18

Full Annexuresenvironmentclearance.nic.in/writereaddata/modification/... · 2014-11-14 · EPC works Unit – 1 & 2: LoA has been issued to M/s. BHEL on 09.04.2010 for the supply

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Full Annexuresenvironmentclearance.nic.in/writereaddata/modification/... · 2014-11-14 · EPC works Unit – 1 & 2: LoA has been issued to M/s. BHEL on 09.04.2010 for the supply
Page 2: Full Annexuresenvironmentclearance.nic.in/writereaddata/modification/... · 2014-11-14 · EPC works Unit – 1 & 2: LoA has been issued to M/s. BHEL on 09.04.2010 for the supply
Page 3: Full Annexuresenvironmentclearance.nic.in/writereaddata/modification/... · 2014-11-14 · EPC works Unit – 1 & 2: LoA has been issued to M/s. BHEL on 09.04.2010 for the supply
Page 4: Full Annexuresenvironmentclearance.nic.in/writereaddata/modification/... · 2014-11-14 · EPC works Unit – 1 & 2: LoA has been issued to M/s. BHEL on 09.04.2010 for the supply
Page 5: Full Annexuresenvironmentclearance.nic.in/writereaddata/modification/... · 2014-11-14 · EPC works Unit – 1 & 2: LoA has been issued to M/s. BHEL on 09.04.2010 for the supply
Page 6: Full Annexuresenvironmentclearance.nic.in/writereaddata/modification/... · 2014-11-14 · EPC works Unit – 1 & 2: LoA has been issued to M/s. BHEL on 09.04.2010 for the supply
Page 7: Full Annexuresenvironmentclearance.nic.in/writereaddata/modification/... · 2014-11-14 · EPC works Unit – 1 & 2: LoA has been issued to M/s. BHEL on 09.04.2010 for the supply
Page 8: Full Annexuresenvironmentclearance.nic.in/writereaddata/modification/... · 2014-11-14 · EPC works Unit – 1 & 2: LoA has been issued to M/s. BHEL on 09.04.2010 for the supply

YTPS (2x800MW)-Progress report for the month of Sep 2014

Location: Near Vadloor in Raichur District,

Karnataka State

Capacity: 2 x 800 MW

Annual Energy: 11913 MU (85% PLF)

Estimated cost of the Project: Rs. 9015.00 crores

Commissioning by: Unit-1: March 2015

Unit-2:June 2015

EPC works Unit – 1 & 2:

LoA has been issued to M/s. BHEL on 09.04.2010 for the supply & erection of BTG & auxiliaries, agreed BoPs & associated civil works at a cost of ₹ 6300 crores (includes US$ 159 million & Euro 244 million). Unit-1-Boiler Erection progress-Structural parts-12377 MT, Pressure parts-8583 MT, Non Pressure parts- 2675 MT, Rotating Machine-1645 MT Unit-2-Boiler Erection progress -Structural parts-11992 MT, Pressure

parts-8109MT Non Pressure parts -1237 MT, Rotating Machine-1473

MT.

ESP & Ducting: Erection is in progress.(9122 MT for Unit-1 & 9094 MT for Unit -2). Turbine: Unit-1- IP turbine roll check and bump check completed. LP1 turbine Front, Rear & side wall Erection completed. Condense-1 (Generator side) –Dome stiffening structure pre-assembly is

in progress. Shell internal fixing and welding is in progress

Page 9: Full Annexuresenvironmentclearance.nic.in/writereaddata/modification/... · 2014-11-14 · EPC works Unit – 1 & 2: LoA has been issued to M/s. BHEL on 09.04.2010 for the supply

Condense-2 (H.P Turbine side)– Dome stiffening structure erection

completed & welding progress.

Turbine: Unit-2- I.P Outer casing & . I P inner casing positioned and

centering completed

Generator: Unit-1: Generator Stator Erected & Rotor insertion

completed. SOST Erection completed.

Switchyard: Towers and Equipment erection is in progress. GF and FF

Roof slab of control room completed. Road, Cable trench and fencing

work in progress.

LT and HT Switchgears – Unit-1 and Unit-2: Panel erection

completed. Cable tray erection works under progress.

RODM: Pipe rack/equipment foundation and treated water tank works

are in progress. Waste water tank works completed.

FOPH: LDO & HFO tanks erection are in progress.

CWPH& Channel: Gate erection is under progress. CW Channel works

is in progress. Structural frame works are in progress.

Ash Handling Plant:

RCC works are in progress. Fabrication of 80% of Bottom ash structure

completed .Erection work is in progress

Coal Handling Plant

Junction Tower works are in progress.

Stacker cum Re-claimer foundation work is in progress

Non EPC works:

Chimney: Chimney shell completed.1000 MT fabrication of flue can and

platform completed out of 2000 MT. Erection of platform & staircase

completed to an extent of 410 MT.

Page 10: Full Annexuresenvironmentclearance.nic.in/writereaddata/modification/... · 2014-11-14 · EPC works Unit – 1 & 2: LoA has been issued to M/s. BHEL on 09.04.2010 for the supply

Induced Draft Cooling Towers: civil works are in progress

Plant water System:

Settling tank works are in progress

GMW: Laying of Raw water pipe line completed to a tune of 5.4 km out of 7.50 km .Jack well Shell concreting is in final stages Railway siding and Marshalling Yard works: Tenders are being finalised Coal: Ministry of Coal vides Notification dtd 03.07.2013 has allocated Deocha-Pachami Coal block in West Bengal for KPCL MoC has been addressed vide letter No. A1M1B3/918 dated 7.10.2013 for allocation of tapered linkage till the coal from the allotted coal block is materialized ( copy of the letter enclosed)

Financial Progress

Expenditure incurred up to 30.09.2014 –Rs. 7530.97 crores

Page 11: Full Annexuresenvironmentclearance.nic.in/writereaddata/modification/... · 2014-11-14 · EPC works Unit – 1 & 2: LoA has been issued to M/s. BHEL on 09.04.2010 for the supply
Page 12: Full Annexuresenvironmentclearance.nic.in/writereaddata/modification/... · 2014-11-14 · EPC works Unit – 1 & 2: LoA has been issued to M/s. BHEL on 09.04.2010 for the supply
Page 13: Full Annexuresenvironmentclearance.nic.in/writereaddata/modification/... · 2014-11-14 · EPC works Unit – 1 & 2: LoA has been issued to M/s. BHEL on 09.04.2010 for the supply
Page 14: Full Annexuresenvironmentclearance.nic.in/writereaddata/modification/... · 2014-11-14 · EPC works Unit – 1 & 2: LoA has been issued to M/s. BHEL on 09.04.2010 for the supply
Page 15: Full Annexuresenvironmentclearance.nic.in/writereaddata/modification/... · 2014-11-14 · EPC works Unit – 1 & 2: LoA has been issued to M/s. BHEL on 09.04.2010 for the supply
Page 16: Full Annexuresenvironmentclearance.nic.in/writereaddata/modification/... · 2014-11-14 · EPC works Unit – 1 & 2: LoA has been issued to M/s. BHEL on 09.04.2010 for the supply
Page 17: Full Annexuresenvironmentclearance.nic.in/writereaddata/modification/... · 2014-11-14 · EPC works Unit – 1 & 2: LoA has been issued to M/s. BHEL on 09.04.2010 for the supply
Page 18: Full Annexuresenvironmentclearance.nic.in/writereaddata/modification/... · 2014-11-14 · EPC works Unit – 1 & 2: LoA has been issued to M/s. BHEL on 09.04.2010 for the supply