162
R NXT Fuji Scalable Placement Platform QD002-07 Setup Manual

Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

Embed Size (px)

Citation preview

Page 1: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

R

NXT

Fuji Scalable Placement Platform

QD002-07

Setup Manual

Page 2: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

Consult Fuji beforehand if you are considering selling this equipment to a third party after it has been installed.

Page 3: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

The manuals listed below are shipped with the NXT machine.

NXT Setup Manual

NXT System Reference

NXT Mechanical Reference

FUJI Intelligent Feeder Manual

NXT Programming Manual

In order to operate this machine in the safest and most efficient manner, please read the provided manuals thoroughly and observe all instructions and warnings.

Keep these manuals in an accessible location near the machine.

Fuji Scalable Placement Platform

NXTSetup Manual

QD002-07

R

Page 4: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

CopyrightsAll rights regarding this manual are reserved by Fuji Machine Manufacturing Co., Ltd. This manual may not, in whole or in part, be reproduced by any means (electronic, mechanical or otherwise), or reused in any way, without the prior written permission of Fuji Machine Manufacturing Co., Ltd.

Trademark Rightsis a trademark of Fuji Machine Manufacturing Co., Ltd., and registered in the following

countries: Austria, Belgium, Denmark, Finland, France, Germany, Greece, Indonesia, Ireland, Italy, Japan, Korea, Luxembourg, the Netherlands, Portugal, Spain, Sweden, the U.K., and the U.S.A.

Warranty and LiabilityFuji Machine Manufacturing Co., Ltd. accepts no responsibility for situations that may arise due to any of the following:

• The use of third party parts.

• The use of non-genuine Fuji parts.

• Incorrect settings made by the customer.

• Improper use of Fuji equipment.

NoticeFuji Machine Manufacturing Co., Ltd. reserves the right to change the content of this manual without notice.

Every effort has been made to ensure that this manual is correct in every detail. However, please contact Fuji in the unlikely event that errors or omissions are detected.

Fuji Machine Manufacturing Co., Ltd. accepts no liability whatsoever for damages that may arise as a result of this manual, with the exception of problems that originate in our products.

R

Page 5: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 Contents

Contents1. Safety Guideline ................................................... 1

1.1 About Symbols ................................................. 11.1.1 Degree of Hazards ................................................. 11.1.2 Examples of the Symbols ....................................... 1

1.2 Safety Rules for All Machine Types.................. 21.3 Safety Rules for NXT........................................ 6

1.3.1 Main Unit ................................................................ 61.3.2 Tray Unit-L............................................................ 101.3.3 Tray Unit-M........................................................... 11

1.4 Safety Labels.................................................. 121.4.1 NXT Safety Label Explanations............................ 15

1.5 The EMERGENCY STOP Button ................... 161.6 Locking System .............................................. 17

1.6.1 Lockout Procedure ............................................... 171.6.2 Unlocking Procedure ............................................ 19

2. Setting Up the NXT............................................. 212.1 Introduction..................................................... 21

3. Machine Set Up .................................................. 233.1 Moving a Machine .......................................... 23

3.1.1 Precautions when moving the machine................ 233.1.2 Transport Procedure............................................. 24

3.2 Removing Fixing Brackets.............................. 283.2.1 Procedure............................................................. 28

3.3 Removing the Linear Motor Shaft Protective Covers .............................................................. 313.3.1 Procedure............................................................. 31

3.4 Making Basic Connections ............................. 323.4.1 Electric power supply............................................ 323.4.2 Network Cable...................................................... 343.4.3 Air supply.............................................................. 35

3.5 Leveling the Machine...................................... 36

NXT Setup Manual i

Page 6: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

Contents QD002-07

3.5.1 Procedure ............................................................. 36

3.6 Making Network Settings ............................... 393.6.1 Procedure ............................................................. 39

3.7 Connecting NXT Bases.................................. 403.7.1 Connecting Method............................................... 413.7.2 Signal Cable Connecting Diagram

(NXT - NXT - NXT)................................................ 43

3.8 Installing Additional Dependent Bases........... 443.8.1 Extension Patterns................................................ 443.8.2 Pneumatic Connections........................................ 453.8.3 Using One 2M Base.............................................. 463.8.4 Using Two 2M Bases............................................ 513.8.5 Using Three 2M Bases ......................................... 573.8.6 Using Four 2M Bases ........................................... 633.8.7 Using One 2M Base and an Independent

4M Base (1)............................................................ 683.8.8 Using Two 2M Bases and an Independent

4M Base (1)............................................................ 753.8.9 Using One 2M Base and an Independent

4M Base (2)............................................................ 843.8.10 Using Two 2M Bases and an Independent

4M Base (2)............................................................ 913.8.11 Using One 4M Base and an Independent

4M Base (1).......................................................... 1003.8.12 Using One 4M Base and an Independent

4M Base (2).......................................................... 1063.8.13 Fastening Extensions ....................................... 112

3.9 Connecting an NXT Base to Other Machine Types....................................................................... 114

3.9.1 Procedure ........................................................... 1153.9.2 Signal Cable Connecting Diagram

(Other machine type - NXT - Other machine type) 116

3.10 Tray Unit-L ................................................. 1173.10.1 Adjusting the Height and the Levelness ........... 117

4. Setting Up NXT Machines in Flexa.................. 1214.1 Introduction .................................................. 1214.2 General Procedures ..................................... 121

ii NXT Setup Manual

Page 7: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 Contents

4.2.1 Creating a factory ............................................... 1214.2.2 Creating a line .................................................... 1214.2.3 Creating a machine ............................................ 122

5. Accessory Software Installation........................ 1255.1 Introduction................................................... 125

5.1.1 Installation outline............................................... 125

5.2 Required Items ............................................. 1265.2.1 Required hardware............................................. 126

5.3 Installing Fuji Flexa....................................... 1285.4 Installing the NXT Accessory Software Server 1365.5 Installing the Realtime Workingrate Buffer

Service........................................................... 1456. Setting Up Fujitrax Verifier................................ 147

6.1 Introduction................................................... 1476.2 Required Items ............................................. 147

6.2.1 Setting up and running the Central Server ......... 1476.2.2 Adding the NXT to the Fujitrax line configuration 1486.2.3 Setting the NXT Fujitrax configuration settings .. 1506.2.4 Registering users for Kit Handy access.............. 151

NXT Setup Manual iii

Page 8: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

Contents QD002-07

MEMO:

iv NXT Setup Manual

Page 9: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 1. Safety Guideline

1. Safety GuidelineFuji machines are designed and produced with safety as one of our main considerations. However, even a perfectly designed machine can be damaged, or someone can still be injured if the user does not follow the safety rules. It is the responsibility of the user to make sure all safety rules are followed during operation and maintenance.Be sure to read these safety rules before operating the machine. Keep this manual close at hand when operating the machine.

1.1 About SymbolsTo avoid injury to persons and damage to the machine, Fuji employs a number of messages and symbols that are used in manuals and on the machines. Be sure you understand the meanings of these symbols before reading the manual.

1.1.1 Degree of Hazards

1.1.2 Examples of the Symbols

Symbol Definition

DANGER Failure to observe this hazard warning will lead to severe injury or death.

WARNING Failure to observe this hazard warning may lead to severe injury or death.

CAUTION Failure to observe this hazard warning may lead to personal injury or damage to the machine.

Symbol ExplanationHazardA triangle is used to draw your attention to a hazard. The symbol inside the triangle indicates the nature of the hazard (in this case, electrical shock).

ProhibitionA circle with a diagonal line is used to draw your attention to an operation that is prohibited. The symbol inside the circle indicates the nature of the operation (in this case, disassembly).

A circle with an exclamation mark is used to draw your attention to to a mandatory action. In other words, you are required to carefully carry out the given instructions.

NXT Setup Manual 1

Page 10: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

1. Safety Guideline QD002-07

1.2 Safety Rules for All Machine Types

DANGERDo not approach moving parts during automatic or manual operation

• Do not place hands or other body parts inside the machine during automatic operation or positioning. Body parts or clothing may be caught in the machine causing personal injury.

WARNINGDo not insert hands or other body parts into the conveyor inlets

• Body parts may get caught in the machine resulting in injury.• If using a single machine independently, install safety covers or

interlock sensors at the conveyor openings, in accordance with your local safety regulations, to prevent injuries at the conveyor.

Do not operate the machine with the safety covers or doors open

• When safety covers or doors are removed, body parts or clothing may be caught in the machine causing personal injury.

• When maintenance works are completed, return the safety covers and doors to their original (closed) position.

Always verify the position of the EMERGENCY STOP buttons before operating the machine

• Always be aware of the positions of the EMERGENCY STOP buttons so that they can be pressed quickly in case of an emergency.

Check the safety functions before starting operation

• Before starting the machine check the operation of the EMERGENCY STOP button, the safety switches on the covers, doors and all other machine safety features.

• Contact a Fuji serviceman immediately if any of the safety functions fails.

Do not remove safety switches or disarm the safety functions

• Do not short or remove the machine’s safety switches. Persons working on the machine may be seriously injured if operation commands are issued by mistake.

2 NXT Setup Manual

Page 11: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 1. Safety Guideline

Check that there is nobody inside the machine when working on the machine with two persons or more

• Verify that nobody is within or near the machine before operating the machine. Operating the machine may cause injury to the person who is carrying out maintenance.

Do not approach a machine that has stopped moving

• There are times during automatic operation when the machine may appear to have stopped while it is waiting for a board, waiting for the next machine, reading marks, transmitting data, etc. In such cases, once certain conditions are fulfilled, the machine will begin moving again automatically, so care should be taken. Only approach the machine after the EMERGENCY STOP button has been pressed.

• When the message "Ready" displays at the machine display, the machine will begin to move once certain conditions are satisfied. Keep in mind that the machine will begin to move regardless of whether these conditions are satisfied intentionally or inadvertently.

Do not place hands near the main conveyor

• Hands or other body parts may be caught in the machine.

Always perform maintenance work after turning OFF the machine power supply.

• Failure to observe this may result in sudden machine movements or electric shock, and is therefore extremely dangerous.

Do not insert or remove connectors while power is being supplied to the machine

• Removing or inserting connectors while power is supplied to the machine may not only cause damage to the machine, but may also cause electrical shock.

Stay clear from the machine when it is being lifted

• Never put hands or feet under the machine when the machine is being raised by means of a jack or other device for leveling or transport.

WARNING

NXT Setup Manual 3

Page 12: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

1. Safety Guideline QD002-07

Do not wear gloves made of cloth when operating the machine

• Rubber gloves will tear when caught by the machine and prevent hands from being drawn into the machine. Gloves made of cotton or similarly strong material may cause hands to be drawn into the machine.

Long hair should be tied back

• Long hair may get caught in running machines. Hair should be kept short or tied back so that it does not get caught in the machine.

Turn off the air supply when carrying out maintenance on cylinders, valves, and filters

• Removing cylinders, valves, or filters without turning the air supply off, may cause parts or particles to be propelled into the eyes.

• Be sure to turn off the air supply when carrying out maintenance on cylinders, valves, and filters.

Be sure to wear protective glasses when removing parts from the machine

• Be sure to wear protective glasses when removing or disassembling parts.

Check the machine monitor and the target axes while manually operating the machine

• When operating the machine, carefully follow the instructions that are displayed at the machine display.

• Operating the machine without looking at the machine display may lead to operating errors or result in damage to the machine or products.

Do not touch the servo amp power terminal for at least five minutes after turning off the power

• The servo amp retains a high voltage even after the power has been turned off.

• Always wait at least five minutes, and ensure that the CHARGE lamp is off, before undertaking any work that may result in contact with the servo amp terminal.

WARNING

4 NXT Setup Manual

Page 13: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 1. Safety Guideline

CAUTIONDo not operate the machine after removing or disabling sensors

• Removing or disabling sensors will disarm the interlock, leading to collisions and damage to the machine.

Confirm the operational status at the machine messages for machines that support automatic changeover

• On machines equipped with an automatic changeover system, it is difficult to ascertain the changeover status from the front of the machine during operation in production mode. Follow the instructions that display at the machine monitor

Ensure to use the handle when opening or closing the safety doors, fences or covers

• Opening or closing the safety doors, fences or covers without using the handle may result in injury to the hand.

• Opening or closing the safety doors, fences or covers with force, without using the handle may result in damage to the machine.

NXT Setup Manual 5

Page 14: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

1. Safety Guideline QD002-07

6 NXT Setup Manual

1.3 Safety Rules for NXT1.3.1 Main Unit

WARNINGDo not insert hands or other body parts into the machine in the area between feeders especially when there are only a few feeders present on the feeder pallet.

• Failure to do so could result in injury due to contact with the body part and the head during movement.

When changing the conveyor width with the module retracted, do not insert hands in the area near the conveyor

• Fingers may be pinced or caught in the movable conveyor rail, resulting in serious injury.

When mounting the MCU, ensure that no one is between the MCU and machine base

• A person could be crushed to death if caught between the MCU and base.

When pushing a module onto the base, check that no one is behind the module

• A person could be crushed between the base and module, resulting in serious injury.

When pushing in a module, do not insert hands between the module cover support and module

• Fingers may be pinced or caught, resulting in serious injury.

When pushing in a module, do not insert hands between the module lower front cover and base

• Fingers may be pinced or caught, resulting in serious injury.

When pulling out or pushing in a module, do not insert hands or other body parts in between modules

• If caught between modules, fingers or other body parts could be cut or severed.

When working on the module in an opening with the cover off, ensure that no one pushes or pulls out in the module

• The module may punch, sever, or cause serious injury.

Page 15: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 1. Safety Guideline

When working on the base in the opening above the waste tape box, ensure that no one pulls out a module

• The module may pinch, sever, or cause serious injury.

When working on the base in an opening with the cover off, ensure that no one pushes or pulls out in the module

• The module may pinch, sever, or cause serious injury.

Do not rotate the module lock knob to [UNLOCK] when a module is loaded on the MCU.

• If the module moves on the MCU, it could pinch and sever fingers, and if it falls from the MCU it could cause severe injury or death.

There is a limit to the number of modules that can be pulled out safely at the same time. (Maximum: Four M3 modules on an 8M base, or two M3 modules on a 4M base.)

• If the maximum is exceeded, the entire machine may fall over to the front, possibly resulting in serious physical harm. This is especially true when the front leveling bolts have not been adjusted.

Do not modify the module stopper mechanism on the base and remove the module without mounting the MCU first.

• The module could fall from the base causing severe injury or death.

Do not stare at the vision process light sources with naked eyes. Wear protective glasses.

• Eye damage may be caused by the light.

Stay off of the base.

• Failure to do so could result in injury.

When handling the MCU, watch out for corners and protrusions.

• Failure to do so could result in injury.

Always be ready to apply the caster brake when handling the MCU.

• Always use the caster brake when stopping an MCU loaded with a module.

WARNING

NXT Setup Manual 7

Page 16: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

1. Safety Guideline QD002-07

When lifting a backup plate, be careful to not put your hands in the areas between the plate, width-changing ball screw, and hexagonal shaft. Also, be careful to not cut your hands on the corners of the conveyor rails.

• Failure to do so could result in injury.

Do not lift a backup plate if you are not strong enough, and maintain correct lifting posture if you do lift a backup plate.

• Because the backup plates are very heavy, lifting them incorrectly could result in back or other injuries.

Never insert hands or other body parts into the duct of the waste tape disposal unit.

• There is a very sharp cutter blade. Exercise extreme caution especially when carrying the unit.

Two or more people should carry the waste tape disposal unit.

• Maintenance of the waste tape disposal unit is usually accompanied by removing the unit from the machine. Two or more people should carry the unit because it is very heavy.

Ensure that the work bench where the waste tape disposal unit is placed is flat.

• The unit may fall to the ground if the work bench is tilted, causing personnel injury and the machine damages.

Do not touch the Y-axis linear motor in a M6S module immediately after production is stopped.

• Contact with the shaft or coil section could cause burns. The shaft and coil section of the Y-axis linear motor remain at high temperatures even after production is stopped.

People with a heart pacemaker should stay clear of the Y-axis.

• A heart pacemaker could malfunction due to the strong magnetic field generated by the linear motor for the Y-axis in M6S modules.

Do not disassemble the linear motor used for the Y-axis in the M6S module.

• Absolutely do not disassemble the linear motor coil and shaft parts. Injury and/or machine damage may occur by magnetic parts shooting out due to the strong force of the magnets.

WARNING

8 NXT Setup Manual

Page 17: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 1. Safety Guideline

CAUTIONBe careful to not pinch your hands when opening and closing the front or side covers.

• Failure to do so could result in injury.

Do not insert fingers or other body parts into the gap between the machine side cover and base.

• Failure to do so could result in injury.

When working in front of the base, ensure that clothing or arms are not caught on the guide pins on the top of the base to prevent the risk of injury.

• Failure to do so could result in injury.

When there is no module on the base, do not block the module position confirmation sensor or module seating confirmation sensor to activate the air cylinder.

• Air cylinder may activate to move lever or clamper causing personnel injury.

Do not push the mark camera unit by hand when moving the placing head.

• The position of the mark camera may be shifted, which negatively affects the placing accuracy of the machine.

Be careful to not put your hands underneath the nozzle station when loading it in the machine.

• Failure to do so could result in injury.

Ensure to place the waste tape disposal unit with the duct upside on the work bench.

• The duct of the unit may creep by its own weight.

Be careful of the magnetic attraction when using a jig near the linear motor of the M6S.

• Injury could result by a jig being drawn towards the linear motor.

Keep magnetic cards, wristwatches and other precision machines away from the linear motor of a M6S module.

• Damage to items may occur due to the magnetic field generated by a linear motor.

NXT Setup Manual 9

Page 18: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

1. Safety Guideline QD002-07

1.3.2 Tray Unit-L

WARNINGWhen pushing the tray unit-L into the machine, ensure that no one is between the tray unit-L and machine base.

• A person could be seriously injured or crushed to death if caught between the tray unit-L and machine.

Lock the caster brake whenever the tray unit-L is removed from the machine.

• Depending on the slope and condition of the floor, the tray unit-L could roll unexpectedly, possibly resulting in injury.

CAUTIONBe careful to not pinch your fingers when opening or closing the tray unit-L covers (upper cover, front cover, lower cover, etc.). Do not leave the doors open while the tray unit-L is unattended.

• Failure to do so could result in injury.

When operating the handle for adjusting the tray unit-L height, make sure that hands are not caught between the handle and cover.

• Failure to do so could result in injury.

When removing or replacing the empty tray box, be careful to not pinch your hands between the tray unit-L and empty tray box.

• Failure to do so could result in injury.

Do not insert your hand through the bottom of the tray unit-L into the inner section where the mechanical parts are.

• Failure to do so could result in injury.

10 NXT Setup Manual

Page 19: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 1. Safety Guideline

1.3.3 Tray Unit-M

WARNINGDo not insert hands or other body parts in the space between the tray unit-M and the feeder pallet when attaching or removing the tray unit-M.

• Failure to do so could result in injury.

Use two or more people to lift, carry and position the tray unit-M.

• The tray unit-M is extremely heavy and injury could result if dropped.

Do not insert hands or other body parts in the side spaces between the machine and the tray unit-M during automatic operation.

• Body parts may be pinched or caught, resulting in injury.

CAUTIONBe careful to not pinch or get body parts caught on the tray unit-M door when opening and closing it. Ensure that the door is never left open.

• Body parts may be pinched or caught, resulting in injury.

NXT Setup Manual 11

Page 20: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

1. Safety Guideline QD002-07

1.4 Safety LabelsTo warn the operator of hazards, safety labels are attached to the machine at the positions indicated in the figure below.

Familiarize yourself with each label and its message before operating the machine.

NXTSAF010Eb

M3(S) Module M6 Module

*1

*1 *1

*1

M6S Module

*1

*1

Çë²»Òª ½ø ÐÐÏßÐԵ綻úµÄÖá µÄ·Ö½â ¡£æÔÚÅʷɳö£¬µ¼ÖÂÊÜÉ˵ÄΣÏÕ¡£

½Ð¤£-n¶i ¦æ½u ©Ê ¹qʾ÷ ªº¶bªº¤ÀÑ¡C¦s¦bºÏ ¥Û-¥X¡A¾É -Pü¶Ëªº¦MÀI ¡C

12 NXT Setup Manual

Page 21: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 1. Safety Guideline

NXTSAF011E

4M base

2M base

Dependent 4M base

*1

*1

*1

*1 *1

*1

*1

*2

*1

*2

NXT Setup Manual 13

Page 22: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

1. Safety Guideline QD002-07

NXTSAF012Ea

Tray unit-L

Tray unit-M

*1

*1

WARNING

MSU

Engineering panel stand

Side cover

14 NXT Setup Manual

Page 23: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 1. Safety Guideline

1.4.1 NXT Safety Label Explanations

Symbol ExplanationWarning: Pinching danger

Do not insert hands or other body parts in the space between adjacent modules.

Mandatory action, Direction: Eye protection

Direct exposure to the lighting unit may result in damage to the eyes. Ensure to use light protection eyewear when necessary.

Caution, Warning: Shock danger

*1: High voltage! Contact may cause electric shock. Turn off the power prior to servicing.

*2: Connect a 200 - 230V AC +/-10% 50/60Hz primary power supply to the machine.

Caution, Warning: Cutting danger

An automatic tape cutter is positioned behind this frame. Exercise extreme caution when performing maintenance.

Warning: Do not step

Do not step or stand on this area.

Caution, Warning: Moving parts

Do not insert hands or other body parts. Moving parts may cause injury. Turn off the power before inserting any body parts.

Warning: High TemperatureContacting with the main body and shaft of the linear motor could result in burns. They are high temperature.

Warning: Magnetic FieldHeart pacemakers and other precision equipment could be affected by the magnetic field. Always keep a distance of 400 mm or more.

Warning: Disassembly prohibitedDo not disassemble the linear motor shaft. Injury may occur by parts shooting out due to the strong force of the magnets.

NXT Setup Manual 15

Page 24: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

1. Safety Guideline QD002-07

1.5 The EMERGENCY STOP ButtonIn the event of an emergency, press any of the red EMERGENCY STOP buttons located on the machine at the positions indicated in the figure below.

NXTSAF001Eb

EMERGENCY STOP buttons

EMERGENCY STOP button

16 NXT Setup Manual

Page 25: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 1. Safety Guideline

1.6 Locking SystemWhen performing maintenance or service on the machine, all personnel who service the machine should use locks to prevent others from turning on the machine power or air. This procedure is referred to as a lockout. To prevent accidents, especially those caused by mistakes when multiple operators are present, all related personnel should have thorough knowledge of lockout procedures.

1.6.1 Lockout ProcedurePrepare 2 commercially available padlocks, and require all service personnel to carry lockout nametags.

1. Switch off the machine power.

2. Rotate the main switch on the base to the OFF position.

3. Lock the main switch with a padlock.All personnel working on the machine should attach their lockout nametags to the padlock.

Note: Note:The presence of a nametag on the padlock signals that the machine is being serviced and that the lock is not to be removed.

0

NXTSAF004

0

NXTSAF006

NXT Setup Manual 17

Page 26: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

1. Safety Guideline QD002-07

4. In the same manner, rotate the air valve handle to the OFF position and lock with the second padlock. All personnel working on the machine should attach their nametags to the padlock.

5. The lockout is complete.

NXTSAF005

18 NXT Setup Manual

Page 27: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 1. Safety Guideline

1.6.2 Unlocking ProcedureWhen finished servicing the machine, all personnel should remove their lockout nametags from the padlocks.

1. Confirm that all personnel are clear of the machine.

2. Confirm that the machine is in a safe condition. Remove the padlock from the air valve and rotate the handle to the ON position.

3. Remove the padlock from the main switch and rotate it to the ON position.

4. This concludes the unlocking procedure.

NXTSAF007

1

NXTSAF008

NXT Setup Manual 19

Page 28: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

1. Safety Guideline QD002-07

MEMO:

20 NXT Setup Manual

Page 29: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 2. Setting Up the NXT

2. Setting Up the NXT2.1 Introduction

The aim of this manual is to provide procedural explanations of how set up the NXT machine. The procedures outlined are to help an NXT user perform the various mechanical, and software related operations necessary to set up the NXT for use.

The order of the procedures in this manual are basically in the order that they should be performed for the easiest set up. In all cases, not all procedures (such as setting the IP address of the base) need to be performed, especially when just moving the machine/base within the factory. Refer to the table below for an outline of the setup process.

Chapter

Section Ord. Step

3. M

achi

ne S

et U

p

Moving a Machine 1 Move the machine to the desired location.

Removing Fixing Brackets 2 Remove the brackets used to fixed the axes during transport.

Making Basic Connections

Electric Power Supply

3 Connect the power cable to the base.

Network Cable 4 Connect the network cable to the base.

Air Supply 5 Connect the air supply to the base.

Leveling the Machine 6 Level the machine and ensure that the conveyor height matches that of the other machines in the line.

Making Network Settings 7 Specify the IP address and other network related settings for the set up base.

Connecting NXT Bases 8* Connect the communication cables between the NXT bases.

Installing Additional Dependent Bases 8* Connect the communication cables and the pneumatic tubes between the NXT bases. Fix the bases with brackets.

Connecting an NXT Base to Other Machine Types

8* Connect the communication cables between the NXT base and neighboring machines other than NXT bases.

Tray Unit-L Adjusting the height and levelness

9 Use a level gauge to adjust the height and levelness.

4. S

ettin

g U

p N

XT

Mac

hine

s in

Fle

xa Creating a factory 10 Create a factory in the Fuji Flexa line configuration, if necessary.

Creating a line 11 Create a line in the Fuji Flexa line configuration, if necessary.

Creating a machine 12 Create the NXT machine in the desired line in the Fuji Flexa line configuration.

NXT Setup Manual 21

Page 30: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

2. Setting Up the NXT QD002-07

Note: * Perform the items required based on the line composition.** These steps are only necessary if Fujitrax Verifier is to be used.

5. A

cces

sory

Sof

twar

eIn

stal

latio

n

Required Items 13 Ensure that the necessary items to install Accessory Software are available.

Installing Fuji Flexa 14 Install Fuji Flexa on the computer that Accessory Software is to be installed, if it is not already installed.

Installing NXT Accessory Software 15 Install the Accessory Software on the computer that is to act as the Accessory Software server.

6. S

ettin

g U

p Fu

jitra

x V

erifi

er

Required Items Installing and running the Central Server

16** Ensure that the Central Server for Fujitrax Verifier has been installed and is running.

Adding the NXT to the Fujitrax line configuration

17** Add the NXT machine to the line configuration for the Kit Server that is to be used for the NXT.

Setting the NXT Fujitrax configuration settings

18** Change the Fujitrax configuration settings on the NXT.

Registering users for Kit Handy access

19** Register the ID for the users that are to access NXT data through Kit Handy.

Chapter

Section Ord. Step

22 NXT Setup Manual

Page 31: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

3. Machine Set UpThe procedures in this chapter are used to set up a machine that is newly arrived or that has been moved to a new location. Not all sections are not required in all cases, just perform the actions necessary.

3.1 Moving a MachineUse a forklift or similar lifting device to move the machine to the setup location. Place leveling sheets on the floor and lower the machine onto the leveling sheets. Furthermore, depending on the machine base configuration, it may be necessary to secure the base to the floor using anchor bolts or adhesive sheets and so forth to prevent the bases from shifting.

3.1.1 Precautions when moving the machineWhen moving a machine, be sure to observe the safety measures described below in order to avoid accidents.

• Be sure that the workers who are moving the machine are wearing safety shoes and helmets.

• Prepare the transport path in advance, and be sure that those who are not assisting in the machine transport are kept out of the area.

• The machine should be moved only by qualified personnel.

• Before moving the machine, attach the machine brackets (red) which were attached when the machine was delivered. (Attach the brackets in the prescribed positions.)

Machine WeightWeights for each type of module, base, and tray unit used in the NXT are listed below. The actual weight of the machine should be calculated based on the type of module(s), base and tray-unit(s) being used. (Values listed below do not include the weight of any packing materials.)

Note:1.Use a forklift which is suitable for the weight of the machine in question.

2.Be sure to insert the forklift forks at the prescribed position.

3.Use care to avoid bending the leveling bolts.

4.If the balance of a lifted machine is unstable, lower the machine immediately.

5.Raise and lower the machine slowly to avoid subjecting the machine to shocks.

NXT Description Weight (kg)

2M base 345kg

Stand-alone control box for 2M base

123kg

Indipendent 4M base 720kg

Dependent 4M base 680kg

NXT Setup Manual 23

Page 32: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

8M base 760kg

M3(S) module 300kg

M6 module 470kg

M6S module 487kg

Trayunit -L(including 7 trays and magnets)

150kg

Trayunit -M 37kg

NXT Description Weight (kg)

24 NXT Setup Manual

Page 33: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

3.1.2 Transport Procedure1. Prepare the required number of leveling sheets suitable for the panel conveyance

height.

Note: The dimensions in the drawing below with an asterisk (*) are reference values.

2. When using 4M bases independently or when connecting two 2M bases, place adhesive sheets between the floor and the leveling sheets to prevent the bases from shifting. Prepare the required number of adhesive sheets.

Note: When using 2M bases independently, secure the bases to the floor with anchor bolts. (Refer to 3.8.3 "Using One 2M Base".) Furthermore, multiple bases should be connected using brackets. (Refer to 3.8.13 "Fastening Extensions".)

Drawing No.

Part Name

No. of Sheets/8M Base

No. of Sheets/4M Base

No. of Sheets/2M Base

Panel Conveyance

Height

GGA8020 Leveling sheet

10 6 4 For H = 900

GGA8040 Leveling sheet

10 6 4 For H = 950

Drawing No. Part Name No. of Pads/4M Base

No. of Pads/2M Base

Panel Conveyance

Height

PG01890 Anti-vibration pad

6 4 For H = 900

PG01900 Anti-vibration pad

6 4 For H = 950

NXTSET001c

25

70

*

8.4

*

H=900

75 12

0*

8.4

*

H=950

100 130

Anti-vibration pad

(PG01890)

Anti-vibration pad

(PG01900)

t = 1 t = 1

NXTSET017Ea

H=900 H=950

NXT Setup Manual 25

Page 34: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

3. At the new position, tentatively set the level blocks in the proper positions for the new machine.

70 575 650 650 575 70

138

443

.5472

.5

1900

1384

43

.5472

.5

1900

2590Unit: mm

Front side of the machine

Front side of the machine

1290

70 70575575

<8M Base>

<4M Base>

NXTSET002E

26 NXT Setup Manual

Page 35: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

4. When moving an already existing machine, remove all tape feeders, air hoses, and disconnect any external wiring to the machine.

5. When moving an already existing machine, use the machine brackets (red) to secure main components. See the illustrations shown in 3.2 "Removing Fixing Brackets".

Note: If there are no machine brackets available, use rope, etc., to secure the various parts of the machine to avoid damaging them.

6. Before moving M6S modules, after ensuring that the linear motor shaft is room temperature, attach the linear motor shaft protective covers. Refer to the illustration in "3.3 Removing the Linear Motor Shaft Protective Covers" for reference.

1384

43.5

472.5

1900

Unit: mm

Front side of the machine

715

70 70575

<2M Base>

NXTSET014E

NXT Setup Manual 27

Page 36: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

7. Insert the forklift so that its left and right forks are the same distance from the machine center. Moreover, the space between the left and right forks should be set as wide as possible.

Note:6.The forklift should be operated in accordance with the manual provided by the forklift manufacturer.

7.To lift 8M or 4M bases insert the forklift 1100 mm or more in from the rear. For 2M bases, insert the forklift from the side so the forklift arms extend under the base through to the opposite side.

8. Using the forklift, lift the machine to a height of 30 cm.

9. Transport the machine by forklift to its new location, then lower the machine slowly onto the leveling sheets or leveling blocks.

DANGER

Do not attempt to perform any tasks beneath the elevated machine.

1900 m

m

2590 mm

1900 m

m

1290 mm

8M base4M base

NXTSET010Ec

1900 mm

715 m

m

2M base

Front side of the machine Front side of the machine

Side of the machine

1100 m

m

or

more

1100 m

m

or

more

28 NXT Setup Manual

Page 37: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

3.2 Removing Fixing BracketsThe next step in the set up process is removing the red fixing brackets attached to the machine. It is important to remove all of these brackets before attempting to turn on the machine.

3.2.1 Procedure

1. Remove the red fixing brackets that are fixing the front of the module to the base. There is one for every two M3(S) modules and one for each M6(S) module. Retain the bolts that go into the front of the module. These bolts are used to fixed the module/base covers.

2. Remove the red fixing brackets that are fixing the back of the module to the base. The quantity of brackets exceeds the number of modules present by one (i.e., a 4M base with two M3(S) modules and one M6(S) modules (three modules total) has four brackets).

3. Remove the feeder pallet fixing brackets. There is one bracket for each module. The fixing brackets are on the right side.

4. Remove the X- and Y-axis fixing brackets from each module. These brackets are attached to the front of the left guide rail for the Y-axis. There is one per module. Do not push on the side of the head or use the handle to try to move the head.

5. Remove the XS-axis fixing brackets from each M3(S) module. These are attached to the right side of the heads.

Note: Remove any additional protection material from inside and outside the machine while removing the fixing brackets. Be sure that the inside of the modules is clear of any shipping materials before continuing.

WARNING

People with a heart pacemaker should stay clear of the Y-axis. A heart pacemaker could malfunction due to the strong magnetic field generated by the linear motor for the Y-axis in M6S modules.

CAUTION

Be careful of the magnetic attraction when using a jig near the linear motor of the M6S. Injury could result by a jig being drawn towards the linear motor.

Keep magnetic cards, wristwatches and other precision machines away from the linear motor of a M6S module. Damage to items may occur due to the magnetic field generated by a linear motor.

NXT Setup Manual 29

Page 38: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

NXTSET215E

<For M3(S) Modules>

30 NXT Setup Manual

Page 39: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

NXTSET216Ea

<For M6 (M6S) Modules>

NXT Setup Manual 31

Page 40: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

3.3 Removing the Linear Motor Shaft Protective Covers (M6S)

Remove the protective covers from the linear motor shaft for M6S modules.

3.3.1 Procedure

1. Open the seam in the protective cover and gently remove the protective cover.

2. Store the protective covers in a safe place. These covers should be used when items such as maintenance is performed on a M6S module.

WARNING

People with a heart pacemaker should stay clear of the Y-axis. A heart pacemaker could malfunction due to the strong magnetic field generated by the linear motor for the Y-axis in M6S modules.

CAUTION

Be careful of magnetic attraction when using jigs/tools near the linear motor of M6S modules. Injury could result by the jig/tool being drawn towards the linear motor.

Keep magnetic cards, wristwatches and other precision machines away from the linear motor of a M6S module. Damage to items may occur due to the magnetic field generated by a linear motor.

M6S Module

NXTSET221E

32 NXT Setup Manual

Page 41: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

3.4 Making Basic ConnectionsThe procedures for connecting the three basic connections; power, network, and air are described below. It should be the easiest to connect these three connections at the same time.

3.4.1 Electric power supplyPower supply of 200 - 230 VAC is required. An external transformer is required when the power supply voltage lies outside this range.

The maximum power capacity is 6.5 kVA. Be sure to connect the machine to a power supply which exceeds this capacity.

The factory power supply should be equipped with a ground leakage breaker meeting the following requirements for safety.

• Rated current: 100 [mA]

• Actuation time: 0.1 sec or less (high speed)

Procedure

1. Remove the waste tape boxes and then remove the cover underneath the power switch.

2. Feed the power cable from the bottom of the base.

DANGER

Verify that the external power supply is OFF before performing this procedure and that no power is being supplied to the cable.

NXT Setup Manual 33

Page 42: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

3. Connect the ground wire to the dedicated ground terminal.

4. Connect the 3-phase cable to the main switch and tighten to the prescribed torque of 1.25 Nm. It is important the the three phases for the power are correct. (After the machine is turned on, ensure that the vacuum pump generates vacuum, not pressure.)

Note: Terminal screw tightening torque: 1.25 N·mTerminal screws should be tightened periodically.

5. Tighten the cable fixing collar to secure the power cable and once the phases for the power has been confirmed, fix the cover back under the power switch.

Cable fixing collar

NXTSET006Eb

Ground wire

Power cable

Power cable

Main switch

Cover

Three-phase

electric wire

E

R001

S001

T001

L1

L2

L3

T1

PE

PE

T2

T3

Rear side of the main switch

10 mm

Primary side

The size of the cable for the primary side should be

AWG 12 (3.5 sq mm) or larger.

NXTSET007Ea

34 NXT Setup Manual

Page 43: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

3.4.2 Network CableThe machine is connected to the host computer by an Ethernet twisted-pair communication cable (category 5) for the purpose of job transmission and production log compilation. Depending on the setup of the factory, this can be run at the same time as the power cable or run with the cables connecting the bases/other machines together.

Procedure1. Connect one end of the transmission cable to the Ethernet connector to a hub or

network connection, and connect the other end to the connector on the machine.

2. Connect the other end to the Ethernet connector in the machine as shown below.

Ferrite core

NXTSET013Ec

Data transmission cable

(connected to host)

Data transmission cable

Base CPU box

NXT Setup Manual 35

Page 44: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

3.4.3 Air supplyConnect an external air supply hose to the machine and adjust the filter regulator to set the air pressure to the specitied value. This should be performed before leveling in order to unclamp the modules that are on the base. This does not have to be performed before leveling if the base has no modules on it.

Procedure

1. Attach a socket to the end of the air supply hose and connect the socket to the air connector plug of the machine.

2. Turn the air supply lever on so air is supplied to the machine.

3. After power is supplied to the machine, adjust the air supply pressure.

4. Pull up the knob on the filter regulator to unlock it.

5. Turn the knob until the digital pressure gauge reads 0.5 MPa.

Note: The digital pressure gauge is located at the front of the base

6. Push down the knob to lock it.

Note: Fuji does not supply the hose.

WARNING

When working with a module pulled out and the cover over the air supply connection is off, ensure that no one pushes in the module. If pushed in while body parts are in the opening, the module may pinch, sever, or cause serious injury.

Air inletDigital pressure gauge

Socket for 3/8" hose

0.5 MPa or more

Hose

20PM plug

LeverKnob

NXTSET005Eb

36 NXT Setup Manual

Page 45: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

3.5 Leveling the MachineUse spirit levels to keep the bases level and adjust the conveyor height so that it matches the panel conveyance height.

3.5.1 Procedure1. Pull out a module and place spirit levels in both the X- and Y-directions at the

measurement position (polished surface) at the rear of the machine.

WARNING

There is a limit to the number of modules that can be pulled out safely at the same time. (Maximum: Four M3 modules on an 8M base, two M3 modules on a 4M base, or one M3 modules on a 2M base.)If the maximum is exceeded, the entire machine may fall over to the front, possibly resulting in serious physical harm. This is especially true when the front leveling bolts have not been adjusted.

<8M Base>

Spirit levelSpirit level

ModuleModule

<4M Base>

Spirit levelSpirit level

Module Module

Module Module

NXTSET003Ec

<2M Base>

Spirit level

Module

NXT Setup Manual 37

Page 46: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

2. Loosen the lock nuts on the leveling bolts shown in the drawing below. Rotate the leveling bolts to adjust the conveyor height so that it matches the panel conveyance height. Adjust the height while watching the spirit levels to ensure that the bases remain level.

3. Next loosen the nuts on the leveling bolts at the front side of the base. Rotate the front side leveling bolts so that the machine weight is applied lightly.

Note: Avoid applying too much of the machine weight to the front side leveling bolts to the extent that the base leveling is affected. These bolts are used as a back-up to support the bases when modules are pulled out.

NXTSET219Ea

Leveling bolts Leveling bolts Leveling bolts

Lock nut

Leveling bolt

Front side Front side Front side

8M base 4M base 2M base

NXTSET220Ea

Leveling bolts

(base front side)

Leveling bolts

(base front side)

Leveling bolts

(base front side)

Lock nut

Leveling bolt

(base front side)

8M base 4M base 2M base

38 NXT Setup Manual

Page 47: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

4. After verifying that the panel conveyance height and the leveling accuracy are correct, tighten the lock nuts on the leveling bolts. Changes can be made by tightening the lock nuts, although the levelness should always be checked again after adjustments have been made.

Note: If the lock nuts are not sufficiently tightened, vibrations may cause a drop in placement accuracy.

NXT Setup Manual 39

Page 48: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

3.6 Making Network SettingsBefore communication is possible with the NXT base, the IP address must be changed to an appropriate IP address for the factory. If the new IP address is not known, then contact the network administrator for an appropriate IP address.

The IP address for a base can be changed remotely with ease. It is necessary to know the current IP address in order to change the IP address to an IP address that is appropriate for the network. The NXT software tool, NetworkSetting, is used to change the current network settings for a base.

3.6.1 Procedure1. Insert the NXT software CD-ROM into the CD-ROM drive and open the drive for the

CD-ROM through Explorer.

2. Double-click [NXT] to open that folder.

3. Double-click NetworkSetting.exe to start the software.

4. When requested, enter the IP address of the base for which to change the network settings and then click [OK].

Note: If the current IP address of the base is unknown, use the information command found in manual mode on one of the modules attached to the base to display the current IP address for the base.

5. Specify the new IP address, subnet mask, and default gateway in the appropriate text boxes and click [Next].

Note: Even if not changing any of these items, these values must be entered using the current values.

6. Specify the host name for the NXT and then enter any domain information if a domain is used.

7. Click [Next].

8. Specify the preferred and alternate DNS servers in the appropriate textboxes if these are used.

9. Once all settings have been completed, click [Ok] and the new settings are sent to the NXT machine.

10.Reboot the NXT machine to enable the new network settings.

40 NXT Setup Manual

Page 49: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

3.7 Connecting NXT BasesFollow this procedure to connect independent NXT bases. Refer to section 3.8 "Installing Additional Dependent Bases" for details of installing additional NXT bases.

Note: In the following explanations, the example NXT panel flow is left to right.

NXTBAS135E

When connecting NXT bases together.

NXT base

NXT base

NXT base

NXTBAS127Eb

Lane 1

Lane 2

Lane 1

Lane 2

3. Connector LANE14. Connector LANE2

1. Previous stage panel loading I/F box2. Next stage panel loading I/F box

NXT base NXT base NXT base

Connecting cable for lane 1 and 2

3 3

1

4

2

4

<Previous Stage> < Next Stage>

NXT Setup Manual 41

Page 50: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

3.7.1 Connecting Method

1. Either open cover A at the front of the base, or remove cover B at the side of the base.

2. Connect the communication cables to the following connectors.

• Connectors LANE1 and LANE2 of the previous stage panel loading I/F box.

• Connectors LANE1 and LANE2 of the next stage panel loading I/F box.

3. Keep the connectors (RH0067* and RH0070*) attached to CN-M1 in the previous stage panel loading I/F box and CN-M2 in the next stage panel loading I/F box.

CAUTION

Be sure to turn off the power to the machine before connecting or removing any cables.

Ensure that the connector position is correct by checking the connector label when connecting connectors.

Be sure to firmly secure the connectors together.

NXTBAS101Ea

Front cover

Hole

Hole

Next stage panel loading I/F box

Previous stage panel loading I/F box

Side coverBase

CN-M1 CN-M2

CN-CV1F CN-CV1F

LANE1

LANE2

LANE1

LANE2

NXTSET217E

Previous stage panel loading I/F box Next stage panel loading I/F box

Connector (RH0067*) Connector (RH0070*)

42 NXT Setup Manual

Page 51: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

4. Pull out the connected cables (2 cables each for ) from the hole at the side of the bases.

• Connectors LANE1 and LANE2 of the panel loading I/F box in the previous stage machine.

• Connectors LANE1 and LANE2 of the panel loading I/F box in the next stage machine.

NXT Setup Manual 43

Page 52: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

3.7.2 Signal Cable Connecting Diagram (NXT - NXT - NXT)

NX

T b

ase

NX

T b

ase

NX

T b

ase

EE

HH

143*(

3 m

)

EE

HH

174*(

1.5

m)

EE

HH

175*(

5 m

)

EE

HH

143*(

3 m

)

EE

HH

174*(

1.5

m)

EE

HH

175*(

5 m

)

EE

HH

143*(

3 m

)

EE

HH

174*(

1.5

m)

EE

HH

175*(

5 m

)

EE

HH

143*(

3 m

)

EE

HH

174*(

1.5

m)

EE

HH

175*(

5 m

)

CN

-M2

CN

-M2

CN

-M1

CN

-M1

LA

NE

2-R

LA

NE

2-F

LA

NE

2-R

LA

NE

2-F

LA

NE

1-R

LA

NE

1-F

LA

NE

1-F

LA

NE

1-R

(Pre

vio

us s

tag

e s

ide

)(P

revio

us s

tag

e s

ide

)(N

ext sta

ge

sid

e)

(Ne

xt sta

ge

sid

e)

NX

TB

AS

10

4E

a

RH

0070*,

connecte

d

befo

re

ship

pin

g

RH

0067*,

connecte

d

befo

re

ship

pin

g

RH

0070*,

connecte

d

befo

re

ship

pin

g

RH

0067*,

connecte

d

befo

re

ship

pin

g

44 NXT Setup Manual

Page 53: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

3.8 Installing Additional Dependent BasesFollow this procedure to connect additional dependent NXT bases. Refer to section 3.7 "Connecting NXT Bases" for details of connecting independent NXT bases.

3.8.1 Extension PatternsSelect a method of extending the NXT configuration from one of the 10 patterns shown below. The configurations cannot be extended in a manner other than using these patterns.

1 2

Stand-alone

control box

Stand-alone

control box

Stand-alone

control box

Stand-alonecontrol box

Independent

4M base

2M base

Using one 2M Base

2M base (2)

1 2 3 4

5 6

2M base (3)

1 2 3 4

5 6

Dependent 2M base

One 2M Base and an Independent 4M Base (1)

Vacuum pump box

7 85 6

Dependent 2M base (2)

Independent

4M base

Independent

4M base

Independent

4M base

Independent

4M base

Two 2M Bases and an Independent 4M Base (1)

1 2

Dependent 2M base

One 2M Base and an Independent 4M Base (2)

Using three 2M Bases

Using four 2M Bases

Two 2M Bases and an Independent 4M Base (2)

Dependent 4M base

65 87

One 4M Base and an Independent 4M Base (1)

Dependent 4M base

3 41 2 Independent

4M base

One 4M Base and an Independent 4M Base (2)

NXTSET019E

7 85 6

2M base (4)

1 2 3 4

Vacuum pump box

Vacuum pump box

3 41 2

Dependent 2M base (2)

Using two 2M Bases

NXT Setup Manual 45

Page 54: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

3.8.2 Pneumatic ConnectionsThe type of pneumatic tube (as shown below) used, and number required to connect the air supply between bases differs depending on the base extension pattern used. Refer to the extension configuration for details of which type, and how many tubes are required.

T1-tube

T2-tube

DWG. No. Description Qty.

PZ16570 Tube 2

A40687 Elbow 4

NXTSET037

DWG. No. Description Qty.

PZ11190 Tube 2

A40687 Elbow 2

NXTSET038

46 NXT Setup Manual

Page 55: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

3.8.3 Using One 2M BaseInstalling the BaseCarry out leveling, and then fasten the 2M bases to the floor at the positions shown in the following diagram.

Anchor bolt

Bracket

Bracket

NXTSET015E

Anchor bolt

Anchor bolt

H = 950 mm

*H is the height from the floor to the level of panel conveyance.

H = 900 mm

NXTSET016E

DWG. No. Description Qty. Remarks

PB18723 Bracket 4 –

PB24701 Spacer 4 Not required on bases retrofitted for side cover interference prevention.

PB21792 Spacer 4 Required when the panel conveyance height is 950 mm.

H5123B Anchor bolt 4 9-6-5-M10 (cut anchor)

NXT Setup Manual 47

Page 56: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

Setting the Jumper and DIP SwitchesSet the jumper switches and the DIP switches on the interface board and the remote I/O board in the base as shown in the diagram below. Refer to the "NXT Mechanical Reference" for details of the location of each board.

CAUTION

Ensure the power to the machine is off before carrying out this procedure.

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4-2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP2AD

DP1AD

DP5

DP1

DP3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP7

DP6

JP3

- 3

JP3

-4

321

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 4

For boards E0

2M base

NXTSET039Ea

1 2

FH1211E0

FH1211E0

The dip switch settings

for only boards with E0

at the end are different.

Interface board in the

base control box

DIP switch

ONON

ON OFF

48 NXT Setup Manual

Page 57: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

Base JP1 SW1 SW2 SW4 SW5 SW6

Open Short Short

Remote I/O board in the base JP1

SW1

SW4

SW5

SW2

SW6

NXTSET040Ea

1 2

2M

NXT Setup Manual 49

Page 58: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

Signal Cable Connection Diagram (Stand-alone Control Box - 2M Base)Connect each signal cable as shown in the following diagram.

Next

stage

side

Previou

s stage

side

Previou

s stage

side

Attached

harne

ss

stage)

CN28A

BRC

N1

CND

RH1162*

CN

-1

CN

-2

Lane

2-R

Lane

2-F

Lane

1-F

CNC

CN

B

CN5

CN6

CN2A

TM1

HU

BC

H6

BLC

N2

BLC

N3

BLC

N4

RH1163*

CN27A

CN27

B

2M

ba

se

Stand-a

lone contro

l box

Modu

le 1

/2 contro

l box

Circu

it breaker bracket

Interfaceboard

CN1

4

CN13

CN29

CN27

BRC

N2

BRC

N3

(Fixed)

CN

-M2

CN

-M2

CN

-M2

RH1152*

RH1067*

RH1062*

RH1063*

RH1067*

RH1066*

RH106

4*

RH1058*

RH1059*

RH1153*

RH1070*

CN

-M1

NXTSET187Ea

Rig

ht

side

module

cover

RH0528*

RH058

4*

RH0583*

RH0070*

Connected

when

sh

ipped

Connected

when

sh

ipped

Connected

when

sh

ipped

Pane

l loading s

igna

lbracket (Next stage)

Pane

l loading

signa

lbracket (Previou

s stage)

Disconnect R

H0067* then

6776

connect R

H1152*

Rear pane

l loading

Attached harne

ss

Lane

2-F

RH1127*

HH

RH0067*

RH1071*

CPU

_BOX

ET

HER

BC

BC

N5

CPU

_BOX

139

4 PO

CPU

_BOX

CU

_N

ET

ET

HER

Contro

l box

BC

BC

N12

Contro

l boxBC

BC

N9

Contro

l box

RH0527*

Left

side

modu

le cover

BC

BC

N9

CPU

_BOX

DI01

CPU

_BOX

DI02

Contro

l box

MS1

CN3

MP1PS1

Vacuum

pump

bracket

Pre

ssure

sw

itch

MP1PS2

Pre

ssure

sw

itch

Y006

GM

Hour meter

CN

-M1

Lane

1-F

CN

-CV

IF

Contro

l box

BC

BC

N1

Rear pane

l loading

CN5

Front pane

l loading

oadad

CN2

CN2

sh

ipped

Pane

l loading

signa

ldd

bracket (Previou

s stage)

ee

Pane

l flow

50 NXT Setup Manual

Page 59: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

Pneumatic Connections

To stand-alone control box

Front view (2M base)

NXTSET020E

NXT Setup Manual 51

Page 60: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

3.8.4 Using Two 2M BasesSetting the Jumper and DIP SwitchesSet the jumper switches and the DIP switches on the interface board and the remote I/O board in the base as shown in the diagram below. Refer to the "NXT Mechanical Reference" for details of the location of each board.

CAUTION

Ensure the power to the machine is off before carrying out this procedure.

FH1211E0

FH1211E0

The dip switch settings

for only boards with E0

at the end are different.

Interface board in the base control box

DIP switch

ONON

ON OFF

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4 -2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP

2A

D

DP

1A

D

DP

5

DP

1D

P3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP

7

DP

6

JP

3-3

JP

3-4

32

1

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 7 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4

For boards E0

2M base 2M base

1 2 3 4

NXTSET045E

52 NXT Setup Manual

Page 61: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4 -2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP

2A

D

DP

1A

D

DP

5

DP

1D

P3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP

7

DP

6

JP

3-3

JP

3-4

32

1

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 7 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4

For boards E0

1 2 3 4

NXTSET046E

2M base 2M base

Remote I/O board in the base JP1

SW1

SW4

SW5

SW2

SW6

NXTSET040Ea

NXT Setup Manual 53

Page 62: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

Base JP1 SW1 SW2 SW4 SW5 SW6

Open Open Short

Open Short Short

1 2 3 4

2M 2M

1 2 3 4

2M 2M

54 NXT Setup Manual

Page 63: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

Signal Cable Connection Diagram (Stand-alone Control Box - 2M Base - 2M Base)Connect each signal cable as shown in the following diagram.

Note: Base connection harness AJ457** are shown in bold.

Stand-alone Control - 2M Base - 2M Base

Harness Connection Diagram (1/2)

A

B

C

D

E

F

G

Not necessary

Panel flow

CN28B

CN27A

Left side

module cover

RH0527*

To I/F CN27 BRCN1

BRCN2

BR

CN

2

BLCN2

BLCN3

BLCN4

BRCN3

(Fixed)

BL

CN

3

BRCN3(Cable)

BR

CN

3

BR

CN

3RH1162*

CN-M1

CN-M2

Lane 2-R

Lane 1-R

Lane 2-FCN-M2CN-M2

Lane 1-F

CN

-M2

CN

-M2

RH1186*

RH1186*

Circuit breaker bracket

CN-1RH0562*

CN-2

RH

11

63

*C

N-M

2

To I/F CN28

2M base RH2012*CN28A

RH0558*

RH0559*

RH0560*

Disconnect RH0584*, then connect RH0559*.

Connected when the base is used in the last stage.

Connected when

shipped

RH0070*

For connection to the stand-alone control box, follow the procedures described in "Using one 2M Base" except otherwise specified.

NXTSET188Ea

Panel loading

signal bracket

(Previous stage)

Panel loading

signal bracket

(Next stage)

NXT Setup Manual 55

Page 64: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

Stand-alone Control - 2M Base - 2M Base

Harness Connection Diagram (2/2)

A

B

C

D

E

F

G

Panel flow

CN27B

CN27A

CN28A

Right side

module cover

RH0528*

BRCN1

BRCN2

BL

CN

2

BLCN2

To I/F CN27

BLCN3

BLCN4

BRCN3

BL

CN

3

RH0583*

BR

CN

3B

RC

N2

CN-M1

Lane 2-F

Lane 1-F

CN

-M1

R0070*

R0067*

CN-M2

CN

-M2

CN

-M2

CN-M2

Lane 2-R

Lane 1-R

Circuit breaker bracket

CN-1

CN-2

RH

11

63

*

CN-M2

CN

-M2

NXTSET189Ea

RH0584*

Connected when shipped

Connected when shipped

Connected

when

shipped

Panel loading

signal bracket

(Previous stage)

Panel loading

signal bracket

(Next stage)

HUBCH6

2M base

56 NXT Setup Manual

Page 65: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

Pneumatic Connections

Connecting the BasesAfter attaching the signal cables and pneumatic connections, fasten neighboring bases using the special bracket. Refer to section 3.8.13 "Fastening Extensions" for details.

Remove the two plugs and attach

the T2 tube elbow connector.

T2 tubes (2)

To stand-alone

control box

Front view

Left side base Right side base

NXTSET021E

Remove the plugs from these

two locations, and then connect

the T2 tubes.

NXT Setup Manual 57

Page 66: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

3.8.5 Using Three 2M BasesSetting the Jumper and DIP SwitchesSet the jumper switches and the DIP switches on the interface board and the remote I/O board in the base as shown in the diagram below. Refer to the "NXT Mechanical Reference" for details of the location of each board.

CAUTION

Ensure the power to the machine is off before carrying out this procedure.

FH1211E0

FH1211E0

The dip switch settings

for only boards with E0

at the end are different.

Interface board in the base control box

DIP switch

ONON

ON OFF

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4-2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP2AD

DP1AD

DP5

DP1

DP3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP7

DP6

JP3

-3

JP3

-4

321

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 4

For boards E0

2M base

2M base

1 2 3 4

2M base

5 6

NXTSET055Ea

58 NXT Setup Manual

Page 67: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

1 2 3 4 5 6

2M base

2M base

1 2 3 4

2M base 2M base

2M base

2M base

5 6

NXTSET056E

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4 -2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP

2A

D

DP

1A

D

DP

5

DP

1D

P3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP

7

DP

6

JP

3-3

JP

3-4

32

1

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 7 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4

For boards E0JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4 -2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP

2A

D

DP

1A

D

DP

5

DP

1D

P3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP

7

DP

6

JP

3-3

JP

3-4

32

1

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 7 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4

For boards E0

Remote I/O board in the base JP1

SW1

SW4

SW5

SW2

SW6

NXTSET040Ea

NXT Setup Manual 59

Page 68: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

Base JP1 SW1 SW2 SW4 SW5 SW6

Open Open Short

Open Open Short

Open Short Short

1 2 3 4

2M 2M

5 6

2M

1 2 3 4

2M 2M

5 6

2M

1 2 3 4

2M 2M

5 6

2M

60 NXT Setup Manual

Page 69: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

Signal Cable Connection Diagram (Stand-alone Control Box - 2M Base - 2M Base - 2M Base)Connect each signal cable as shown in the following diagram.

Note: Base connection harness AJ457** are shown in bold.

Diagram number

reference

Connection diagram

1 Connect the stand-alone control box and the first 2M base according to the connection diagram as shown on the page with this symbol in section 3.8.4 "Using Two 2M Bases".

2 Connect according to this connection diagram.

3 Connect the third 2M base according to the connection diagram as shown on the page with this symbol in section 3.8.4 "Using Two 2M Bases".

Ctrl

box1 1 2 2 3

2M

base

2M

base

2M

base

NXTSET190E

Base connection harness AJ457** requires two sets.

NXT Setup Manual 61

Page 70: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

Stand-alone Control - 2M Base - 2M Base - 2M Base

Harness Connection Diagram

A

B

C

D

E

F

G

E

F

Panel flow

RH2012*CN28A

BRCN1 RH0558*

Disconnect RH0584*, then

connect RH0559*.

BRCN2

BR

CN

2

BLCN2RH0559*

BRCN3

(Fixed)BLCN3 RH0560*

BRCN3(Cable) Connected when the

base is used in the last stage.

BLCN4

BR

CN

3

BR

CN

3

Panel loading

signal bracket

(Previous stage)

CN-M1

Panel loading

signal bracket

(Next stage)

RH0070*

Connected when

shipped

CN-M2

CN

-M2

CN

-M2

CN-M2

Lane 2-F Lane 2-R RH1186*

Lane 1-F Lane 1-R RH1186*

Circuit breaker bracket

CN-1RH0562*

CN-2

To I/F CN28

NXTSET193Ea

G

A

CN27B

CN27A

To I/F CN27

B HUB

CH6

C

D

BL

CN

2B

LC

N2

CN

-M1

RH0067*

Connected when

shipped

2M base

62 NXT Setup Manual

Page 71: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

Pneumatic Connections

Connecting the BasesAfter attaching the signal cables and pneumatic connections, fasten neighboring bases using the special bracket. Refer to section 3.8.13 "Fastening Extensions" for details.

Remove the two plugs and attach the T2 tube elbow connector.

T2 tubes (2)

To stand-alone

control box

Front view

Independent 2M base Dependent

2M base

T2 tubes (2)

Dependent 2M base

NXTSET022E

Remove the plugs from these

two locations, and then connect

the T2 tubes.

NXT Setup Manual 63

Page 72: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

3.8.6 Using Four 2M BasesSetting the Jumper and DIP SwitchesSet the jumper switches and the DIP switches on the interface board and the remote I/O board in the base as shown in the diagram below. Refer to the "NXT Mechanical Reference" for details of the location of each board.

CAUTION

Ensure the power to the machine is off before carrying out this procedure.

FH1211E0

FH1211E0

The dip switch settings

for only boards with E0

at the end are different.

Interface board in the base control box

DIP switch

ONON

ON OFF

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4-2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP2AD

DP1AD

DP5

DP1

DP3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP7

DP6

JP3

-3

JP3

-4

321

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 4

For boards E0

2M 2M

1 2 3 4

2M

5 6

2M

7 8

NXTSET069Ea

64 NXT Setup Manual

Page 73: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4 -2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP

2A

D

DP

1A

D

DP

5

DP

1D

P3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP

7

DP

6

JP

3-3

JP

3-4

32

1

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 7 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4

For boards E0

1 2 3 4 5 6 7 8

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4 -2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP

2A

D

DP

1A

D

DP

5

DP

1D

P3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP

7

DP

6

JP

3-3

JP

3-4

32

1

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 7 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4

For boards E0

1 2 3 4 5 6 7 8

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4 -2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP

2A

D

DP

1A

D

DP

5

DP

1D

P3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP

7

DP

6

JP

3-3

JP

3-4

32

1

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 7 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4

For boards E0

1 2 3 4 5 6 7 8

NXTSET070E

2M 2M 2M 2M 2M 2M 2M 2M

2M 2M 2M 2M

NXT Setup Manual 65

Page 74: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

Base JP1 SW1 SW2 SW4 SW5 SW6

Open Open Short

Open Open Short

Open Open Short

Open Short Short

Remote I/O board in the base JP1

SW1

SW4

SW5

SW2

SW6

NXTSET040Ea

1 2 3 4

2M 2M

5 6

2M

7 8

2M

1 2 3 4 5 6 7 8

2M 2M 2M 2M

1 2 3 4 5 6 7 8

2M 2M 2M 2M

1 2 3 4 5 6 7 8

2M 2M 2M 2M

66 NXT Setup Manual

Page 75: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

Signal Cable Connection Diagram (Vacuum Pump Box - Stand-alone Control Box - 2M Base - 2M Base - 2M Base - 2M Base)Connect each signal cable as shown in the following diagram.

Diagram number

reference

Connection diagram

1 Connect the stand-alone control box and the first 2M base according to the connection diagram as shown on the page with this symbol in section 3.8.4 "Using Two 2M Bases".

2 Connect the second and third 2M base according to the connection diagram as shown on the page with this symbol in section 3.8.5 "Using Three 2M Bases".

3 Connect the fourth 2M base according to the connection diagram as shown on the page with this symbol in section 3.8.4 "Using Two 2M Bases".

4 Connect the stand-alone control box and the vacuum pump box according to the connection diagram of this item. Do not pass the harness for the vacuum pump box (RH2141*, RH2142*, RH2143*) through the interior of the base. The harness should be installed along the outside of the base.

Ctrl

box1 1

4

2 2 2

2M

base

2M

base

2M

base

2 2

2M

base

NXTSET194E

Vacuum

pump

box

Base connection harness AJ457** requires three sets.

NXT Setup Manual 67

Page 76: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

Pneumatic Connections

Connecting the BasesAfter attaching the signal cables and pneumatic connections, fasten neighboring bases using the special bracket. Refer to section 3.8.13 "Fastening Extensions" for details.

Panel flow

NXTSET196Ea

Stand-alone control box

2M base

(1st)

2M base

(2nd)

2M base

(3rd)

2M base

(4th)

RH2142*

To I/F CN6

RH2141*Thermo fuse

Inverter bracket

MS1CN3

Inverter bracket

MS1CN1

Control box

BCBCN2

Thermo fuse 2

Inverter bracketMS3CN3Inverter bracketMS3CN1

RH2143*

Vacuum pump box

Stand-alone Control - 2M Base (First) - Vacuum Pump Box

Harness Connection Diagram

Remove the two plugs and attach the T2 tube elbow connector.

T2 tubes (2)

To stand-alone

control box

Front view

Independent 2M base Dependent

2M base

T2 tubes (2)

Dependent 2M base

NXTSET022E

Remove the plugs from these

two locations, and then connect

the T2 tubes.

68 NXT Setup Manual

Page 77: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

3.8.7 Using One 2M Base and an Independent 4M Base (1)Setting the Jumper and DIP SwitchesSet the jumper switches and the DIP switches on the interface board and the remote I/O board in the base as shown in the diagram below. Refer to the "NXT Mechanical Reference" for details of the location of each board.

CAUTION

Ensure the power to the machine is off before carrying out this procedure.

FH1211E0

FH1211E0

The dip switch settings

for only boards with E0

at the end are different.

Interface board in the base control box

DIP switch

ONON

ON OFF

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4-2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP2AD

DP1AD

DP5

DP1

DP3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP7

DP6

JP3

-3

JP3

-4

321

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 4

For boards E0

Independent4M

Dependent2M

5 6

NXTSET087Ea

NXT Setup Manual 69

Page 78: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4 -2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP

2A

D

DP

1A

D

DP

5

DP

1D

P3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP

7

DP

6

JP

3-3

JP

3-4

32

1

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 7 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4

For boards E0

5 6

Independent

4M

Dependent

2M

Independent

4M

Dependent

2M

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4 -2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP

2A

D

DP

1A

D

DP

5

DP

1D

P3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP

7

DP

6

JP

3-3

JP

3-4

32

1

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 7 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4

For boards E0

5 6

NXTSET088E

Remote I/O board in the base JP1

SW1

SW4

SW5

SW2

SW6

NXTSET040Ea

70 NXT Setup Manual

Page 79: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

Base JP1 SW1 SW2 SW4 SW5 SW6

Open Open Short

Open Open Short

Open Short Short

Independent4M

Dependent2M

5 6

Independent4M

Dependent2M

5 6

Independent4M

Dependent2M

5 6

NXT Setup Manual 71

Page 80: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

Signal Cable Connection Diagram (Independent 4M Base - 2M Base)Connect each signal cable as shown in the following diagram.

Note: Base connection harness AJ110** are shown in bold.

4M base

CN27A

CN28A

Left side

module

cover

BRCN1

RH0558*

BRCN2

BR

CN

2

RH0559*

BRCN3(Fixed)

BR

CN

3

RH0560*

Connected when the baseis used in the last stage.

BRCN3(Cable)

BR

CN

3

RH1163*

Joint harness

Disconnect RH0070*, then

connect RH0583*.

Panel loading

signal bracket

(Previous stage)

Panel loading

signal bracket

(Next stage)

CN-M1 CN-M2

Connected when shipped

RH0067*

CN

-M2

CN

-M1

RH0583*

Lane 2-F Lane 2-R

RH1186*

Lane 1-F Lane 1-R

RH1186*

Circuit breaker bracket 2

CN-1

RH0562*CN-2

Previous stage side Next stage side

To I/F CN28

RH2012*A

B

C

D

E

F

G

H

I

Panel flow

4M Base - 2M Base Harness Connection Diagram (1/2)NXTSET197Ea

RH0527*

72 NXT Setup Manual

Page 81: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

2M base

Panel flow

NXTSET198Ea

CN27B

CN27A

CN28ARight side

module coverTo I/F CN27

HUB

CH6

BRCN1

RH0558*

BLCN2 BRCN2

BR

CN

2

BL

CN

2 Connected when

shipped RH0559*

BLCN3BRCN3(Fixed)

BL

CN

3

BR

CN

3

Connected when

shipped

RH0560*

BLCN4

RH1163*

Connected when

shipped

RH0067* CN-M1

CN

-M1

CN-M2

CN

-M2 Connected when

shipped

RH0070*

RH0583*

RH0528*

RH0584*

RH0583*

Lane 2-F Lane 2-R

RH1186*

Lane 1-F Lane 1-R

RH1186*

Circuit breaker barcket

CN-1

RH0562*CN-2

Previous stage side Next stage side

RH2012*A

B

C

D

E

F

G

H

I

4M Base - 2M Base Harness Connection Diagram (2/2)

Panel loading

signal bracket

(Previous stage)

Panel loading

signal bracket

(Next stage)

NXT Setup Manual 73

Page 82: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

Pneumatic Connections<For the Independent 4M Base (serial No. up to 294)>

Independent 4M base Dependent 2M base

Front viewNXTSET024Ea

Remove the two plugs and attach the T2 tube elbow connector.

T2 tubes (2)

Remove the plugs from these

two locations, and then connect

the T2 tubes.

74 NXT Setup Manual

Page 83: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

<For the Independent 4M Base (serial No. 295 and later)>

Connecting the BasesAfter attaching the signal cables and pneumatic connections, fasten neighboring bases using the special bracket. Refer to section 3.8.13 "Fastening Extensions" for details.

Independent 4M base Dependent 2M base

Front viewNXTSET025Ea

Remove the two plugs and attach the T2 tube elbow connector.

T2 tubes (2)

Remove the plugs from these

two locations, and then connect

the T2 tubes.

NXT Setup Manual 75

Page 84: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

3.8.8 Using Two 2M Bases and an Independent 4M Base (1)Setting the Jumper and DIP SwitchesSet the jumper switches and the DIP switches on the interface board and the remote I/O board in the base as shown in the diagram below. Refer to the "NXT Mechanical Reference" for details of the location of each board.

CAUTION

Ensure the power to the machine is off before carrying out this procedure.

FH1211E0

FH1211E0

The dip switch settings

for only boards with E0

at the end are different.

Interface board in the base control box

DIP switch

ONON

ON OFF

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4-2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP2AD

DP1AD

DP5

DP1

DP3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP7

DP6

JP3

-3

JP3

-4

321

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 4

Independent

4MDependent

2M

5 6 7 8

NXTSET101Ea

Dependent

2M

76 NXT Setup Manual

Page 85: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4 -2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP

2A

D

DP

1A

D

DP

5

DP

1D

P3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP

7

DP

6

JP

3-3

JP

3-4

32

1

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 7 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4

For boards E0

5 6 7 8

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4 -2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP

2A

D

DP

1A

D

DP

5

DP

1D

P3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP

7

DP

6

JP

3-3

JP

3-4

32

1

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 7 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4

For boards E0

5 6 7 8

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4 -2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP

2A

D

DP

1A

D

DP

5

DP

1D

P3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP

7

DP

6

JP

3-3

JP

3-4

32

1

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 7 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4

For boards E0

5 6 7 8

Independent

4M

Dependent

2M

NXTSET102E

Independent

4M

Dependent

2M

Dependent

2M

Independent

4M

Dependent

2M

Dependent

2M

Dependent

2M

NXT Setup Manual 77

Page 86: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

Base JP1 SW1 SW2 SW4 SW5 SW6

Open Open Short

Open Open Short

Open Open Short

Open Short Short

Remote I/O board in the base JP1

SW1

SW4

SW5

SW2

SW6

NXTSET040Ea

Independent4M

5 6 7 8

Dependent2M

5 6 7 8

Independent4M

Dependent2M

5 6 7 8

Independent4M

Dependent2M

5 6 7 8

Independent4M

Dependent2M

78 NXT Setup Manual

Page 87: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

Signal Cable Connection Diagram (Independent 4M Base - 2M Base - 2M Base)Connect each signal cable as shown in the following diagram.

Note: Two sets of base connection harnesses AJ110** are shown in bold.

4M base

CN28A

CN27ALeft side

moudle cover

RH0527*

BRCN1

RH0558*

BRCN2

BR

CN

2

RH0559*BRCN3(Fixed)

RH0560*Connected when the baseis used in the last stage.

BRCN3(Cable)

BR

CN

3B

RC

N3

RH1163*

Joint harness

Disconnect RH0070*, then

connect RH0583*.

Connected when

shipped RH0067*

CN-M1 CN-M2

CN

-M2

CN

-M1

RH0583*

Lane 2-F Lane 2-R

RH1186*

Lane 1-F Lane 1-R

RH1186*

Circuit breaker bracket 2

CN-1RH0562*

CN-2

Previous stage side Next stage side

RH2012*

4M Base - 2M Base - 2M Base Harness Connection Diagram (1/4)

NXTSET199Ea

A

B

C

D

E

F

G

H

I

Panel loading

signal bracket

(Previous stage)

Panel loading

signal bracket

(Next stage)

Panel flow

NXT Setup Manual 79

Page 88: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

2M base

CN27B

CN28ACN27A

To I/F CN27

HUB

CH6

BRCN1

RH0558*

Disconnect RH0584*, then

connect RH0559*.BLCN2 BRCN2

BRC

N2

BLC

N2

RH0559*

RH0559*

RH0558*

BLCN3BRCN3(Fixed)

BRC

N3

BLC

N3

RH0560*

RH0560* BRCN3(Cable)BLCN4

BRC

N3

BRC

N3

RH1163*RH1163*

Joint harness

Connected when the baseis used in the last stage.

Disconnect RH0070*, then

connect RH0583*.

RH0583*RH0583*

RH1186*RH1186*

RH1186*RH1186*

Circuit breaker bracket

CN-1

RH0562*

RH0562* CN-2

Previous stage side Next stage side

CN-M1

CN

-M1

CN-M2

CN

-M2

Lane 2-F Lane 2-R

Lane 1-RLane 1-F

RH2012*

RH2012*

4M Base - 2M Base - 2M Base Harness Connection Diagram (2/4)

NXTSET200Ea

A

A

B

C

D

E

F

G

H

I

B

C

D

E

F

G

H

I

Panel flow

Connected when

shipped

RH0067*

To I/F CN28

Panel loading

signal bracket

(Previous stage)

Panel loading

signal bracket

(Next stage)

80 NXT Setup Manual

Page 89: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

2M base

CN27B

CN28A

CN27A

To I/F CN27

HUB

CH6

BRCN1

BLCN2 BRCN2

BR

CN

2

BLC

N2

RH0559*

RH0558*

BLCN3BRCN3(Fixed)

BLC

N3

RH0560* BRCN3(Cable)BLCN4

BR

CN

3

RH1163*

RH0583*

RH1186*

RH1186*

Circuit breaker bracket

CN-1

RH0562* CN-2

Previous stage side Next stage side

CN-M1

CN

-M1

CN-M2

Lane 2-F Lane 2-R

Lane 1-RLane 1-F

RH

20

12

*

4M Base - 2M Base - 2M Base Harness Connection Diagram (3/4)

NXTSET201Ea

A

B

C

D

E

F

G

H

I

Panel flow

Connected when

shipped

RH0067*

Connected when

shipped

Connected when

shipped

RH0584*

RH0070*

RH0583*Connected when

shipped

Right side

module cover

RH0528*

Panel loading

signal bracket

(Previous stage)Panel loading

signal bracket

(Next stage)

NXT Setup Manual 81

Page 90: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

Do not pass the harness (RH2141*, RH2142*, RH2143*) between the 4M base and the vacuum pump box through the interior of the base. The harness should be installed along the outside of the base.

4M base

Vacuum pump boxM141A

M141Thermo fuse

Inverter bracket

MS3CN3

Inverter bracket

MS3CN1

RH2143*

RH2141*

RH2142*

Thermo fuse

Inverter bracket

MS1CN3

Inverter bracket

MS1CN1

Control box

BCBCN18

Interface board

CN6

NXTSET202E

4M Base - 2M Base - 2M Base Harness Connection Diagram (2/4)

82 NXT Setup Manual

Page 91: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

Pneumatic Connections<For the Independent 4M Base (serial No. up to 294)>

Independent 4M base Dependent 2M base Dpendent 2M base

Front viewNXTSET026Ea

Remove the two plugs and attach the T2 tube elbow connector.

Remove the plugs from these

two locations, and then connect

the T2 tubes.

T2 tubes (2)T2 tubes (2)To vacuum

pump box

Remove the pluges from locations A, and

then connect the T2 tube.

Remove the plug from location B, and

then connect the tube to the vacuum

pump box.

A

B

A

NXT Setup Manual 83

Page 92: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

<For the Independent 4M Base (serial No. 295 and later)>

Connecting the BasesAfter attaching the signal cables and pneumatic connections, fasten neighboring bases using the special bracket. Refer to section 3.8.13 "Fastening Extensions" for details.

NXTSET027Ea

Independent 4M base Dependent 2M base Dpendent 2M base

Front view

Remove the two plugs and attach the T2 tube elbow connector.

T2 tubes (2)T2 tubes (2)To vacuum

pump box

Remove the plugs from these

two locations, and then connect

the T2 tubes.

Remove the pluges from locations A, and

then connect the T2 tube.

Remove the plug from location B, and

then connect the tube to the vacuum

pump box.

84 NXT Setup Manual

Page 93: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

3.8.9 Using One 2M Base and an Independent 4M Base (2)Setting the Jumper and DIP SwitchesSet the jumper switches and the DIP switches on the interface board and the remote I/O board in the base as shown in the diagram below. Refer to the "NXT Mechanical Reference" for details of the location of each board.

CAUTION

Ensure the power to the machine is off before carrying out this procedure.

FH1211E0

FH1211E0

The dip switch settings

for only boards with E0

at the end are different.

Interface board in the base control box

DIP switch

ONON

ON OFF

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4-2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP2AD

DP1AD

DP5

DP1

DP3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP7

DP6

JP3

-3

JP3

-4

321

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 4

For boards E0

1 2

NXTSET119Ea

Independent

4M

Dependent

2M

NXT Setup Manual 85

Page 94: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4 -2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP

2A

D

DP

1A

D

DP

5

DP

1D

P3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP

7

DP

6

JP

3-3

JP

3-4

32

1

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 7 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4

For boards E0

1 2

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4 -2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP

2A

D

DP

1A

D

DP

5

DP

1D

P3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP

7

DP

6

JP

3-3

JP

3-4

32

1

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 7 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4

For boards E0

NXTSET120E

1 2

Independent

4M

Dependent

2M

Independent

4M

Dependent

2M

Remote I/O board in the base JP1

SW1

SW4

SW5

SW2

SW6

NXTSET040Ea

86 NXT Setup Manual

Page 95: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

Base JP1 SW1 SW2 SW4 SW5 SW6

Open Short Short

Open Open Short

Open Open Short

1 2

Independent4M

Dependent2M

1 2

Dependent2M

Independent4M

1 2

Dependent2M

Independent4M

NXT Setup Manual 87

Page 96: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

Signal Cable Connection Diagram (2M Base - Independent 4M Base)Connect each signal cable as shown in the following diagram.

Note: Base connection harness AJ517** are shown in bold.

A

B

C

D

E

F

G

H

J

I

2M base

Module 1&2

Left side

module cover

RH0527*

To I/F CN27

To I/F CN28

Disconnect RH0584*,

then connect RH1698*.

Previous stage signal(Fixed)

Connected when shipped

RH0583*

Connected when

shipped

RH0067*

Disconnect RH0070*,

then connect RH1189*.

Circuit breaker bracket

Previous stage side Next stage side

Lane 2-F

Lane 1-F

Lane 2-R

Lane 1-R

CN-M2

CN

-M2

RH1189*

RH1186*

RH1186*

RH1190*

CN-1

CN-M2

CN

-M2

CN

-M2

CN

-M1

CN-M2

CN-M1

RH1162*

RH1163*

BLCN4

BLCN3BRCN3

BR

CN

3

BRCN2

BR

CN

2

BRCN1 RH1187*

RH1170*

RH2012*

RH1188*

RH1698*

RH1280*

BLCN2

CN27B CN27B

CN28A

BLC

N3

BLC

N3

BLC

N2

BLC

N3

CN-2

NXTSET203Ea

2M Base - 4M Base Harness Connection Diagram (1/2)

Panel flow

Panel loading

signal bracket

(Next stage)

Panel loading

signal bracket

(Previous stage)

88 NXT Setup Manual

Page 97: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

A

B

C

D

E

G

H

I

J

F

4M base

Module 3 ~ 6

Right side

module cover

RH0528*

Next stage signal

RH0583*Connected when

shipped

Interlock board 1I/O_F

Safety circuit

Disconnect RH0067*,

then connect RH1189*. RH0070*

Connected when

shipped

Circuit breaker bracket 2

Previous stage side Next stage side

Lane 2-F

Lane 1-F

Lane 2-R

Lane 1-R

CN

-M2

CN-M2CN-M1

CN

-M1

RH1189*

RH1186*

RH1186*

RH1190*

CN-1

CN-2

RH1187*

RH1170*

RH2012*CN27A

CN28A

RH1188*

RH0971*

RH0715*

RH0258* BRCN3(Fixed)

BRCN2

BRC

N2

BRC

N3

BRC

N3

BRC

N3

BRCN1I/F1 CN27

RH1280*

NXTSET204Ea

2M Base - 4M Base Harness Connection Diagram (2/2)

Panel loading

signal bracket

(Next stage)

Panel loadingneel lo

signal bracketnaal b

(Previous stage)viious

Disconnect I/O_F of RH0258*,8

then connect I/O_F of RH0971*7

into the board.

Disconnect CN27 of RH0715*,

then connect CN27 of RH1170* .

Panel flow

NXT Setup Manual 89

Page 98: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

Pneumatic Connections<For the Independent 4M Base (serial No. up to 294)>

T1 tubes (2)

Independent 4M baseDependent

2M base

Reuse the plugs.

Attach the used plugs.

Remove the plugs (2), and

then connect the T1 tubes.

NXTSET028Ea

90 NXT Setup Manual

Page 99: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

<For the Independent 4M Base (serial No. 295 and later)>

Connecting the BasesAfter attaching the signal cables and pneumatic connections, fasten neighboring bases using the special bracket. Refer to section 3.8.13 "Fastening Extensions" for details.

T1 tubes (2)

Independent 4M baseDependent

2M base

Reuse the plugs.

Attach the used plugs.

Remove the plugs (2), and

then connect the T1 tubes.

NXTSET029Ea

NXT Setup Manual 91

Page 100: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

3.8.10 Using Two 2M Bases and an Independent 4M Base (2)Setting the Jumper and DIP SwitchesSet the jumper switches and the DIP switches on the interface board and the remote I/O board in the base as shown in the diagram below. Refer to the "NXT Mechanical Reference" for details of the location of each board.

CAUTION

Ensure the power to the machine is off before carrying out this procedure.

FH1211E0

FH1211E0

The dip switch settings

for only boards with E0

at the end are different.

Interface board in the base control box

DIP switch

ONON

ON OFF

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4-2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP2AD

DP1AD

DP5

DP1

DP3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP7

DP6

JP3

-3

JP3

-4

321

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 4

For boards E0

NXTSET133Ea

1 2 3 4

Independent

4M

Dependent

2M

Dependent

2M

92 NXT Setup Manual

Page 101: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4 -2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP

2A

D

DP

1A

D

DP

5

DP

1D

P3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP

7

DP

6

JP

3-3

JP

3-4

32

1

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 7 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4

For boards E0

21

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4 -2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP

2A

D

DP

1A

D

DP

5

DP

1D

P3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP

7

DP

6

JP

3-3

JP

3-4

32

1

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 7 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4

For boards E0

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4 -2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP

2A

D

DP

1A

D

DP

5

DP

1D

P3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP

7

DP

6

JP

3-3

JP

3-4

32

1

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 7 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4

For boards E0

NXTSET134E

43 1 2 3 4

1 2 3 4

Independent

4MDependent

2M

Dependent

2M

Independent

4MDependent

2M

Dependent

2M

Independent

4MDependent

2M

Dependent

2M

NXT Setup Manual 93

Page 102: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

Base JP1 SW1 SW2 SW4 SW5 SW6

Open Open Short

Open Open Short

Open Open Short

Open Short Short

Remote I/O board in the base JP1

SW1

SW4

SW5

SW2

SW6

NXTSET040Ea

3 41 2

Dependent2M

Independent4M

1 2 3 4

Dependent2M

Independent4M

1 2 3 4

Dependent2M

Independent4M

1 2 3 4

Dependent2M

Independent4M

94 NXT Setup Manual

Page 103: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

Signal Cable Connection Diagram (2M Base - 2M Base - Independent 4M Base)Base connection harnesses AJ457** (2M - 2M) and AJ517** (4M - 2M) are shown in bold.

NXTSET205Ea

2M Base - 2M Base - 4M Base - Vacuum Pump Harness Connection Diagram (1/4)

RH1162*

RH0562*

RH1186*

RH1186*

CN-M2

CN-1

CN-2

CN-M2

CN-M1

CN27A

CN28A

CN27B CN27B

BRCN1

BRCN2BLCN2

BLC

N2

BLC

N3

BLC

N3

CN

-M1

CN

-M2

BLC

N3

BRCN3BLCN3

BRCN3

BRC

N3

BRC

N2

BRC

N3

BLCN4

To I/F CN27

To I/F CN28

2M base

Module 1 & 2

Left side

module cover

RH0527* RH0558*

RH1170*

RH2012*

A

B

C

D

E

F

G

H

I

J

RH1188*

RH0559*

RH0560*

Disconnect RH0584*, then

connect RH0559*.

RH1280*

Previous stage signal

(Fixed)

(Cable)

Disconnect BRCN3 of RH0583*,

then connect BRCN3 of RH0560*.

Connected when

shipped

RH0067*

Lane 2-F Lane 2-R

Lane 1-RLane 1-F

Circuit breaker bracket

Previous stage side Next stage side

BRC

N3

Panel loading

signal bracket

(Previous stage)Panel loading

signal bracket

(Next stage)

Panel flow

NXT Setup Manual 95

Page 104: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

RH0562*

RH1163*

RH1186*

RH1186*

CN-1

CN-2

CN-M2 CN-M2

CN-M2

CN-M1

CN

-M2

CN

-M2

CN

-M2

CN

-M1

HUBCH6

BL

CN

2B

LC

N3

2M base

To I/F CN27

RH0558*

RH2012*B

D

E

F

N

O

P

Q

K

L

M

H

I

J

BLCN2 BRCN2

BRCN1

BLCN3

BLCN4

BRCN3

BRCN2

BR

CN

2B

RC

N2

RH0559*

RH0560*

Disconnect RH0584*, thenconnect RH1698*.

RH1698*

RH2012*

RH0583*

CN27A

CN27B

CN28A

RH1187*

Disconnect RH0070*, thenconnect RH1189*.

RH1189*

RH1186*

RH1186*

RH1190*

Lane 2-F Lane 2-R

Lane 1-RLane 1-F

Circuit breaker bracket

Previous stage side Next stage side

To I/F CN28

NXTSET206Ea

2M Base - 2M Base - 4M Base - Vacuum Pump

Harness Connection Diagram (2/4)

BL

CN

3

Panel flow

Connected when

shipped

RH0067*

Panel loading

signal bracket

(Previous stage) Panel loading

signal bracket

(Next stage)

Connect when shipped

96 NXT Setup Manual

Page 105: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

CN-1

CN-2

CN

-M1

Right side module coverRH0528*

RH1170*

RH0715*

C

G

N

O

P

Q

R

A

L

M

RH1280*

RH0971*

RH0258*BRCN3

BRCN2

BRCN1I/F1 CN27

CN28A

RH0583*

RH1187*

RH1187*

RH1188*

Connected when shipped

(to next stage)

(Fixed)Disconnect I/O_F of RH0258*,

then connect I/O_F of RH0971*.

Interlock board 1I/O_F

Safety circuit

Disconnect RH0067*, thenconnect RH1189*.

Connected when

shipped

RH0070*

RH1189*

CN-M1 CN-M2

CN

-M2

BRC

N3

BRC

N3

BRC

N3

BRC

N2

RH1186*

RH1186*

RH1190*

Lane 2-F Lane 2-R

Lane 1-RLane 1-F

Circuit breaker bracket 2

Previous stage side Next stage side

NXTSET207Ea

2M Base - 2M Base - 4M Base - Vacuum Pump Harness Connection Diagram (3/4)

4M base

Panel loading

signal bracket

(Previous stage)

Panel loading

signal bracket

(Next stage)

Disconnect CN27 of RH0715*,

then connect CN27 of RH1170*.

Panel flow

NXT Setup Manual 97

Page 106: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

MS3CN1

MS3CN3

M141

M141A

4M base

Module 5 ~ 8

CN27A

RK

RH2143*

RH2141*

RH2142*

RH2012*

MS1CN1

MS1CN3

BCBCN18

Thermo fuse 2

Inverter bracket

Inverter bracket

Vacuum pump box

Inverter bracket

Inverter bracket

Thermo fuse

Control box

I/F board

CN6

NXTSET208Ea

2M Base - 2M Base - 4M Base - Vacuum Pump Harness Connection Diagram (4/4)

98 NXT Setup Manual

Page 107: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

Pneumatic Connections<For the Independent 4M Base (serial No. up to 294)>

T2 tubes (2) T1 tubes (2)

Independent 4M baseDependent

2M baseDependent

2M base

Reuse the plugs.

Remove the plugs (2), and then connect the T1 tubes.

NXTSET030Ea

Remove the plugs (2) from these two

locations, and then connect the T2 tubes.

To vacuum pump box

Attach the used plugs to locations A.

Remove the plug from B, and then

connect the tube to the vacuum

pump box.

A

B

A

NXT Setup Manual 99

Page 108: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

<For the Independent 4M Base (serial No. 295 and later)>

Connecting the BasesAfter attaching the signal cables and pneumatic connections, fasten neighboring bases using the special bracket. Refer to section 3.8.13 "Fastening Extensions" for details.

T2 tubes (2)

Dependent

2M base

Dependent

2M base

Reuse the plugs.

Remove the plugs (2), and then connect the T1 tubes.

NXTSET031Ea

Remove the plugs (2) from these two

locations, and then connect the T2 tubes.

To vacuum pump box

Attach the used plugs to locations A.

Remove the plug from B, and then

connect the tube to the vacuum

pump box.

A

B

A

T1 tubes (2)

Independent 4M base

100 NXT Setup Manual

Page 109: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

3.8.11 Using One 4M Base and an Independent 4M Base (1)Setting the Jumper and DIP SwitchesSet the jumper switches and the DIP switches on the interface board and the remote I/O board in the base as shown in the diagram below. Refer to the "NXT Mechanical Reference" for details of the location of each board.

CAUTION

Ensure the power to the machine is off before carrying out this procedure.

FH1211E0

FH1211E0

The dip switch settings

for only boards with E0

at the end are different.

Interface board in the base control box

DIP switch

ONON

ON OFF

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4-2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP2AD

DP1AD

DP5

DP1

DP3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP7

DP6

JP3

-3

JP3

-4

321

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 4

For boards E0

NXTSET151Ea

5 6 7 8

Independent

4M

Dependent

4M

NXT Setup Manual 101

Page 110: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4 -2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP

2A

D

DP

1A

D

DP

5

DP

1D

P3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP

7

DP

6

JP

3-3

JP

3-4

32

1

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 7 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4

For boards E0JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4 -2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP

2A

D

DP

1A

D

DP

5

DP

1D

P3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP

7

DP

6

JP

3-3

JP

3-4

32

1

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 7 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4

For boards E0

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4 -2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP

2A

D

DP

1A

D

DP

5

DP

1D

P3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP

7

DP

6

JP

3-3

JP

3-4

32

1

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 7 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4

For boards E0

NXTSET152E

65 87 65 87

65 87

Independent

4M

Dependent

4M

Independent

4M

Dependent

4M

Independent

4M

Dependent

4M

102 NXT Setup Manual

Page 111: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

Base JP1 SW1 SW2 SW4 SW5 SW6

Open Open Short

Open Short Short

Open Open Short

Open Open Short

Remote I/O board in the base JP1

SW1

SW4

SW5

SW2

SW6

NXTSET040Ea

7 85 6

Independent4M

Dependent4M

7 85 6

Independent4M

Dependent4M

7 85 6

Independent4M

Dependent4M

7 85 6

Independent4M

Dependent4M

NXT Setup Manual 103

Page 112: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

Signal Cable Connection Diagram (Independent 4M Base - 4M Base)Connect each signal cable as shown in the following diagram.

Do not pass the harness for the vacuum pump box (RH2130*, RH2131*, RH2133*) through the interior of the base. The harness should be installed along the outside of the base.

Note: Base connection harness AJ110** are shown in bold.

Panel flow

4M base

CN27A

CN28A

Left side

module cover

RH0527*

BRCN1RH0558*

Disconnect RH0543*, then

connect RH0559*.BRCN2

BRC

N2

RH0559*

BRCN3

(Fixed)

BRCN3

(Cable)

BRC

N3

RH0560*Connected when the base is used in the last stage.

BRC

N3

RH0987*

Joint harness

Panel loadingsignal bracket(Previous stage)

Panel loadingsignal bracket(Next stage)

CN-M1 CN-M2

Connected when

shipped RH0067* CN

-M2

CN

-M1

RH1230*

Lane 2-F Lane 2-R

RH1186*

Lane 1-F Lane 1-R

RH1186*

Circuit breaker bracket 2

CN-1RH0562*

NXTSET209Ea

CN-2

Previous stage side Next stage side

Thermo fuse

Inverter bracket

MS1CN3

Inverter bracket

MS1CN1

I/F board

CN6

Control box

BCBCN18

RH2133*

RH2130*

RH2131*

RH2012*

4M Base - 4M Base Harness Connection Diagram (1/2)

A

B

C

D

E

F

G

H

I

J

K

L

104 NXT Setup Manual

Page 113: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

4M base

CN27B

CN28A

Right side

module cover

RH0528*

To I/F CN27

I/O RConnected when

shipped

RH0259*

To HUB CH6

BLCN2

BLC

N2

To module 4 harness connectorBLCN3

BLC

N3

BLCN4

To I/F2 CN9

Connected when

shipped RH0067*

CN-M1Panel loadingsignal bracket(Next stage)

CN

-M1

CN-M2

Connected when shipped

RH0070*

CN

-M2

Lane 2-F Lane 2-R

Lane 1-F Lane 1-R

Circuit breaker bracket 1

CN-1

RH0562*

RH1186*

RH1186*

RH1230*

RH0987*

RH0560*

RH0559*

RH0558*

CN-2

Thermo fuse 2

Inverter bracket

MS3CN3Inverter bracket

MS3CN1

RH2133*

RH2130*

RH2131*

RH2012*

Panel flow

4M Base - 4M Base Harness Connection Diagram (2/2)

NXTSET210Ea

A

B

C

D

E

F

G

H

I

J

K

L

Panel loadingsignal bracket(Previous stage)

NXT Setup Manual 105

Page 114: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

Pneumatic Connections<For the Independent 4M Base (serial No. up to 294)>

<For the Independent 4M Base (serial No. 295 and later)>

Connecting the BasesAfter attaching the signal cables and pneumatic connections, fasten neighboring bases using the special bracket. Refer to section 3.8.13 "Fastening Extensions" for details.

Reuse the plugs.T1 tubes (2)

Remove the plugs (2), and then connect the T1 tubes.

Independent 4M base Dependent 4M base

NXTSET032EaFront view

Reuse the plugs.T1 tubes (2)

Remove the plugs (2), and then connect the T1 tubes.

Independent 4M base Dependent 4M base

NXTSET033EaFront view

106 NXT Setup Manual

Page 115: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

3.8.12 Using One 4M Base and an Independent 4M Base (2)Setting the Jumper and DIP SwitchesSet the jumper switches and the DIP switches on the interface board and the remote I/O board in the base as shown in the diagram below. Refer to the "NXT Mechanical Reference" for details of the location of each board.

CAUTION

Ensure the power to the machine is off before carrying out this procedure.

FH1211E0

FH1211E0

The dip switch settings

for only boards with E0

at the end are different.

Interface board in the base control box

DIP switch

ONON

ON OFF

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4 -2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP2AD

DP1AD

DP5

DP1

DP3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP7

DP6

JP3

-3

JP3

-4

321

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 4

For boards E0

NXTSET169Ea

Dependent

4M

Independent

4M

1 2 3 4

NXT Setup Manual 107

Page 116: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4 -2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP

2A

D

DP

1A

D

DP

5

DP

1D

P3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP

7

DP

6

JP

3-3

JP

3-4

32

1

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 7 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4

For boards E0JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4 -2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP

2A

D

DP

1A

D

DP

5

DP

1D

P3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP

7

DP

6

JP

3-3

JP

3-4

32

1

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 7 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4

For boards E0

JP2-2JP2-1

JP2-4JP2-3

1 2 3 1 2 3

1 2 3 1 2 3

1 2 3 1 2 3

JP4 -1

JP5

JP4 -2

JP6

JP1-4 JP1-31 2 3 1 2 3

DP

2A

D

DP

1A

D

DP

5

DP

1D

P3

JP3-1

JP3-2

JP3-5

JP3-6

1 23 4

1 23 4

DP

7

DP

6

JP

3-3

JP

3-4

32

1

ONON

ON

ON ON

ON

1 2 3 4 5 61 2 3 4 5 6 7 8

1 2 3 4 5 6 7 81 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4

For boards E0

NXTSET170E

21 43 21 43

21 43

Independent

4M

Dependent

4M

Independent

4M

Dependent

4M

Independent

4M

Dependent

4M

108 NXT Setup Manual

Page 117: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

Base JP1 SW1 SW2 SW4 SW5 SW6

Open Open Short

Open Short Short

Open Open Short

Open Open Short

Remote I/O board in the base JP1

SW1

SW4

SW5

SW2

SW6

NXTSET040Ea

3 41 2

Independent4M

Dependent4M

3 41 2

Independent4M

Dependent4M

3 41 2

Independent4M

Dependent4M

3 41 2

Independent4M

Dependent4M

NXT Setup Manual 109

Page 118: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

Signal Cable Connection Diagram (4M Base - Independent 4M Base)Connect each signal cable as shown in the following diagram.

Do not pass the harness for the vacuum pump box (RH2130*, RH2131*, RH2133*) through the interior of the base. The harness should be installed along the outside of the base.

Note: Base connection harness AJ456** are shown in bold.

Dependent

4M base

CN27B CN27B

CN27ARH1170*

Left side

module cover

RH0527*

CN28A

To I/F CN27

To HUB CH6

I/O RRH1187*

BLCN2

BLC

N2

RH1188*

Previous stage side BLCN3To module 4

Joint harness RH1325*

BLC

N3

BLC

N3

BLC

N3

BLCN4

To I/F 2 CN9

Panel loadingsignal bracket(Previous stage)

Connected when

shipped

RH0067*

CN-M1

Panel loadingsignal bracket(Next stage)

CN

-M2

CN

-M1

CN-M2

CN

-M2

CN

-M2

RH1189*

CN-M2 CN-M2Lane 2-F Lane 2-R RH1186*

Lane 1-F Lane 1-R RH1186*

Circuit breaker bracket 1

CN-1

CN-2RH1190*

M141A

Thermo fuse 2M141

Inverter bracket

MS3CN3

Inverter bracket

MS3CN1

RH2131*

RH2130*

RH2133*

To I/F CN28

RH2012*

Panel flow

4M Base - 4M Base Harness Connection Diagram (1/2)

NXTSET211Ea

A

B

C

D

E

F

G

H

I

J

K

L

M

110 NXT Setup Manual

Page 119: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

RH1170*

CN27A

CN28A

RH

07

15

*

Right side

module cover

RH0528*

BRCN1RH1187*

BRCN2

BR

CN

2

RH1188*

RH0258* Next stage signalBRCN3

(Fixed)

Connected when

shipped

RH0583*

Interlock board 1B

RC

N3

BR

CN

3

BR

CN

3

RH0971*

RH1280*

Safety circuit

Panel loadingsignal bracket

(Previous stage)

Panel loadingsignal bracket(Next stage)

CN-M1 CN-M2Connected when

shipped

RH0070*

CN

-M1

BC

N-M

2RH1189*

Lane 2-F Lane 2-RRH1186*

Lane 1-F Lane 1-RRH1186*

Circuit breaker 2

CN-1

CN-2RH1190*

Previous stage side Next stage side

Thermo fuse

Inverter bracket

MS1CN3

Inverter bracket

MS1CN1

RH2131*

RH1230*

RH2133*

I/F board

CN6

Control box

BCBCN18

RH2012*

Panel flow

4M Base - 4M Base Harness Connection Diagram (2/2)NXTSET212Ea

Note 1

Note 1

Note 1: Disconnect CN27 of RH0715*, and then connect CN27 of RH1170*.

Note 2: Disconnect I/O_F of RH0528*, and then connect I/O_F of RH0971*.

NXT Setup Manual 111

Page 120: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

Pneumatic Connections<For the Independent 4M Base (serial No. up to 294)>

<For the Independent 4M Base (serial No. 295 and later)>

Connecting the BasesAfter attaching the signal cables and pneumatic connections, fasten neighboring bases using the special bracket. Refer to section 3.8.13 "Fastening Extensions" for details.

Reuse the plugs. T1 tubes (2)

Remove the plugs (2), and then

connect the T1 tubes.

Remove the plugs (2), and then

connect the T1 tubes.

Independent 4M baseDependent 4M base

NXTSET034Ea

Front view

Reuse the plugs. T1 tubes (2)

Remove the plugs (2), and then

connect the T1 tubes.Remove the plugs (2), and then

connect the T1 tubes.

Independent 4M baseDependent 4M base

NXTSET035Ea

Front view

112 NXT Setup Manual

Page 121: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

3.8.13 Fastening ExtensionsAll individual bases are connected together for base extensions.

Connection of Bases at the Front

DWG. No. Description Qty.

PM39012 Bracket 2

PM39021 Bracket 1

PM39031 Bracket 1

PM39040 Bolt 1

NXTSET018

NXT Setup Manual 113

Page 122: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

Connection of Bases at the Rear

DWG. No. Description Qty.

PM21380 Bracket 1

PM21390 Bracket 1

NXTSET036

114 NXT Setup Manual

Page 123: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

3.9 Connecting an NXT Base to Other Machine Types

Follow the procedures below to connect an NXT to other machine types that are to be the next and previous stages.

Note: In the following explanations, the example NXT panel flow is left to right.

When connecting other machine types to a NXT base.

Othermachine

type

Othermachine

type

NXTbase

NXTBAS128E

NXTBAS129Eb

Lane 1

Lane 2

Lane 1

Lane 2

3. Connector LANE14. Connector LANE2

1. Previous stage panel loading I/F box2. Next stage panel loading I/F box

Other machine type

Connecting cable for the 1 and 2 lane

Other machine type

A type B type

3 3

1

4

2

4

<Previous Stage> < Next Stage>

NXT base

NXT Setup Manual 115

Page 124: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

3.9.1 Procedure

1. Either open the front cover, or remove the side cover of the base.

2. Connect the communication cables (A or B type) to the following connectors.

• Connectors LANE1 and LANE2 of the previous stage panel loading I/F box.

• Connectors LANE1 and LANE2 of the next stage panel loading I/F box.

Note: Select proper communication cables and harnesses for the previous/next stage machines.

3. Keep the connectors (RH0067* and RH0070*) attached to CN-M1 in the previous stage panel loading I/F box and CN-M2 in the next stage panel loading I/F box.

4. Gently pull out the connected cables (1 or 2 cables each for both the previous and the next stage) from the hole at the side of the base, and then connect it (or them) to "send next stage input signal" terminal of the previous machine, or "send previous stage output signal" terminal of the next machine.

CAUTION

Be sure to turn off the power to the machine before connecting or removing any cables.

Ensure that the connector position is correct by checking the connector label when connecting connectors.

Be sure to firmly secure the connectors together.

NXTBAS101Ea

Front cover

Hole

Hole

Next stage panel loading I/F box

Previous stage panel loading I/F box

Side coverBase

CN-M1 CN-M2

CN-CV1F CN-CV1F

LANE1

LANE2

LANE1

LANE2

NXTSET217E

Previous stage panel loading I/F box Next stage panel loading I/F box

Connector (RH0067*) Connector (RH0070*)

116 NXT Setup Manual

Page 125: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

3.9.2 Signal Cable Connecting Diagram (Other machine type - NXT - Other machine type)

EE

HH

143*

(3 m

)

EE

HH

118*

(Con

vers

ion

har

ness

)

EE

HH

117*

(Con

vers

ion

har

ness

)

RH

0814

*(3

m)

RH

0814

*(3

m)

RH

0816

*(3

m)

RH

0816

*(3

m)

RH

0816

*(3

m)

RH

0814

*(3

m)

EE

HH

174*

(1.5

m)

EE

HH

175*

(5 m

)E

EH

H14

3*(3

m)

EE

HH

174*

(1.5

m)

EE

HH

175*

(5 m

)

EE

HH

143*

(3 m

)E

EH

H17

4*(1

.5 m

)

EE

HH

175*

(5 m

)E

EH

H14

3*(3

m)

EE

HH

174*

(1.5

m)

EE

HH

175*

(5 m

)

LAN

E1-

F

LAN

E2-

F

CN

-M1

CN

-M2

LAN

E2-

R

LAN

E1-

R

RH

0070

*, c

onne

cted

befo

re s

hipp

ing

RH

0067

*, c

onne

cted

befo

re s

hipp

ing

Oth

er m

achi

ne ty

peN

XT

base

Oth

er m

achi

ne ty

pe

Whe

n us

ing

LAN

E 2

Whe

n us

ing

LAN

E 2

(Pre

viou

s st

age

side

)(P

revi

ous

stag

e si

de)

NX

TBS

105E

(Nex

t sta

ge s

ide)

(Nex

t sta

ge s

ide)

NXT Setup Manual 117

Page 126: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

3.10 Tray Unit-LPerform the following procedures to adjust the height and levelness for a new tray unit-L, or a tray unit-L which is being used at a particular machine for the first time. Once tray unit-L height and levelness adjustments have been made for that machine, it is not necessary to perform adjustments again when removing or attaching the tray unit-L.

3.10.1 Adjusting the Height and the LevelnessTwo level gauges are needed to perform the procedures listed below. First, perform a preliminary adjustment of the height and levelness of the tray unit-L when it is removed from the machine. Then, attach the tray unit-L to the machine and perform final adjustments.

1. Release the left and right lock levers located near the bottom of the tray unit-L.

2. Turn the handle to adjust the height of the tray unit-L until the roller to match with the groove of the part supply base. Do not insert the tray unit-L into the NXT yet.

Lock levers NXTMTU013E

Tray unit rollers

Handle

Part supply base grooveNXTMTU014Ea

Tray unit roller

118 NXT Setup Manual

Page 127: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 3. Machine Set Up

3. Place 2 levels on the lower plate of the tower inside the tray unit-L.

4. Loosen the lock knob on the bottom of the tray unit-L by turning it to the left. While looking at a level gauge, turn the adjustment knob until the tray unit-L is level in the X-direction.

5. With the power to the machine on, carefully insert the unit into the machine. Once fully inserted, the tray unit-L is automatically clamped.

Door side

Levels

Y

X NXTMTU015E

Adjusting knob

Lock knob

X X'

NXTMTU016E

NXT Setup Manual 119

Page 128: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

3. Machine Set Up QD002-07

6. While looking at a level gauge, turn the adjustment knob and ensure the the machine is level in the X-direction.

7. Tighten the lock knob by turning it to the left.

8. While looking at a level gauge, turn the handle to adjust the tray unit-L until it is level in the Y-direction.

Caution: As the tray unit-L is clamped in the machine, the connector pins can be damaged when the height of the tray unit-L is changed. Care should be taken when adjusting the height.

9. Tighten the left and right lock levers.

10.Lock the left and right caster brakes.

Adjusting knob

Lock knob

X X'

NXTMTU016E

Handle

Y Y'

NXTMTU017Ea

Caster brakes

120 NXT Setup Manual

Page 129: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 4. Setting Up NXT Machines in Flexa

4. Setting Up NXT Machines in Flexa4.1 Introduction

The factory must be set up correctly to enable communication between the NXT machines and Fuji Flexa. In addition, this data is also used by the Accessory Software server to communicate with the NXT machines. Information entered during line set up is also brought into a job to create the job line configuration. This means that once the NXT machines are properly setup, it is simply a matter of bringing an entire line into a job to add the NXT machines. This ensures the machines will match that of the factory/line. Line Editor is used to set up the NXT machines and is accessed from within Director.

The biggest difference between setting up a line with NXT machines versus other Fuji machines, is the way the line is comprised. For other Fuji machines, each machine represents a separate machine in the line. For the NXT, multiple bases that are next to each other are set up as one NXT “machine” even though the bases are separate. This means that it is quite possible that there will be only one “machine” in a line with just NXT machines. Flexa handles these grouped bases/modules as one machine for line balancing, optimizing, and transmission.

4.2 General Procedures4.2.1 Creating a factory

Use the procedures below to create a new factory. This is not necessary if the new line is to be set in an existing factory.

1. Click [Factory Lines] from the [View] menu.

2. The group list pane displays the groupings and items in a hierarchical format. The group contents pane displays the contents of the selected item. When setting up the factory for the first time, the group list pane will only have the [System] group. Right-click in the group contents pane and select [New] – [Factory…].

3. The [New Factory] dialog box displays. Enter the new name for the factory in the text box and click [OK].

4. The new factory displays in both panes. Click the new factory and the lines display in the group contents pane.

4.2.2 Creating a line1. With a factory in the group pane selected, right-click in the group contents pane and

select [New] – [Line…] to display the [New Line – Fuji Flexa] dialog box.

2. Enter a line name in the [Line name] text box.

3. Select the option for the line status. A virtual line is a line that does not actually exist. An example of when a virtual line is used is when programmers are programming future jobs and the lines are different to the current ones due to factory restructuring. The virtual line can be used to create the line in the job and after the factory has been changed, the recipes can be transmitted to the machines.

4. Click [OK] and the new line displays in both panes.

NXT Setup Manual 121

Page 130: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

4. Setting Up NXT Machines in Flexa QD002-07

4.2.3 Creating a machineWhen adding the NXT machine to a line, remember that bases that are next to each other should be grouped together to form a single NXT “machine”. Up to 32 modules can be grouped together in this way.

1. With a line in the group pane selected, right-click in the group contents pane and select [New] – [Machine…] to display the [New Machine] dialog box.

2. The factory name and line name display in the top of the dialog box. Ensure that the names are correct. If the names are incorrect, select the correct name from the drop-down list.

3. If the [Display model names in line information] setting has been selected in Server Setup, enter the model name for the machine in the [Model name] group. This is used to decide if a recipe can be transmitted to a certain machine or not. If the model name does not match the name of the machine in the job, then transmission is not possible. If the [Display model names in line information] option has not been selected, then [Model name] does not display.

Note: The same model name in a line should never be repeated within the same line even for a machine in the line configured the same. Same model names can only be used across lines.

4. Select “NXT” for the machine type from the drop-down list.

Note: If the NXT machine type does not exist, then it is possible that the license has not been upgraded, and the modules and settings have not been upgraded with the new license. Upgrade the license and then upgrade the modules and settings for the Director computers using the license upgrade.

5. Select the line machine order. If this is the first machine, then only one option is available.

6. Enter the machine nickname. This displays in Transmission Control and in the group list. If the [Display model names in line information] option has not been selected, then this must match the name of the machine in the job to enable transmission.

Note: Machine nicknames cannot be repeated and must be unique for each machine.

7. Click [OK] to close the dialog box when data entry for the machine is complete. The [Edit Machine] dialog box displays.

8. Click [Edit Base] and the [Edit Base] dialog box displays.

9. By default one row for a base displays. Double-click the data field for the first row in the [Base Name] column and the [Enter Computer Name] dialog box displays.

10.Enter the IP address or network name for the first base and click [OK]. It is also possible to browse the network for the base by clicking [Browse].

11.Double-click the data field for the first row in the [Machine Communication Server} column and the [Enter Computer Name] dialog box displays.

12.Enter the IP address or network name for the computer with the communication server to be used for communicating with the machine and click [OK]. It is also possible to browse the network for the computer by clicking [Browse].

122 NXT Setup Manual

Page 131: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 4. Setting Up NXT Machines in Flexa

13.Double-click the data field for the first row in the [Base Type} column and select the base type from the drop-down list. When the base type is selected the diagram in the [Base Image] group is updated.

Note: If this NXT base is already connected to the network, set up, and turned on, then the base type can be automatically determined by clicking [Load Base Type]. The line the machine is being set up on must be a real line for this command to be available.

14.Click [Add] and a new row displays.

15.Double-click the data field for the new row in the [Base Name] column and the [Enter Computer Name] dialog box displays.

16.Enter the IP address or network name for the next base and click [OK]. It is also possible to browse the network for the base by clicking [Browse].

17.Double-click the data field for the new row in the [Machine Communication Server} column and the [Enter Computer Name] dialog box displays.

18.Enter the IP address or network name for the computer with the communication server to be used for communicating with the machine and click [OK]. It is also possible to browse the network for the computer by clicking [Browse].

19.Double-click the data field for this row in the [Base Type] column and select the base type from the drop-down list. When the base type is selected the diagram in the [Base Image] group is updated.

20.Repeat steps 14 to 19 until all of the bases that are to be grouped together have been added.

Note: Use [Up] and [Down] to change the base order if necessary.

21.Click [OK] and the [Edit Machine] dialog box is updated to display the added bases.

22.Enter the necessary settings for the three top options in this dialog box. The chart below explains the meanings of the different settings.

Field Label Meaning

Get Production Data

If set to “Yes”, production data for Line Monitor and Line Reporter is obtained for this machine. If set to “No”, then production data for this machine is not obtained.

Board Flow Specifies the direction that the panels are conveyed through the NXT.

Conveyor Type Specifies the type of conveyor that is present in the NXT. “Dual” means that a double conveyor system is installed in all of the modules. “Single” means that a single conveyor system is installed in all of the modules.

NXT Setup Manual 123

Page 132: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

4. Setting Up NXT Machines in Flexa QD002-07

23.It is possible to check and change the settings for the different bases by clicking the plus in front of the base name. The settings for that base then display. The chart below explains the meanings of the different settings.

24.After specifying the communication settings for the machine, click [Save] and then [Close] to close the [Edit Machine] dialog box.

25.If the line was a “real line” then a dialog box displays with a message regarding updating the transmission server. Click [Yes] to update the transmission server with the new information.

Field Label Meaning

Base Name Specifies the IP address or the network name of the base. This is necessary to enable communication with the base.

Base Type Specifies the number of open positions that are on the base. This specifes the type of base.

Machine Communication Server

This is the name of the computer that is running the Machine Communication Service. This computer also runs the Line Monitor Server and Transmission server.

124 NXT Setup Manual

Page 133: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 5. Accessory Software Installation

5. Accessory Software Installation5.1 Introduction

This software is required to perform the special non-production commands on the NXT and must be installed on a computer. The Accessory Software system uses a server/client system with one Accessory Software server being installed on a computer and Realtime Workingrate Buffer services being installed on the Fuji Flexa communication servers used for the NXTs. Accessory Software clients then connect to the Accessory Software server and this server is connected to the Realtime Workingrate Buffer Services which collect the data from Fuji Flexa. The Accessory Software server is responsible for the communication between all the clients. The client computers connect to the Accessory Software server through Internet Explorer 5.5 (service pack 2 or higher) or higher. Due to this, software management of this software is much easier because no special software is installed on the client computers. Only the server computers need to be changed when upgrading.

The server computers get the information about the available NXT machines from the line settings made in Fuji Flexa. Once the NXT machines have been registered in Fuji Flexa, Accessory Software is able to connect to them. Fuji Flexa must be installed on the Accessory Software server computer in order to allow the server to connect to Flexa. A full Fuji Flexa installation is not required. It is sufficient if a "Fuji Flexa External Components" installation is performed on the computer.

Note: If this software has been already installed for use with NXT within the same Fuji Flexa User Server, then the steps in this chapter do not need to be performed.

5.1.1 Installation outlineThe steps below outline the major items that should be performed when installing Accessory Software. Refer to the section referenced below for details on that item.

• Install Fuji Flexa system and have set up the line configuration. To perform this, follow the procedures in chapter 4. "Setting Up NXT Machines in Flexa".

• Install Fuji Flexa on the computer for the Accessory Software server if it is not already installed. Follow the procedures in section 5.3 "Installing Fuji Flexa".

• Install the NXT Accessory Software Server software. Follow the procedures in section 5.4 "Installing the NXT Accessory Software Server" to install the Accessory Software server.

• Install the Realtime Workingrate Buffer Services on all of the Fuji Flexa communication servers being used to communicate with the NXT machines. Follow the procedures in section 5.5 "Installing the Realtime Workingrate Buffer Service" for how to install the Realtime Workingrate buffer service.

NXT Setup Manual 125

Page 134: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

5. Accessory Software Installation QD002-07

5.2 Required ItemsThe items listed below are required for installation.

• Fuji Flexa Installation CD-ROM (only if Fuji Flexa is not installed on the computer)

• Fuji Flexa Setup disk (License) (only if Fuji Flexa is not installed on the computer)

• NXT Application CD-ROM

• Windows 2000 Setup CD-ROM

5.2.1 Required hardwareAccessory Software ServerThe computer that the Accessory Software is to be installed on is going to be the Accessory Software server and must have the required items listed below.

Realtime Workingrate Buffer ServiceThe computer that the Accessory Software is to be installed on is going to be the Accessory Software server and must have the required items listed below.

Item Requirement

Operating system Windows 2000 Server or Windows 2000 Professional (SP2 or later)

Processor Pentium 3, 1 GHz computer or faster

Memory 256 MB or more

Hard disk For set up, 1 GB or more of free disk space recommended

Display VGA Monitor with resolution 800 by 600 and 65,536 colors (16 bit) or higher

Network Correctly configured TCP/IP network

Browser Microsoft Internet Explorer 6.0 (SP1 or later)

Other MouseKeyboardFloppy disk driveCD-ROM drive

Item Requirement

Operating system Windows 2000 Server or Windows 2000 Professional (SP2 or later)

Processor Pentium 3 1 GHz computer or faster

Memory 256 MB or more

126 NXT Setup Manual

Page 135: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 5. Accessory Software Installation

Hard disk For set up, 1 GB or more of free disk space recommended

Display VGA Monitor with resolution 800 by 600 and 65,536 colors (16 bit) or higher

Network Correctly configured TCP/IP network

Software Fuji Flexa Communication Server installed and running

Browser Microsoft Internet Explorer 6.0 (SP1 or later)

Other MouseKeyboardFloppy disk driveCD-ROM drive

Item Requirement

NXT Setup Manual 127

Page 136: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

5. Accessory Software Installation QD002-07

5.3 Installing Fuji FlexaThis must be installed before installing Accessory Software. If Fuji Flexa is already installed on the computer then proceed to the next section. It is not necessary to install a “complete” Fuji Flexa installation, a “Fuji Flexa External Component” installation is sufficient. For detailed information on installing Fuji Flexa, refer to the “Fuji Flexa Setup Manual”.

If NXT accessory software installation is attempted on a computer without Fuji Flexa installed, the message shown below displays.

1. Insert the Fuji Flexa Installation CD-ROM into the CD-ROM drive.

128 NXT Setup Manual

Page 137: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 5. Accessory Software Installation

2. Click [Next] to display the next step of the installation process.

3. Read the Fuji Flexa License Agreement carefully and click [Yes] to accept the terms of the agreement to display the next step.

NXT Setup Manual 129

Page 138: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

5. Accessory Software Installation QD002-07

4. Select [No] and then click [Next] to display the next step.

5. Insert the Fuji Flexa Setup Disk in the floppy disk drive and click [Next] to display the next step.

130 NXT Setup Manual

Page 139: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 5. Accessory Software Installation

6. Select [Fuji Flexa External Component Installation] and click [Next].

7. Select the installation destination folder and click [Next] to display the next step.

NXT Setup Manual 131

Page 140: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

5. Accessory Software Installation QD002-07

8. Specify the name of the computer being used as the User Server and click [Next] to display the next step.

9. Confirm the server setting is correct and click [OK] and then click [Next] to continue.

132 NXT Setup Manual

Page 141: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 5. Accessory Software Installation

10.Select the folder for the Fuji Flexa startup menu shortcuts and click [Next].

11.None of the machine communication components need to be installed. Ensure that the check boxes in this step are cleared and then click [Next] to display the next step of the installation process.

NXT Setup Manual 133

Page 142: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

5. Accessory Software Installation QD002-07

12.The installer now has the information necessary to install Fuji Flexa. Check the settings and click [Next] to start the installation process.

13.The files necessary for the specified installation type are installed.

134 NXT Setup Manual

Page 143: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 5. Accessory Software Installation

14.The installation of the necessary services is performed.

15.Click [Finish] to restart the computer and complete the installation procedure.

NXT Setup Manual 135

Page 144: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

5. Accessory Software Installation QD002-07

5.4 Installing the NXT Accessory Software ServerThis process can be performed once Fuji Flexa is installed on the computer.

1. Insert the NXT Accessory Software CD-ROM into the CD-ROM drive.

2. Click [Next] to start the installation process.

136 NXT Setup Manual

Page 145: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 5. Accessory Software Installation

3. Select the installation destination folder and click [Next].

4. Enter a virtual directory name and click [Next].

NXT Setup Manual 137

Page 146: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

5. Accessory Software Installation QD002-07

5. Select the check boxes for the .NET Framework option if .NET Framework is not installed on the computer. If the Fuji Flexa version is not current, select the Flexa Patch File check box. Click [Next] to proceed to the next step after all of the necessary options have been selected.

6. A progress bar displays and some services are stopped.

138 NXT Setup Manual

Page 147: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 5. Accessory Software Installation

7. The NXT accessory software is installed on the system with the specified options.

8. The installation for IIS automatically starts.

NXT Setup Manual 139

Page 148: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

5. Accessory Software Installation QD002-07

9. Click [Next] to go to the next step of the component wizard.

10.The component wizard starts configuring and installing components.

140 NXT Setup Manual

Page 149: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 5. Accessory Software Installation

11.Insert the Windows 2000 Professional CD-ROM into the CD-ROM drive when requested. Specify the file destination and click [OK] to continue.

12.IIS files are copied and installed.

NXT Setup Manual 141

Page 150: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

5. Accessory Software Installation QD002-07

13.Once IIS has been installed, the dialog box below displays. Click [Finish].

14.A progress bar displays and some services are started.

142 NXT Setup Manual

Page 151: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 5. Accessory Software Installation

15.Click [Next] to proceed with the .NET Framework installation.

16.The .NET Framework files are installed.

NXT Setup Manual 143

Page 152: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

5. Accessory Software Installation QD002-07

17.Click [OK] to complete the installation.

18.The .NET Framework SP2 installation automatically starts and installs that software if that option was selected.

19.Click [Finish] to complete the installation process.

144 NXT Setup Manual

Page 153: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 5. Accessory Software Installation

5.5 Installing the Realtime Workingrate Buffer Service

The Realtime Workingrate Buffer Service (RWB service) must be installed on all Fuji Flexa communication server computers that are used for NXTs. This process can be performed once the Accessory Software Server has been installed and is running. The Accessory Software server is accessed through the web browser and the necessary software is downloaded and installed from this server.

1. Double-click the [Internet Explorer] icon on the desktop of the computer running the Fuji Flexa communication server for a NXT.

2. Enter the address (URL) "http://<NXT accessory software server name>/fujiweb" and then press Enter. If the server computer is located and the server is running, a loading page displays. Once the necessary items have been loaded, the [Home] page displays. This page provides basic information on the NXT machines.

3. Click [Service List] from the header in Floor Monitor.

4. Click [Download] at the bottom of the screen. The screen changes to the donwload screen.

5. Click [Download] to start the download process.

6. Click [Open] in the dialog box that displays. This option means that the software will be downloaded to the computer and the installation process will automatically start. If [Save] is selected, the installer will only be downloaded and saved on the computer, not automatically started after the save location is specified.

7. Click [Yes] in the message box that asks if the RWB service should be installed. If the service has already been installed, a second message displays, asking if the service should be updated with the downloaded service.

8. Select the installation destination folder and click [Next]. The software is installed.

9. Click [Finish] to complete the installation process. It is necessary to restart the computer to start the service.

NXT Setup Manual 145

Page 154: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

5. Accessory Software Installation QD002-07

MEMO:

146 NXT Setup Manual

Page 155: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 6. Setting Up Fujitrax Verifier

6. Setting Up Fujitrax Verifier6.1 Introduction

Fujitrax Verifier is used to perform two main functions. The first main function is feeder/part verification. The other major function is parts management. There are many other functions available through Fujitrax Verifier, however these will not be covered in this manual. For information on Fujitrax functions, refer to the Fujitrax Verifier Operation Manual.

Fujitrax Verifier must be properly set up and running before performing the steps in this chapter to connect to the NXT machines. Follow the steps below to set up an already installed and configured Fujitrax system to work with the NXT. Setting up and configuring a complete Fujitrax is not covered in this chapter. For details on setting up and configuring Fujitrax Verifier or more details on the items covered in this chapter, refer to the Fujitrax Verifier Operation Manual.

6.2 Required ItemsIn order to use Fujitrax Verifier with the NXT, there are several required items.

• Fujitrax Verifier Central Server must be installed and running on the computer with the Kit Server.

• The NXT must be added to the line configuration for the computer with the Kit Server.

• The NXT Fujitrax configuration setting must be turned on.

• The NXT user must be added to the Kit Handy Settings when using Kit Handy.

Follow the procedures below to perform these actions.

6.2.1 Setting up and running the Central ServerThe Central Server requires no special installation steps when installing the Kit Server. This software is automatically installed when a compatible Kit Server version is installed on a computer. However, the settings for the Central Server must be specified such as the master database service name. This software should always be running whenever the computer is on because it is a service.

1. On the computer with the Kit Server installed that is to be used for NXT machine, open the Fuji Central Server Settings program by using the shortcut in the start up menu. When selected the [Fuji Central Server Settings] dialog box is displayed.

2. Enter “FUJIADMIN” in the [User ID] text box and then enter the appropriate password for this user ID.

3. Enter service name for the verifier database.

4. Specify the maximum desired log size for the Central Server from the [Log Size] drop-down list.

5. Leave the default setting for [Miss Prevention Timer].

NXT Setup Manual 147

Page 156: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

6. Setting Up Fujitrax Verifier QD002-07

6. Specify the desired setting regarding quick verification.

7. Click [OK] and then reboot the computer to enable the new settings.

6.2.2 Adding the NXT to the Fujitrax line configurationFollow the steps below when adding the NXT to the Fujitrax Verifier line configuration.

1. Open the Kit Line Configuration program by using the shortcut in the start up menu.

2. Enter “FUJIADMIN” as the user ID and then enter the appropriate password and service name for the master database.

3. Click [OK] and the [Kit Line Configuration] window displays.

4. Select the Factory from the left pane and select [Add Line] from the [Edit] menu.

5. Specify the name of the NXT line in the [Line Name] data field and then specify the name of the computer running the central server for the NXT in the [KITServer Hostname] data field.

6. Click the new line in the left pane and the field updates to display the specified name.

7. Click [Add Machine] from the [Edit] menu. The right pane changes to display the data fields for the new machine.

8. In the [Machine Nickname] field, specify the name of the NXT machine. The name should match that used by Fuji Flexa for the machine.

9. Select [NXT] from the [Machine Type] drop-down list.

10.In the [Recipe Name, Top] and [Recipe Name, Bottom] fields enter the name of the base. It does not matter that these settings are the same, because the NXT does not use these settings. However, some value must be entered in these fields or an error will occur when trying to save the line configuration.

11.Specify the board flow direction and the parts out settings in the appropriate fields.

12.Enter the name of the computer running the Central Server for this base in the [Central Server Name] field. This should match the name used for the Kit Server for the line.

13.Enter the name of the computer running the Accessory Software server in the data field for [Maintenance Server Name].

14.Click the new machine in the left pane and the machine name updates to display the specified name.

Setting Meaning

Every time of removed feeder This specifies that a quick verify check of a feeder and the parts must be performed before the feeder is set in the machine. This is required even if an ID (relationship) between the feeder and parts already exists.

Normal This specifies that a quick verify is not required before a feeder is set in the machine, however an ID (relationship) between the feeder and parts set on the feeder must exist.

148 NXT Setup Manual

Page 157: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 6. Setting Up Fujitrax Verifier

15.Click [Add Base] from the [Edit] menu. The right pane changes to display the data fields for the new base.

16.In the [Base Name] field, specify the name of the first NXT base for the machine.

17.Specify the base type using the [Base Type] drop-down list.

18.Click the new base in the left pane and the base name updates to display the specified name.

19.Click [Add Module] from the [Edit] menu. The right pane changes to display the data fields for the new module.

20.Specify the module type by using the [Module Type] drop-down list.

21.Click the new module in the left pane and the module name updates to display the specified module type.

22.Repeat steps 19 to 21 until all of the modules for that base have been specified.

23.Click the base, and if the NXT machine is comprised of multiple bases, click [Add Base] from the [Edit] menu. The right pane changes to display the data fields for the new base.

24.Repeat steps 14 to 23 until all bases for the NXT machine have been specified.

25.If there are any other NXT machines on the same line then select the new NXT machine and repeat steps 7 to 24 until all NXT machines in the line have been specified.

26.If there are any other lines for this Kit Server with NXT machines, add the machines at this time.

27.Select [Save] from the [File] menu and then [OK], and the file is saved to the database and computers.

28.Select [Exit] from the [File] menu to quit Kit Line Configuration Editor.

NXT Setup Manual 149

Page 158: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

6. Setting Up Fujitrax Verifier QD002-07

6.2.3 Setting the NXT Fujitrax configuration settingsFollow the steps below to change the setting on the NXT machine to work with the Fujitrax Verifier system..

1. Double-click the [Internet Explorer] icon on the desktop.

2. Enter the address (URL) "http://<NXT accessory software server name>/fujiweb" and then press Enter. If the server computer is located and the server is running, a loading page displays. Once the necessary items have been loaded, the [Home] page displays. This page provides basic production information for the NXTs.

3. From Floor Monitor, click the machine or module number for the NXT for which Machine Accessories is to be used. The Machine Accessories log on page is displayed

4. Enter or select a user ID from the drop-down list.

5. Enter the password for the user and click [Log on]. Once connected to the machine, the top diagram of the picture will match the machine that was selected. In the lower left side, the menu for possible actions displays. In the lower right side, the details for the selected item displays.

6. Click [Machine Configuration] from [Menu]. Accessory Software connects to the machine and receives the machine information. When completed, the settings page displays.

7. Select [Fujitrax Settings] from the [Category] drop-down list. When a category has been selected the settings shown under the list automatically change to the selected category.

8. Select the [ON] option for the [Verify ON/OFF] settings.

9. Leave the other settings with their default settings unless special settings are required. For details on the settings, refer to the NXT Accessory Software Operation Manual.

10.Once the settings have been completed, click [Send to Machine] to send the new setting to the machine. During transmission to the machine, the operation panel will change to the transmission display. When sending the new setting is complete, a page displays with that message. If any other changes need to be made, use the drop-down list to select the category for the setting.

11.Once all changed settings have been sent to the machine, click [Close].

150 NXT Setup Manual

Page 159: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

QD002-07 6. Setting Up Fujitrax Verifier

6.2.4 Registering users for Kit Handy accessFollow the steps below to allow the registered users to access the NXT information through Kit Handy.

1. Open Kit Manger by using the shortcut in the start up menu.

2. Enter “FUJIADMIN” as the user ID and then enter the appropriate password and service name for the master database. It is necessary to log on with this ID to change the Kit Handy settings.

3. Click [OK] and Kit Manager starts.

4. Double-click the factory from the left pane and the lines for that factory display.

5. Double-click the line to display the machines for that line.

6. Select the NXT machine and then right-click it. A shortcut menu displays.

7. Select [Handy User Settings] from the shortcut menu. The [Handy User Settings] dialog box for the selected machine displays.

8. Enter the user ID to be registered in the [User ID] text box.

9. Click [Add] and the entered user ID displays in the list.

10.Continue repeating steps 8 to 9 until all of the user IDs for that NXT have been registered.

11.Click [Close] to complete the user ID registration process. The registered user IDs are now capable of accessing the information screens for that NXT.

12.Log off Kit Manager by selecting [Exit] from the [File] menu.

NXT Setup Manual 151

Page 160: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

6. Setting Up Fujitrax Verifier QD002-07

MEMO:

152 NXT Setup Manual

Page 161: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

NXT Setup Manual

FUJI Internet

Fuji Internet aims at providing up-to-date information to our customers in the most efficient manner. This site makes a range of services available, from manual updates and virtual training, to online technical reports. Fuji hopes that this site will be used as a source of information in addition to the services provided by your agent. Fuji Internet is located at http://www.fuji.co.jp/Fuji Internet membership is required to access the Technical Information section of the site. Please contact your agent for membership details. At any comments or opinions regarding this document can be sent to [email protected]

Management No. Date Notes

QD002-00QD002-01QD002-02QD002-03QD002-04QD002-05QD002-06QD002-07QD002-07a

June 15, 2004September 10, 2004April 26, 2005January 10, 2006February 22, 2006March 10, 2006March 20, 2006April 13, 2006May 23, 2006

SET-NXT-1.0E

FUJI Machine Manufacturing Co., Ltd.19 Chausuyama, Yamamachi, Chiryu, Aichi Prefecture, 472-8686 Japan

Copyright© 2006 by Fuji Machine Manufacturing Co., Ltd.Printed in Japan

Page 162: Fuji Scalable Placement Platform NXT - IslandSMTislandsmt.com/wp-content/uploads/2017/04/Fuji-NXT-Setup-07.pdfAll rights regarding this manual are reserved by Fuji Machine Manufacturing

Fuji Machine Manufacturing Co., Ltd. serves its customers from the following locations:

Fuji Machine Manufacturing Co., Ltd.

19 Chausuyama Yamamachi, Chiryu, Aichi, 472-8686 Japan

Tel: 81-566-81-2111 Fax: 81-566-83-1140

Fuji America Corporation

171 Corporate Woods Parkway, Vernon Hills, IL. 60061 USA

Tel: 847-913-0162 Fax: 847-913-0186

Fuji Machine Mfg (Europe) GmbH

Peter-Sander-Str. 43, D-55252 Mainz-Kastel Germany

Tel: 06134-202120 Fax: 06134-202200

Fuji do Brasil Maquinas Industriais Ltda.

Rua Joao Cachoeira, 128 Itaim Bibi, Sao Paulo, SP 04535-000 Brazil

Tel: 55-11-3167-1650 Fax: 55-11-3079-1833

Fuji Machine Philippines, Inc.

Warehouse 888 Don Mariano Lim Industrial Complex (La Fuerza Compound) Alabang, Zapote Rd., Almanza Uno Las Pinas City, Philippines

Tel: 02-809-4565 Fax: 02-807-2767

Fuji Machine Mfg (Singapore) Pte Ltd.

Blk 2/51, Ubi Avenue 1, #01-24, Paya Ubi Industrial Park, Singapore 408933

Tel: 67464966 Fax: 68412326

Fuji Malaysia Office

C/O Mecomb Malaysia Sdn Bhd 2487, Jalan Sultan Azlan Shah, 11700 Penang, Malaysia

Tel: 04-656-4002 Fax: 04-656-2941

Fuji Taiwan Office

C/O Ascentex Industry Corp. 3 Fl, No. 396, Sec. 1, Nei Hu Rd., Taipei, Taiwan R.O.C.

Tel: 02-8797-8716 Fax: 02-8797-8717

Fuji Machine Mfg. Co., Ltd. China Representative Office

Room A, 26F, Zhaofeng World Trade Building, No. 369, Jiangsu Road, Shanghai, China

Tel: 021-5240-0730 Fax: 021-5240-0728