SRR Number :
Last SAR Number :Dear Customer
to the site coming up for commissioning.
1
Project Name: Name of site Engineer:
Company: Phone Number: Fax Number:
Department: email:
Location: Address
(please provide details
of how to reach the site.If possible attach a site
map indicating nearest
rail/bus/air terminus.)
Nearest Railway Station __________________________________________________________________
Nearest Airport __________________________________________________________________
Nearest Bus Station __________________________________________________________________
Availabilty of alternate mode of transport (taxi/auto) __________________________________________________________________
Hotels Nearby __________________________________________________________________
__________________________________________________________________
__________________________________________________________________
Whom to contact for Guest House accomodation __________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
Site Details
We kindly request you to fill the following form In complete and prior refax it to (+91-080-42515305/06) us atleast 15 days
______________________________________________________________________________________
SITE READINESS REPORT
Format No.:FS/FORM/SRR Page 1 of 3
8/10/2019 FS FORM SRR-Site Rediness Report
http://slidepdf.com/reader/full/fs-form-srr-site-rediness-report 2/3
8/10/2019 FS FORM SRR-Site Rediness Report
http://slidepdf.com/reader/full/fs-form-srr-site-rediness-report 3/3
SITE READINESS REPORT
2 Panel Wiring (contd)
Communication Wiring (LAN checking on your side is limited to continuity)
a All ______________ LAN communication cables have been terminated and checked. Yes / No Date:___/___/20__
b All ______________ LAN communication cables have been terminated and checked. Yes / No Date:___/___/20__
c All ______________ LAN communication cables have been terminated and checked. Yes / No Date:___/___/20__
d All ______________ LAN communication cables have been terminated and checked. Yes / No Date:___/___/20__
3 Customer Readiness
Yes / No Date:___/___/20All machinery/ equipment/ plant/ process to be automated is ready to be energised and tested with sufficient availabilityof process raw material to conduct cold runs and subsequent hot trials
As detailed above the site will be ready for commissioning by _/ _/20__ and kindly depute your engineer to site by then.Further we agree that any delay at site because of non availabilty of the above will be charged to our account at existing manpower rates and to and
Customer Name, Sign & Date
fro travel boarding and lodging charges for idle days will be charged at actuals.
___________________
___________________
___________________
Format No.:FS/FORM/SRR Page 3 of 3