8
FRENCH CONTEMPORARY SINGLE VANITY CRATE STORAGE • Keep Stone Top in it's crate until installation • Store crate vertically in a safe location • Do not stack anything on top of crate 1 OF 8 TOOL AND MATERIAL REQUIREMENTS e

FRENCH CONTEMPORARY SINGLE VANITY CRATE STORAGE · 2020. 7. 1. · FRENCH CONTEMPORARY SINGLE VANITY CRATE STORAGE • Keep Stone Top in it's crate until installation • Store crate

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FRENCH CONTEMPORARY SINGLE VANITY CRATE STORAGE · 2020. 7. 1. · FRENCH CONTEMPORARY SINGLE VANITY CRATE STORAGE • Keep Stone Top in it's crate until installation • Store crate

F R E N C H C O N T E M P O R A R Y S I N G L E VA N I T Y

C R A T E S T O R A G E

• K e e p S t o n e T o p i n i t ' s c r a t e u n t i l i n s t a l l a t i o n

• S t o r e c r a t e v e r t i c a l l y i n a s a f e l o c a t i o n

• D o n o t s t a c k a n y t h i n g o n t o p o f c r a t e

1 O F 8

TOOL AND MATERIAL REQUIREMENTS

e

Page 2: FRENCH CONTEMPORARY SINGLE VANITY CRATE STORAGE · 2020. 7. 1. · FRENCH CONTEMPORARY SINGLE VANITY CRATE STORAGE • Keep Stone Top in it's crate until installation • Store crate

PARTS LIST

A. Stone Top (Oval or Rectangular) E. Mounting Bracket (x4)

F. Lock Washer (x4)

B. Backsplash (Sold Separately)

C. Basin (Oval or Rectangular)G. Threaded Rod (x4)

H. Wing Nut (x4)

2 O F 8

D. Vanity Base

F R E N C H C O N T E M P O R A R Y S I N G L E VA N I T Y

Page 3: FRENCH CONTEMPORARY SINGLE VANITY CRATE STORAGE · 2020. 7. 1. · FRENCH CONTEMPORARY SINGLE VANITY CRATE STORAGE • Keep Stone Top in it's crate until installation • Store crate

Remove metal bands, unscrew the slats or lid,and lift the Stone Top [ A ] out of the crate.

Carefully, without allowing any freefall,rotate the crate from vertical to flat.

STONE TOP INSPECTION

Inspect the Stone Top [ A ] for cracks or defects.If defects are detected, do not install and please call 877-777-7059. If no defects are detected; clean Stone Top [ A ] with a soft cloth.

Always carry Stone Top [ A ] vertically

Do not carry Stone Top [ A ] horizontally as itincreases the risk of breakage or cracking.

CLEANING AND MAINTENANACE INSTRUCTIONS• Avoid abrasive and harsh chemical cleaners.• RH Stone Tops [A] have a honed finish, hand polished edges, and are

sealed twice with inert silicone sealant• Stone Tops [A] should be re-sealed annually

3 O F 8

STONE TOP UN-PACKING AND TRANSPORT

W H E N M O V I N G S T O N E T O P , A L W A Y S U S E A T W O - M A N C R E W

F R E N C H C O N T E M P O R A R Y S I N G L E VA N I T Y

Page 4: FRENCH CONTEMPORARY SINGLE VANITY CRATE STORAGE · 2020. 7. 1. · FRENCH CONTEMPORARY SINGLE VANITY CRATE STORAGE • Keep Stone Top in it's crate until installation • Store crate

STONE TOP INSTALLATION

4 O F 8

F R E N C H C O N T E M P O R A R Y S I N G L E VA N I T Y

Page 5: FRENCH CONTEMPORARY SINGLE VANITY CRATE STORAGE · 2020. 7. 1. · FRENCH CONTEMPORARY SINGLE VANITY CRATE STORAGE • Keep Stone Top in it's crate until installation • Store crate

PRIMARY INSTALLATION REQUIREMENTS:

• Professional two-man crew.• Water supply and drain piping installed according to local plumbing and building codes (sold seperately).

• Wall and floor are square and plumb at installation site.• Vanity Base [ D] installed square and plumb with wall and floor. Vanity Base [ D] also needs to be level.• Ensure Stone Top [A] is the correct size to match the Vanity Base [ D ].

BASIN INSTALLATION STEPS:

1. Apply a continuous bead of silicone sealant to the top surface of lavatory basin rim where it comes in contact withunderside of Stone Top [A] (see illustration below).

2. Position basin [C] in it's final location and secure Mounting Bracket under the basin [C] lip. Make sure overflow of

basin [C] is located on the same side as the pre-drilled faucet holes in Stone Top [A].

3. Align Threaded Rod G], Lock Washer [F] and Wing Nut [H] with pre-installed Stone Top threaded insert andsecure on all (4) points with mounting bracket [E].

( x 4 ) B a s i n [C ]Mounting Points

5 O F 8

M o u n t i n gB r a c k e t [E ]

L o c k i n gW a s h e r [F ]

W i n g N u t [H ]

AssembledView

T o p S u r f a c e o f B a s i n [ A ]

S t o n e T o p U n d e r s i d e

T h r e a d e d

R o d [G]

F R E N C H C O N T E M P O R A R Y S I N G L E VA N I T Y

Page 6: FRENCH CONTEMPORARY SINGLE VANITY CRATE STORAGE · 2020. 7. 1. · FRENCH CONTEMPORARY SINGLE VANITY CRATE STORAGE • Keep Stone Top in it's crate until installation • Store crate

6 O F 8

F R E N C H C O N T E M P O R A R Y S I N G L E VA N I T Y

Page 7: FRENCH CONTEMPORARY SINGLE VANITY CRATE STORAGE · 2020. 7. 1. · FRENCH CONTEMPORARY SINGLE VANITY CRATE STORAGE • Keep Stone Top in it's crate until installation • Store crate

7 O F 8

R E C T A NGU LAR S T O N E T O P

O V A L S T O N E T O P

F R E N C H C O N T E M P O R A R Y S I N G L E VA N I T Y

Page 8: FRENCH CONTEMPORARY SINGLE VANITY CRATE STORAGE · 2020. 7. 1. · FRENCH CONTEMPORARY SINGLE VANITY CRATE STORAGE • Keep Stone Top in it's crate until installation • Store crate

R E C T A N G U L A R B A S I N

8 O F 8

F R E N C H C O N T E M P O R A R Y S I N G L E VA N I T Y

O V A L B A S I N