Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
C O N T E N T
1 FOREWORD ……………………….
2 HEAVY HAULAGE ……………………
3 HEAVY LIFT …………………………
4 EQUIPMENT RENTAL ……………….
5 CONTACT ADDRESS …………………
page
01
02
10
29
36
Harbour-Link Logistics Sdn. Bhd. (HLLSB) has formed and strengthened strategic
alliances with joint ventures significantly in both domestic and international.
The HLLSB established mission early on to motivate and guide the many
subsidiaries that now comprise the group. This mission includes an emphasis on
creativity, leadership, drive and diligence, all of which serve as daily reminder of
the deeper objectives of the Group. The mission statement leads HLLSB to seek
new means to accomplish goals and provides motivation during times of hardship.
With the gained experience within a span of more than 25 years, we sturdily
manifest the success is:
(a) To satisfy our customers with our reliable and economical service;
(b) To arrange advanced equipment and facilities as well as create a service
system to meet the diversified needs of our customers.
The new millennium has bought us visions and futuristic prospective to penetrate
into all aspect of industrialization and further enhance our better serve to our
customers in Malaysia.
Towards the new era, HLLSB aims for the ACCURATE, SAFE AND EFFICIENCY.
Through the thriving development force in the total-logistics services,
1
F O R E W O R D
HARBOUR-LINK LOGISTICS SDN. BHD. (206893-W)
Wholly owned subsidiary of Harbour-Link Group Berhad (HLGB)
With our skill work force and
strong technical back up, we can
bring your cargo climbing the hill,
over the sea and across the stream
all in a package.
Work plan, project management,
JSA, method statement are all in
one.
Supply of cross beam & saddle
1 Technical information for Hydraulic Goldhofer trailer during Transportation
2 Offloading by hydraulic jacking system using trailer jack
2
O ur services cover :
Receiving cargo ex-hook vessel, Ro-Ro, barging, transportation, lifting, erection, mechanical installation,
jacking / skidding / positioning for all kind of cargoes, big / small oversize and over weight.
H E A V Y H A U L A G E
The oversize / overweight load topples.With conventional equipment,this is unavoidable.
5 degrees
BACK VIEW
With our proposed multi-axletrailer c/w Hydraulic jacking system, toppling is avoided.
2
1
Prime Mover (Scania) X 3 units
Goldhofer Drop Deck Platform (240 Ton Capacity) X 1 unit
Self propelled multi - axle trailer (Goldhofer) X 6 liners
3
E quipment List for Transport:
Multi - axle trailer (Goldhofer) X 20 liners Multi - axle trailer (Commetto) X 6 liners
Prime Mover (Man) X 1unit
H E A V Y H A U L A G E
1 Transport 450 Ton vessel by 1½ module self-propelled system with turntable
2 Transport 260 Ton vessel by 12 axle-lines with 1½ module self-propelled
3 RO-RO operation at Port Wharf
4 Transport Shell MDS Air Separation Unit (112 Ton)
4
H E A V Y H A U L A G E
1
2
4 3
H E A V Y H A U L A G E
5 Transport 97 Ton Sulfinol Regenerator (27m length X 5.6m Ø) by 2 units Goldhofer multi-axle trailer
(1½ module x 4 axle-line joined with drop deck)
6 Transport 158 Ton Propane Condenser by 12 axle-lines Goldhofer trailer 7 Transport 97 Ton Sulfinol Regenerator from MLNG laydown to plant site
8 Transport / installation of 76 Ton transformer at Miri Tudan Power Station site
5
5
6
7
8
1 Loading of 76 Ton transformer ex-mother vessel to barge / landing craft
2 Transport of transformer including jacking / skidding work
3 Receiving 760 Ton Feed Gas Absorber for MLNG Tiga project at Bintulu Port
6
H E A V Y H A U L A G E
3
1
2
H E A V Y H A U L A G E
4 Transport 760 Ton Absorber from Bintulu Port to MLNG Tiga site (distance - 7km)
5 Transport 120 Ton incinerator by 8 axle-lines x 1½ module Goldhofer trailer
7
4
5
H E A V Y H A U L A G E
1 Transport 148 Ton genset from Bintulu Port to Kidurong Power Station (distance – 7km)
2 Receiving 140 Ton transformer at Kuching Port
3 Transport 120 Ton genset engine including Ro-Ro, jacking/skidding/positioning at Tanjung Aru
Power Station, Kota Kinabalu
4 Transport 50 Ton Detergent Feedstock Splitter (28m length) from Bintulu Port to SMDS site
8
1
2
3
4
H E A V Y H A U L A G E
5 Transport crane main body (P&H5300) by Goldhofer multi-axle trailer
6 Transport Runner by Goldhofer multi-axle trailer to Bakun site
9
5
6
Harbour was a Major Heavy Lift contractor for MLNG
Rejuvenation & MLNG / MLNG Dua Revamp (MRR) Project year 2002 – 2005. With our experience Rigging Team, we provide Malaysia LNG the following services:
1) Site survey & consult of suitable lifting gear / equipment
2) Job Safety Analysis (JSA)
3) Work Method Statement (WMS) review
4) Lifting plan / Rigging study & supervision
5) Manpower – Rigging crews
VENT STACK & STRUCTURE DISPOSAL WORK – MLNG1 BINTULU Foundation Height: 87m
Cargo Weight: 30 Ton (heaviest)
Attachment: 60m main boom + 39m luffing jib
Working Radius: 22m
Equipment: 300 Ton (Kobelco P&H5300) crawler crane
Year: 2002
10
H E A V Y L I F T
REMOVAL / REINSTALL OF AIR INTAKE STACK – MRR PROJECT Cargo Weight: 12 Ton
Working Radius: 48m
Equipment: 300 Ton (Kobelco P&H5300) crawler crane c/w luffing jib
360 Ton (Liebherr LT1300) mobile crane c/w luffing jib
Year: 2002, 2003, 2004, 2005
11
H E A V Y L I F T
General Requirement of Heavy Lift Activities
in Oil & Gas Industry
Lift Plan Rigging study
AutoCAD drawing
Job Safety Analysis (JSA)
To identify hazard and unsafe acts in workplace.
To analyze the individual activities and its
potential hazards
To determine appropriate control and solution to
eliminate or reduce the hazards/risk.
Work Method Statement (WMS)
Pre-lifting Activities
Lift Day Activities
Post Lifting Activities
Manpower
Equipment List
Safety Issues
Permit To Work (PTW)
Hazard management tool
Means of hazards control and mitigation
Specification and formal agreement of requirements
Identified responsibilities
Know the correct completion and how to use
Identified relevant certificates and documents
Criteria for re-authorization
Audit / feedback loops for improvement
ERECTION & MECHANICAL INSTALLATION OF THERMAL INCINERATOR – MRR PROJECT Cargo Weight: 120 Ton
Cargo Dimension: 6m (W) x 18m (L) x 6m (H)
Foundation Height: 4m
Equipment: 300 Ton (Kobelco P&H5300) &
150 Ton (Sumitomo LS248RH-2) crawler crane
Year: 2002
12
H E A V Y L I F T
INSTALLATION OF FIN FAN COOLER – MLNG MODULE 5 Cargo Weight: 29 Ton
Cargo Dimension: 6.0m (W) x 15.8m (L) x 2.0m (H)
Foundation Height: 17m
Working Radius: 16m
Equipment: 150 Ton (Sumitomo LS248RH-2) crawler crane
Year: 2002
13
H E A V Y L I F T
REMOVAL / REINSTALL OF THERMAL REBOILER – MLNG MODULE 5 Cargo Weight: 50 Ton
Cargo Dimension: 3.2m (W) x 12.4m (L) x 4.0m (H)
Foundation Height: 21m
Working Radius: 18m
Equipment: 300 Ton (Kobelco P&H5300) crawler crane
Year: 2003
14
H E A V Y L I F T
REMOVAL / INSTALLATION OF DEAERATOR – MLNG REVAMP MODULE 1, 2, 3 Cargo Weight: 80 Ton
Cargo Dimension: 19m (L) x 2.26mØ Attachment: 48m main boom + 100 Ton auxiliary counterweight
Foundation Height: 21m
Working Radius: 24m
Equipment: 400 Ton (Demag CC2000 Superlift) crawler crane
Year: 2003
15
H E A V Y L I F T
REMOVAL / INSTALLATION OF PROPANE CONDENSER – MLNG SHUTDOWN WORK DOSH INSPECTION MODULE 4 Cargo Weight: 178 Ton
Cargo Dimension: 12.5m (L)
Working Radius: 18m
Equipment: 400 Ton (Demag CC2000 Superlift) crawler crane
Year: 2003 (Module 4)
16
H E A V Y L I F T
REMOVAL / INSTALLATION OF SULFINOL REGENERATOR C1103 – MRR PROJECT MODULE 1 Cargo Weight: 97 Ton
Cargo Dimension: 27.6m (L) X 5.7mØ Attachment: 80m main boom + 24m luffing jib
Working Radius: 38m
Equipment: 600 Ton (Manitowoc M4600) Ringer Crane
Year: 2003
17
H E A V Y L I F T
PROVISION OF BARGE CRANE SERVICES FOR LNG LOADING ARMS MAJOR OVERHAUL – MLNG JETTY BERTH 1 Barge Dimension: 230ft (L) X 60ft (W) X 12ft (H)
Cargo Weight: 38 Ton (without main riser)
Cargo Dimension: 3.0m (W) X 31m (L) X 15.5m (H)
Working Radius: 19m
Equipment: 300 Ton (Demag CC2000) & 50 Ton (Kobelco P&H550S) crawler crane
Year: 2004
18
H E A V Y L I F T
LIFTING & SHIFTING OF OUTFEED SECTION & PRESS SECTION – DAIKEN SARAWAK SDN. BHD. BINTULU Outlet Section: 125 Ton, 6.24m (W) X 5.24m (L) X 5.83m (H)
Press Section: 225 Ton, 5.32m (W) X 8.87m (L) X 5.83m (H)
Equipment: Two (2) sets of Hydraulic Gantries (400 Ton ~ 800 Ton Cap.)
Year: September, 2004
19
H E A V Y L I F T
LIFTING OF PULLER MACHINE TO REMOVE TUBE BUNDLE – MLNG3 Cargo Weight: Tube Bundle (24.5 Ton) + Puller Machine (9.5 Ton)
Cargo Dimension: 9.1m (L) X 3.0mØ
Working Radius: 10m
Equipment: 360 Ton Truck Crane (Liebherr LT1300)
Year: July, 2005
20
H E A V Y L I F T
REMOVE & REINSTALL OF PROPANE CONDENSER – MLNG DUA MODULE 4 Cargo Weight: 175 Ton
Cargo Dimension: 12.5m
Working Radius: 28m
Equipment: 600 Ton (Manitowoc M4600) Ringer Crane
Year: August, 2005
21
H E A V Y L I F T
LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95 Ton)
Cargo Dimension: 4.5m (L) X 2.5m (H), 7m (L) X 1.4m (H)
Equipment: 360 Ton Truck Crane (Liebherr LT1300)
Year: June, 2006
22
H E A V Y L I F T
LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT
Equipment: 150 Ton Crawler Crane (Sumitomo LS248RH-2)
Year: June, 2006
23
H E A V Y L I F T
REPLACEMENT & UPGRADING OF GANGWAY AT MLNG JETTY BERTH #1 Cargo Weight: 4.0 Ton Equipment: 300 Ton Crawler Crane (M4600 S4) Working Radius: 22m Year: August 2006
24
H E A V Y L I F T
▲ Lifting of bridge span
▲ Erection of building structure
AD – HOC WORKS
25
H E A V Y L I F T
◄▲ Miri Airport Upgrading Project
AD – HOC WORKS
26
◄ Installation of vessel
▲ River diversion at Bakun
H E A V Y L I F T
▲ Bintulu Port New Building
H E A V Y L I F T
AD – HOC WORKS
27
◄▲ Tatau Zedtee Plywood Project
AD – HOC WORKS
28
H E A V Y L I F T
▲ Erection of vessel ◄ Lifting & dredging on barge at Sebangun Wharf
AD – HOC WORKS
29
▲ Construction of Cement Silo
▲ Discharging of drum
H E A V Y L I F T
–
Removal of Tower Crane at Parkcity Mall
AD – HOC WORKS
30
H E A V Y L I F T
Forklift ►
▲ Sky Master
Zoom Boom Forklift ▼
31
The large Harbour fleet covers a wide range of capacities with both hydraulic and mechanical cranes
available. We also provide any others construction equipment to support our fleet in order to handle on package work for our value customers.
Mobile Crane (20 Ton ~ 360 Ton) X 41 units
Crawler Crane (35 Ton ~ 600 Ton) X 11 units
Lorry Crane (3 Ton ~ 15 Ton) X 7 units
Zoom Boom Forklift (3 Ton ~ 6 Ton) X 2 units
Forklift (3 Ton ~ 10 Ton) X 8 units
Sky Master (24m Boom) X 3 units
E Q U I P M E N T R E N T A L
Manitowoc M4600 S4 Standard Crane ►
32
600 Ton Manitowoc M4600 S3 Ringer Crane ▼
E Q U I P M E N T R E N T A L
◄ ▲ 400 Ton Demag CC2000 Superlift Crawler Crane
500 Ton Demag CC2400 Superlift Crawler Crane ▲▼
33
E Q U I P M E N T R E N T A L
–––
50 Ton Kobelco P&H 550S Crawler Crane ►
150 Ton Hitachi KH700▲ 150 Ton Sumitomo LS248RH2▲ Crawler Crane Tower Crane
34
E Q U I P M E N T R E N T A L
360 Ton Liebherr LT1300 Truck Crane ▲▼ ►
35
E Q U I P M E N T R E N T A L
120 Ton Tadano TG1200M Mobile Crane ►
◄▲ 160 Ton Tadano TG1600M Mobile Crane
◄ 100 Ton Tadano TG1000M Mobile Crane
36
E Q U I P M E N T R E N T A L
HERE WE ARE! ◄ Heavy Lift Dept.
37
C O N T A C T A D D R E S S
C O N T A C T A D D R E S S
Head Office:
1st Floor, No. 38-41, BDA-Shahida Commercial Centre, P.O.Box 309, 97008 Bintulu, Sarawak, Malaysia.
Tel: 60-86-332815 Fax: 60-86-332429
E-mail: [email protected]
Kidurong Operation Office:
Lot 3064, Kidurong Industrial Estate, 97000 Bintulu, Sarawak, Malaysia.
Tel: 60-86-253811 / 12
Fax: 60-86-251676
E-mail: [email protected]