Upload
cecily-edwina-logan
View
232
Download
0
Tags:
Embed Size (px)
Citation preview
Freight AC electric loco KZ8A Passenger AC electric loco KZ4A
ELEKTROVOZ KURASTYRU ZAUTYPRODUCTINDICATORS
ENTERED: • December 2012
PARTICIPANTS: • JCS «NC «Kazakstan Temir Zholy» (50%)
• «Alstom Transport S.A.» (France) (25%)
• CJCS «TransMashHolding» (Russia) (25%)
PROJECT COST: • 10,6 billion tenge (71 million dollars)
CAPACITY: • Up to 100 sections per year
LOCALIZATION: • actual: 24% • planned: 53% (2017)
LABOUR PRODUCT-TY:• 75,8 million tenge (410 thousand dollars)
JOBS: • actual: 168 • planned: 380 (2016)
Freight AC electric loco KZ8A Passenger AC electric loco KZ4A
Speed 120 km/h
Power capacity 8800 kW
Axle arrangement Bo-Bo + Bo-Bo
Recuperation 7600 kW
Traction motor asynchronous
Temperature range -50С … +40С
Safety control system
KLUB-U
Radio RVS
Speed 200 km/h
Power capacity 4800 kW
Axle arrangement Bo-Bo
Recuperation 4400 kW
Traction motor asynchronous
Temperature range -50С … +40С
Safety control system
KLUB-U
Radio RVS
Advantages:
Energy saving up to 20%
Speed increase up to 10%
Weight of train increase by30%
Three times extended
maintenance cycle
+ 38%
+7%
Converters
Brakes
Subject to the development of production of these components within the EAEU level of production localization KZ8A will be more than 50%
+ 6 %
+ 7%
Traction transformer
Traction motor
2015
2017
2016 2014
Further steps in the localization