3

Full page photo · 2020-07-07 · Building and Other Structures Machinery and Equipment Outlay Sub-total GRAND TOTAL 5060404001 5060405011 92,939,489.27 244760,074.10 0.00% 22.98%

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Full page photo · 2020-07-07 · Building and Other Structures Machinery and Equipment Outlay Sub-total GRAND TOTAL 5060404001 5060405011 92,939,489.27 244760,074.10 0.00% 22.98%
Page 2: Full page photo · 2020-07-07 · Building and Other Structures Machinery and Equipment Outlay Sub-total GRAND TOTAL 5060404001 5060405011 92,939,489.27 244760,074.10 0.00% 22.98%
Page 3: Full page photo · 2020-07-07 · Building and Other Structures Machinery and Equipment Outlay Sub-total GRAND TOTAL 5060404001 5060405011 92,939,489.27 244760,074.10 0.00% 22.98%