Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
FOREST SERVICE HANDBOOK PACIFIC SOUTHWEST REGION (R5) VALLEJO, CALIFORNIA FSH 2409.18 TIMBER SALE PREPARATION HANDBOOK CHAPTER 30 - PROJECT ANALYSIS AND DESIGN - GATE 2
Supplement No.: 2409.18-2019-1
Effective Date: 4/25/2019
Duration: This supplement expires 5 years from the effective date unless superseded orremoved earlier.
Approved: Randy Moore, Regional Forester
Date Approved: 4/11/2019
Posting Instructions: Handbook supplements are numbered consecutively by Handbooknumber and calendar year. Post by document; remove the entire document and replace it with this supplement. Retain this transmittal as the first page(s) of this document.
Last Change: 2409.18 Chapter 40, Change 2018-2, Date 11/2/2018
New Document: 2409.18_30
Superseded Document(s): 2409.18-2014-1
Digest: Reviewed and made only minor style changes.
FSH 2409.18 TIMBER SALE PREPARATION HANDBOOK CHAPTER 30 - PROJECT ANALYSIS AND DESIGN - GATE 2 Supplement No.:2409.18-2019-1 - Effective Date: 4/25/2019
P a g e 2
TABLE OF CONTENTS 31.2 – Documentation ............................................................................................................. 3
FSH 2409.18 TIMBER SALE PREPARATION HANDBOOK CHAPTER 30 - PROJECT ANALYSIS AND DESIGN - GATE 2 Supplement No.:2409.18-2019-1 - Effective Date: 4/25/2019
P a g e 3
31.2 – Documentation Use regional form R5 2400-202 to document cutting unit information to facilitate sale plan implementation at Gate 3.
FOREST SERVICE HANDBOOK PACIFIC SOUTHWEST REGION (R5) VALLEJO, CALIFORNIA FSH 2409.18 TIMBER SALE PREPARATION HANDBOOK CHAPTER 30 - PROJECT ANALYSIS AND DESIGN - GATE 2
Supplement No.: 2409.18-2019-1
Effective Date: 4/25/2019
Duration: This supplement expires 5 years from the effective date unless superseded or removed earlier.
Approved: Randy Moore, Regional Forester
Date Approved: 4/11/2019
Posting Instructions: Handbook supplements are numbered consecutively by Handbook number and calendar year. Post by document; remove the entire document and replace it with this supplement. Retain this transmittal as the first page(s) of this document.
Last Change: 2409.18 Chapter 40, Change 2018-2, Date 11/2/2018
New Document: 2409.18_30
Superseded Document(s): 2409.18-2014-1
Digest: Reviewed and made only minor style changes.
FSH 2409.18 TIMBER SALE PREPARATION HANDBOOK CHAPTER 30 - PROJECT ANALYSIS AND DESIGN - GATE 2 Supplement No.:2409.18-2019-1 - Effective Date: 4/25/2019
P a g e 2
TABLE OF CONTENTS 31.2 – Documentation ............................................................................................................. 3
FSH 2409.18 TIMBER SALE PREPARATION HANDBOOK CHAPTER 30 - PROJECT ANALYSIS AND DESIGN - GATE 2 Supplement No.:2409.18-2019-1 - Effective Date: 4/25/2019
P a g e 3
31.2 – Documentation Use regional form R5 2400-202 to document cutting unit information to facilitate sale plan implementation at Gate 3.