SNCF INFRA – PROJETS SYSTÈME INGÉNIERIE Christian Courtois 2014 10 29
1
! 31000km of railway track
! 15500km electrified lines ! 1500V DC : 5800km ! 25000V AC : 9600km (HSL : >2000km) ! Others: 100km
! Yearly traffic on SNCF Réseau ! 12000 operated trains by a day ! 82 billion passenger-km ! 48 billion passenger km for TGV ! 5,5 billion passenger-km international ! 1135 million passengers all types ! 747 million passenger in Paris Suburb
area ! 19,5 billion tonne-km ! many freight operators and
passenger Thello operator
FRENCH RAILWAY NETWORK
SNCF INFRA – PROJETS SYSTÈME INGÉNIERIE Christian Courtois 2014 10 29
! EUROPEAN NETWORK ! 4 main voltages
! 7 UIC/national pan head design
! 7 materials for contact strips ! pure carbon, ! impregnated carbon, ! copper gladded carbon ! copper, steal, ! copper alloyed, ! aluminium.
OCL 100 mm² - Rotative speed 200 km/h (radius 4m)
Ventilation
1,95 m
1,60m
1,95 m
1,45 m - 1,60 m
1,60 m
1,80 m
1,80 m
1,60 m
1,45 m
1,45 m 1,95 m
1,95 m
1,95 m
1,95 m
1,95 m
1,80 m
1,95 m
And HS : 1,60m
1,95 m
1,95 m
1,95 m
1,95 m
1,60 m 1,95 m
25 kV 50 Hz
15 kV 16,7 Hz
3 kV dc
1,5 kV dc
PANTOGRAPH HEADS USED IN EUROPE
SNCF INFRA – PROJETS SYSTÈME INGÉNIERIE Christian Courtois 2014 10 29
UIC 608 – 1,450 m
25 kV France
TGV Pan head (adapted in Switzerland and Italy)
UIC 608 – 1,950 m
1,5 kV Normale
1,5 kV Midi
UIC 608 – 1,600 m
25 kV + 1,5 kV hors Midi
1450
PANTOGRAPH HEADS USED TODAY IN FRANCE
SNCF INFRA – PROJETS SYSTÈME INGÉNIERIE Christian Courtois 2014 10 29
TSI 1600 mm All AC & DC applications (except Midi OCL)
TSI 1950 mm All DC applications
TSI PAN HEAD IN FRANCE
SNCF INFRA – PROJETS SYSTÈME INGÉNIERIE Christian Courtois 2014 10 29
FRANCO –EUROPEAN INTEROPERABILITY What are the accepted pan head profiles? Electrification system
Type of OHL Pan head today accepted
New pan head ?
25kV 50Hz 50’s type
V200
V350 High Speed
1,45 1,60 TSI 1,60
TSI 1,95
1500V dc compound 1,60 1,95
TSI 1,60
TSI 1,95
none
1500V dc “midi”
Not tensioned
90m spans
1,95 TSI 1,60
SNCF INFRA – PROJETS SYSTÈME INGÉNIERIE Christian Courtois 2014 10 29
NEW PAN HEAD PROFILES IN FRANCE questions? New pan head
Electrification system and OHL type
Contact strip type
gauge Dynamics: Fm and uplift
1,95 25kV high speed V350
Carbon or impregnated carbon
To be studied OK
1,95 25kV conventional 50’s
Carbon or impregnated carbon
To be studied
Risk: tunnels and bridges
Adaptation required if more than one panto
1,95 25kV V200 Carbon or impregnated carbon
To be studied
Risk: tunnels and bridges
OK
TSI ‘s 1,6 and 1,95 following Fm curve
1,5 kV
compound
metallic or impregnated carbon
OK Necessity of a lower Fm or new OHL type
1,60 1,5kV midi OHL metallic or impregnated carbon
OK High Risk: dewirement
SNCF INFRA – PROJETS SYSTÈME INGÉNIERIE Christian Courtois 2014 10 29
WORK TO BE DONE ON INFRA SIDE
! AC ! Check uplift ! Check gauge due to bridges and tunnels
! DC ! Replace compound by new type ! Midi: study adaptations
SNCF INFRA – PROJETS SYSTÈME INGÉNIERIE Christian Courtois 2014 10 29
TSI ENERGY case
! TSI compliance through ! Subsystem
assessment ! Use of IC OHL
TSI
Subsystem
Inline tests
Interoperability constituent
Design
Dynamic simulation
8
SNCF INFRA – PROJETS SYSTÈME INGÉNIERIE Christian Courtois 2014 10 29
9
MAIN PARAMETERS
Curve radius and cant Dynamic uplift Pantograph sway
PANTOGRAPH GAUGE
SNCF INFRA – PROJETS SYSTÈME INGÉNIERIE Christian Courtois 2014 10 29
10
COMBINED PARAMETERS
PANTOGRAPH GAUGE
SNCF INFRA – PROJETS SYSTÈME INGÉNIERIE Christian Courtois 2014 10 29
V350 TSI – Very High Speed Design
! A TSI certified design
! Allows the three 1,45 to 1,95 m pan heads
! Paris to Germany line (LGV Est) operated at 320km/h
! 2 operators : ICE (DB) & TGV (SNCF)
11
25000V AC High Speed OCL – designed for new, upgraded & renewed lines
SNCF INFRA – PROJETS SYSTÈME INGÉNIERIE Christian Courtois 2014 10 29
12
V160 TSI & V200 TSI – Conventional lines 25000V AC OCL – designed for new, upgraded & renewed lines
SNCF INFRA – PROJETS SYSTÈME INGÉNIERIE Christian Courtois 2014 10 29
13
V160 TSI & V200 TSI – Conventional Lines GAUGE & DESIGN
Straight line Curve radius = 4000 m Stagger = 0 mm
Curve radius = 300 m Stagger = - 240 mm
OCL design allows
both 1600mm & 1950mm pantograph heads
SNCF INFRA – PROJETS SYSTÈME INGÉNIERIE Christian Courtois 2014 10 29
14
ELECTRICAL GAUGE RESTRICTIONS CAN LIMIT INTEROPERABILITY IN TUNNELS
1600mm electrical gauge : OK
1950mm electrical gauge : NOK
V160 TSI & V200 TSI – Conventional Lines
SNCF INFRA – PROJETS SYSTÈME INGÉNIERIE Christian Courtois 2014 10 29
15
CSRR TSI Caténaire Simple Régularisée Renforcée DC OCL (750V to 3kV) – designed for new, upgraded & renewed lines
Under development for full TSI compliant design ! Automatically tensioned OCL ! Optimised mechanical tension of wires by simulations ! Standardised design components issued from HS lines ! High intensity supply : optimised electrical behaviour
SNCF INFRA – PROJETS SYSTÈME INGÉNIERIE Christian Courtois 2014 10 29
16
CSRR TSI 1500V DC OCL – designed for new, upgraded & renewed lines
! New DC lines designed for : ! Very high traffic load ! Freight traffic ! National passenger lines
! OCL design is TSI compliant up to 220km/h
! Gauges in tunnels are OK for renewed lines (compound CSRR)
OCL design allows
both 1600mm & 1950mm pantograph heads
SNCF INFRA – PROJETS SYSTÈME INGÉNIERIE Christian Courtois 2014 10 29
MIDI OHL
! How to accept 1600mm pan heads with 90m spans?
! Simulations have shown that: ! Without wind, 1600mm can be
used ! Particular points in stations to
be studied ! If wind risk too high: add pole at
span- midpoint
SNCF INFRA – PROJETS SYSTÈME INGÉNIERIE Christian Courtois 2014 10 29
SIMULATION TO STUDY PAN HEAD COMPATIBILITY WITH OHL GEOMETRY ! Multibody simulation associated with dynamic use, geometry and
pantograph kinematics :
SNCF INFRA – PROJETS SYSTÈME INGÉNIERIE Christian Courtois 2014 10 29
! To study the TSI compliance of the OCL designs, some new functionalities were added to the OSCAR software
! Fully flexible multibody model of the pantograph is now available
! It allows to study accurately interaction between the CW and pan heads and contact strips
SIMULATION TO STUDY PAN HEAD COMPATIBILITY WITH OHL GEOMETRY
SNCF INFRA – PROJETS SYSTÈME INGÉNIERIE Christian Courtois 2014 10 29
CONCLUSION 1 Electrification system
Type of OHL To accept solution
25kV 50Hz 50’s type
TSI 1,95 Check bridges and tunnels
Adapt design for Fm 25kV 50Hz V200 TSI 1,95 Check bridges and
tunnels
25kV 50Hz V350 And former types
High Speed
TSI 1,95 OK
Check very particular points
1500V dc compound TSI 1,60
TSI 1,95
Decrease Fm
Decrease Fm 1500V dc “midi” Not tensioned
90m spans
TSI 1,60 Decrease Fm and adapt geometry with new poles if wind risk
SNCF INFRA – PROJETS SYSTÈME INGÉNIERIE Christian Courtois 2014 10 29
CONCLUSION 2
• There are many possibilities to accept pan heads • The worst case is due to bridges and tunnels • In no windy situation 1600mm panhead can circulate under 1950mm OHL needing a risk management
• Simulation helps to check compatibility • French TSI OHLs accept both TSI euro-panheads