34
2 nd EMEG Meeting “Euro-Mediterranean Research and Innovation Policy and Policy Dialogue in relation to societal challenges” Sousse (TN), 22-23 September 2014 From Lisbon to Sousse: along the EMEG work C. Bogliotti (CIHEAM-IAMB)

From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

2nd EMEG Meeting “Euro-Mediterranean Research and Innovation Policy and Policy Dialogue in relation to societal

challenges”

Sousse (TN), 22-23 September 2014

From Lisbon to Sousse: along the EMEG work

C. Bogliotti (CIHEAM-IAMB)

Page 2: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

MEDSPRING Mediterranean Science, Policy, Research

and Innovation Gateway • Societal challenges to reinforce cooperation

• Strenghtening cooperation on R&I (networking, capacity

building, brokerage)

• Building synergies for sustainable Euro-Med cooperation with a vision on co-ownership and integration

• Supporting policy dialogue on R&I

Page 3: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

• Addressed to the societal challenges: resource efficiency (water), high quality affordable food, energy

• Recommendation to the Euro-Mediterranean R&I agenda

• Task 1: Research results and their uptake

• Task 2: Research policies

• Task 3: Holistic / integrated approach

EMEG

1 EMEG

2 EMEG

Page 4: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

The dialogue process in MEDSPRING

4

Page 5: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

1. Identifying “topics or niches” favorable for research results uptake and market opportunities.

2. Identifying solutions (market, youths oriented)

3. Partnership / clusters (categories)

4. Barriers and factors enhancing impact (variables)

5. Type of actions/solution to be addressed

EMEG Lisbon meeting (20-21 June 2013)

5

Page 6: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

Main topics/niches - Water

Open Consultation

EMEG Meeting

6

Page 7: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

Main topics/niches - Food Open

Consultation EMEG Meeting

7

Page 8: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

Main topics/niches - Energy

Open Consultation

EMEG Meeting

8

Page 9: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

Lisbon Position paper - overarching paradigms

9

Resources efficiency - Water: “Managing water resources under scarcity, pollution and uncertain conditions while improving agricultural water use efficiency as well as treatment and re-use of non-conventional water” .

High quality affordable Food: “Integrated development and rehabilitation of rural arid and semi-arid areas capitalizing on sustainable agriculture including traditional and organic farming, empowering rural communities and valorizing agricultural resources” .

Energy: “Capitalizing on local large availability of solar energy, by developing adapted packages of solutions for sustainable remote communities, both in terms of supply and demand, in addition to promoting the well integrated penetration of renewable energy solutions in the inhabited areas, while taking into account local cultural heritage”.

Page 10: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

The link between the 2 EMEG

Page 11: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

The work after the 2 EMEG

a) horizontal: objectives, impacts,

variables and actions to be implemented to ensure effective policy dialogue, regardless the sector of application;

b) specific: objectives, impacts,

variables and actions to be implemented in the frame of policies addressed to specific societal challenges (water, food, energy). 11

1. Organize/clusterize workgroups outcomes in order to classify them into 2 categories:

Page 12: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

The work after the 2 EMEG

It could be organized as follows: • Main Problems and Outcomes in R&I policy dialogue • Specific Policy objectives and expected impacts (per

problems categories) • Variables to improve effectiveness of policy dialogue • Recommendations

12

2. Drafting of the position paper.

Page 13: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

The next step: water-food-energy nexus

Page 14: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

The next step: water-food-energy nexus

Page 15: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

2nd EMEG Meeting “Euro-Mediterranean Research and Innovation Policy and Policy Dialogue in relation to societal

challenges”

Sousse (TN), 22-23 September 2014

Preparatory material for the 2 EMEG

C. Bogliotti (CIHEAM-IAMB)

Page 16: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

The Sousse workshop cycle

Background documentation

Open consultation

2nd EMEG Workshop

Position paper

European Community

16

MedSpring AGORA

Page 17: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

Inputs from Policy Stocktaking: objectives and outcomes (1)

• Strategic Objectives (objectives which are deemed to be the ideal frame of Euro-Mediterranean policy dialogue in Research and Innovation). a) Fostering long-term and stable cooperation b) Ensuring a participatory approach in national and EU

research programme designing c) Developing programmes tailored on country needs d) Encouraging MPCs participation in EU research

framework programmes e) Ensuring North-South co-ownership in programmes'

designing and implementation 17

Page 18: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

Inputs from Policy Stocktaking: objectives and outcomes (2)

• Operational Objectives (objectives which should be reached through the Euro-Mediterranean policy dialogue on Research and Innovation). a) Higher Education b) Mobility c) Capacity Building d) Technology Transfer e) Uptake of research results

18

Page 19: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

Inputs from Policy Stocktaking: objectives and outcomes (3)

Following the identification of objectives, some positive factors and problems have been systematized through an assessment of the main results of the Euro-Mediterranean cooperation in the last few years.

Positive factors a) Progresses towards the establishment of an Article 185 initiative for the

Mediterranean. b) 3 Mediterranean Partner Countries are in the top 20 Third Countries with

the highest number of participant in approved projects in FP7. c) About 7% of the topics of FP7 call were specifically addressed to the

Mediterranean Partner Countries. d) Some key issues for the Mediterranean such as “Food” and “Environment”

are well addressed in the first Work Programme of H2020. e) There is more involvement of the civil society in recently approved projects

in the Euro-Mediterranean region

19

Page 20: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

Inputs from Policy Stocktaking: objectives and outcomes (4)

Following the identification of objectives, some positive factors and problems have been systematized through an assessment of the main results of the Euro-Mediterranean cooperation in the last few years.

Problems a) The organization of the 2nd Euro-Mediterranean Ministerial Conference

on Research and Innovation is still on hold. b) There has been no increase in the % of Mediterranean Partner Countries

participants from FP6 to FP7 (remained at about 10%). c) Low number of topics (3) addressed to Mediterranean Partner Countries

in the first Work Programme of H2020 (about 0,5%). d) Key issues like health and energy are not directly addressed by H2020

calls oriented to the Mediterranean

20

Page 21: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

Inputs from Open Consultation: Main Objectives

21

Q2.1 – “Please state how important are the following objectives of the Euro-Mediterranean policy dialogue on R&I”

55

27

1 0 00

10

20

30

40

50

60

Very important (A1)

Important (A2) Not so important (A3)

I don't know (A4) No answer

1) Fostering long-term and stable cooperation

49

31

03

00

10

20

30

40

50

60

Very important (A1)

Important (A2) Not so important (A3)

I don't know (A4) No answer

2) Ensuring a participatory approach in national and EU research programmes designing

Page 22: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

Inputs from Open Consultation: Main Objectives

22

Q2.1 – “Please state how important are the following objectives of the Euro-Mediterranean policy dialogue on R&I”

56

22

2 2 10

10

20

30

40

50

60

Very important (A1)

Important (A2) Not so important (A3)

I don't know (A4) No answer

3) Developing programmes tailored on country needs.

50

28

1 3 10

10

20

30

40

50

60

Very important (A1)

Important (A2) Not so important (A3)

I don't know (A4) No answer

4) Encouraging MPCs participation in EU research FP

Page 23: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

Inputs from Open Consultation: Main Objectives

23

Q2.1 – “Please state how important are the following objectives of the Euro-Mediterranean policy dialogue on R&I”

30

42

6 41

05

1015202530354045

Very important (A1)

Important (A2) Not so important (A3)

I don't know (A4) No answer

5) Ensuring North-South co-ownership in programmes' designing and implementation.

Page 24: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

Inputs from Open Consultation: Main Problems

24

Q3.1 – “In your opinion, what is the degree of achievement of the following objectives (Objectives are listed accordingly their score)? What were the main bottlenecks in the effective achievement of these objectives?”

2

11

6

00

2

4

6

8

10

12

High (SQ001) Medium (SQ002) Low (SQ003) Other

Degree of achievement: 1) Fostering long-term and stable cooperation

14

12

11

0

0 2 4 6 8 10 12 14 16

Differences in Eu/MPCs approaches to cooperation (SQ001)

Political willingness (SQ002)

Institutional capacity (SQ003)

Other

main bottlenecks: 1) Fostering long-term and stable cooperation

Main Problem: Differencies in EU/MPCs approaches to cooperation

Page 25: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

Inputs from Open Consultation: Main Problems

25

Q3.1 – “In your opinion, what is the degree of achievement of the following objectives (Objectives are listed accordingly their score)? What were the main bottlenecks in the effective achievement of these objectives?”

Main Problems: - Low policy-makers awareness on societal needs - Poor involvement of stakeholders in the process

2

7

6

1

0

1

2

3

4

5

6

7

8

High (SQ001) Medium (SQ002) Low (SQ003) Other

Degree of achievement: 2) Ensuring a participatory approach in national and EU research programmes designing

Page 26: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

Inputs from Open Consultation: Main Problems

26

Q3.1 – “In your opinion, what is the degree of achievement of the following objectives (Objectives are listed accordingly their score)? What were the main bottlenecks in the effective achievement of these objectives?”

Main Problem: Low programme’s adaptability to countries’ specificities

0

7

9

00

1

2

3

4

5

6

7

8

9

10

High (SQ001) Medium (SQ002) Low (SQ003) Other

Degree of achievement: 3) Developing programmes tailored on country needs.

12

9

8

0

0 2 4 6 8 10 12 14

Low programme's adaptability to countries' specifities (SQ001)

Policy-makers misperception of country needs (SQ002)

Poor involvement of stakeholders in the process (SQ003)

Other

main bottlenecks: 3) Developing programmes tailored on country needs

Page 27: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

Inputs from Open Consultation: Main Problems

27

Q3.1 – “In your opinion, what is the degree of achievement of the following objectives (Objectives are listed accordingly their score)? What were the main bottlenecks in the effective achievement of these objectives?”

Main Problem: Bureaucracy and administrative procedures

4

10

21

0

2

4

6

8

10

12

High (SQ001) Medium (SQ002) Low (SQ003) Other

Degree of achievement: 4) Encouraging MPCs participation in EU research FP

6

10

6

1

0 2 4 6 8 10 12

Differences in EU/MPCs needs and priorities (SQ001)

Bureacracy and administrative procedures (SQ002)

Number of MPCs-oriented calls (SQ003)

Other

main bottlenecks: 4) Encouraging MPCs participation in EU research FP

Page 28: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

Inputs from Open Consultation: Main Problems

28

Q3.1 – “In your opinion, what is the degree of achievement of the following objectives (Objectives are listed accordingly their score)? What were the main bottlenecks in the effective achievement of these objectives?”

Main Problems: - Ineffective communication/definition of common priorities among EU and MPCs

- Discrepancies between planned and implemented project activities

2

8

5

1

0

1

2

3

4

5

6

7

8

9

High (SQ001) Medium (SQ002) Low (SQ003) Other

Degree of achievement: 5) Ensuring North-South co-ownership in programmes' designing and implementation.

7

6

4

2

0 1 2 3 4 5 6 7 8

Ineffective communication/definition of common priorities among EU and MPCs

(SQ001)

Discrepancies between planned and implemented project activities (SQ002)

Project's results enhancement and monitoring (SQ003)

Other

main bottlenecks: 5) Ensuring North-South co-ownership in programmes' designing and implementation.

Page 29: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

Inputs from Open Consultation: Main Objectives vs. Main Problems Main Objectives Main Problems

A. Fostering long-term and stable cooperation

- Differences in EU/MPCs approaches to cooperation

B. Ensuring a participatory approach in national and EU research programme designing

- Low policy-makers awareness on societal needs - Poor involvement of stakeholders in the process

C. Developing programmes tailored on country needs

- Low programmes adaptability to Countries’ specificities

D. Encouraging MPCs participation in EU research framework programmes - Bureaucracy and administrative procedures

E. Ensuring North-South co-ownership in programmes’ designing and implementation

- Ineffective communication/definition of common priorities among EU and MPCs - Discrepancies between planned and implemented project activities

29

Page 30: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

Inputs from Open Consultation: Solutions

30

Networking & Communication

• Increasing dialogue and interactions among North and South of the Mediterranean to build a common approach to cooperation and intensify financial synergies

• Institutional awareness raising on the importance of research and innovation and on the benefits of long-term cooperation

• Organizing meetings, social & awareness events involving North and South Mediterranean stakeholders and policy makers in order to set-up a valid and shared common strategy

• Increasing dissemination and information conferences/events addressed to researchers

Q3.3 – “Please, suggest possible/feasible solutions to overcome the above mentioned problems”

Page 31: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

Inputs from Open Consultation: Solutions

31

Management & Institutional responsibility

• Streamlining and simplifying bureaucratic processes and application procedures • Harmonizing research policies and procedures • Promoting capacity building actions on governance, project development and

management • Inspiring the definition of research funding priorities based on scientific/knowledge

aspects rather than on political issues • Promoting participatory approach in the decision making process (e.g. involvement of

scientists) and a North-South co-ownership of in the designing of programmes and implementation of projects

• Developing research programmes targeting medium and long term common benefits and effects

• Increasing the number of MPCs oriented calls • Following-up the results of projects and leveraging on the excellent ones • Reducing discrepancies between planned and implemented activities

Q3.3 – “Please, suggest possible/feasible solutions to overcome the above mentioned problems”

Page 32: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

Inputs from Open Consultation: Solutions

32

Resources (financial/human) & Capacity • Improving capacity building, offering training opportunities for all stakeholders

especially the ones belonging to civil society • Improving governance capacity building • Improving capacity building for high-qualified Project Managers in MPCs, by

ensuring training opportunities on application procedures and cooperation projects management

• Setting-up new financial instruments

Q3.3 – “Please, suggest possible/feasible solutions to overcome the above mentioned problems”

Page 33: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

Inputs from Open Consultation: Solutions

33

Responsiveness to users’ needs

• Designing specific programs more focused on MPCs needs, open and flexible enough to allow countries participation according to their specificities.

• Improving the involvement of stakeholders in the different steps of the process, especially in the identification and prioritization of real needs

• Paying more attention to final users needs and priorities in designing R&I projects

• Identifying most important barriers and difficulties during the designing of projects

Q3.3 – “Please, suggest possible/feasible solutions to overcome the above mentioned problems”

Page 34: From Lisbon to Sousse: along the EMEG work · Sousse (TN), 22-23 September 2014 . From Lisbon to Sousse: along the EMEG work . C. Bogliotti (CIHEAM-IAMB) MEDSPRING Mediterranean Science,

Workgroup tasks • EMEG experts are asked to contextualize Main Problems

(coming from open consultation) according with specific societal challenges to obtain Specific Problems

• Defining Specific Policy Objectives linked to Specific Problems • Prioritization of Specific Policy Objectives • Metaplan: definition of Expected Impacts • Brainstorming: barriers/enhancing factors (Variables) • Defining Possible Actions for each Secific Objective • Group leaders/Facilitators : Ayman Rabi/Marinella Giannelli

(WATER), Moez Jebara/Gaetano Ladisa (FOOD), Victor Silva/Chiara Morini (ENERGY) + Zeinab El-Sadr

34