BIM at One William Street From Design to Fabrication…. An Engineers perspective One William Street By Patrick Hendry For EMF Griffiths 15/10/2014

From Design to Fabrication…. One William Street An ... · BIM Co-ordination EMF Griffiths as mechanical designer took on the ‘BIM’ coordinator role and lead weekly coordination

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: From Design to Fabrication…. One William Street An ... · BIM Co-ordination EMF Griffiths as mechanical designer took on the ‘BIM’ coordinator role and lead weekly coordination

BIM at One William Street From Design to Fabrication…. An Engineers perspective One William Street

By Patrick Hendry For EMF Griffiths 15/10/2014

Page 2: From Design to Fabrication…. One William Street An ... · BIM Co-ordination EMF Griffiths as mechanical designer took on the ‘BIM’ coordinator role and lead weekly coordination

EMF Griffiths

Australian based Building Services Engineering Design consultancy business. 54 No. Staff including 25 professional engineers. Offices in Brisbane, Gold Coast and Sydney providing engineering and consultancy for: • Mechanical • Electrical • Fire Services • Hydraulics • Vertical Transportation • ESD • Building Tuning

Page 3: From Design to Fabrication…. One William Street An ... · BIM Co-ordination EMF Griffiths as mechanical designer took on the ‘BIM’ coordinator role and lead weekly coordination

My role with EMF Griffiths

Senior Mechanical Design Engineer. CPEng, RPEQ. Not a BIM Modeler.

Page 4: From Design to Fabrication…. One William Street An ... · BIM Co-ordination EMF Griffiths as mechanical designer took on the ‘BIM’ coordinator role and lead weekly coordination

The Design & Construction Team

Client Cbus

Design Manager Brookfield Multiplex

Civil & Structural Engineer

Hyder

Building Services Engineer

EMF Griffiths

D&C Contractor Brookfield Multiplex

Architect Woods Bagot

D&C Specialist Sub-contractors

M/E/H/F

Page 5: From Design to Fabrication…. One William Street An ... · BIM Co-ordination EMF Griffiths as mechanical designer took on the ‘BIM’ coordinator role and lead weekly coordination

New build commercial office development 42 above ground levels 3 basement levels GFA = 125,960sqm NLA = 75,935sqm Total Cars – 318 Motorbikes - 37 Bicycles – 600

Project appreciation

Page 6: From Design to Fabrication…. One William Street An ... · BIM Co-ordination EMF Griffiths as mechanical designer took on the ‘BIM’ coordinator role and lead weekly coordination

Rating Tool Project Requirement Target

National Australian Built

Environment Rating Scheme

5 Stars

(Base Building Energy)

National Australian Built

Environment Rating Scheme

3 Stars

(Water)

National Australian Built

Environment Rating Scheme

3 Stars

(Waste)

National Australian Built

Environment Rating Scheme

3 Stars

(Indoor Environment

Quality)

5 Stars 6 Stars

5 Stars 6 Stars

Environmental Ratings

53

Page 7: From Design to Fabrication…. One William Street An ... · BIM Co-ordination EMF Griffiths as mechanical designer took on the ‘BIM’ coordinator role and lead weekly coordination

SOUTH WEST ELEVATION

CURRENT NORTH EAST ELEVATION

7

BIM Journey Not a project requirement. Instigated by the BMPX acting as the D&C Contractor. Not by the Client or Anchor Tenant (QLD Government). REVIT Architect, Services Engineer and Structural Engineer.

Page 8: From Design to Fabrication…. One William Street An ... · BIM Co-ordination EMF Griffiths as mechanical designer took on the ‘BIM’ coordinator role and lead weekly coordination

CURRENT NORTH EAST ELEVATION

8

BIM Journey Services design produced in 2D CAD until the tender documentation stage. Mechanical tender documentation in REVIT. Electrical, hydraulic and fire services documented on 2D CAD with REVIT model as a guide for co-ordination purposes only.

CURRENT NORTH EAST ELEVATION

Page 9: From Design to Fabrication…. One William Street An ... · BIM Co-ordination EMF Griffiths as mechanical designer took on the ‘BIM’ coordinator role and lead weekly coordination

42

Post Tender design development EMF Griffiths retained to complete the mechanical design. Remaining services 80% designed, the remaining 20% to be documented by the specialist D&C sub-contractors.

Page 10: From Design to Fabrication…. One William Street An ... · BIM Co-ordination EMF Griffiths as mechanical designer took on the ‘BIM’ coordinator role and lead weekly coordination

45

BIM Co-ordination EMF Griffiths as mechanical designer took on the ‘BIM’ coordinator role and lead weekly coordination workshops as the using Navisworks. Participants issued models 24hrs before the meeting. Meetings held for 8 months, initially 6hrs reducing to 2hrs as the design was refined.

Page 11: From Design to Fabrication…. One William Street An ... · BIM Co-ordination EMF Griffiths as mechanical designer took on the ‘BIM’ coordinator role and lead weekly coordination

43

BIM design workload 60% Modeling 40% co-ordination and management

Page 12: From Design to Fabrication…. One William Street An ... · BIM Co-ordination EMF Griffiths as mechanical designer took on the ‘BIM’ coordinator role and lead weekly coordination

45

BIM Co-ordination Coordination workshops attended by specialist BIM modelers & specialist design engineers. Key to achieving an effective model which accurately depicts practical compliant engineering systems

Page 13: From Design to Fabrication…. One William Street An ... · BIM Co-ordination EMF Griffiths as mechanical designer took on the ‘BIM’ coordinator role and lead weekly coordination

45

Lower Ground Level End of Trip Facilities

Page 14: From Design to Fabrication…. One William Street An ... · BIM Co-ordination EMF Griffiths as mechanical designer took on the ‘BIM’ coordinator role and lead weekly coordination

45

Lower Ground Level Fire Pump Room

Page 15: From Design to Fabrication…. One William Street An ... · BIM Co-ordination EMF Griffiths as mechanical designer took on the ‘BIM’ coordinator role and lead weekly coordination

45

Lower Ground Overview

Page 16: From Design to Fabrication…. One William Street An ... · BIM Co-ordination EMF Griffiths as mechanical designer took on the ‘BIM’ coordinator role and lead weekly coordination

REVIT benefits Know it works, don’t just think it can be made to work. Initial input time consuming, but impacts of changes are realised more quickly. Upfront problem solving. Navisworks model available on site Lower project risk!

16

Page 17: From Design to Fabrication…. One William Street An ... · BIM Co-ordination EMF Griffiths as mechanical designer took on the ‘BIM’ coordinator role and lead weekly coordination

REVIT benefits Management of sub-contractors. Upfront problem solving.

17

Navisworks available on site to aid decision making.

Page 18: From Design to Fabrication…. One William Street An ... · BIM Co-ordination EMF Griffiths as mechanical designer took on the ‘BIM’ coordinator role and lead weekly coordination

REVIT - Disrupting the status quo! The balance of effort between the Design Team (input) and the Construction Team (output) fundamentally changed. Bucking the recent trend.

18

REVIT MEP is continually improving but is often frustrating. Shortage of experienced modelers.

Page 19: From Design to Fabrication…. One William Street An ... · BIM Co-ordination EMF Griffiths as mechanical designer took on the ‘BIM’ coordinator role and lead weekly coordination

Design to Fabrication Specialist services sub-contractors not directly using the REVIT model other than for clash detection through Navisworks. They are using independent specialist fabrication ‘BIM’ tools which export files for incorporation into the Navisworks model.

Page 20: From Design to Fabrication…. One William Street An ... · BIM Co-ordination EMF Griffiths as mechanical designer took on the ‘BIM’ coordinator role and lead weekly coordination

BIM’s future a Design Engineer’s dream

A single model which EFFECTIVELY allows a single data input to analyse: 1) Thermal loads 2) Façade performance 3) Day-lighting 4) Electrical Lighting 5) Energy consumption

Page 21: From Design to Fabrication…. One William Street An ... · BIM Co-ordination EMF Griffiths as mechanical designer took on the ‘BIM’ coordinator role and lead weekly coordination

BIM’s future an Engineer’s view

Greater industry familiarity will increase knowledge of the benefits and reduce associated costs. This has been demonstrated by the GBCA Green Star initiative. EMF Griffiths recently completed 100 Green Stars that is our projects Green Star’s tally 100. We’ve noticed a huge difference in the market’s perception of the associated risks .

Page 22: From Design to Fabrication…. One William Street An ... · BIM Co-ordination EMF Griffiths as mechanical designer took on the ‘BIM’ coordinator role and lead weekly coordination

Questions? www.emf.com.au EMF Brisbane 82 Arthur Street Fortitude Valley, QLD 4006 Ph: (07) 3254 2788 Fax: (07) 3254 2799 [email protected] EMF Gold Coast Suite 6, Robina Quays Corporate Park 34-36 Glenferrie Drive, Robina, QLD 4226 Ph: (07) 5593 2075 Fax: (07) 5593 2095 [email protected] EMF Sydney Level 2, Suite 201 276 Pitt Street, Sydney NSW 2000 Ph: (02) 9283 8445 Fax: (02) 9283 2331 [email protected]