Front cover 266-268 Maroondah Highway, Chirnside Park
Approx. distance from proposed sitework
hansen partnership pty ltdmelbourne|byron bay| vietnam
level 4 136 exhibition stmelbourne vic 3000
t 61 3 9654 8844 f 61 3 9654 8088e [email protected]
w hansenpartnership.com.au
project ref:dwg no.:date:revision:
19.531VIA-00116/12/19-
Existing viewPhotomontage 1Waurn Ponds Maintenance and
Stabling Facility
Camera location550m
View location 1 - from 300 Reservoir Rd, facing south towards proposed facility
Photomontage created by:SH - B.AImages created using:3ds max 2020, Corona renderer 5, autocad 2020, adobe photoshop, illustrator & indesign cc 2020Method used to collect relevant data:Photo locations obtained on site by Geocomp Consulting pty ltd on the 12/11/19Camera:Canon EOS 5Ds Digital SLRCamera lens:Canon EF 50mm f/1.8 USM
Photograph taken:04:15pm on the 12/11/19Photo taken at:160cm above ground level
View location 1:e: 258975.8655n: 5765867.3839rl: 123.6000
150°140° 160° 170° 180° 190° 200° 210° 220° 70°SW
S
Approx. distance from proposed sitework
hansen partnership pty ltdmelbourne|byron bay| vietnam
level 4 136 exhibition stmelbourne vic 3000
t 61 3 9654 8844 f 61 3 9654 8088e [email protected]
w hansenpartnership.com.au
project ref:dwg no.:date:revision:
19.531VIA-00216/12/19-
Photomontage 1Waurn Ponds Maintenance and Stabling Facility
Camera location
View of proposed development - stage 1
550m
View location 1 - from 300 Reservoir Rd, facing south towards proposed facility
Photomontage created by:SH - B.AImages created using:3ds max 2020, Corona renderer 5, autocad 2020, adobe photoshop, illustrator & indesign cc 2020Method used to collect relevant data:Photo locations obtained on site by Geocomp Consulting pty ltd on the 12/11/19Camera:Canon EOS 5Ds Digital SLRCamera lens:Canon EF 50mm f/1.8 USM
Photograph taken:04:15pm on the 12/11/19Photo taken at:160cm above ground level
View location 1:e: 258975.8655n: 5765867.3839rl: 123.6000
150°140° 160° 170° 180° 190° 200° 210° 220° 70°SW
S
Approx. distance from proposed sitework
hansen partnership pty ltdmelbourne|byron bay| vietnam
level 4 136 exhibition stmelbourne vic 3000
t 61 3 9654 8844 f 61 3 9654 8088e [email protected]
w hansenpartnership.com.au
project ref:dwg no.:date:revision:
19.531VIA-00316/12/19-
Photomontage 1Waurn Ponds Maintenance and Stabling Facility
Camera location
View of proposed development outlined in red and removed vegetation in orange - stage 1
550m
View location 1 - from 300 Reservoir Rd, facing south towards proposed facility
Photomontage created by:SH - B.AImages created using:3ds max 2020, Corona renderer 5, autocad 2020, adobe photoshop, illustrator & indesign cc 2020Method used to collect relevant data:Photo locations obtained on site by Geocomp Consulting pty ltd on the 12/11/19Camera:Canon EOS 5Ds Digital SLRCamera lens:Canon EF 50mm f/1.8 USM
Photograph taken:04:15pm on the 12/11/19Photo taken at:160cm above ground level
View location 1:e: 258975.8655n: 5765867.3839rl: 123.6000
150°140° 160° 170° 180° 190° 200° 210° 220° 70°SW
S
Approx. distance from proposed sitework
hansen partnership pty ltdmelbourne|byron bay| vietnam
level 4 136 exhibition stmelbourne vic 3000
t 61 3 9654 8844 f 61 3 9654 8088e [email protected]
w hansenpartnership.com.au
project ref:dwg no.:date:revision:
19.531VIA-00416/12/19-
Photomontage 1Waurn Ponds Maintenance and Stabling Facility
Camera location
View of proposed development - stage 2
550m
View location 1 - from 300 Reservoir Rd, facing south towards proposed facility
Photomontage created by:SH - B.AImages created using:3ds max 2020, Corona renderer 5, autocad 2020, adobe photoshop, illustrator & indesign cc 2020Method used to collect relevant data:Photo locations obtained on site by Geocomp Consulting pty ltd on the 12/11/19Camera:Canon EOS 5Ds Digital SLRCamera lens:Canon EF 50mm f/1.8 USM
Photograph taken:04:15pm on the 12/11/19Photo taken at:160cm above ground level
View location 1:e: 258975.8655n: 5765867.3839rl: 123.6000
150°140° 160° 170° 180° 190° 200° 210° 220° 70°SW
S
Approx. distance from proposed sitework
hansen partnership pty ltdmelbourne|byron bay| vietnam
level 4 136 exhibition stmelbourne vic 3000
t 61 3 9654 8844 f 61 3 9654 8088e [email protected]
w hansenpartnership.com.au
project ref:dwg no.:date:revision:
19.531VIA-00516/12/19-
Photomontage 1Waurn Ponds Maintenance and Stabling Facility
Camera location550m
View location 1 - from 300 Reservoir Rd, facing south towards proposed facility
Photomontage created by:SH - B.AImages created using:3ds max 2020, Corona renderer 5, autocad 2020, adobe photoshop, illustrator & indesign cc 2020Method used to collect relevant data:Photo locations obtained on site by Geocomp Consulting pty ltd on the 12/11/19Camera:Canon EOS 5Ds Digital SLRCamera lens:Canon EF 50mm f/1.8 USM
Photograph taken:04:15pm on the 12/11/19Photo taken at:160cm above ground level
View location 1:e: 258975.8655n: 5765867.3839rl: 123.6000
View of proposed development outlined in red and removed vegetation in orange - stage 2
150°140° 160° 170° 180° 190° 200° 210° 220° 70°SW
S
Approx. distance from proposed sitework
hansen partnership pty ltdmelbourne|byron bay| vietnam
level 4 136 exhibition stmelbourne vic 3000
t 61 3 9654 8844 f 61 3 9654 8088e [email protected]
w hansenpartnership.com.au
project ref:dwg no.:date:revision:
19.531VIA-00616/12/19-
Existing viewPhotomontage 2Waurn Ponds Maintenance and
Stabling Facility
Camera location535m
View location 2 - from 250 Reservoir Rd, facing south towards proposed facility
Photomontage created by:SH - B.AImages created using:3ds max 2020, Corona renderer 5, autocad 2020, adobe photoshop, illustrator & indesign cc 2020Method used to collect relevant data:Photo locations obtained on site by Geocomp Consulting pty ltd on the 12/11/19Camera:Canon EOS 5Ds Digital SLRCamera lens:Canon EF 50mm f/1.8 USM
Photograph taken:04:50pm on the 12/11/19Photo taken at:160cm above ground level
View location 2:e: 259029.6660n: 5765867.7470rl: 123.4000
150°140°240° 160° 170° 180° 190° 200° 210° 220°SW
S
Approx. distance from proposed sitework
hansen partnership pty ltdmelbourne|byron bay| vietnam
level 4 136 exhibition stmelbourne vic 3000
t 61 3 9654 8844 f 61 3 9654 8088e [email protected]
w hansenpartnership.com.au
project ref:dwg no.:date:revision:
19.531VIA-00716/12/19-
Photomontage 2Waurn Ponds Maintenance and Stabling Facility
Camera location
View of proposed development - stage 1
535m
View location 2 - from 250 Reservoir Rd, facing south towards proposed facility
Photomontage created by:SH - B.AImages created using:3ds max 2020, Corona renderer 5, autocad 2020, adobe photoshop, illustrator & indesign cc 2020Method used to collect relevant data:Photo locations obtained on site by Geocomp Consulting pty ltd on the 12/11/19Camera:Canon EOS 5Ds Digital SLRCamera lens:Canon EF 50mm f/1.8 USM
Photograph taken:04:50pm on the 12/11/19Photo taken at:160cm above ground level
View location 2:e: 259029.6660n: 5765867.7470rl: 123.4000
150°140°240° 160° 170° 180° 190° 200° 210° 220°SW
S
Approx. distance from proposed sitework
hansen partnership pty ltdmelbourne|byron bay| vietnam
level 4 136 exhibition stmelbourne vic 3000
t 61 3 9654 8844 f 61 3 9654 8088e [email protected]
w hansenpartnership.com.au
project ref:dwg no.:date:revision:
19.531VIA-00816/12/19-
Photomontage 2Waurn Ponds Maintenance and Stabling Facility
Camera location535m
View location 2 - from 250 Reservoir Rd, facing south towards proposed facility
Photomontage created by:SH - B.AImages created using:3ds max 2020, Corona renderer 5, autocad 2020, adobe photoshop, illustrator & indesign cc 2020Method used to collect relevant data:Photo locations obtained on site by Geocomp Consulting pty ltd on the 12/11/19Camera:Canon EOS 5Ds Digital SLRCamera lens:Canon EF 50mm f/1.8 USM
Photograph taken:04:50pm on the 12/11/19Photo taken at:160cm above ground level
View location 2:e: 259029.6660n: 5765867.7470rl: 123.4000
View of proposed development outlined in red and removed vegetation in orange - stage 1
150°140°240° 160° 170° 180° 190° 200° 210° 220°SW
S
Approx. distance from proposed sitework
hansen partnership pty ltdmelbourne|byron bay| vietnam
level 4 136 exhibition stmelbourne vic 3000
t 61 3 9654 8844 f 61 3 9654 8088e [email protected]
w hansenpartnership.com.au
project ref:dwg no.:date:revision:
19.531VIA-00916/12/19-
Photomontage 2Waurn Ponds Maintenance and Stabling Facility
Camera location
View of proposed development - stage 2
535m
View location 2 - from 250 Reservoir Rd, facing south towards proposed facility
Photomontage created by:SH - B.AImages created using:3ds max 2020, Corona renderer 5, autocad 2020, adobe photoshop, illustrator & indesign cc 2020Method used to collect relevant data:Photo locations obtained on site by Geocomp Consulting pty ltd on the 12/11/19Camera:Canon EOS 5Ds Digital SLRCamera lens:Canon EF 50mm f/1.8 USM
Photograph taken:04:50pm on the 12/11/19Photo taken at:160cm above ground level
View location 2:e: 259029.6660n: 5765867.7470rl: 123.4000
150°140°240° 160° 170° 180° 190° 200° 210° 220°SW
S
Approx. distance from proposed sitework
hansen partnership pty ltdmelbourne|byron bay| vietnam
level 4 136 exhibition stmelbourne vic 3000
t 61 3 9654 8844 f 61 3 9654 8088e [email protected]
w hansenpartnership.com.au
project ref:dwg no.:date:revision:
19.531VIA-01016/12/19-
Photomontage 2Waurn Ponds Maintenance and Stabling Facility
Camera location535m
View location 2 - from 250 Reservoir Rd, facing south towards proposed facility
Photomontage created by:SH - B.AImages created using:3ds max 2020, Corona renderer 5, autocad 2020, adobe photoshop, illustrator & indesign cc 2020Method used to collect relevant data:Photo locations obtained on site by Geocomp Consulting pty ltd on the 12/11/19Camera:Canon EOS 5Ds Digital SLRCamera lens:Canon EF 50mm f/1.8 USM
Photograph taken:04:50pm on the 12/11/19Photo taken at:160cm above ground level
View location 2:e: 259029.6660n: 5765867.7470rl: 123.4000
View of proposed development outlined in red and removed vegetation in orange - stage 2
150°140°240° 160° 170° 180° 190° 200° 210° 220°SW
S
Approx. distance from proposed sitework
hansen partnership pty ltdmelbourne|byron bay| vietnam
level 4 136 exhibition stmelbourne vic 3000
t 61 3 9654 8844 f 61 3 9654 8088e [email protected]
w hansenpartnership.com.au
project ref:dwg no.:date:revision:
19.531VIA-01116/12/19-
Existing viewPhotomontage 3Waurn Ponds Maintenance and
Stabling Facility
Photomontage created by:SH - B.AImages created using:3ds max 2020, Corona renderer 5, autocad 2020, adobe photoshop, illustrator & indesign cc 2020Method used to collect relevant data:Photo locations obtained on site by Geocomp Consulting pty ltd on the 14/11/19Camera:Canon EOS 5Ds Digital SLRCamera lens:Canon EF 50mm f/1.8 USM Camera location
150m
View location 3 - from 255 Reservoir Rd, facing southeast towards proposed facility
Photograph taken:05.10pm on the 14/11/19Photo taken at:160cm above ground level
View location 3:e: 259367.4960n: 5765568.1440rl: 107.7970
120°110° 130° 140° 150° 160° 170° 180° 190°SE
S
Approx. distance from proposed sitework
hansen partnership pty ltdmelbourne|byron bay| vietnam
level 4 136 exhibition stmelbourne vic 3000
t 61 3 9654 8844 f 61 3 9654 8088e [email protected]
w hansenpartnership.com.au
project ref:dwg no.:date:revision:
19.531VIA-01216/12/19-
Photomontage 3Waurn Ponds Maintenance and Stabling Facility
Photomontage created by:SH - B.AImages created using:3ds max 2020, Corona renderer 5, autocad 2020, adobe photoshop, illustrator & indesign cc 2020Method used to collect relevant data:Photo locations obtained on site by Geocomp Consulting pty ltd on the 14/11/19Camera:Canon EOS 5Ds Digital SLRCamera lens:Canon EF 50mm f/1.8 USM Camera location
View of proposed development - stage 1
150m
View location 3 - from 255 Reservoir Rd, facing southeast towards proposed facility
Photograph taken:05.10pm on the 14/11/19Photo taken at:160cm above ground level
View location 3:e: 259367.4960n: 5765568.1440rl: 107.7970
120°110° 130° 140° 150° 160° 170° 180° 190°SE
S
Approx. distance from proposed sitework
hansen partnership pty ltdmelbourne|byron bay| vietnam
level 4 136 exhibition stmelbourne vic 3000
t 61 3 9654 8844 f 61 3 9654 8088e [email protected]
w hansenpartnership.com.au
project ref:dwg no.:date:revision:
19.531VIA-01316/12/19-
Photomontage 3Waurn Ponds Maintenance and Stabling Facility
Photomontage created by:SH - B.AImages created using:3ds max 2020, Corona renderer 5, autocad 2020, adobe photoshop, illustrator & indesign cc 2020Method used to collect relevant data:Photo locations obtained on site by Geocomp Consulting pty ltd on the 14/11/19Camera:Canon EOS 5Ds Digital SLRCamera lens:Canon EF 50mm f/1.8 USM Camera location
150m
View location 3 - from 255 Reservoir Rd, facing southeast towards proposed facility
Photograph taken:05.10pm on the 14/11/19Photo taken at:160cm above ground level
View location 3:e: 259367.4960n: 5765568.1440rl: 107.7970
View of proposed development outlined in red and removed vegetation in orange - stage 1
120°110° 130° 140° 150° 160° 170° 180° 190°SE
S
Approx. distance from proposed sitework
hansen partnership pty ltdmelbourne|byron bay| vietnam
level 4 136 exhibition stmelbourne vic 3000
t 61 3 9654 8844 f 61 3 9654 8088e [email protected]
w hansenpartnership.com.au
project ref:dwg no.:date:revision:
19.531VIA-01416/12/19-
Photomontage 3Waurn Ponds Maintenance and Stabling Facility
Photomontage created by:SH - B.AImages created using:3ds max 2020, Corona renderer 5, autocad 2020, adobe photoshop, illustrator & indesign cc 2020Method used to collect relevant data:Photo locations obtained on site by Geocomp Consulting pty ltd on the 14/11/19Camera:Canon EOS 5Ds Digital SLRCamera lens:Canon EF 50mm f/1.8 USM Camera location
View of proposed development - stage 2
150m
View location 3 - from 255 Reservoir Rd, facing southeast towards proposed facility
Photograph taken:05.10pm on the 14/11/19Photo taken at:160cm above ground level
View location 3:e: 259367.4960n: 5765568.1440rl: 107.7970
120°110° 130° 140° 150° 160° 170° 180° 190°SE
S
Approx. distance from proposed sitework
hansen partnership pty ltdmelbourne|byron bay| vietnam
level 4 136 exhibition stmelbourne vic 3000
t 61 3 9654 8844 f 61 3 9654 8088e [email protected]
w hansenpartnership.com.au
project ref:dwg no.:date:revision:
19.531VIA-01516/12/19-
Photomontage 3Waurn Ponds Maintenance and Stabling Facility
Photomontage created by:SH - B.AImages created using:3ds max 2020, Corona renderer 5, autocad 2020, adobe photoshop, illustrator & indesign cc 2020Method used to collect relevant data:Photo locations obtained on site by Geocomp Consulting pty ltd on the 14/11/19Camera:Canon EOS 5Ds Digital SLRCamera lens:Canon EF 50mm f/1.8 USM Camera location
150m
View location 3 - from 255 Reservoir Rd, facing southeast towards proposed facility
Photograph taken:05.10pm on the 14/11/19Photo taken at:160cm above ground level
View location 3:e: 259367.4960n: 5765568.1440rl: 107.7970
View of proposed development outlined in red and removed vegetation in orange - stage 2
120°110° 130° 140° 150° 160° 170° 180° 190°SE
S
Approx. distance from proposed sitework
hansen partnership pty ltdmelbourne|byron bay| vietnam
level 4 136 exhibition stmelbourne vic 3000
t 61 3 9654 8844 f 61 3 9654 8088e [email protected]
w hansenpartnership.com.au
project ref:dwg no.:date:revision:
19.531VIA-01616/12/19-
Existing viewPhotomontage 4Waurn Ponds Maintenance and
Stabling Facility
Photomontage created by:SH - B.AImages created using:3ds max 2020, Corona renderer 5, autocad 2020, adobe photoshop, illustrator & indesign cc 2020Method used to collect relevant data:Photo locations obtained on site by Geocomp Consulting pty ltd on the 14/11/19Camera:Canon EOS 5Ds Digital SLRCamera lens:Canon EF 50mm f/1.8 USM Camera location
215m
View location 4 - from 255 Reservoir Rd, facing east towards proposed facility
Photograph taken:05.20pm on the 14/11/19Photo taken at:160cm above ground level
View location 4:e: 259376.8680n: 5765639.9590rl: 110.8530
70°140° 80° 90° 100° 110° 120° 130° 140° 150°SE
E
Approx. distance from proposed sitework
hansen partnership pty ltdmelbourne|byron bay| vietnam
level 4 136 exhibition stmelbourne vic 3000
t 61 3 9654 8844 f 61 3 9654 8088e [email protected]
w hansenpartnership.com.au
project ref:dwg no.:date:revision:
19.531VIA-01716/12/19-
Photomontage 4Waurn Ponds Maintenance and Stabling Facility
Photomontage created by:SH - B.AImages created using:3ds max 2020, Corona renderer 5, autocad 2020, adobe photoshop, illustrator & indesign cc 2020Method used to collect relevant data:Photo locations obtained on site by Geocomp Consulting pty ltd on the 14/11/19Camera:Canon EOS 5Ds Digital SLRCamera lens:Canon EF 50mm f/1.8 USM Camera location
View of proposed development - stage 1
215m
View location 4 - from 255 Reservoir Rd, facing east towards proposed facility
Photograph taken:05.20pm on the 14/11/19Photo taken at:160cm above ground level
View location 4:e: 259376.8680n: 5765639.9590rl: 110.8530
70°140° 80° 90° 100° 110° 120° 130° 140° 150°SE
E
Approx. distance from proposed sitework
hansen partnership pty ltdmelbourne|byron bay| vietnam
level 4 136 exhibition stmelbourne vic 3000
t 61 3 9654 8844 f 61 3 9654 8088e [email protected]
w hansenpartnership.com.au
project ref:dwg no.:date:revision:
19.531VIA-01816/12/19-
Photomontage 4Waurn Ponds Maintenance and Stabling Facility
Photomontage created by:SH - B.AImages created using:3ds max 2020, Corona renderer 5, autocad 2020, adobe photoshop, illustrator & indesign cc 2020Method used to collect relevant data:Photo locations obtained on site by Geocomp Consulting pty ltd on the 14/11/19Camera:Canon EOS 5Ds Digital SLRCamera lens:Canon EF 50mm f/1.8 USM Camera location
215m
View location 4 - from 255 Reservoir Rd, facing east towards proposed facility
Photograph taken:05.20pm on the 14/11/19Photo taken at:160cm above ground level
View location 4:e: 259376.8680n: 5765639.9590rl: 110.8530
View of proposed development outlined in red and removed vegetation in orange - stage 1
70°140° 80° 90° 100° 110° 120° 130° 140° 150°SE
E
Approx. distance from proposed sitework
hansen partnership pty ltdmelbourne|byron bay| vietnam
level 4 136 exhibition stmelbourne vic 3000
t 61 3 9654 8844 f 61 3 9654 8088e [email protected]
w hansenpartnership.com.au
project ref:dwg no.:date:revision:
19.531VIA-01916/12/19-
Photomontage 4Waurn Ponds Maintenance and Stabling Facility
Photomontage created by:SH - B.AImages created using:3ds max 2020, Corona renderer 5, autocad 2020, adobe photoshop, illustrator & indesign cc 2020Method used to collect relevant data:Photo locations obtained on site by Geocomp Consulting pty ltd on the 14/11/19Camera:Canon EOS 5Ds Digital SLRCamera lens:Canon EF 50mm f/1.8 USM Camera location
View of proposed development - stage 2
215m
View location 4 - from 255 Reservoir Rd, facing east towards proposed facility
Photograph taken:05.20pm on the 14/11/19Photo taken at:160cm above ground level
View location 4:e: 259376.8680n: 5765639.9590rl: 110.8530
70°140° 80° 90° 100° 110° 120° 130° 140° 150°SE
E
Approx. distance from proposed sitework
hansen partnership pty ltdmelbourne|byron bay| vietnam
level 4 136 exhibition stmelbourne vic 3000
t 61 3 9654 8844 f 61 3 9654 8088e [email protected]
w hansenpartnership.com.au
project ref:dwg no.:date:revision:
19.531VIA-02016/12/19-
Photomontage 4Waurn Ponds Maintenance and Stabling Facility
Photomontage created by:SH - B.AImages created using:3ds max 2020, Corona renderer 5, autocad 2020, adobe photoshop, illustrator & indesign cc 2020Method used to collect relevant data:Photo locations obtained on site by Geocomp Consulting pty ltd on the 14/11/19Camera:Canon EOS 5Ds Digital SLRCamera lens:Canon EF 50mm f/1.8 USM Camera location
215m
View location 4 - from 255 Reservoir Rd, facing east towards proposed facility
Photograph taken:05.20pm on the 14/11/19Photo taken at:160cm above ground level
View location 4:e: 259376.8680n: 5765639.9590rl: 110.8530
View of proposed development outlined in red and removed vegetation in orange - stage 2
70°140° 80° 90° 100° 110° 120° 130° 140° 150°SE
E
Approx. distance from proposed sitework
hansen partnership pty ltdmelbourne|byron bay| vietnam
level 4 136 exhibition stmelbourne vic 3000
t 61 3 9654 8844 f 61 3 9654 8088e [email protected]
w hansenpartnership.com.au
project ref:dwg no.:date:revision:
19.531VIA-02116/12/19-
Existing viewPhotomontage 5Waurn Ponds Maintenance and
Stabling Facility
Photomontage created by:SH - B.AImages created using:3ds max 2020, Corona renderer 5, autocad 2020, adobe photoshop, illustrator & indesign cc 2020Method used to collect relevant data:Photo locations obtained on site by Geocomp Consulting pty ltd on the 14/11/19Camera:Canon EOS 5Ds Digital SLRCamera lens:Canon EF 50mm f/1.8 USM Camera location
1535m
View location 5 - from 395 Pettavel Rd, facing north towards proposed facility
Photograph taken:06:10pm on the 14/11/19Photo taken at:160cm above ground level
View location 5:e: 258497.2510n: 5763212.6390rl: 82.5020
340°140° 350° 0° 10° 20° 30° 40° 50° 60°NE
N
Approx. distance from proposed sitework
hansen partnership pty ltdmelbourne|byron bay| vietnam
level 4 136 exhibition stmelbourne vic 3000
t 61 3 9654 8844 f 61 3 9654 8088e [email protected]
w hansenpartnership.com.au
project ref:dwg no.:date:revision:
19.531VIA-02216/12/19-
Photomontage 5Waurn Ponds Maintenance and Stabling Facility
Photomontage created by:SH - B.AImages created using:3ds max 2020, Corona renderer 5, autocad 2020, adobe photoshop, illustrator & indesign cc 2020Method used to collect relevant data:Photo locations obtained on site by Geocomp Consulting pty ltd on the 14/11/19Camera:Canon EOS 5Ds Digital SLRCamera lens:Canon EF 50mm f/1.8 USM Camera location
View of proposed development - stage 1
1535m
Photograph taken:06:10pm on the 14/11/19Photo taken at:160cm above ground level
View location 5:e: 258497.2510n: 5763212.6390rl: 82.5020
View location 5 - from 395 Pettavel Rd, facing north towards proposed facility
340°140° 350° 0° 10° 20° 30° 40° 50° 60°NE
N
Approx. distance from proposed sitework
hansen partnership pty ltdmelbourne|byron bay| vietnam
level 4 136 exhibition stmelbourne vic 3000
t 61 3 9654 8844 f 61 3 9654 8088e [email protected]
w hansenpartnership.com.au
project ref:dwg no.:date:revision:
19.531VIA-02316/12/19-
Photomontage 5Waurn Ponds Maintenance and Stabling Facility
Photomontage created by:SH - B.AImages created using:3ds max 2020, Corona renderer 5, autocad 2020, adobe photoshop, illustrator & indesign cc 2020Method used to collect relevant data:Photo locations obtained on site by Geocomp Consulting pty ltd on the 14/11/19Camera:Canon EOS 5Ds Digital SLRCamera lens:Canon EF 50mm f/1.8 USM Camera location
1535m
Photograph taken:06:10pm on the 14/11/19Photo taken at:160cm above ground level
View location 5:e: 258497.2510n: 5763212.6390rl: 82.5020
View location 5 - from 395 Pettavel Rd, facing north towards proposed facility
View of proposed development outlined in red and removed vegetation in orange - stage 1
340°140° 350° 0° 10° 20° 30° 40° 50° 60°NE
N
Approx. distance from proposed sitework
hansen partnership pty ltdmelbourne|byron bay| vietnam
level 4 136 exhibition stmelbourne vic 3000
t 61 3 9654 8844 f 61 3 9654 8088e [email protected]
w hansenpartnership.com.au
project ref:dwg no.:date:revision:
19.531VIA-02416/12/19-
Photomontage 5Waurn Ponds Maintenance and Stabling Facility
Photomontage created by:SH - B.AImages created using:3ds max 2020, Corona renderer 5, autocad 2020, adobe photoshop, illustrator & indesign cc 2020Method used to collect relevant data:Photo locations obtained on site by Geocomp Consulting pty ltd on the 14/11/19Camera:Canon EOS 5Ds Digital SLRCamera lens:Canon EF 50mm f/1.8 USM Camera location
View of proposed development - stage 2
1535m
Photograph taken:06:10pm on the 14/11/19Photo taken at:160cm above ground level
View location 5:e: 258497.2510n: 5763212.6390rl: 82.5020
View location 5 - from 395 Pettavel Rd, facing north towards proposed facility
340°140° 350° 0° 10° 20° 30° 40° 50° 60°NE
N
Approx. distance from proposed sitework
hansen partnership pty ltdmelbourne|byron bay| vietnam
level 4 136 exhibition stmelbourne vic 3000
t 61 3 9654 8844 f 61 3 9654 8088e [email protected]
w hansenpartnership.com.au
project ref:dwg no.:date:revision:
19.531VIA-02516/12/19-
Photomontage 5Waurn Ponds Maintenance and Stabling Facility
Photomontage created by:SH - B.AImages created using:3ds max 2020, Corona renderer 5, autocad 2020, adobe photoshop, illustrator & indesign cc 2020Method used to collect relevant data:Photo locations obtained on site by Geocomp Consulting pty ltd on the 14/11/19Camera:Canon EOS 5Ds Digital SLRCamera lens:Canon EF 50mm f/1.8 USM Camera location
1535m
Photograph taken:06:10pm on the 14/11/19Photo taken at:160cm above ground level
View location 5:e: 258497.2510n: 5763212.6390rl: 82.5020
View location 5 - from 395 Pettavel Rd, facing north towards proposed facility
View of proposed development outlined in red and removed vegetation in orange - stage 2
340°140° 350° 0° 10° 20° 30° 40° 50° 60°NE
N
Government Land Standing Advisory Committee | Waurn Ponds Train Maintenance & Stabling Facility | Hansen Partnership Pty Ltd
Technical Methodology for Photomontage Preparation
1. The photomontage process undertaken utilised the following software programmes:
Autocad LT 2020; for compilation of site survey information and cadastral information including
topography and property boundary data, referenced to both Australian height datum and Australian Map
Grid data.
3ds Max 2020 (3D modeller); for construction of a three-dimensional model of the proposed
development by Hansen Partnership Pty Ltd based on the 3d models prepared by AECOM (as a .skp file).
Positioning and alignment of the three-dimensional model of the proposed development is based on
photo locations and reference points obtained on site by Geocomp Consulting Pty Ltd, referenced to both
Australian Height Datum and Australian Map Grid data.
Corona Renderer (rendering software); for applying textures to the model of the proposed development
to replicate the architects proposed treatments and finishes, and applying light settings to replicate the
existing conditions of the day the photos were taken.
Adobe Photoshop CC2020; for rendering views from the dimensional modelled cameras. Locations are
superimposed into the photograph without any distortion or manipulation, except for necessary changes
to provide a true representation of the proposal within its context.
Adobe Illustrator and Indesign CC2020; for sheet layout and text compilation.
2. The 3 Dimensional model of the proposed development was prepared by Hansen Partnership Pty Ltd and
based on the 3d model prepared by AECOM (as a .skp file). A team comprising urban designer/photographer
and surveyor visited the site on 12th, 14th and 29th November 2019. The positioning of the model in 3ds
Max 2020 (3D modeller) is based on Waurn Ponds Train Stabling and Maintenance Facility Concept Plan
(WLU-AJM-WLU-WPD-SKT-CRA-WPD-0300050 – Revision A.7) and CAD files prepared by AECOM;
Survey data obtained on site by Mr Ken Toleman, a licensed surveyor and Director of Geocomp
International Pty Ltd, and
Digital photographs taken on site by Mr Patrick Iwanyshyn.
3. The model utilises photo locations and reference points obtained on site by Geocomp Consulting Pty Ltd,
referenced to both Australian Height Datum and Australian Map Grid data. Overlaid on these reference points
was a three-dimensional representation of the proposed development. Those reference points are included in
survey data provided by Geocomp Consulting and identified graphically in the survey control point
photographs provided on the following pages.
4. The photos used in the photomontages were taken using a Digital SLR camera (Canon EOS 5Ds) with a
Canon EF 28mm f/1.8 USM lens.
Government Land Standing Advisory Committee | Waurn Ponds Train Maintenance & Stabling Facility | Hansen Partnership Pty Ltd
5. The positioning of the camera was set upon a spirit levelled tripod oriented towards the proposed
development and taken at a height of 1.6m above ground level. The camera was not tilted but rather set as
horizontal. The photographs were taken on the 12th, 14th and 29th November 2019 during daylight hours.
Figure 1: View Location 1 – 300 Reservoir Road survey control points.
Figure 2: View Location 1 – 300 Reservoir Road survey control points.
Figure 3: View Location 2 – 250 Reservoir Road survey control points.
Figure 4: View Location 3 – 255 Reservoir Road survey control points.
Figure 5: View Location 4 – 255 Reservoir Road survey control points.
Figure 6: View Location 4 – 255 Reservoir Road survey control points.
Figure 7: View Location 5 – 395 Pettavel Road survey control points.