm 5 µm 10 µm 20 µm

5/4/2017 Influent 1.3 2.2 5.2 12.8

5/4/2017 Effluent 12.4 17.2 30.2 52.2

DateMean particle size

(volumetric), Influent (µm)

Mean particle size (volumetric), Effluent

(µm)Relative change, percent

5/4/2017 96.6 20.4 79%

Mean particle size reduced by approximately 80 percent

Page 14: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

Los Angeles County Sanitation District - City of Lancaster Primary Filtration Demonstration Project (November 2016 - November 2017)

14

Tertiary Treatment – 18 MGD

Serves approximately 160,000 people

Page 15: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

Los Angeles County Sanitation District - City of Lancaster - Primary Filtration Demonstration Project

15

0

10

20

30

40

50

60

70

80

90

100

0

100

200

300

400

500

600

700

800

11/8/16 12/28/16 2/16/17 4/7/17 5/27/17 7/16/17 9/4/17

Re

mo

va

l (%

)

TS

S (

mg

/L)

Lancaster Primary Filter Daily Average TSS

TSS Removal (%) Filter Influent TSS Filter Effluent TSS

Avg Influent TSS Avg Effluent TSS Avg Removal (%)

Avg Inf TSS: 392 mg/L

Avg Eff TSS: 56 mg/L

Avg Removal: 86%

Page 16: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

Los Angeles County Sanitation District - City of Lancaster - Primary Filtration Demonstration Project

16

0

10

20

30

40

50

60

70

80

90

100

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

11/8/16 12/28/16 2/16/17 4/7/17 5/27/17 7/16/17 9/4/17

Wa

ste

Ra

tio

(%

)

Ga

llon

s p

er

da

y

Lancaster Primary Filter Waste Ratios

Waste Ratio (%) Filtered Effluent (gal/d) BW Volume (gal/d) SW Volume (gal/d)

Average Volumes

Effluent: 35,527 gal

BW: 3,713 gal

SW: 1,852 gal

BW+SW: 5,430 gal

Page 17: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

First Full Scale InstallationLinda County Water District WWTP

17

Average Flow : 1.2 MGD (2016-2017)

2.5 MGD (2018-2019)

Downstream Process:

Nitrogen Removal, Tertiary Filtration

LCWD WWTP

Sacramento

Page 18: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

First Full Scale InstallationLinda County Water District WWTP

18

Primary Filter Capacity:

Average Flow - 1.5 MGD

Peak Flow - 3 MGD

Page 19: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

First Full Scale Installation –Linda County Water District WWTP

19

Design Completed in June 2016

Construction Started in October 2016

Started-up in August 2017

Page 20: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

First Full Scale Installation Linda County Water District WWTP

20

Page 21: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

First Full Scale InstallationLinda County Water District WWTP

21

Primary Clarifier –average flow capacity 5 MGD

Primary Filter – average flow capacity 1.5 MGD

Page 22: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

First Full Scale InstallationLinda County Water District WWTP

22

Page 23: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

First Full Scale Installation Primary Filter – Cloth Depth Filter

23

Page 24: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

First Full Scale Installation Primary Filter – Cloth Depth Filter

24

Filter Influent Filter Effluent

Influent Effluent

Page 25: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

First Full Scale Installation Thickening System - Volute Thickener

25

Page 26: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

First Full Scale Installation Thickening System – Phase Separator

26

Page 27: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

Flow Diagram– Linda County Water District WWTP

27

Page 28: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

Primary Filter System Initial PerformanceLinda County Water District

28

0

10

20

30

40

50

60

70

80

90

100

0

100

200

300

400

500

7/1/17 8/20/17 10/9/17 11/28/17 1/17/18

Re

mo

va

l (%

)

TS

S (

mg/L

)

LCWD Primary Filter Daily Average TSS

TSS Removal (%) Filter Influent TSS Filter Effluent TSS

Avg Influent TSS Avg Effluent TSS Avg Removal (%)

Avg Inf TSS: 276 mg/L

Avg Eff TSS: 48 mg/L

Avg Removal: 83%

Page 29: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

Summary of Average Wastewater Characteristics (Linda County Water District)

29

* Based on historical data at LCWD WWTP

Parameter

Primary Clarifier

Influent

Primary Clarifier

Effluent Primary Filter

Avg Value (mg/L) % Removal * Avg Value (mg/L) % Removal

BOD5 220 26% 106 52%

Soluble BOD5 51 0% 51 0%

COD 501 24% 254 49%

TSS 200 50% 40 80%

VSS 188 47% 38 80%

TKN 46 0% 41 11%

Page 30: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

Conclusions

30

Primary filtration is an emerging advanced primary treatment technology for increased carbon diversion

Replaces primary clarifiers with primary filters:

TSS/VSS removal efficiency 50-70 percent

BOD/COD removal efficiency 40-55 percent

Footprint 80 to 85 percent

Page 31: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

Conclusions

Actual performance/feasibility will be site specific

• Plant size

• Influent characteristics

• Efficiency of existing aeration system

• Available capacity

• Power cost

• Use of digester gas

31

Page 32: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

Conclusions

Observed/expected side benefits:

• Response to upset conditions

• Load equalization

• Overall improvement in downstream biological treatment

Other considerations:

• Impact on denitrification

• Comparison with other technologies with similar concept

• Material/enclosure considerations compared to tertiary filters

• Digester design considerations

32

Page 33: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

ConclusionsPrimary Filtration Potential Benefits

25-30 % in aeration costs

20-25 % in secondary treatment capacity

30-40 % in digester gas energy production

80 - 85 % Primary treatment footprint

Page 34: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

Estimated Savings

34

Savings Per MGD

Construction Cost Saving $600,000

Annual O&M Costs Saving $30,000

Net Present Value $1,100,000

Assuming a 10% implementation of the (primary filtration technology) in US, the estimated present value of the savings will be approximately $5B

Wastewater Treatment System Cost Savings Resulting from Primary Filtration

Page 35: Full Scale and Demonstration Primary Filter Projects ... · •Primary Filtration for Carbon Diversion •Background ... Sand Island Primary Filtration Testing (August 2016 –May

QUESTIONS & COMMENTS

35

Onder Caliskaner

E-mail: [email protected]

Phone: (916)-858-2738