Upload
skyla
View
31
Download
0
Tags:
Embed Size (px)
DESCRIPTION
FRESCA2 Update on the dipole design and new calculations. EUCARD - WP7- HFM Collaboration Meeting LASA Milano Jorge Enrique MUÑOZ GARCIA. outline. Introduction : related projects & magnet overview Dummy-coils : replacement of superconducting coils Instrumentation : strain gauges - PowerPoint PPT Presentation
Citation preview
FRESCA2
Update on the dipole design and new calculations
EUCARD - WP7- HFM Collaboration Meeting LASA Milano
Jorge Enrique MUÑOZ GARCIA
Jorge Enrique MUÑOZ GARCIAEUCARD - WP7- HFM Collaboration Meeting LASA Milano
September 18th, 2012
Jorge Enrique MUÑOZ GARCIA 2EUCARD - WP7- HFM Collaboration Meeting LASA Milano
outline
• Introduction: related projects & magnet overview
• Dummy-coils: replacement of superconducting coils
• Instrumentation: strain gauges
• FEM model: expected stresses during the assembly, pre-load, and cool-down
• FEM model: cases of study
• Work in progress
Jorge Enrique MUÑOZ GARCIA 3EUCARD - WP7- HFM Collaboration Meeting LASA Milano
outline
• Introduction: related projects & magnet overview
• Dummy-coils: replacement of superconducting coils
• Instrumentation: strain gauges
• FEM model: expected stresses during the assembly, pre-load, and cool-down
• FEM model: cases of study
• Work in progress
RMC FRESCA2
Jorge Enrique MUÑOZ GARCIA 4Juan Carlos Perez “Fresca2 construction status, assembly procedures, tooling and test facilities” EuCard-WP7-HFM 9th Collaboration Meeting
Introduction: related projects
Short Model Coil12.5 T peak field on the coil @ 1.9KWeight: 2 double pancake racetrack coils mounted in a bolted steel structure composed of 2 horizontal and 2 vertical pads, to obtain a “coil pack”Fe yoke / Al shell: 20 mm thick
Race-track Model Coil16 T peak field / 18.3kAWeight: 2 double pancake racetrack coils mounted in a bolted steel structure composed of 2 horizontal and 2 vertical pads, to obtain a “coil pack”Fe yoke / Al shell Øout = 0.570m
Facility for the REception of Superconducting CAbles13 T bore field / 10.8kA @ Ø100mm apertureWeight: 10 tBlock-type coil design with flared ends:
4 double-pancakes,Bladder-and-key type of structureFe yoke / Al shell: 65 mm thick, Øout = 1.030mMagnet length: 2.255 m
SMC
EUCARD - WP7- HFM Collaboration Meeting LASA Milano
• Target: 13 T / Ø100 mm bore• Ø1.030 m; length: 2.255 m• Al shell, 65 mm thick, 1.6 m long• Iron yoke
– Holes for 4 Al-axial rods• Horizontal stainless steel pad
– 3 bladders– 2 load keys (1horizontal, 1vertical)
• Iron / Ti central post• Vertical iron pad
– 2 bladders,– 2 load keys
• Auxiliary bladders between yokes• 4 double-layer coils
Introduction: magnet overviewFRESCA2 Cross-section
Jorge Enrique MUÑOZ GARCIA 6EUCARD - WP7- HFM Collaboration Meeting LASA Milano
outline
• Introduction: related projects & magnet overview
• Dummy-coils: replacement of superconducting coils
• Instrumentation: strain gauges
• FEM model: expected stresses during the assembly, pre-load, and cool-down
• FEM model: cases of study
• Work in progress
Dummy coils: replacements of coilsFRESCA2 Cross-section
Jorge Enrique MUÑOZ GARCIA 7
Al block
Al block
Replacement of coils & pole by 2 Al-blocksdummy-coils
Mechanical test of the structure: at room temperature (warm) at cryogenic temperature (cold)
Instrumentation (strain gauges): Aperture (dummy-coils) Shell Rod
Qualification of the structure Validation of the assembly process Validation of the FEM model
EUCARD - WP7- HFM Collaboration Meeting LASA Milano
Jorge Enrique MUÑOZ GARCIA 8EUCARD - WP7- HFM Collaboration Meeting LASA Milano
outline
• Introduction: related projects & magnet overview
• Dummy-coils: replacement of superconducting coils
• Instrumentation: strain gauges
• FEM model: expected stresses during the assembly, pre-load, and cool-down
• FEM model: cases of study
• Work in progress
Jorge Enrique MUÑOZ GARCIA 9EUCARD - WP7- HFM Collaboration Meeting LASA Milano
Instrumentation: strain gaugesFRESCA2
Rods
Shell
Dummy-coil
Jorge Enrique MUÑOZ GARCIA 10EUCARD - WP7- HFM Collaboration Meeting LASA Milano
outline
• Introduction: related projects & magnet overview
• Dummy-coils: replacement of superconducting coils
• Instrumentation: strain gauges
• FEM model: expected stresses during the assembly, pre-load, and cool-down
• FEM model: cases of study
• Work in progress
iron yoke
shell
vertical pad end plate
coils
rod
wedge
Jorge Enrique MUÑOZ GARCIA 11
FRESCA2 dummy-coil: FEM modelcomponents
Shell [Aluminum]Yoke [Iron]Pad-h [stainless steel]
Shim-in [G10]Shim-mid [G10]
Pad-v [Iron]
Yoke [stainless steel]
Pad-v [stainless steel]
Dummy [Aluminum]
Key-h [stainless steel]Key-v [stainless steel]
solid95 3D 20-node structural solid element (brick)conta174 3D 8-node surface-to-surface contacttarge170 3D target segmentfriction = 0.2 everywhere that components come into contact with each other
EUCARD - WP7- HFM Collaboration Meeting LASA Milano
Rod [Aluminum]
End-plate [Nitronic]
Jorge Enrique MUÑOZ GARCIA 12EUCARD - WP7- HFM Collaboration Meeting LASA Milano
FEM model: assembly processExpected stresses: FRESCA2 2D dummy-coils
Cross-section at the middle of
FRESCA2
• Comparison of stress during assembly & cool-down: FEM simulation vs. strain gauges measurements
Outside shell 0°
Outside shell 45°Outside shell 90°
dummy aperture
Jorge Enrique MUÑOZ GARCIA 13EUCARD - WP7- HFM Collaboration Meeting LASA Milano
FEM model: assembly processExpected stresses: FRESCA2 2D dummy-coils
• Comparison of stress during h-bladder operation: Peak stress outside the shell: 50MPa
Peak compression in the dummy-aperture: 120MPa
Outside shell
dummy aperture
Cross-section at the middle of
FRESCA2
FRESCA2dummy 2D model
Jorge Enrique MUÑOZ GARCIA 14EUCARD - WP7- HFM Collaboration Meeting LASA Milano
FEM model: assembly processExpected stresses: FRESCA2 2D dummy-coils
• Comparison of stress during v-bladder operation: Peak stress outside the shell : 25MPa
Peak compression in the dummy-aperture : 30MPa
Outside shell
dummy aperture
Cross-section at the middle of
FRESCA2
FRESCA2dummy 2D model
Jorge Enrique MUÑOZ GARCIA 15EUCARD - WP7- HFM Collaboration Meeting LASA Milano
FEM model: assembly processExpected stresses: FRESCA2 2D dummy-coils
• Comparison of stress during key operation: Peak stress outside the shell : 30MPa
Peak compression in the dummy-aperture : 75MPa
Outside shell
dummy aperture
Cross-section at the middle of
FRESCA2
FRESCA2dummy 2D model
Jorge Enrique MUÑOZ GARCIA 16EUCARD - WP7- HFM Collaboration Meeting LASA Milano
FEM model: assembly processExpected stresses: FRESCA2 2D dummy-coils
• Comparison of stress during cool-down: Peak stress outside the shell : 120MPa
Peak compression in the dummy-aperture : 200MPa
Outside shell
dummy aperture
Cross-section at the middle of
FRESCA2
FRESCA2dummy 2D model
Jorge Enrique MUÑOZ GARCIA 17EUCARD - WP7- HFM Collaboration Meeting LASA Milano
FEM model: assembly processExpected stresses: FRESCA2 3D dummy-coils
Key operation
• Comparison of stress during key operation: Peak stress outside the shell : 30MPaDummy peak compression: 75MPa
dummy
shell
FRESCA2dummy 3D model
Jorge Enrique MUÑOZ GARCIA 18EUCARD - WP7- HFM Collaboration Meeting LASA Milano
FEM model: assembly processExpected stresses: FRESCA2 3D dummy-coils
Rod pre-tension
• Comparison of stress during rod pre-tension: Peak stress inside the shell @90°
Dummy stress concentration at the straight section
dummy
shell
FRESCA2dummy 3D model
Jorge Enrique MUÑOZ GARCIA 19EUCARD - WP7- HFM Collaboration Meeting LASA Milano
FEM model: assembly processExpected stresses: FRESCA2 3D dummy-coils
Cool-down
• Comparison of stress during cool-down: Peak stress inside the shell @0°
Dummy stress concentration at the straight section
Longitudinal location of strain gauges
dummy
shell
FRESCA2dummy 3D model
Rod pre-tension
Jorge Enrique MUÑOZ GARCIA 20EUCARD - WP7- HFM Collaboration Meeting LASA Milano
FEM model: assembly processExpected stresses: FRESCA2 3D dummy-coils vs. superconducting coils
Cool-down
• Comparison of stress during cool-down: Peak stress outside the shell @0°
Dummy stress concentration at the straight section
coils
rails
end shoes
wedge
pole
dummy
coil pack
coilsVs.
dummy
Jorge Enrique MUÑOZ GARCIA 21EUCARD - WP7- HFM Collaboration Meeting LASA Milano
FEM model: assembly processExpected stresses during the assembly process
• Stress in the compression system: Aluminum rod longitudinal average stress: 160MPa @RT 225MPa @cryogenic
End-plate stress within yield stress limits*
*
Jorge Enrique MUÑOZ GARCIA 22EUCARD - WP7- HFM Collaboration Meeting LASA Milano
outline
• Introduction: related projects & magnet overview
• Dummy-coils: replacement of superconducting coils
• Instrumentation: strain gauges
• FEM model: expected stresses during the assembly, pre-load, and cool-down
• FEM model: cases of study
• Work in progress
Jorge Enrique MUÑOZ GARCIA 23EUCARD - WP7- HFM Collaboration Meeting LASA Milano
Cases of study
• FRESCA2 dummy-coils– Coils replaced by a block (this presentation)
• Validation of the assembly process• Validation of the model: comparison with the strain gauges
measurements
• FRESCA2 superconducting coils– FRESCA2 mech– FRESCA2 wedge (contact), overall friction– FRESCA2 wedge (no contact), overall friction– FRESCA2 wedge (glued, no contact)– FRESCA2 wedge (glued, contact)
Jorge Enrique MUÑOZ GARCIA 24EUCARD - WP7- HFM Collaboration Meeting LASA Milano
outline
• Introduction: related projects & magnet overview
• Dummy-coils: replacement of superconducting coils
• Instrumentation: strain gauges
• FEM model: expected stresses during the assembly, pre-load, and cool-down
• FEM model: cases of study
• Work in progress
• 3D FEM model:– Updating of geometries:• Update Ørod in the dummy-coil model• Wedge geometries
– Analysis & comparison of the results• Different cases of study
• Instrumentation of the structure:– Strain gauges on dummy aperture at 90°, 45°– Strain gauges on rods
Jorge Enrique MUÑOZ GARCIA 25EUCARD - WP7- HFM Collaboration Meeting LASA Milano
Work in progress
Jorge Enrique MUÑOZ GARCIA 26EUCARD - WP7- HFM Collaboration Meeting LASA Milano
Thank you
Assembly process: rotating device@ 927
½ yoke weight ≈ 2400 kg
Shell weight ≈ 860 kg
Jorge Enrique MUÑOZ GARCIA 27EUCARD - WP7- HFM Collaboration Meeting LASA MilanoJuan Carlos Perez “Fresca2 construction status, assembly procedures, tooling and test facilities” EuCard-WP7-HFM 9th Collaboration Meeting
The assembled parts will be rotated to horizontal position
Yoke and shell will be transported toan assembly table
bearing rollers will be used to slide the coil-pack into the
yoke aperture
The Al-block will be transported
to the assembly table
(Coil-pack weight ≈ 2000 kg)
Assembly process: table@ 927
Jorge Enrique MUÑOZ GARCIA 28EUCARD - WP7- HFM Collaboration Meeting LASA MilanoJuan Carlos Perez “Fresca2 construction status, assembly procedures, tooling and test facilities” EuCard-WP7-HFM 9th Collaboration Meeting
Two bladders will be used to push the ½ yokes towards the shell inner radius to allow gap keys insertion
Insertion of the keys in between the ½ yokes
Assembly process: ½ Yokes centring@ 927
Jorge Enrique MUÑOZ GARCIA 29EUCARD - WP7- HFM Collaboration Meeting LASA MilanoJuan Carlos Perez “Fresca2 construction status, assembly procedures, tooling and test facilities” EuCard-WP7-HFM 9th Collaboration Meeting
3 vertical bladders will be used to lift the coil-pack and remove the rollers
Temporary keys will be inserted to center the coil –pack into the yoke
aperture
Assembly process: table@ 927
Jorge Enrique MUÑOZ GARCIA 30EUCARD - WP7- HFM Collaboration Meeting LASA MilanoJuan Carlos Perez “Fresca2 construction status, assembly procedures, tooling and test facilities” EuCard-WP7-HFM 9th Collaboration Meeting
Pumping horizontal bladders & insertionof horizontal keys
Horizontal bladders insertion
Assembly process: horizontal bladder operation@ 927
Jorge Enrique MUÑOZ GARCIA 31EUCARD - WP7- HFM Collaboration Meeting LASA MilanoJuan Carlos Perez “Fresca2 construction status, assembly procedures, tooling and test facilities” EuCard-WP7-HFM 9th Collaboration Meeting
Pumping vertical bladders & insertion of vertical keys
Final configuration after loading operation
Assembly process: vertical bladder operation@ 927
Mechanical test Room temperature Cold-down
Jorge Enrique MUÑOZ GARCIA 32EUCARD - WP7- HFM Collaboration Meeting LASA MilanoJuan Carlos Perez “Fresca2 construction status, assembly procedures, tooling and test facilities” EuCard-WP7-HFM 9th Collaboration Meeting