Greetings, Free State High School community — Thank you for your continued patience. Over the summer break, we will be working inside and outside the building to complete the project’s final updates. Here’s a short list of what to expect: Resurfaced Parking Lots: The only available parking and entrances into the building will be on the building’s west side. If you are coming to the building for Summer School, enter through the performing arts hallway entrance on the school’s west side. Temporary Walls at Commons/2nd-Floor Hallways: Removed to complete final details, but the space remains unaccessible. Classroom and Corridor Renovations: In progress throughout the building as we update finishes and technology systems. Auditorium: Closed while the house lighting is replaced. Restrooms: Closed due to renovation, with the exception of those in the performing arts area, office, and Outdoor Athletics Fieldhouse. Weight Room/Classroom Renovations: Summer athletics training will not be interrupted. If you are coming to the building for athletics, enter at the athletics hallway entrance on the west side of the school. Existing Library: Closed for extensive renovations. See the site plans on the following page, which further visualize these updates. Please stay safe and obey all signage. We hope you all have a great end of the school year and a relaxing summer! FOLLOW OUR PROGRESS ON TWITTER: @FSHS_MGC | SITE PLANS CONSTRUCTION UPDATE SUMMER 2019 FREE STATE HIGH SCHOOL | USD 497

FREE STATE HIGH SCHOOL | USD 497 CONSTRUCTION ......C500A C500B C500C C500D C400 C420 C500 C400C C430 C433 C501A 901 900 500A W4 W3 PR 030 PR 030 PROJECT NO: DATE: SHEET: UNLESS A

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FREE STATE HIGH SCHOOL | USD 497 CONSTRUCTION ......C500A C500B C500C C500D C400 C420 C500 C400C C430 C433 C501A 901 900 500A W4 W3 PR 030 PR 030 PROJECT NO: DATE: SHEET: UNLESS A

Greetings, Free State High School community —

Thank you for your continued patience. Over the summer break, we will be working inside and outside the building to complete the project’s final updates. Here’s a short list of what to expect:

• Resurfaced Parking Lots: The only available parking and entrances into the building will be on the building’s west side.

If you are coming to the building for Summer School, enter through the performing arts hallway entrance on the school’s west side.

• Temporary Walls at Commons/2nd-Floor Hallways: Removed to complete final details, but the space remains unaccessible.

• Classroom and Corridor Renovations: In progress throughout the building as we update finishes and technology systems.

• Auditorium: Closed while the house lighting is replaced.

• Restrooms: Closed due to renovation, with the exception of those in the performing arts area, office, and Outdoor Athletics Fieldhouse.

• Weight Room/Classroom Renovations: Summer athletics training will not be interrupted.

If you are coming to the building for athletics, enter at the athletics hallway entrance on the west side of the school.

• Existing Library: Closed for extensive renovations.

See the site plans on the following page, which further visualize these updates. Please stay safe and obey all signage.

We hope you all have a great end of the school year and a relaxing summer!

FOLLOW OUR PROGRESS ON TWITTER: @FSHS_MGC | SITE PLANS

CONSTRUCTION UPDATESUMMER 2019

FREE STATE HIGH SCHOOL | USD 497

Page 2: FREE STATE HIGH SCHOOL | USD 497 CONSTRUCTION ......C500A C500B C500C C500D C400 C420 C500 C400C C430 C433 C501A 901 900 500A W4 W3 PR 030 PR 030 PROJECT NO: DATE: SHEET: UNLESS A

Construction Zone — No Access

No Access After Summer School

Access at Designated Entry Only

Designated Entry

Site Plans

_______AS102

A7

REGION INSIDE DOTTED LINES:BASE BID: RELOCATE UNDERGROUND GAS, WATER, AND ELECTRIC UTILITIES TO SERVE NEW GREENHOUSE IN LOCATION SHOWN.ALT. 7: NEW CONCRETE PAD, SIDEWALK, AND GREENHOUSE STRUCTURE (BASIS OF DESIGN: 30'X48' STUPPY "RAINBOW PLUS" MODEL WITH AUTOMATIC ENERGY CURTAIN AND LINK 4 CONTROLLER (IN LIEU OF WADSWORTH CONTROLLER). NO EVAPORATIVE COOLING SYSTEM. RE-USE FANS FROM EXISTING GREENHOUSE STRUCTURE.

BASE BID: NEW PARKING LOT PER CIVIL

BASE BID: NEW 6' WIDE ACCESSIBLE SIDEWALK PER CIVIL. SIDEWALK TO CONNECT NEW PARKING LOT TO EXISTING TENNIS COURTS

REGION WITH DIAGONAL HATCH:ALT. 6: OUTDOOR CLASSROOM - 1000 SF OF INTEGRAL COLOR CONCRETE PAVERS, 12 OUTDOOR WOOD/CONCRETE BENCHES, AND 4 NEW TREES

BASE BID: 2" MILL AND OVERLAY OF EXISTING DRIVE AND PARKING LOT

BASE BID: NEW SIDEWALKS PER CIVIL

A

B

CDE

F

G

N

KEY PLAN

PROJECT NO:DATE:SHEET:

UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND DATE IS AFFIXED, THIS

DOCUMENT IS PRELIMINARY AND IS NOT INTENDED FOR CONSTRUCTION, RECORDING

PURPOSES OR IMPLEMENTATION

A

B

C

D

E

F

G

H

J

K

L

M

N

P

A

B

C

D

E

F

G

H

J

K

L

M

N

P

2 13456789101112131415161718

2 13456789101112131415161718

owner:USD 497 - Lawrence Public SchoolsFree State High School4700 Overland DriveLawrence, KS 66049785.832.6050 voice

architect:Gould Evans 706 Massachusetts StreetLawrence, KS 66044785.330.7055 voicewww.gouldevans.com

construction manager:McCown Gordon Construction422 Admiral Blvd.Kansas City, MO 64106816.877.0690 voice

structural engineer:Bob D. Campbell4338 BelleviewKansas City, MO 64111816.531.4144 voice

mechanical/electrical/plumbing engineer:Henderson Engineers8345 Lenexa Drive, Suite 300Lenexa, KS 66214913.742.5397 voice

code consultant:Henderson Engineers8345 Lenexa Drive, Suite 300Lenexa, KS 66214913.742.5397 voice

civil engineer:BG Consultants1405 Wakarusa DriveLawrence, KS 66049785.742.4474 voice

AS101ARCHITECTURAL SITE

PLAN

01170110

4700 OVERLAND DRIVELAWRENCE, KS 66049

02/16/2017

LAWRENCEFREE STATEHIGH SCHOOLADDITION &RENOVATION

CONSTRUCTION DOCUMENTS

© 2016 Gould Evans, P.A.

SCALE: 1/64" = 1'-0"

SITE PLAN - LEVEL 1 A1

NUMBER DESCRIPTION DATE

435

437

534

532

433

416A

416F400D

400C

903

401 403 405 407 409 411 413 415 417 423 425419 427 429 431

426424422

523 525 527

420418

515

515A

513

515B 521

519

517

530528526524522520518516514512510508506504500

400A 400B

400E400F

400

C400DC400B

414

414A

502

531

430

529

428

906 904

902

C820

416B

416C

416D

416E

C400A

421

C416

501

C401

C500A

C500B C500C C500D

C400

C420

C500

C400C

C430

C433

C501A

901

900

500A

W4

W3PR

030

PR030

PROJECT NO:DATE:SHEET:

UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND DATE IS AFFIXED, THIS

DOCUMENT IS PRELIMINARY AND IS NOT INTENDED FOR CONSTRUCTION, RECORDING

PURPOSES OR IMPLEMENTATION

A

B

C

D

E

F

G

H

J

K

L

M

N

P

A

B

C

D

E

F

G

H

J

K

L

M

N

P

2 13456789101112131415161718

2 13456789101112131415161718

owner:USD 497 - Lawrence Public SchoolsFree State High School4700 Overland DriveLawrence, KS 66049785.832.6050 voice

architect:Gould Evans 706 Massachusetts StreetLawrence, KS 66044785.330.7055 voicewww.gouldevans.com

construction manager:McCown Gordon Construction422 Admiral Blvd.Kansas City, MO 64106816.877.0690 voice

structural engineer:Bob D. Campbell4338 BelleviewKansas City, MO 64111816.531.4144 voice

mechanical/electrical/plumbing engineer:Henderson Engineers8345 Lenexa Drive, Suite 300Lenexa, KS 66214913.742.5397 voice

code consultant:Henderson Engineers8345 Lenexa Drive, Suite 300Lenexa, KS 66214913.742.5397 voice

civil engineer:BG Consultants1405 Wakarusa DriveLawrence, KS 66049785.742.4474 voice

AG102SIGNAGE FLOOR PLAN

LEVEL 2

01170110

4700 OVERLAND DRIVELAWRENCE, KS 66049

02/16/2017

LAWRENCEFREE STATEHIGH SCHOOLADDITION &RENOVATION

CONSTRUCTION DOCUMENTS

© 2016 Gould Evans, P.A.

NUMBER DESCRIPTION DATE16 ASI 005 09/06/201834 PR 030 02/28/2019

Room Signage Key - Level 2

CD Number Name Signage Number

508 CLASSROOM 523509 CLASSROOM 525510 CLASSROOM 527511 CUST. / ELEC. 529512 RESTROOM 531513 CLASSROOM 534514 CLASSROOM 532515 CLASSROOM 530516 CLASSROOM 528517 CLASSROOM 526518 CLASSROOM 524519 CLASSROOM 522520 CLASSROOM 520521 CLASSROOM 518522 CLASSROOM 516523 CLASSROOM 514524 CLASSROOM 512525 CLASSROOM 510526 CLASSROOM 508527 CLASSROOM 506528 CLASSROOM 504529 CLASSROOM 502530 CLASSROOM 500530A BREAK OUT 500A813 AHU 901814 WEIGHT ROOM 903815 WRESTLING / DANCE / CHEER 906816 CLASSROOM CLASSROOM816 CLASSROOM 905817 MECHANICAL 904818 STORAGE 902819 STORAGE 900820 CORRIDOR C820C400 CORRIDOR C400AC400A LEARNING POCKET C400BC400B LEARNING POCKET C400CC400C LEARNING POCKET C400DC401 CORRIDOR C401C402 CORRIDOR C420C403 CORRIDOR C430C404 CORRIDOR C433C404A LEARNING POCKET C404AC405 CORRIDOR C400C416 STAFF OFFICES C416C500 CORRIDOR C500AC500A LEARNING POCKET C500BC500B LEARNING POCKET C500CC500C LEARNING POCKET C500DC501 CORRIDOR C500C501A LEARNING POCKET C501A

Room Signage Key - Level 2

CD Number Name Signage Number

400 CLASSROOM 401401 WORKROOM 403402 CLASSROOM 405403 CLASSROOM 407404 CLASSROOM 409405 CLASSROOM 411406 CLASSROOM 413407 CLASSROOM 415408 CLASSROOM 417409 LAB 419411 LAB 423412 LAB 425413 CLASSROOM 427414 CLASSROOM 429415 CLASSROOM 431416 CLASSROOM 433417 CLASSROOM 435418 CLASSROOM 437419 RESTROOM 430420 RESTROOM 428421 CLASSROOM 426421 LAB PREP 421422 CLASSROOM 424423 CLASSROOM 422424 CLASSROOM 420425 CLASSROOM 418426A OFFICE 416A426B OFFICE 416B426C OFFICE 416C426D OFFICE 416D426E OFFICE 416E426F OFFICE 416F427 RESTROOM 414428 ELEC. / AV / IT 414A429 BREAK OUT 400B430 MEDIA CENTER 400430A STORAGE 400C430B IT OFFICE 400D431 BREAK OUT 400A500 BREAK OUT 400F501 BREAK OUT 400E502 CUSTODIAL 501503 OFFICE 513504 SOCIAL STUDIES STAFF ROOM 515504A OFFICE 515A504B OFFICE 515B505 RESTROOM 517506 RESTROOM 519507 IT 521

SCALE: 1/32" = 1'-0"

SIGNAGE PLAN LEVEL 2 1A

ASI005

_______AS102

A7

REGION INSIDE DOTTED LINES:BASE BID: RELOCATE UNDERGROUND GAS, WATER, AND ELECTRIC UTILITIES TO SERVE NEW GREENHOUSE IN LOCATION SHOWN.ALT. 7: NEW CONCRETE PAD, SIDEWALK, AND GREENHOUSE STRUCTURE (BASIS OF DESIGN: 30'X48' STUPPY "RAINBOW PLUS" MODEL WITH AUTOMATIC ENERGY CURTAIN AND LINK 4 CONTROLLER (IN LIEU OF WADSWORTH CONTROLLER). NO EVAPORATIVE COOLING SYSTEM. RE-USE FANS FROM EXISTING GREENHOUSE STRUCTURE.

BASE BID: NEW PARKING LOT PER CIVIL

BASE BID: NEW 6' WIDE ACCESSIBLE SIDEWALK PER CIVIL. SIDEWALK TO CONNECT NEW PARKING LOT TO EXISTING TENNIS COURTS

REGION WITH DIAGONAL HATCH:ALT. 6: OUTDOOR CLASSROOM - 1000 SF OF INTEGRAL COLOR CONCRETE PAVERS, 12 OUTDOOR WOOD/CONCRETE BENCHES, AND 4 NEW TREES

BASE BID: 2" MILL AND OVERLAY OF EXISTING DRIVE AND PARKING LOT

BASE BID: NEW SIDEWALKS PER CIVIL

A

B

CDE

F

G

N

KEY PLAN

PROJECT NO:DATE:SHEET:

UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND DATE IS AFFIXED, THIS

DOCUMENT IS PRELIMINARY AND IS NOT INTENDED FOR CONSTRUCTION, RECORDING

PURPOSES OR IMPLEMENTATION

A

B

C

D

E

F

G

H

J

K

L

M

N

P

A

B

C

D

E

F

G

H

J

K

L

M

N

P

2 13456789101112131415161718

2 13456789101112131415161718

owner:USD 497 - Lawrence Public SchoolsFree State High School4700 Overland DriveLawrence, KS 66049785.832.6050 voice

architect:Gould Evans 706 Massachusetts StreetLawrence, KS 66044785.330.7055 voicewww.gouldevans.com

construction manager:McCown Gordon Construction422 Admiral Blvd.Kansas City, MO 64106816.877.0690 voice

structural engineer:Bob D. Campbell4338 BelleviewKansas City, MO 64111816.531.4144 voice

mechanical/electrical/plumbing engineer:Henderson Engineers8345 Lenexa Drive, Suite 300Lenexa, KS 66214913.742.5397 voice

code consultant:Henderson Engineers8345 Lenexa Drive, Suite 300Lenexa, KS 66214913.742.5397 voice

civil engineer:BG Consultants1405 Wakarusa DriveLawrence, KS 66049785.742.4474 voice

AS101ARCHITECTURAL SITE

PLAN

01170110

4700 OVERLAND DRIVELAWRENCE, KS 66049

02/16/2017

LAWRENCEFREE STATEHIGH SCHOOLADDITION &RENOVATION

CONSTRUCTION DOCUMENTS

© 2016 Gould Evans, P.A.

SCALE: 1/64" = 1'-0"

SITE PLAN - LEVEL 1 A1

NUMBER DESCRIPTION DATE

Paving 5/28-6/3No Parking untilpaving is complete

Student/Staffparking

Entrance

Staff/Student accessfor summer school.

SchoolActivities asnormal

AthleticEntrance

Limitedstaffusage.Lightingchangestakingplace.

No Constructionactivities

Back ofhouse/dockavailable

No Parking

No Parking/Access

No ParkingConstruction Zone-

No Access

Construction Zone- No Access

No Access after summerschool

Access at designatedentry

Designated Entry

LEVEL 2

LEVEL 1

KEY

No Parking or Access

Construction ZoneNo Access

Student/Staff

Parking

No Parking

Construction ZoneNo Access

Closed5/28–6/3

Normal SchoolActivity

Access for Summer School

Back of housedock available

Athletics Entrance

Entrance

Ltd.Staff

Usage

Construction ZoneNo Access

Construction ZoneNo Access

Access Weight Room from west stairs only

FREE STATE HIGH SCHOOL | USD 497CONSTRUCTION UPDATES | SUMMER 2019