19
From Integrated Corridor Management to Integrated Regional Management Dallas Experience September 22, 2015

From Integrated Corridor Management to Integrated Regional … · 2020-03-04 · SmartNET EcoTrafiX) User DSS Sub-System SmartNET (EcoTrafiX) Sub-System. SmartFusion Sub-System 511DFW

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: From Integrated Corridor Management to Integrated Regional … · 2020-03-04 · SmartNET EcoTrafiX) User DSS Sub-System SmartNET (EcoTrafiX) Sub-System. SmartFusion Sub-System 511DFW

From Integrated Corridor Management to Integrated Regional Management

Dallas Experience

September 22, 2015

Page 2: From Integrated Corridor Management to Integrated Regional … · 2020-03-04 · SmartNET EcoTrafiX) User DSS Sub-System SmartNET (EcoTrafiX) Sub-System. SmartFusion Sub-System 511DFW

US 75 Corridor Networks

• Freeway with continuous Frontage Roads

• Managed HOV lanes • Dallas North Toll way • DART Bus and Ligh Rail

Network • Three Cities, 900 Signals,

167 Miles of Arterials • Multiple TMCs • Regional ATIS

Presenter
Presentation Notes
Primary corridor in Yellow, over 25 miles (name cities) “Travel-Shed” is shown by the thicker blue line. CBD is at the southern end of the travel-shed. Corridor includes: 8-lane freeway with continuous FRs (272 miles) Managed HOV lanes (14 miles in each direction) - highlighted in Orange DART Red Line immediately adjacent to the freeway – map shows the red, blue, and orange lines Toll Road bounding the western side (100 miles), DART Blue Line bounding the eastern side, and Regional Arterials crossing the corridor for significant lengths with bus service.
Page 3: From Integrated Corridor Management to Integrated Regional … · 2020-03-04 · SmartNET EcoTrafiX) User DSS Sub-System SmartNET (EcoTrafiX) Sub-System. SmartFusion Sub-System 511DFW
Page 4: From Integrated Corridor Management to Integrated Regional … · 2020-03-04 · SmartNET EcoTrafiX) User DSS Sub-System SmartNET (EcoTrafiX) Sub-System. SmartFusion Sub-System 511DFW

Dallas ICMS Architecture- operations Public Web

IVR

Public XML

Trip Planner

Social Media

My511 - Alerts

Mobile Application

Integrated corridor M

anagement

Integrated corridor M

anagement

Integrated corridor M

anagem

ent

Collection & Fusion platform

Integrated corridor

Management

Integrated corridor

Management

Integrated corridor

Management

Integrated corridor

Management

Integrated corridor

Management

Integrated corridor

Management

Integrated corridor

Management

C2C DART Events AVL/APC DART

GTFS Weather NAVTEQ

Arterials

Parking Management

Integrated corridor

Management

TxDOT XML

(HOV)

Expert Rules

Evaluation Prediction

ICM Coordinator

Agency Administrator

DSS Dialogue

SmartNET (EcoTrafiX)

Agency User

DSS Sub-System SmartNET (EcoTrafiX) Sub-System

SmartFusion Sub-System

511DFW

Page 5: From Integrated Corridor Management to Integrated Regional … · 2020-03-04 · SmartNET EcoTrafiX) User DSS Sub-System SmartNET (EcoTrafiX) Sub-System. SmartFusion Sub-System 511DFW

Additional Needs

• Regional Expansion • Resources and Responsibilities Sharing • Sharing of ICM Coordinator Responsibility • Improved User Interface • Map Centric • Situation Awareness • ATMS and DSS Automation • Transit Applications • Dynamic Performance Measures

Page 6: From Integrated Corridor Management to Integrated Regional … · 2020-03-04 · SmartNET EcoTrafiX) User DSS Sub-System SmartNET (EcoTrafiX) Sub-System. SmartFusion Sub-System 511DFW

6 Confidential Property of Schneider Electric

Software Suite (Hardware agnostic)

Schneider Electric Traffic Management Solution

City Highway

Tolling Tunnel

Presenter
Presentation Notes
Highways
Page 7: From Integrated Corridor Management to Integrated Regional … · 2020-03-04 · SmartNET EcoTrafiX) User DSS Sub-System SmartNET (EcoTrafiX) Sub-System. SmartFusion Sub-System 511DFW

NCTCOG Coverage Area

Page 8: From Integrated Corridor Management to Integrated Regional … · 2020-03-04 · SmartNET EcoTrafiX) User DSS Sub-System SmartNET (EcoTrafiX) Sub-System. SmartFusion Sub-System 511DFW

DFW Metroplex

Page 9: From Integrated Corridor Management to Integrated Regional … · 2020-03-04 · SmartNET EcoTrafiX) User DSS Sub-System SmartNET (EcoTrafiX) Sub-System. SmartFusion Sub-System 511DFW

Event Ownership / Transfer

Page 10: From Integrated Corridor Management to Integrated Regional … · 2020-03-04 · SmartNET EcoTrafiX) User DSS Sub-System SmartNET (EcoTrafiX) Sub-System. SmartFusion Sub-System 511DFW

ICM Coordinator Flexibility

Page 11: From Integrated Corridor Management to Integrated Regional … · 2020-03-04 · SmartNET EcoTrafiX) User DSS Sub-System SmartNET (EcoTrafiX) Sub-System. SmartFusion Sub-System 511DFW

Situation Awareness

Presenter
Presentation Notes
EcoTrafiX: Map view with Events and Traffic Speeds layer on.
Page 12: From Integrated Corridor Management to Integrated Regional … · 2020-03-04 · SmartNET EcoTrafiX) User DSS Sub-System SmartNET (EcoTrafiX) Sub-System. SmartFusion Sub-System 511DFW

Real Time Transit Information

Page 13: From Integrated Corridor Management to Integrated Regional … · 2020-03-04 · SmartNET EcoTrafiX) User DSS Sub-System SmartNET (EcoTrafiX) Sub-System. SmartFusion Sub-System 511DFW

Incident Response Plan #1: LRT RAIL DISRUPTION SHUTTLE

LOVERS LANE STATION & MOCKINGBIRD STATION Instruction: Initiate Bus Bridge to transport passengers between Lover’s Lane Station and Mockingbird Station.

ROUTING TO MOCKINGBIRD STATION (Use Destination Code 04) FROM LOVERS LANE STATION L. MILTON TO EXIT LOVERS LANE STATION R. GREENVILLE R. YALE L. WORCOLA R. INTO MOCKINGBIRD STATION

ROUTING TO LOVERS LANE STATION (Use Destination Code 06) FROM MOCKINGBIRD STATION

L. OUTER ROAD TO EXIT MOCKINGBIRD STATION L. TWIN SIXTIES R. US 75 FRONTAGE ROAD R. LOVERS LANE R. GREENVILLE R. INTO LOVERS LANE STATION

Use bus requirements and supervisory staff for Bus Bridge Step #1: Announce Change in Operation to Train operators and trains supervisors. Step #2: Notify Bus Control to Set up Bus Bridge #1 between Lovers Lane Station and Mockingbird at 9:00 am. Step #3: Order 10 buses including 5 at Mockingbird and 5 at Lovers Step 4: Request DART Police, Fare Enforcement, Bus Supervisors. Step 5: Notify DART PIO to inform community and users

Time Period Pass/Hr Bus Require.

Supervisors Required at each sation.

Police or fare enforcement

Before 6:00 am 600/hr 8 buses 2 2 6:00 am to 9:00 am 1600/hr 20 buses 2 2 9:00 am until 3:00 pm 600 10 buses 2 2 3:00 pm until 7:00 pm 1600 20 buses 2 2 After 7:00 pm 600 8 buses 2 2

Page 14: From Integrated Corridor Management to Integrated Regional … · 2020-03-04 · SmartNET EcoTrafiX) User DSS Sub-System SmartNET (EcoTrafiX) Sub-System. SmartFusion Sub-System 511DFW

LRT Rail Distruption Shuttle Lovers Ln. Stn.

Mockingbird Stn.

Bus Bridge

Page 15: From Integrated Corridor Management to Integrated Regional … · 2020-03-04 · SmartNET EcoTrafiX) User DSS Sub-System SmartNET (EcoTrafiX) Sub-System. SmartFusion Sub-System 511DFW

Bus Bridge Response Plan

Page 16: From Integrated Corridor Management to Integrated Regional … · 2020-03-04 · SmartNET EcoTrafiX) User DSS Sub-System SmartNET (EcoTrafiX) Sub-System. SmartFusion Sub-System 511DFW

MAP CENTRIC • Where is my Bus? • Where is my Train? • What is the load on the train? • How is the weather? Past 30 mins, Projected 30 mins • What is going on the platform? • Are there any stranded passengers? • How heavy is the traffic? • How heavy is the snow falling? • Are the streets clear? • Has the accident been cleared?

External Sources • Transit Master Bus/Rail - AVL/CAD • Vehicle Load APC Data Feed • Weather Data Feed • Surveillance

Cameras DART (Police, Safety, Rail Platform, Transit Centers, Operations / Maintenance Facilities, Revenue, etc) NTTA, TXDOT • GIS Data

Layers

Public Facing • Everbridge

• Publisher

• DARTNet

• PAVMBs

Input Form(s): • Incidents Details • Alerts • Public Input • Employee Input

Core Intelligence: TTA optimized modeling engine against Data Repository (Historical, Real-Time, Projected

Web Enabled App: Platforms/OS: Laptop – Tablet – Smartphone

Controlled Views/Access • Public • DART User • Power

Viewer • Administrator

Report Generator: • Post Incident Summaries • Incident Queries by Date /

Incident Type/Class, etc. • Automated Periodic

reports • (OCC Logs/Business)

1

2 3

DART Supervisory System

Page 17: From Integrated Corridor Management to Integrated Regional … · 2020-03-04 · SmartNET EcoTrafiX) User DSS Sub-System SmartNET (EcoTrafiX) Sub-System. SmartFusion Sub-System 511DFW

SERVICE DISRUPTION UPDATES NO DISRUPTION – SCHEDULED SERVICE LEVELs …….

SEVERE DISRUPTION…….ICE ON GROUND……SCENARIO-1 IN EFFECT…. MAJOR ACCIDENT…….CRT ACTIVATED…….DOWNTOWN CORRIDOR EFFECTED….

1 - TITLE BLOCK

2 – SCROLLING TXT

3 – SYSTEM MAP (OVERVIEW MAP with incident location

4 – INCIDENT MAP (CLOSE UP MAP with details)

5 – ‘REAL-TIME’ UDPATES (automatically updated from OCL logs/Publisher?)

INCIDENT UPDATES: 8:30 AM: NB Train (Orange Line) collided with a DART Big Bus at Akard Station (N) Crossing.. 8:32 AM: Major damage (xxxxx….) reported and confirmed by Rail Field Supervisor. 8:34 AM: All CBD Stations affected and CRT activated 8:37 AM: Bus Bridge Requested 8:50 AM: DART and Dallas PD on-site 8: 55 AM: Two bus bridges (Akard to Union and Union to Akard confirmed)

6 – ‘REAL-TIME’ UDPATES (automatically updated from Weather Service?)

WEATHER UPDATES: 8:30 AM: …………………………………….. 8:32 AM: ………………………………………………………………………………………………………………….. 8:34 AM: ……………………………………………………………………….. 9:50 AM:…………………………………………..

Page 18: From Integrated Corridor Management to Integrated Regional … · 2020-03-04 · SmartNET EcoTrafiX) User DSS Sub-System SmartNET (EcoTrafiX) Sub-System. SmartFusion Sub-System 511DFW

Data Archival

Page 19: From Integrated Corridor Management to Integrated Regional … · 2020-03-04 · SmartNET EcoTrafiX) User DSS Sub-System SmartNET (EcoTrafiX) Sub-System. SmartFusion Sub-System 511DFW

Performance Measures