Upload
vuhuong
View
233
Download
7
Embed Size (px)
Citation preview
3600PEOPLE EMPLOYEDDURING OPERATIONS
3
4
2 PRODUCTION UNITS AND TWO LNGSTORAGE TANKS
24HROPERATION
WORLD’S MOST GREENHOUSE EFFICIENT LNG PLANT OUTSIDE THE ARCTIC CIRCLE
120CARGOES PER YEAR
A$ 3.9bnSPENT WITH AUSTRALIANBUSINESSES FY15-16
>A$ 1bnCONTRIBUTED TO COMMUNITY PROJECTS AND SERVICES
140000M3
EACH CONTAINING
EACH TANK HOLDS ENOUGH LNG TO POWER MELBOURNE FOR A WEEK
1 LARGE STORAGE TANK HAS APPROXIMATELYTHE SAME VOLUME AS 1 LNG SHIP1X 1X
≈CHINA, JAPAN, SOUTH KOREA, INDIA, SINGAPORE, MALAYSIA, THAILAND, UAE, PAKISTAN, MEXICO, JORDAN, KUWAIT, TAIWAN
EXPORT DESTINATIONS INCLUDE:
DRILLSurat Basin, Queensland
FROM GAS TO LIQUEFIED NATURAL GAS (LNG)
24GAS PROCESSINGFACILITIES
6CENTRAL PROCESSINGPLANTS
2WATER TREATMENTPLANTS
540kmPIPELINE NETWORK - EQUIVALENT TO THE DISTANCE FROM TOOWOOMBA TO GLADSTONE
5000kmGATHERING PIPELINES- EQUIVALENT TO THE DISTANCE FROM BRISBANE TO PERTH
>2600WELLS DRILLED AND CONNECTED TO THE PIPELINE NETWORK
WATER
>A$ 1bnINVESTED IN TREATINGWATER FOR USE BYAGRICULTURE AND INDUSTRY
1 2
PROCESSSurat Basin, Queensland
AROUND
LIQUEFYLNG Plant, Curtis Island, Gladstone
EXPORTLNG Plant, Curtis Island, Gladstone
WE WILL SUPPLY MORE THAN
75PETAJOULESOF GAS TO AUSTRALIAN CUSTOMERS IN 2017, REPRESENTING MORE THAN
10% OF EAST COASTGAS DEMAND
SUPPLYto Australian market