30
French market and projects revisited 6th June 2017 – London France Energie Eolienne (FEE)

French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

Frenchmarketandprojectsrevisited

6thJune2017–London

FranceEnergieEolienne(FEE)

Page 2: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

FEE–theFrenchWindEnergyAssociaDonCreated in 1996, France Energie Eolienne (FEE) supports and represents the windenergysector(bothonshore&offshore)inFrance.

Missions

ü  FEE represents the wind industry at public, naDonal, European and regionalauthoriDesandregulaDngbodies,

ü  The associaDon acDvely par@cipates in the crea@on of legisla@ve and regulatorytexts,

ü  It supports its members and facilitates their development in France. TheassociaDon promotes the interests of the associa@on members and organisesnetworking events as the annual na@onal summit: “colloque naDonaléolien”(around1000parDcipantsinSeptember2016).

•  300members(June2017):theybuiltmorethan90%oftheinstalledwindturbines

inFranceandoperate85%ofthem.

•  www.fee.asso.fr@feeasso

2

Page 3: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

TheactualFrenchWindEnergyMarket

3

-  14470jobsinthewindindustryon31.12.2015

-  +1950jobsin2015(i.e.+15%)

-  790companies-  ~12GWinstalled

capacity(onshore)on31.12.2016

-  +1560,5MWinstalledcapacity(onshore)in2016

-  1stoffshorewindfarms(boYomfixed)commissionedfrom2021.

à2017edi@on(2016figures)tocome:September2017!

Page 4: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

PlayersoftheFrenchmarket–mid-2016

4

Page 5: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

Theenergyplan(PPE–10/2016)

•  BoZom fixed offshore wind: between 0,5 and 6 GWaddi@onalcapaci@esawardedby2023.

•  Floa@ngoffshorewind:–  a«MRE»objecDf(withDdalwave),between0,2and2GWaddi@onalcapaci@esawardedby2023.

•  Ongoing process concerning the preparaDon of the 1stFOWcommercialtender(zoning):–  IntheMediterraneanSea–  InBriYany(NorthandSouth)

•  PPEtobeupdatedinthenextmonths5

FEE recommandation

(2030)

15 000 MW

6 000 MW

Page 6: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

OffshorewindinFrance–theawardedprojects(boYomfixed)

6

Page 7: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

3GWawardedthrough2rounds

7

Page 8: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

FécampEMF-WPD

CourseullesEMF-WPD

LocaDon Seine-MariDme Calvados

Power 498MW 450MW

Nbofturbines 83 75

FoundaDon GBS Monopile

Waterdepth 26à36m 21à32m

Distancefromthecoast 13km 10km

Area 65km² 50km²

Offshorewindopportuni@esinFrance…FocusonRound1“EMF-wpd”Projects

EPCI Foundations FCP / COU - SNA

EPCI OSS COU – FCP - SNA

Onshore Grid

EPCI IAC COU – FCP - SNA

EPCI Export Cables COU – FCP - SNA

EPC / T&I WTG COU – FCP - SNA

Page 9: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

2007-2013 2014-2015 2016 2017 From2018

Preliminarydialogue

Publicdebate

EnvironmentalandTechnical

studies

Endofmi@ga@onperiod

SubmissionoftheApplica@onfor

Authoriza@on(EIA)

Gran@ngof

authoriza@ons[Q2]

Nego@a@onofthemaincontracts

Selec@onofsuppliers[S22016]

FinancialInvestmentDecision

Closing

Firmorders

Startoffabrica@on

Construc@onon2years:supplyof

components,installa@on&commissioning

Opera@on

during25ans

ProjectsDevelopment Construc@onandopera@on

Engineeringandriskassessment

Startoftheprocurementprocessfor

construc@onlots(Direc@ve2014/17)

Offshorewindopportuni@esinFrance…Provisionalscheduleànewonetobeprecised

Page 10: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

Newtenderingprocess–thecompeDDvedialogue

•  Tenderingprocessin2steps:–  Pre-qualificaDonontechnical&financialcapaciDes;–  Aoer a pre-selecDonof the EnergyMinister : technical dialoguebetween

the State (ministry + other services, TSO etc.) and the prequalifiedcandidatesonthetendercondiDons.

•  Aimoftheprocedure:–  createatransparentandflexibletenderàincreasedconcurrenceinorder

toobtainthebestpriceandproject.•  Addi@onalinforma@on:

–  TheprocedurecanbebasedonpreliminaryinvesDgaDons(windresourcesdata, geophysical survey + environmental survey), coordinated by theState.

àTheprocedureshouldrulethenextoffshorewindtenders (fromthe3rdroundoffDunkerque).

10

Page 11: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

Ongoingtenders(3rdand4throunds)

•  Dunkerque(250-750MW)–3rdround–  Launched:OngoingcompeDDvedialogueprocedure/phase1achieved:i.e.

pre-selecDon of the candidates (10 candidates pre-selected according tothepress)+startofthediscussionsonthetender.

•  Oléron(~500MW-tbc)–4thround–  PublicconsultaDononthesiteachieved;startofthecompeDDvedialogue

proceduretocome(summer2017?)withphase1–postponedbecauseofgeneralelecDon.

•  Bassure-de-Baas/Berck-LeTouquet(~250MW/+-tbc)–  1st public consultaDon – a few informaDon available at the moment.

ShouldbeclarifiedwiththenewGovernment.

11

Page 12: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

WindenergyinFrance–stateoftheart

12

Page 13: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

OffshorewindinFrance,abiggerpotenDaltodevelop

13

TakingintoaccountthepotenDalseaboardarea,theindustrialcapacityofthesector’splayers, and the necessary coordinaDon,FEE es@mates that 15GW of installedcapacityisarealis@ctargetfor2030.

Page 14: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

An emerging industrial sector in France

Significant assets for the offshore wind industry

14

France benefits from significant assets to develop a wind energy industrywhich will createemploymentsandeconomicacDviDes:

•  An industrial know-how with significant experience in automoDve, aeronauDcs,manufacturing of large ships, O&G, nuclear or mechanical and electromechanicalcomponents

•  Ac@veinvestmentbyFrenchregionswiththefoundaDonofseveralclustersaroundportandinfrastructureacDviDes

•  Ports are already preparing to adapt their infrastructures to welcome new acDviDesdedicated to offshorewindfarms (assembly, logisDcs, operaDon andmaintenance,…) :Dunkerque,Dieppe,Fécamp,LeHavre,Cherbourg,Brest,Nantes-SaintNazaire,Bordeaux

•  Large researchanddevelopment resources (technical centres,university, laboratories,dedicatedsitesfortests…)

Page 15: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

AnemergingmarketsectorinFrance–Industrialinvestmentsannounced

15

Page 16: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

Anemergingsector–thechallenge

16

A completely new market to develop, based on long standing governmentaldecisions.ThismeanslotsofOPPORTUNITIES!Butthereareplentlyofchallenges:

-  UnprecedentsoilcondiDons-  ImplementaDonofnewtechnologies-  AvailabilityandperformanceofnewmanufacturingfaciliDesandharbours-  Lackoftrackrecordandexperience-  MarketdevelopmentthroughM&A-  RiskoflegalrecourseagainstauthorizaDons-  Long-termvisionforinvestors:FrenchgovernmenthascommiYedtocut

relianceonnuclearenergy(75to50%by2030)-operatedbystate-controlledEDF–butstrugglestofinallyactthisstrategyinthemulD-yearinvestmentplan.

Page 17: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

WhataboutfloaDngoffshorewindinFrance?

17

Page 18: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

FOWPilotfarms-ADEME

•  AcallfortenderslaunchedinAugust2015andclosedinApril2016.4projectsawardedinJulyandNovember2016.

•  Operated by the ADEME (agency of the Ministry ofEnvironment,EnergyandtheSea).

•  Financedbyan investmentprogramcalled«ProgrammedesInvesDssements d’Avenir » (PIA – management by CGI andoperatedbyADEME)

•  Ini@alsupportoftheGovernment:–  150M€foralltheprojects+aFiTforeachproject.àHasbeenincreasedtoup300M€+FiTforeachproject

18

Page 19: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

FloaDngoffshorewind–pilotfarms(1/2)

19

ü  4awardedprojects:3intheMediterranean,1inBriZany(4x24MW)

ü  2siteswereawardedon22thJuly2016(Gruissan&Groix)

ü  2siteswereawardedon3rdNovember2016(Leucate&Faraman)

Page 20: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

FloaDngoffshorewind–pilotfarms(2/2)

20

Page 21: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

Thepilotfarmscalenders

•  July & November 2016: 4 projects – 96MW (4x24MW)awarded.

•  2017*: conciliaDon meeDngs + start of the surveysprocess

•  Endof2017*:permitsapplicaDon•  Endof2018-2019*:permitsdelivery•  2020*:installaDon•  2021*:commissioning*ExampleforGruissan–EolmedconsorDum

21

Page 22: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

ApathwayforFOWdevelopment

07.06.17 22

2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2030

Callforp

rojects

Commercial

tend

er

6GWofFOWcommissionedby2030

Preparations (zoning) and Competitive

dialogue

Surveys and permits Manufacturin

g and installation

Operation

≈3yearsbetweenthepilotandcommercialfarmscommissionings

Call for projects pilot farms

Surveys and permits

Manufacturingand

installation Operation

Page 23: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

TheFrenchpotenDal–1/2

•  BriYany

23

Page 24: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

TheFrenchpotenDal–2/2

•  MediterraneanSea

24

Page 25: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

LeadingFOWfoundaDons

25

Page 26: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

AnemergingindustrialsectorinFranceFrenchcomponentsuppliersknow-howandexperDse

26

Page 27: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

FacilitaDnginternaDonalcooperaDon

Whyhavingpartnership?

27

•  Maximizemarketopportuni@es!•  Exchangerespec@veknow-howandexperience

•  Diversifyandgrowmorerapidly

•  Getaccesstobiggercontracts

•  Mutualizetherisksandinvesment(technical,financial…)andthusreassureinvestors,bankers

•  Exportanddemonstratecapabili@esinterna@onally

•  Benchmarkthebestavailableprac@ceandtechnologies

•  ShareknowledgeaboutNa@onalenvironment(regulaDon,culture,andwayofdoingbusiness)

•  Valorizeinnova@vetechnologiesandtechniques(althoughnotyetappliedintheOFWsector)

Page 28: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

OngoingworksatFEE

•  Mari@me spa@al planning: contribuDons of the industry(awardedprojectsandfuturesitesforoffshorewind)

•  Reformofthegridconnec@onsystem(shareoftherisks)•  WGonthelegalframework(deriskingandpermits)•  WG on the Works rules for employees on the Sea (legal

framework)

28

Page 29: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

Agenda2017-2018

•  8thnaDonalwindenergycongress–«colloquenaDonaléolien»:19-20September2017–Paris–  www.colloque-naDonal-eolien.com–  Nearly1000parDcipants,40exhibitors–  FocusedontheFrenchmarket

•  FOWT2018:25-26April2018–Marseille(Provence)

–  FOWTistheworldwidelargesteventforfloaDngoffshorewindwww.fowt-conferences.com

–  NB:theNorwegiandelegaDonwasoneofthemostimportantin2017!

29

Page 30: French market and projects revisited€¦ · The actual French Wind Energy Market 3 - 14 470 jobs in the wind industry on 31.12.2015 - +1950 jobs in 2015 (i.e. +15%) - 790 companies

ThankyouforyouraYenDon

MaYhieuMonnierHeadofUnit–Industry,Offshore,Technical

Works&Territories

30