Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
Malawi Government
Framework for Strengthening the Functions
of the
Ministry of Gender, Children and Social Welfare
2014–2018
April 2014
ii
FOREWORD
The Ministry of Gender, Children and Social Welfare (MoGCSW) has developed the
Framework for Strengthening the Functions of the Ministry of Gender, Children and Social
Welfare in response to various challenges the ministry faces in the implementation of its
core business. This document presents the framework and an implementation strategy, an
activity plan, and a monitoring and evaluation plan.
The framework is intended to help the MoGCSW improve coordination across its
programme areas; provide for more systematic staff development; mobilise and allocate
resources more efficiently; and improve programme implementation, supervision, and
monitoring. It addresses MoGCSW’s roles of leadership and governance, coordination,
workforce development, financing, and information management.
The framework offers opportunities for meeting the ministry’s short- and long-term national
goals, as set forth in the Constitution of Malawi (1994), Vision 2020 (1998), the Malawi
Growth and Development Strategy II (2011 to 2016), the Economic Recovery Plan (2012),
the Joint Sector Strategic Plan for the Gender, Youth and Sports Sector Working Group
(2012 to 2017), as well as the Millennium Development Goals (2000).
The framework will enhance the ministry’s capacity to fulfill its mandate and contribute to
the country’s economic growth. Therefore, the ministry pledges its full commitment to
implementing the framework and to creating an environment conducive to stakeholders’
participation in that task. Since the framework requires adequate financial and technical
support, it is my hope that development and cooperating partners will support the
MoGCSW’s implementation activities. In so doing, our partnerships will be strengthened.
I urge all ministry staff, stakeholders, and partners to support implementation of this
framework in order to improve service delivery and effectively contribute to the country’s
poverty reduction efforts, thereby improving the welfare of women, men, girls, and boys at
all levels.
Mary Clara Makungwa
MINISTER OF GENDER, CHILDREN AND SOCIAL WELFARE
iii
PREFACE
The Ministry of Gender, Children and Social Welfare, in the execution of its mandate, has
emphasised effective and improved service delivery. There is, however, consensus among
stakeholders that a number of challenges are constraining improvements in the ministry’s
delivery of services. Some of these challenges include poor coordination within the ministry
and with its stakeholders; human resource capacity gaps; inadequate financial and technical
resources to effectively implement programmes and projects; and a poor and fragmented
information management system. The ministry recognises that its success and that of its
partners depends on adequate financial resources, efficient organizational systems and
tools, a workforce with the requisite skills, motivated staff, and adequate infrastructure,
equipment, and supplies.
In the quest to strengthen coordination, leadership, governance, and management, the
ministry has developed the Framework for Strengthening the Functions of the Ministry of
Gender, Children and Social Welfare to guide, refocus, and strengthen its operations. The
framework has five priority areas: leadership and governance; coordination; workforce;
financing; and information. Each priority area has specific outcomes and objectives. The
framework, accompanied by an implementation strategy, activity plan, and monitoring and
evaluation plan, provides direction for MoGCSW to strengthen its operations in support of
its policy and programme mandates and commitments, which are highlighted in the Joint
Sector Strategic Plan for Gender, Youth and Sports. The ministry will lead implementation
of the framework at all levels.
Development of the framework was led by a taskforce of representatives from all ministry
departments and included broad engagement of stakeholders from the public sector,
development partners, the private sector, civil society, and communities throughout the
country. On behalf of the MoGCSW, I would like to express my sincere gratitude to the
taskforce and to the individuals and organizations that made valuable contributions during
the development of the framework. The United States Agency for International
Development (USAID) deserves special thanks for funding the development of the
framework. Let me also thank the USAID-funded Health Policy Project, which provided
technical and logistical support throughout the process.
Dr. Mary Shawa
SECRETARY FOR GENDER, CHILDREN AND SOCIAL WELFARE
iv
ACRONYMS AND ABBREVIATIONS
CA Chief Accountant
CHRMO Chief Human Resource Management Officer
CSC Civil Service Commission
CSO Civil Society Organisations
DA Director of Administration
DC District Councils
DCD Director of Community Development
DCDO District Community Development Officer
DCSO District Community Services Officer
DGA Director of Gender Affairs
DEC District Executive Committee
DHRMD Department of Human Resource Management and Development
DPR Director of Planning and Research
DSW Director of Social Welfare
DSWO District Social Welfare Officer
HR Human Resources
ICT Information Communications Technology
JSR Joint Sector Review
JSSP Gender, Youth and Sports Sector Working Group Joint Sector Strategic Plan
LG Local Government
LGFC Local Government Finance Committee
M&E Monitoring and Evaluation
MGDS Malawi Growth and Development Strategy
MoGCSW Ministry of Gender, Children and Social Welfare
MoWCD Ministry of Women and Child Development
MYDS Ministry of Youth Development and Sports
NGO Non-Governmental Organisation
OPC Office of the President and Cabinet
PRO Public Relations Officer
PS Principal Secretary
SWG Sector Working Group
TD Technical Directors
TOR Terms of Reference
TWG Technical Working Group
USAID United States Agency for International Development
v
TABLE OF CONTENTS
FOREWORD ......................................................................................................................................ii
PREFACE .......................................................................................................................................... iii
ACRONYMS AND ABBREVIATIONS .................................................................................................. iv
1.0 INTRODUCTION .................................................................................................................... 1
1.1 MINISTRY OF GENDER, CHILDREN AND SOCIAL WELFARE MANDATE AND
ORGANIZATION ........................................................................................................................... 1
1.2 MoGCSW PROGRAMMES, SERVICES, AND STRATEGIC DIRECTION ................................. 2
1.3 CHALLENGES AND OPPORTUNITIES ................................................................................. 3
1.4 PURPOSE OF THE INSTITUTIONAL FRAMEWORK IN RELATION TO KEY POLICIES ........... 4
2.0 BROAD DIRECTIONS OF THE INSTITUTIONAL FRAMEWORK ............................................... 6
2.1 GOAL ................................................................................................................................. 6
2.2 EXPECTED OUTCOMES ..................................................................................................... 6
2.3 KEY OBJECTIVES ................................................................................................................ 6
3.0 PRIORITY AREAS OF THE FRAMEWORK ............................................................................... 8
3.1 PRIORITY AREA 1: LEADERSHIP AND GOVERNANCE ....................................................... 8
3.2 PRIORITY AREA 2: COORDINATION ................................................................................. 9
3.3 PRIORITY AREA 3: WORKFORCE .................................................................................... 10
3.4 PRIORITY AREA 4: FINANCING ....................................................................................... 11
3.5 PRIORITY AREA 5: INFORMATION ................................................................................. 12
4.0 IMPLEMENTATION ARRANGEMENTS ................................................................................ 14
4.1 INSTITUTIONAL ARRANGEMENTS .................................................................................. 14
4.2 ROLE OF STAKEHOLDERS IN THE IMPLEMENTATION OF THE INSTITUTIONAL
FRAMEWORK ............................................................................................................................. 14
4.3 IMPLEMENTATION STRATEGY ........................................................................................ 15
4.4 ACTIVITY PLAN ................................................................................................................ 15
4.5 MONITORING AND EVALUATION PLAN ......................................................................... 15
4.6 RESOURCE MOBILISATION ............................................................................................. 15
4.7 REVIEW AND EVALUATION OF THE INSTITUTIONAL FRAMEWORK ............................... 16
ANNEX 1 IMPLEMENTATION STRATEGY ....................................................................................... 1
ANNEX 2 ACTIVITY PLAN ............................................................................................................... 1
ANNEX 3: MONITORING AND EVALUATION PLAN & COSTINGS .................................................... 1
1
1.0 INTRODUCTION
1.1 MINISTRY OF GENDER, CHILDREN AND SOCIAL WELFARE MANDATE AND
ORGANIZATION
The Ministry of Gender, Children and Social Welfare (MoGCSW) is mandated to promote
gender equality and protect the welfare of Malawian women, men, girls, and boys to
become self-reliant and active participants in and beneficiaries of the national development
agenda. It is responsible for putting in place systems, structures, policies, programmes, and
services whose impact will culminate in the realization of national development goals. Its
mission is “to promote social economic empowerment and protection of women, men, girls,
and boys using community and welfare approaches.” The vision of the MoGCSW is “Socially,
economically, and politically empowered women, men, girls and boys.”
A functional review of the ministry recommended the establishment of two new
directorates: the Directorate of Child Development Affairs and the Directorate of Social
Support Services. These will augment the work of MoGCSW’s three technical departments
at the central level. The functions of the three technical departments are as follows:
Department of Gender Affairs: To promote gender equality and safeguard the
welfare and participation of women in the social, political, and economic
development process
Department of Community Development: To provide community development
services to the Malawi nation
Department of Social Welfare: To provide welfare services to vulnerable groups
through the functional areas of family and child welfare, child development, child
protection, social cash transfers, probation and after-care, and public assistance
The technical departments are supported by departments of planning and research and
administration. They have the following responsibilities:
Department of Planning and Research: Facilitate policy, planning, monitoring,
research, and evaluation
Department of Administration: Coordinate, supervise, and provide management
direction and logistic requirements for the ministry
At the district level, the ministry has two sections: 1) Social Welfare, which is headed by a
District Social Welfare Officer (DSWO), and 2) Community Development, which is headed by
the District Community Development Officer (DCDO). At the district level, Gender Affairs
programmes are managed within the Community Development section. The ministry has
established the position of District Community Services Officer (DCSO) at Grade ‘G’ (P7),
whose incumbents oversee both the social welfare and community development sections.
2
During the environmental scan for this exercise, 21 DCSOs are operating in district councils.
Placement of DCSOs in the remaining seven district councils is under way.
1.2 MoGCSW PROGRAMMES, SERVICES, AND STRATEGIC DIRECTION
The MoGCSW implements the following programmes and services:
i. Department of Gender Affairs
a. Gender mainstreaming
b. Economic and social empowerment (political, cultural, and human rights) of
women
ii. Department of Child Development Affairs
a. Integrated early childhood development programmes
b. Coordination of primary child protection services
iii. Department of Community Development
a. Community mobilisation and capacity building
b. Home management and nutrition
c. Adult literacy
iv. Department of Social Welfare
a. Probation and rehabilitation services
b. Family and child welfare
c. Generic social work
d. Social cash transfers
Implementation of these programmes is done within the context of decentralisation. The MoGCSW headquarters is responsible for policy direction, standards setting, guidance and oversight, national-level coordination and implementation, monitoring and evaluation, and capacity building. MoGCSW district sections are responsible for the implementation and coordination of programmes and services at the district level, serving as the primary link between the ministry, district level stakeholders, and the communities. In the recent past, strategic programmatic priorities of the ministry were guided by the
Strategic Plan of the Ministry of Women and Child Development (MoWCD) (2006 – 2011).1
1 The name of this ministry was changed from the MoWCD to its present name in 2009.
3
In June 2011, the MoGCSW and its partners in the sectors of Gender, Children, Youth
Development and Sports embarked on the development of a joint-sector strategic plan for
gender, youth, and sports to guide a sector-wide programme approach in support of the
Malawi Growth and Development Strategy (MGDS) II. The Gender, Youth and Sports Sector
Working Group Joint Sector Strategic Plan (JSSP) (2012-2017) serves to guide MoGCSW
programmatic priorities. The MoGCSW, together with the Ministry of Youth Development
and Sports, plays the lead role in ensuring that the sector is well-coordinated and that the
programmes and key strategic partnerships under the JSSP are effectively implemented.
1.3 CHALLENGES AND OPPORTUNITIES
Over the years, the ministry has faced a number of challenges in fulfilling its comprehensive
and critically important mandate. These include uncoordinated management and delivery of
programmes and services, inadequate financial and human resources, inefficiencies in
resource allocation, weak management and supervision, and inadequate monitoring and
evaluation (M&E). This generally has resulted in inferior operations and poor service
delivery across all levels. Many of these challenges were acknowledged in the MoWCD
strategic plan (2006-2011) and identified as critical factors in that plan’s successful
implementation. In the recent past, several initiatives, including an Organizational
Development Strategy (2009), were launched to address these factors. None of these efforts
was sustained, however, in part because resources have been directed to individual
programme priorities rather than to crosscutting systems and operational needs.
It is evident, however, that systematic and structural weaknesses continue to create
bottlenecks and threaten the ministry’s ability to fulfill its mandate and programmatic
leadership role in support of the MGDS II. Stakeholder interviews and consultations
conducted in 2013 revealed that the ministry still has challenges in coordinating its
programmes, coordinating partners within the sector, allocating resources to its core
programmes, providing effective guidance to implementing agencies, and keeping its staff
well-motivated and productive. Stakeholders within and outside the ministry have called for
immediate efforts to strengthen the ministry as an institution so that it is able to effectively
implement all its programmes and coordinate key strategic partners as guided by the JSSP,
as well as coordinate the programmes of the sector working groups (SWGs).
The Framework for Strengthening the Functions of the Ministry of Gender, Children and
Social Welfare responds to this call, providing a much-needed holistic view of the
MoGCSW’s operational needs. Together with the accompanying implementation strategy
and action plan, it offers strategic guidance and a roadmap for strengthening MoGCSW
organizational systems and functions critical to the realization of the ministry’s overall goal
of economically and socially empowered Malawian women, men, girls, and boys.
4
1.4 PURPOSE OF THE INSTITUTIONAL FRAMEWORK IN RELATION TO KEY
POLICIES
The framework’s purpose is to establish priorities and guide the MoGCSW to strengthen its
operations in support of its policy and programme mandates and commitments. This
framework is critically important, in that its outcomes directly affect the achievement of a
host of international commitments and national policy goals. These are summarised below.
1.4.1 International Conventions
Malawi is a signatory to a number of gender, children, and social welfare-related
international declarations, conventions, and instruments that promote gender equality and
empowerment of women, protection and promotion of the rights of children, promotion of
the rights of vulnerable individuals, and social support. These include the Convention on the
Elimination of all Forms of Discrimination Against Women (1979); the African Union Protocol
to the African Charter on Human and People’s Rights on the Rights of Women in Africa
(2003); the Beijing Declarations (1995); the Vienna Declaration on Human Rights and Rights
of Women (1993); the Southern African Development Community Protocol on Gender and
Development (2008), which Malawi signed in October 2009; the Convention on the Rights of
the Child (1989); the International Labour Organisation Convention 182 on the Worst Forms
of Child Labour (1999); the African Charter on Human and Peoples’ Rights (1986); the
Millennium Development Goals (2000); Livingstone Call for Action on Social Protection; and
the 2000 Dakar Framework for Action.
1.4.2 MGDS II (2011 to 2016)
Programmes of the MoGCSW are part of the MGDS II under Theme 2: Social Development;
Theme 3: Social Support and Disaster Risk Management; and Theme 6: Crosscutting Issues
(subtheme one): Gender and Child Development, Youth Development and Empowerment.
1.4.3 Programme Policies
The MoGCSW is the lead institution for policy development and oversight for the
programmes governed by the ministry. These policies include the National Gender Policy
(2011, in draft), the Early Childhood Policy (2006), the Orphans and Other Vulnerable
Children Policy (2003), the Community Development Policy (2012, in draft), and the Social
Protection Policy (2009).
5
1.4.4 National Instruments and Laws
The instruments and laws that this framework supports include: the Constitution of Malawi;
the Child Care, Protection and Justice Act of 2010; the Gender Equality Act of 2013; the
Adoption of Children Act (1949); the Penal Code (1929); the Affiliation Act (1948); and the
Wills and Inheritance Act (2010).
Additionally, the framework links to and is subject to provisions in public-sector
management policies such as the Malawi Public Sector Act and Malawi Public Service
Regulations.
6
2.0 BROAD DIRECTIONS OF THE INSTITUTIONAL FRAMEWORK
2.1 GOAL
The framework’s overall goal is to improve the effectiveness, efficiency, and sustainability of
MoGCSW operations, enabling the ministry to fulfill its mandates and its policy and
programme commitments. By 2018, the strategic improvements in MoGCSW operations
guided by the framework will result in a highly regarded ministry that provides strong
national leadership in the areas of gender, child development, social support services,
community development, and social welfare.
2.2 EXPECTED OUTCOMES
The framework aims to achieve the following outcomes:
1. Strong leadership and governance
2. Well-coordinated delivery of services
3. Vibrant and productive workforce
4. Adequate resources to implement the ministry’s programmes
5. Quality, timely, and harmonised information collected, shared, and used
2.3 KEY OBJECTIVES
The framework has fourteen objectives mapped to the five outcomes. These are:
1. Strong leadership and governance
1.1. To realign ministry structure and functions from headquarters to districts in line
with the Decentralisation Policy
1.2. To ensure that all programmatic policies, guidelines, and standards are developed
and disseminated
1.3. To strengthen advocacy and communication for all ministry programmes
1.4. To provide leadership for effective and efficient coordination and implementation
of the JSSP and other key policies
2. Well-coordinated delivery of services
2.1. To strengthen coordination of programmes and departments within the MoGCSW
2.2. To strengthen partnerships for delivery of programmes and services
3. Vibrant and productive workforce
3.1. To strengthen MoGCSW human resource systems
3.2. To strengthen the performance of ministry staff at all levels
3.3. To strengthen the performance of all volunteer cadres in the ministry
3.4 To strengthen MoGCSW institutions
7
4. Adequate resources to implement the ministry’s programmes
4.1. To mobilise adequate resources for the ministry and rationally allocate them
across ministry programmes at all levels
4.2. To ensure cost efficiency, transparency, and accountability of MoGCSW finances
5. Quality, timely, and harmonised information collected, shared, and used
5.1. To generate and manage information for evidence-based decision making
5.2. To ensure information is shared and used by ministry staff and stakeholders
8
3.0 PRIORITY AREAS OF THE FRAMEWORK
Based on its expected outcomes and objectives, the framework has five priority areas aimed
at addressing the ongoing and emerging challenges identified by ministry management and
staff and key stakeholders as critical to the ministry’s success. The priority areas are:
Leadership and Governance, Coordination, Workforce, Financing and Information.
3.1 PRIORITY AREA 1: LEADERSHIP AND GOVERNANCE
Leadership and good governance aim to ensure that strategic policies exist and are
combined with effective regulation, oversight, and accountability. Within the MoGC&SW,
this includes policy development, implementation, and monitoring in gender, children’s
affairs, social support services, community development, and social welfare. The MoGCSW
is well-positioned to lead efforts to develop and harmonise policies across these sectors and
to provide leadership to other sectoral ministries and donor and civil-society partners for
coordinated policy implementation, including devolution of policy implementation and
decision making to the district level. While the ministry has had some successes, critical
shortfalls remain, including policy gaps, failure to mobilise support for existing policies, and
poor policy oversight and enforcement. Complex and poorly defined functions,
relationships, and structures combined with poor communication between central and
district levels within the ministry have led to duplication of efforts, inefficient and
inequitable use of resources, and high levels of frustration among ministry personnel. These
challenges are compounded by undue external influence and the silence of ministry
leadership in advocating for ministry priorities.
3.1.1 Recommendations
To address these challenges, the ministry should ensure the following:
i. The operational structure of the ministry is strengthened to facilitate performance of
its governance functions and delivery of its programmes and services in a
streamlined and cross-sectoral manner.
ii. The ministry devolves district functions being implemented at the central level and
strengthens district offices to empower them to properly coordinate and direct
service delivery.
iii. Draft sectoral polices, guidelines, and standards are finalised and existing policies,
standards, and guidelines are reviewed, harmonised, and updated; and all policies,
standards, and guidelines are disseminated, implemented, and monitored.
iv. Gender is mainstreamed within the ministry at headquarters, district offices, and
institutions in order to protect the rights of men and women in the workplace,
promote gender equality, and strengthen MoGCSW policies and programmes.
v. The ministry mainstreams social inclusion and crosscutting issues, including HIV and
AIDS, age, and disability in its policies and programmes.
9
vi. Technocrats advise politicians, other policy makers, donors, and civil society on the
role and mandate of the ministry to promote clarity of mission, informed decision
making, and support for MoGCSW policies, programmes, and services.
vii. The ministry strengthens its communication and advocacy functions, by establishing
a public relations function, developing and implementing a communication strategy,
and improving its relations and interface with the media.
viii. The ministry co-leads with the Ministry of Youth, Sports and Culture the launch,
dissemination, and oversight of the JSSP, operationalization of the SWGs and
Technical Working Groups (TWGs), and mobilisation of financial and technical
resources for implementation of the JSSP.
3.2 PRIORITY AREA 2: COORDINATION
Coordination of policies and programmes is an essential function of the MoGCSW, whose
domain covers multiple, interrelated sectors. Potential opportunities for strong cross-
programme coordination and collaboration exist, given that programmes from multiple
sectors are housed within the MoGCSW. However, the current lack of internal formal
mechanisms and failure to promote coordination has resulted instead in overlap and
duplication of efforts among departments and programmes, conflicting strategies for similar
issues, and complex and competing reporting channels. Further, lack of integrated planning
of programmes and operations has led to programme gaps in accordance with national and
district plans, misallocation of resources, and personalization of projects. Unclear terms of
reference (TOR) for departments and unclear division of labour between central and district
staff have led to inconsistent messages to partners, inefficiencies in service delivery, role
confusion, and compartmentalization of departments and units.
The multisectoral nature of the MoGCSW also requires strong collaboration with other
ministries and government entities. Clarity of roles and responsibilities among these players
and mechanisms for systematic exchange of information are essential, but typically lacking.
This has resulted in disjointed programming, competition for scarce resources, and poor
accountability. The JSSP aims to address some of these challenges through joint planning
and reporting. Its success, however, will depend on strong coordination among the various
sectors and partners.
Coordination of service delivery also is a critical function of the MoGCSW, whose mandate
includes guidance and oversight of implementing partners in addition to direct service
delivery. Thus, the success of the MoGCSW in ensuring equitable access to services and
quality of services is largely dependent on the ministry’s capacity to coordinate the work of
many partners: government, development agencies, nongovernmental organizations
(NGOs), civil society organizations (CSOs), and the private sector. Yet current systems and
capacities to promote and sustain coordination among these partners are weak.
10
3.2.1 Recommendations
To address the issues of coordination, the ministry should ensure the following:
i. Mandates and terms of reference for each department in the ministry are clarified.
ii. An internal communication strategy for the ministry is developed and
operationalised.
iii. Intradepartmental meetings are institutionalised, and the frequency and business of
management meetings are rationalised.
iv. Joint planning and review forums among the ministry’s departments and units at
central and district levels are implemented.
v. Effective national- and district-level coordination structures are established to
deliberate issues, share information, and enhance networking.
vi. Joint planning and review forums for the ministry and its partners and stakeholders
are institutionalised.
3.3 PRIORITY AREA 3: WORKFORCE
A vibrant, productive workforce is fundamental to the successful operations of the ministry.
However, numerous human resources (HR) challenges interfere with the effective delivery
of services. For instance, the MoGCSW is operating at a staff vacancy rate of nearly 50
percent. The ministry is also hampered by low staff morale and confidence, uncertainty in
career progression and upgrading opportunities, and inadequate capacity-building
programmes for staff. These have resulted in low staff-retention rates.
There is also an unsustainable reliance on volunteers for implementation of key programme
activities at the community level. The lack of incentives for the volunteers may lead to
volunteer fatigue, which would negatively affect the implementation of most of the
ministry’s programmes at the community level.
In general, the HR system is poor, unresponsive to the need for staff motivation, and unsystematic in the deployment, development, and utilization of staff. The competencies of staff are therefore inadequate to effectively spearhead policy implementation, set standards, and supervise, monitor, review, and evaluate programmes and projects. The ministry, therefore, needs to improve the capacity and morale of its workforce and also
ensure that it retains the skills and experience of both the employed and volunteer cadres
of its workers.
11
3.3.1 Recommendations
To improve the capacity, productivity, and effectiveness of the workforce, the ministry
should ensure the following:
i. The vacancy rate in the ministry’s establishment is reduced.
ii. The 2013 functional review is completed and implemented in line with the
decentralisation policy.
iii. All human resource practices and procedures are reviewed and aligned with current HR
policies.
iv. Human resources practices and procedures mainstream crosscutting issues of gender,
disability, and HIV and AIDS.
v. A capacity-building programme for ministry personnel is developed and implemented.
vi. A staff performance appraisal system is implemented.
vii. Incentives and compensation for all volunteers working for the ministry are reviewed
and updated.
viii. The capacity of volunteers working for the ministry is strengthened.
ix. The community support system for volunteers is enhanced.
x. Magomero College, other MoGCSW training centres, and reformatory and social
rehabilitation centres are upgraded and adequately supported.
3.4 PRIORITY AREA 4: FINANCING
The MoGCSW faces multiple challenges in the area of financing. First among these is the
inadequacy of its financial resources, particularly from the government. Much of the funding
for its programmes and projects comes from donor partners. However, typically, these
external funds are restricted to specific, targeted programmes or projects for direct project
activities, equipment, technical assistance, and monitoring and evaluation. Thus, the
ministry faces a shortfall in funds, especially for its operations.
Resource allocation also is problematic. Funding from the Ministry of Finance is not always
based on plans and budget, which creates challenges for the ministry to allocate its
resources in a transparent manner. To supplement its meagre financial base, the ministry
relies on donors to support its initiatives. However, not all the ministry’s mandated
programmes align with donor priorities. Thus, projects such as social cash transfer, gender
mainstreaming, gender equality and women’s empowerment, and HIV and AIDS are
adequately resourced, while others, such as early childhood development, adult literacy,
and community development are extremely under-resourced. The ministry has no effective
resource mobilisation strategy to fill the funding gaps. Financial management capacity
within the ministry is inadequate due to staffing shortages, limited competent personnel,
and inadequate systems. As a result, opportunities to contain costs and to improve cost
efficiencies are overlooked. Due to its multiple funding streams, the ministry maintains
parallel financial management systems that use different tools and software. Capacity
within the ministry to support and use these different systems is limited.
12
3.4.1 Recommendations
To address these funding shortfalls and financial challenges, the Ministry should ensure the
following:
i. A resource mobilisation strategy for the ministry is developed and implemented.
ii. A resource allocation system for the ministry is developed and implemented.
iii. Administrative costs of programme implementation are reduced.
iv. Effective financial management procedures and practices of all ministry programmes
and projects are established and adhered to; routine performance audits are
conducted.
v. Internal auditors responsible for running the ministry’s programmes are
knowledgeable and skilled in electronic financial management systems.
3.5 PRIORITY AREA 5: INFORMATION
The generation and use of information for evidence-based decision making and
programming is a core value and essential function of the ministry. Yet, too often, the
MoGCSW does not have access to the information it needs, because most information is out
of date or cannot easily be analysed, synthesised, and applied. The multisector nature of the
MoGCSW contributes to the challenges. Separate information systems have been
established for programme departments and projects using different platforms and
different measures, often driven by different funding agencies. The need to harmonise
these systems is recognised, but has not been acted upon due to limited capacity and
resources. Evidence-based programming relies on research to guide programme design and
evaluation. However, the ministry is guided primarily by the research priorities of funding
partners, as it cannot champion a research agenda of its own due to financial constraints.
Record keeping is poor at all levels within the ministry and feedback on reports that are
produced is inadequate, particularly between central and district levels and with partners.
Infrastructure to capture, store, manage, and retrieve information is necessary for
information to be used. Yet, ministry hardware and software, including such basic
equipment as computers and printers, are inadequate and outdated. Information use also
requires staff knowledge and skills, which are lacking in many cadres.
3.5.1 Recommendations
The Ministry should ensure the following:
i. An integrated M&E framework for the ministry at national and district levels is
developed and operationalised.
ii. A functional MoGCSW management information system is established.
iii. A research agenda for the ministry is developed and managed.
iv. Functional information-sharing platforms for the ministry are established.
v. Programme monitoring and reporting mechanisms are strengthened and
streamlined.
13
vi. The capacity of the MoGCSW information communications technology (ICT) unit to
procure and manage ICT hardware and software and to provide user support is
strengthened.
vii. The capacity of ministry staff in information systems and M&E is strengthened.
14
4.0 IMPLEMENTATION ARRANGEMENTS
4.1 INSTITUTIONAL ARRANGEMENTS
The framework focuses on strengthening operations to enable the ministry to better fulfill
its mandate and support of the JSSP, the MGDS II, and other key policy documents.
Therefore, institutional responsibility for implementation of the framework shall mainly
reside with the ministry`s departments at headquarters level, its district offices, and its
institutions, as outlined in the JSSP. Other major stakeholders shall include Office of the
President and Cabinet (OPC), Department of Human Resource Management and
Development (DHRMD), central and line ministries, CSOs, donors and development
partners, and the traditional leadership. The framework will also be implemented in line
with government circulars and standard operating procedures.
4.2 ROLE OF STAKEHOLDERS IN THE IMPLEMENTATION OF THE INSTITUTIONAL
FRAMEWORK
The roles of stakeholders in the implementation of the framework shall be as follows:
4.2.1 Ministry of Gender, Children and Social Welfare
The MoGCSW will be responsible for overall planning, implementation, monitoring, and
reporting on the framework. Under the overall leadership of the Office of the Principal
Secretary (PS), directorates will implement their respective areas of interventions in
operationalizing the framework. The Directorate of Administration will be the lead in
implementing the framework and the Directorate of Planning and Research will be the lead
in monitoring implementation of the framework. District officers and institutions will
manage the framework at their levels and will submit reports to MoGCSW headquarters.
4.2.2 Central Ministries (Including OPC, DHRMD, Ministry of Finance, Ministry of
Economic Planning and Development, and Ministry of Local Government and Rural
Development)
The OPC and the DHRMD will provide policy guidance to the MoGCSW on implementing the
framework. The Ministry of Finance and the Ministry of Economic Planning and
Development will mobilise and provide financial resources and programme coordination for
the framework. The Ministry of Local Government and Rural Development will provide
guidance on decentralisation and local authority issues. Local councils will coordinate key
partners in the implementation of MoGCSW activities at the district level, including district
executive committee (DEC) members and district assemblies.
4.2.3 Line Ministries
The line ministries such as Agriculture, Health, Education, Youth Development and Sports,
and Disability and Elderly Affairs will provide technical assistance and support for the
framework’s implementation through gender focal points, TWGs, and SWGs.
15
4.2.4 Civil Society Organizations
CSOs will lead in advocacy, resource mobilization, and implementation of the framework,
particularly at the district level.
4.2.5 Development Partners
Development partners will provide advocacy and financial and technical resources to
support the implementation of the framework.
4.3 IMPLEMENTATION STRATEGY
Implementation of this framework will be championed by the MoGCSW, working closely
with government ministries, development partners, CSOs, and private-sector and other
relevant stakeholders. The MoGCSW will operationalise the recommendations outlined in
Section 3.0 above in line with the Malawi Public Service Regulations, the Decentralisation
Policy, and other guidelines. The implementation strategy is presented in Annex 1. It
includes a set of 40 strategies linked to the 14 objectives of this framework and identifies
the lead responsibility and timeline for each strategy.
4.4 ACTIVITY PLAN
Activities that will be undertaken to implement the strategies are presented in Annex 2.
They are presented in table format and arranged by priority area, objective, and strategy.
Key implementers of the activities and timelines also are provided.
4.5 MONITORING AND EVALUATION PLAN
The ministry’s Planning and Research Department will coordinate and lead the M&E process
for the framework and ensure timely reporting and dissemination of results. The M&E Plan
is presented in Annex 3. Outputs, performance indicators, targets, baselines, and data
sources are given for each objective. The Planning and Research Department will develop
and manage an M&E platform for this plan, as part its development of the ministry’s larger
M&E system (see Objective 5.1 of Annex 1, Implementation Strategy). All ministry personnel
and stakeholders implementing programmes related to this framework at the national,
district, and community levels will report periodically to the Planning and Research
Department, in line with the developed M&E platform. Annual progress reports for the
framework shall be produced and disseminated among stakeholders and through various
communication products, meetings, and annual reviews.
4.6 RESOURCE MOBILISATION
The MoGCSW will cost the activity plan: that is, it will develop cost estimates for the
activities that have been identified to implement the framework. The ministry will solicit
financial and technical resources for implementation of the framework from the Malawi
government and funding and development partners.
16
4.7 REVIEW AND EVALUATION OF THE INSTITUTIONAL FRAMEWORK
This framework will be reviewed and evaluated after five years. The ministry’s Planning and
Research Department will coordinate the evaluation. The ministry will commission an
independent assessment of the framework’s implementation and its results will be
disseminated to respective coordinating, funding, and implementing partners. The results
will be used to inform policy, programme, and institutional reviews.
A1-1
ANNEX 1
IMPLEMENTATION STRATEGY
A1-2
1.0 INTRODUCTION
The strategy that will be employed to implement the Framework for Strengthening the
Functions of the Ministry of Gender, Children and Social Welfare (MoGCSW) is presented
here. It includes supporting strategies for each objective within the five priority areas.
These are given in Section 2.0. The implementation plan, which names the lead organization
or individual responsible for implementing each strategy and the timeline for
implementation, is presented in table format in Section 3.0.
2.0 STRATEGIES FOR PRIORITY AREAS
The Framework for Strengthening the Functions of the MoGCSW includes 14 objectives
across the five priority areas of Leadership and Governance, Coordination, Workforce,
Financing and Information. These objectives and the forty strategies that will be
implemented to achieve them are presented below by priority area.
2.1 Leadership and Governance
Objective 1.1: To realign ministry structure and functions from headquarters to districts
in line with the Decentralisation Policy
Strategies 1.1.1 Devolve all ministry functions being implemented at the central level.
1.1.2 Streamline the structure at district level and harmonise the responsibilities of
staff at all levels.
Objective 1.2: To ensure that all programmatic policies, guidelines and standards are
developed and disseminated
Strategies 1.2.1 Finalise all draft policies, guidelines, and standards.
1.2.2 Develop relevant policies, guidelines, and standards that are not in place.
1.2.3 Disseminate the available policies, guidelines, and standards.
1.2.4 Mainstream gender and other crosscutting issues of HIV and AIDS, age, and
disability in all of the ministry’s policies, guidelines, standards, and
programmes.
Objective 1.3: To strengthen advocacy and communication for all ministry programmes
Strategies
1.3.1 Institutionalise a public relations function within the MoGCSW. 1.3.2 Develop and implement an integrated communications strategy. 1.3.3 Increase interface with the media fraternity.
A1-3
Objective 1.4: To provide leadership for effective and efficient coordination and
implementation of the Joint Sector Strategic Plan (JSSP) and other key
policies
Strategies
1.4.1 Mobilise financial and technical resources for the JSSP and other key MoGCSW policies.
1.4.2 Launch and disseminate the JSSP and other key MoGCSW policies. 1.4.3 Ensure that the sector working group (SWG) and the technical working
groups (TWGs) are active and productive.
2.2 Coordination
Objective 2.1: To strengthen coordination of programmes and departments within the
MoGCSW
Strategies
2.1.1 Clarify mandates and terms of reference (TOR) for each department in the
ministry.
2.1.2 Develop and operationalise an internal communication strategy for the
ministry.
2.1.3 Rationalise the frequency and business of management meetings.
2.1.4 Institutionalise intradepartmental meetings.
2.1.5 Institutionalise joint planning and review forums among the ministry’s
departments and units.
Objective 2.2: To strengthen partnerships for delivery of programmes and services
Strategies
2.2.1 Establish effective national- and district-level coordination structures.
2.2.2 Institutionalise joint planning and review forums for the ministry and its
partners and stakeholders.
2.3 Workforce
Objective 3.1: To strengthen MoGCSW human resource systems
Strategies
3.1.1 Complete and implement the 2013 functional review.
3.1.2 Reduce the vacancy rate in the ministry’s establishment.
3.1.3 Review practices/procedures and implement them in line with current
human resource (HR) policies, including crosscutting issues of gender,
disability, and HIV and AIDS.
A1-4
Objective 3.2: To strengthen performance of ministry staff at all levels
Strategies
3.2.1 Develop and implement a capacity-building programme for ministry
personnel.
3.2.2 Implement a staff performance appraisal system.
Objective 3.3: To strengthen the performance of all volunteer cadres in the ministry
Strategies
3.3.1 Review and update the incentives and compensations for all volunteers
working for the ministry.
3.3.2 Build the capacity of all volunteers working with the ministry.
3.3.3 Enhance the community support system for the volunteers.
Objective 3.4: To strengthen MoGCSW institutions
Strategies
3.4.1 Upgrade Magomero College and other training centres.
3.4.2 Renovate existing reformatory and social rehabilitation centres.
2.4 Financing
Objective 4.1: To mobilise adequate resources for the ministry and rationally allocate
them across ministry programmes and institutions at all levels
Strategies
4.1.1 Develop and implement a resource mobilisation strategy for the ministry’s
programmes.
4.1.2 Develop and implement a resource allocation system for the ministry’s
programmes and institutions.
Objective 4.2: To ensure cost efficiency, transparency, and accountability of MoGCSW
finances
Strategies
4.2.1 Reduce administrative costs in the implementation of programmes.
4.2.2 Ensure that effective financial management systems and practices, including
close financial monitoring, are in place.
4.2.3 Enhance the capacity of auditors, accounts personnel, and programme
officers (especially for electronic financial records and management).
A1-5
2.5 Information
Objective 5.1: To generate and manage information for evidence-based decision making
at national and district levels
Strategies
5.1.1 Develop and operationalise an integrated monitoring and evaluation (M&E)
framework for MoGCSW programmes.
5.1.2 Establish a functional MoGCSW management information system.
5.1.3 Develop and manage a research agenda for the ministry.
Objective 5.2: To ensure information is shared and used by ministry staff and
stakeholders at national and district levels
Strategies
5.2.1 Establish functional information-sharing platforms for the ministry.
5.2.2 Enhance the ministry’s capacity for information management and use.
A1-6
3.0 IMPLEMENTATION PLAN
Priority Area 1: Leadership and Governance
Outcome: Strong leadership and governance
Objective Strategy Lead Responsibility2 Timeframe
1.1 To realign ministry structure and functions from headquarters to districts in line with the Decentralisation Policy
1.1.1 Devolve all ministry functions being implemented at the central level
PS 2013 - 2014
1.1.2 Streamline the structure at district level and harmonise the responsibilities of staff at all levels
CHRMO 2013 - 2014
1.2 To ensure that all programmatic policies, guidelines, and standards are developed and disseminated
1.2.1 Finalise all draft policies, guidelines, and standards MoGCSW directors 2013 - 2014
1.2.2 Develop relevant policies, guidelines, and standards that are not in place
MoGCSW directors 2013 - 2016
1.2.3 Disseminate the available policies, guidelines, and standards
MoGCSW directors 2013 - 2017
1.2.4 Mainstream gender and other crosscutting issues of HIV and AIDS, age, and disability in all ministry policies, guidelines, standards, and programmes
DGA 2013 - 2017
1.3 To strengthen advocacy and communication for all ministry programmes
1.3.1 Institutionalise a public relations function within the MoGCSW
PS 2013 - 2014
1.3.2 Develop and implement an integrated communications strategy
PRO 2013 - 2017
2 PS = Principal Secretary; CHRMO = Chief Human Resource Management Officer; DGA = Director of Gender Affairs; PRO = Public Relations Officer: DA = Director of
Administration; DPR = Director of Planning and Research; DCSO = District Community Services Officer; CA = Chief Accountant
A1-7
Priority Area 1: Leadership and Governance
Outcome: Strong leadership and governance
Objective Strategy Lead Responsibility2 Timeframe
1.3.3 Increase interface with the media fraternity PRO 2013 - 2017
1.4 To provide leadership for effective and efficient coordination and implementation of the JSSP and other key MoGCSW policies
1.4.1 Mobilise financial and technical resources for the JSSP and other key MoGCSW policies
PS 2013 - 2017
1.4.2 Launch and disseminate the JSSP other key MoGCSW policies
PS 2013 - 2017
1.4.3 Ensure that the sector working group and technical working groups are active and productive
PS 2013 - 2017
Priority Area 2: Coordination
Outcome: Well-coordinated delivery of services
Objective Strategy Lead Responsibility Timeframe
2.1 To strengthen coordination of programmes and departments within the MoGCSW
2.1.1 Clarify mandates and terms of reference for each department in the ministry
CHRMO 2013 - 2017
2.1.2 Develop and operationalise an internal communication strategy for the ministry
DA 2013 - 2017
2.1.3 Rationalise the frequency and business of management meetings
DA 2013 - 2017
2.1.4 Institutionalise intradepartmental meetings DA 2013 - 2017
2.1.5 Institutionalise joint planning and review forums for the ministry’s departments and units
DPR 2013 - 2017
2.2 To strengthen partnerships for delivery of programmes and services
2.2.1 Establish effective national- and district-level coordination structures
PS 2013 - 2017
2.2.2 Institutionalise joint planning and review forums for the ministry and its partners and stakeholders
DPR 2013 - 2017
A1-8
Priority Area 3: Workforce
Outcome: Vibrant and productive workforce
Objective Strategy Lead Responsibility Timeframe
3.1 To strengthen MoGCSW human resource systems
3.1.1 Complete and implement the 2013 functional review
CHRMO 2013
3.1.2 Reduce the ministry’s staff vacancy rate CHRMO 2013 - 2017
3.1.3 Review practices/procedures and implement them in line with current human resource policies, including crosscutting issues of gender, disability, and HIV and AIDS
CHRMO 2013 - 2017
3.2 To strengthen performance of ministry staff at all levels
3.2.1 Develop and implement a capacity-building programme for ministry personnel
CHRMO 2013 - 2017
3.2.2 Implement a staff performance appraisal system CHRMO 2013 - 2017
3.3 To strengthen the performance of all volunteer cadres in the ministry
3.3.1 Review and update the incentives and compensations for all volunteers working for the ministry
PS 2013 - 2017
3.3.2 Build capacity for all volunteers working with the ministry
Technical directors for social welfare and community development
2013 - 2017
3.3.3 Enhance the community support system for the volunteers
DCSO 2013 - 2017
3.4 Strengthen MoGCSW institutions
3.4.1 Upgrade Magomero College to an institution of higher learning
PS 2013 - 2017
3.4.2 Renovate existing reformatory and social rehabilitation centres
PS 2013-2017
A1-9
Priority Area 4: Financing
Outcome: Adequate resources to implement the Ministry’s programmes
Objective Strategy Lead Responsibility Timeframe
4.1 To mobilise adequate resources for the ministry and rationally allocate them across ministry programmes and institutions at all levels
4.1.1 Develop and implement a resource mobilisation strategy for the ministry’s programmes and institutions
PS 2013 - 2017
4.2.2 Develop and implement a resource allocation system for the ministry programmes and institutions
CA 2013 - 2017
4.2 To ensure cost efficiency, transparency, and accountability of MoGCSW finances
4.2.1 Reduce administrative costs in the implementation of programmes
DA 2013 - 2017
4.2.2 Ensure that effective financial management systems and practices, including close financial monitoring, are in place
CA 2013 - 2017
4.2.3 Enhance the capacity of auditors, accounts personnel, and programme officers (especially for electronic financial records and management)
CHRMO 2013 - 2017
A1-10
Priority Area 5: Information Outcome: Quality, timely, and harmonised information collected, shared, and used
Objective Strategy Lead Responsibility Timeframe
5.1 To generate and manage information for evidence-based decision making at national and district levels
5.1.1 Develop and operationalise an integrated M&E framework for MoGCSW programmes
DPR 2013 - 2017
5.1.2 Establish a functional MoGCSW management information system
DPR 2013 - 2017
5.1.3 Develop and manage a research agenda for the ministry
DPR 2013 - 2017
5.2 To ensure information is shared and used by ministry staff and stakeholders at national and district levels
5.2.1 Establish functional information sharing platforms for the ministry
DPR 2013 - 2017
5.2.2 Enhance MoGCSW’s capacity for information management and use
PS 2013 - 2017
A2-1
ANNEX 2
ACTIVITY PLAN
A2-2
Priority Area 1: Leadership and Governance
Strategy Activity Implementers Year
2014 2015 2016 2017 2018
Objective 1.1: To realign ministry structure and functions from headquarters to districts in line with the Decentralisation Policy
1.1.1 Devolve all ministry functions being implemented at the central level
1.1.1.1 Identify functions to be devolved Principal Secretary (PS), technical directors (TDs), Director of Planning and Research (DPR), Chief Human Resource Management Officer (CHRMO)
X X
1.1.1.2 Conduct meetings with local government (LG), district councils (DCs), and Local Government Finance Committee (LGFC) on devolved functions
PS, TDs, DCs, LGFC, LG X X
1.1.2 Streamline the structure at the district level and harmonise the responsibilities of staff at all levels
1.1.2.1 Review district level structures, systems, and functions
CHRMO, Director of Administration (DA), LG, DCs
X
1.1.2.2 Develop appropriate structure for approval CHRMO, LG, DCs, Department of Human Resource Management and Development (DHRMD)
X
1.1.2.3 Develop clear job descriptions CHRMO, TDs, LG, DCs
X
A2-3
Strategy Activity Implementers Year
2014 2015 2016 2017 2018
1.1.2.4 Sensitise district personnel on structure, systems, and functions
CHRMO, DA, LG, DCs
X X
Objective 1.2: To ensure that all programmatic policies, guidelines, and standards are developed and disseminated
1.2.1 Finalise all draft policies, guidelines, and standards
1.2.1.1 Review draft policies in line with Office of the President and Cabinent (OPC) guidelines (National Gender Policy, Community Development Policy, and Adult Literacy Policy); review draft guidelines and standards
DPR, TDs, CHRMO, OPC, DHRMD
X
1.2.1.2 Conduct PS’s review meetings for policies PS, TDs, DPR X
1.2.1.3 Finalise draft policies, standards, and guidelines
DPR, TDs, CHRMO, OPC
X
1.2.2 Develop relevant policies, guidelines, and standards not yet in place
1.2.2.1 Identify and prioritise gaps in relevant policies, guidelines, and standards
DPR, TDs X X
1.2.2.2 Develop issue papers PS, DPR, TDs X X
1.2.2.3 Conduct consultative meetings DPR, TDs, CHRMO X X
1.2.2.4 Draft policies, guidelines, and standards DPR, TDs X X
1.2.2.5 Validate and finalise draft policies, guidelines, and standards
DPR, TDs X X X
1.2.3 Disseminate the available policies, guidelines and standards
1.2.3.1 Develop a dissemination plan PS, DPR, TDs X
1.2.3.2 Translate policies, guidelines, and standards to local languages
DPR, TDs X X X
1.2.3.3 Manage and implement the dissemination plan
DPR, TDs, Public Relations Officer (PRO)
X X X X
1.2.3.4 Evaluate dissemination of policies, guidelines, and standards
DPR, TDs, PRO
X X
A2-4
Strategy Activity Implementers Year
2014 2015 2016 2017 2018
1.2.4 Mainstream gender and other crosscutting issues of HIV and AIDS, age, and disability in all ministry policies, guidelines, standards, and programmes
1.2.4.1 Develop guidelines for gender mainstreaming PS, Director of Gender Affairs (DGA), DPR, all directors
X
1.2.4.2 Conduct sensitisation meetings for mainstreaming gender with all heads of departments, institutions, and districts
DGA, DPR, TDs, principals, district community services officers (DCSOs)
X X
1.2.4.3 Institutionalise gender focal points in all departments, institutions, training centres, and districts
DGA, CHRMO X X
1.2.4.4 Train all gender focal points DGA, CHRMO X X
1.2.4.5 Engender all ministry policies and programmes
DGA, CHRMO, all Directors, principals, DCSOs
X X X X X
Objective 1.3: To strengthen advocacy and communication for all the ministry’s programmes
1.3.1 Institutionalise a public relations function within the MoGCSW
1.3.1.1 Develop terms of reference (TOR) for the PRO; recruit for and appoint the position
PS, CHRMO X
1.3.1.2 Establish and equip the Public Relations Unit PS, PRO, CHRMO, DA
X X
1.3.2 Develop and implement an integrated communications strategy
1.3.2.1 Conduct consultative meetings and surveys to get input for the communications strategy for MoGCSW programmes
PRO, TDs, DPR, DA X X
1.3.2.2 Draft the strategy PRO, TDs, DPR, DA X X
1.3.2.3 Vet and finalise the communications strategy PS, PRO, DPR, TDs X X
1.3.2.4 Orient ministry personnel in the PRO, DPR, TDs, DA X X
A2-5
Strategy Activity Implementers Year
2014 2015 2016 2017 2018
communications strategy
1.3.2.5 Implement the communications strategy PRO, PS, TDs X X X X X
1.3.3 Increase interface with the media fraternity
1.3.3.1 Identify media houses and journalists to work with
PRO, DA X X
1.3.3.2 Conduct consultative meetings to get input for a publicity plan (linked to the communications strategy, 1.3.2)
PRO, DA, DPR, TDs, journalists X X
1.3.3.3 Develop the publicity plan PRO, DA, DPR, TDs
X
1.3.3.4 Sensitise/train journalists on MoGCSW programmes, issues, and functions
PS, PRO, DA, TDs X X X X X
1.3.3.5 Implement the publicity plan PRO, DA, TDs X X X X
Objective 1.4: To provide leadership for effective and efficient coordination and implementation of the JSSP
1.4.1 Mobilise financial and technical resources for the JSSP
1.4.1.1 Develop a resource mobilisation strategy PS, DPR, TDs, Ministry of Youth Development and Sports (MYDS)
X
1.4.1.2 Meet potential donors/partners PS, DPR, TDs, MYDS
X
1.4.1.3 Develop funding proposals DPR, TDs, MYDS X X X X X
1.4.2 Launch and disseminate the JSSP
1.4.2.1 Conduct the launch of the JSSP PS, DPR, TDs, MYDS
X
1.4.2.2 Develop a dissemination and reporting plan PS, PRO, DPR, TDs, MYDS
X
1.4.2.3 Implement the dissemination and reporting plan
DPR, TDs, MYDS, PRO
X X X X X
1.4.3 Ensure that the sector working group
1.4.3.1 Develop schedules of meetings DPR, TDs, MYDS X
1.4.3.2 Conduct quarterly meetings DPR, TDs, MYDS, X X X X X
A2-6
Strategy Activity Implementers Year
2014 2015 2016 2017 2018
(SWG) and technical working groups (TWGs) are active and productive
SWG/TWG members
1.4.3.3 Develop joint TWG programmes DPR, TDs, MYDS X X X X X
1.4.3.4 Conduct joint TWG planning and review meetings
DPR, TDs, MYDS X X X X X
1.4.3.5 Conduct joint sector reviews (JSRs) PS, DPR X X X X X
Priority Area 2: Coordination
Strategy Activity Implementers Year
2014 2015 2016 2017 2018
Objective 2.1: To strengthen coordination of programmes and departments within the MOGCSW
2.1.1 Clarify mandates and TOR for each department in the ministry
2.1.1.1 Communicate mandates and TOR of all departments as outlined in the functional review, linked to the MoGCSW communications strategy (1.3.2) and the internal communication strategy (2.1.2)
PS, DPR, CHRMO, TDs, OPC, DHRMD X
2.1.1.2 Conduct periodic reviews of the mandates and TOR of all departments and communicate outcomes
PS, DPR, TDs, CHRMO, OPC, DHRMD
X X
2.1.2 Develop and operationalise an internal communication strategy for the ministry
2.1.2.1 Gather input from managers and staff for developing an internal communication strategy
PS, PRO, DPR, TDs, DA
X
2.1.2.2 Develop the internal communication strategy DPR, TDs, DA, PRO
X X
2.1.2.3 Implement the internal communication strategy
PS, PRO, DPR, TDs, DA
X X X X
2.1.2.4 Periodically review the internal PRO, DPR, TDs, X
X
A2-7
Strategy Activity Implementers Year
2014 2015 2016 2017 2018
communication strategy DA
2.1.3 Rationalise the frequency and business of management meetings
2.1.3.1 Review gaps and redundancies in frequency and business of management meetings
PS, DA, TDs, DPR X
2.1.3.2 Develop an improved management meeting schedule and guidelines
PS, DA, TDs X
2.1.3.3 Implement the schedule and guidelines; conduct periodic assessments
DA, TDS, DPR, DA X X X X X
2.1.3.4 Disseminate management decisions in line with the internal communication strategy (2.1.2)
DA, TDs, DPR, DA X X X X X
2.1.4 Institutionalise intradepartmental meetings
2.1.4.1 Review the current schedule of departmental meetings; identify areas of common interest/business across departments
TDs, DA, DPR X
2.1.4.2 Develop revised schedule of meetings and meeting guidelines for the priority areas
TDs, DA, DPR X
2.1.4.3 Implement the revised schedule and conduct periodic assessments
TDs, DA, DPR X X X X X
2.1.5 Institutionalise joint planning and review forums among the ministry’s departments and units
2.1.5.1 Develop TORs for the planning and review forums
DA, DPR, TDs X
2.1.5.2 Conduct meetings quarterly DA, DPR, TDs X X X X X
2.1.5.3 Disseminate information in line with the internal communication strategy (2.1.2)
DA, DPR, TDs X X X X X
Objective 2.2: To strengthen partnerships for delivery of programmes and services
2.2.1 Establish effective national- and district- level coordination
2.2.1.1 Review current coordination structures: strengths, weaknesses, gaps, and opportunities for improvement
DPR, TDs, DA, CHRMO, LG, DCs, partners
X
A2-8
Strategy Activity Implementers Year
2014 2015 2016 2017 2018
structures 2.2.1.2 Develop effective structures for stakeholder coordination at both national and district levels
DPR, TDs, DA, CHRMO, LG, DCs
X
2.2.1.3 Monitor structures for effective coordination DPR, TDs, DAs, LG, DCs
X X X X
2.2.2 Institutionalise joint planning and review forums between the ministry and its partners/stakeholders
2.2.2.1 Develop TOR for the joint planning and review forums
DA, DPR, TDs, partners/stakeholders
X
2.2.2.2 Develop a schedule of forums DA, DPR, TDs, partners/ stakeholders
X
2.2.2.3 Conduct joint planning and review forums DA, DPR, TDs, partners/ stakeholders
X X X X X
2.2.2.4 Disseminate information in line with internal communication strategy (2.1.2)
DA, DPR, TDs, partners/ stakeholders
X X X X X
Priority Area 3: Workforce
Strategy Activity Implementers Year
2014 2015 2016 2017 2018
Objective 3.1: To strengthen MoGCSW human resource systems
3.1.1 Complete and implement the 2013 functional review
3.1.1.1 Obtain authorised establishment warrant for all positions in the functional review report (new and upgraded positions)
PS, CHRMO X
3.1.1.2 Appoint implementation committee to PS, CHRMO X
A2-9
Strategy Activity Implementers Year
2014 2015 2016 2017 2018
monitor the implementation process
3.1.1.3 Seek authority from DHRMD to fill vacant positions (new, upgraded, and retitled positions)
CHRMO X
3.1.2 Reduce the vacancy rate in the ministry’s establishment
3.1.2.1 Identify vacant positions
CHRMO X X X X X
3.1.2.2 Obtain authority to fill vacant positions from DHRMD
CHRMO X X X X X
3.1.2.3 Submit recommendations to Civil Service Commission (CSC)/Appointment and Disciplinary Committee to fill vacant positions
CHRMO, CSC X X X X X
3.1.2.4 Conduct interviews and placement CHRMO, CSC X X X X X
3.1.3 Review practices/procedures and implement them in line with current human resource policies, including crosscutting issues of gender, disability, and HIV and AIDS
3.1.3.1 Identify practices and procedures to be reviewed and propose options
PS, CHRMO X
X
3.1.3.2 Implement proposed options PS, CHRMO X
3.1.3.3 Monitor implementation of human resource policies and report outcomes
PS, CHRMO
X X X X X
Objective 3.2: To strengthen performance of ministry staff at all levels
3.2.1 Develop and implement a capacity-building programme for ministry personnel
3.2.1.1 Appoint a capacity development/training committee
PS, CHRMO X
3.2.1.2 Conduct a capacity needs assessment for all staff
CHRMO X X
3.2.1.3 Prepare a capacity development plan CHRMO X
A2-10
Strategy Activity Implementers Year
2014 2015 2016 2017 2018
3.2.1.4 Implement the training and development plan CHRMO X X X X
3.2.1.5 Evaluate the capacity development programme CHRMO X X
3.2.2 Implement a staff performance appraisal system
3.2.2.1 Develop/refine the staff performance appraisal system
CHRMO X
3.2.2.2 Sensitise and train staff on the system CHRMO X X
3.2.2.3 Implement the staff performance appraisal system
CHRMO X X X X
3.2.2.4 Monitor the implementation process and its outcomes and report findings
PS, CHRMO X X X X
Objective 3.3: To strengthen the performance of all volunteer cadres in the ministry
3.3.1 Review and update the incentives and compensations for all volunteers working for the ministry
3.3.1.1 Conduct a review of volunteer services and compensations; develop recommendations for revision (increase in honorarium) and standardization
DA, TDs, CHRMO X
3.3.1.2 Develop and finalise a plan to revise honoraria and other compensation
PS, DA, TDs, CHRMO, DCSO
X
3.3.1.3 Develop a volunteer charter TDs, DA, DCSO X
3.3.1.4 Implement the plan and charter (e.g., procure bicycles, protective wear, bags, solar radios, etc.)
TDs, DA, DCSO X X X X
3.3.2 Build the capacity of all volunteers working with the ministry
3.3.2.1 Conduct a training needs assessment among volunteers
TDs, DCSO X
3.3.2.2 Develop a training plan TDs, DCSO, CHRMO
X
3.3.2.3 Implement the training plan TDs, DCSO, CHRMO
X X X X
3.3.2.4 Evaluate the impact of changes in volunteer incentives/compensation, training, and community support
TDs, DCSO, CHRMO, DPR
X X
A2-11
Strategy Activity Implementers Year
2014 2015 2016 2017 2018
3.3.3 Enhance the community support system for the volunteers
3.3.3.1 Conduct community sensitization meetings TDs X
3.3.3.2 Conduct community mobilisation through training programmes for community and influential leaders
TDs, DCSO X X X X X
Objective 3.4: To strengthen MoGCSW institutions
3.4.1 Upgrade Magomero College and other training centres
3.4.1.1 Develop a plan to obtain accreditation of Magomero College to offer diplomas in community development and early childhood development
PS, Principal, Director of Social Welfare (DSW), CHRMO, DA, National Council of Higher Learning
X
3.4.1.2 Develop/review standards, capacity, and performance of the training centres at Liwonde, Ntchisi, Mzuzu, and Kwacha
PS, DSW, CHRMO, DA, Centre managers
X
3.4.1.3 Assess needs for infrastructure refurbishment/construction, equipment, materials/supplies, human resources, training, and technical assistance at each training centre
PS, DSW, CHRMO, DA, Principal, centre managers
X X
3.4.1.4 Develop costed plans to make necessary improvements at each training centre
PS, DSW, CHRMO, DA, Principal, centre managers
X
3.4.1.5 Implement the plans DSW, CHRMO, DA, centre managers
X X X X
3.4.2 Renovate existing reformatory and social rehabilitation centres
3.2.4.1 Review/develop guidelines and standards for reformatory and social rehabilitation centres
PS, DSW, DA, centre managers
X X
3.2.4.2 Conduct needs assessments to bring centres up to standards
PS, DSW, DA, centre managers
X X
A2-12
Strategy Activity Implementers Year
2014 2015 2016 2017 2018
3.2.4.3 Develop a costed plan to renovate the centres PS, DSW, DA, centre managers
X X
3.2.4.4 Implement the renovation plans PS, DSW, DA, centre managers
X X X
Priority Area 4: Financing
Strategy Activity Implementers Year
2014 2015 2016 2017 2018
Objective 4.1: To mobilise adequate resources for the ministry and rationally allocate them across ministry programmes at all levels
4.1.1 Develop and implement a resource mobilisation strategy for the ministry’s programmes
4.1.1.1 Develop an issues paper (well- researched) articulating the socioeconomic cost of dwindling resource allocation to the ministry, the resource history, gaps, and opportunities
DPR
X
4.1.1.2 Develop a resource mobilisation strategy based on the issues paper
PS, DPR, TDs, DA X
4.1.1.3 Hold initial roundtable advocacy meetings on the strategy with government funding decisionmakers and funding partners
PS, DPR, TDs, DA, government/Parliament, funding partners
X
4.1.1.4 Implement the strategy PS, DPR, TDs, DA X X X X
4.1.1.5 Continuously monitor and report on resource mobilisation performance
PS, DPR X X X X
4.2.2 Develop and implement a resource allocation system for the ministry’s
4.1.2.1 Conduct a rapid assessment of the key resource requirements of the ministry’s programmes
DPR, TDs, DA X
4.1.2.2 Hold internal consultative meetings on PS, DPR, TDs, DA X
A2-13
Strategy Activity Implementers Year
2014 2015 2016 2017 2018
programmes the resource allocation system
4.1.2.3 Develop ministry resource allocation guidelines
PS, DPR, TDs, DA X
4.1.2.4 Disseminate the guidelines to the ministry staff and conduct training
PS, DPR X
4.1.2.5 Continuously monitor and report on compliance with the guidelines
PS, DPR X X X X
Objective 4.2: To ensure cost efficiency, transparency, and accountability of MoGCSW finances
4.2.1 Reduce administrative costs in the implementation of programmes
4.2.1.1 Develop an expenditure tracking system DPR, Chief Accountant (CA), DA X
4.2.1.2 Conduct a workshop for all key staff on cost-saving strategies
DPR, CA, TDs, DA X
4.2.2 Ensure that effective financial management systems and practices, including close financial monitoring, are in place
4.2.2.1 Orient members of staff in the Public Finance Management Act and Public Procurement Act
CA, DA X
4.2.2.2 Develop and implement monthly activity and expenditure reports
DPR, CA X X X X X
4.2.2.3 Conduct biannual expenditure review meetings
DPR, CA X X X X X
4.2.3 Enhance the capacity of auditors, accounts personnel, and programme officers (especially for electronic financial
4.2.3.1 Procure and provide computers for financial records and management
CA, DA X
4.2.3.2 Conduct trainings of auditors, accountants, and programme officers on electronic financial management (linked to 3.2.1)
CHRMO, CA X
4.2.3.3 Conduct orientation sessions on the specific financial reporting requirements of
CHRMO, CA X
A2-14
Strategy Activity Implementers Year
2014 2015 2016 2017 2018
records and management)
particular donors
Priority Area 5: Information
Strategy Activity Implementers Year
2014 2015 2016 2017 2018
Objective 5.1: To generate and manage information for evidence-based decision making at national and district levels
5.1.1 Develop and operationalise an integrated M&E framework for MoGCSW programmes
5.1.1.1 Compile and review reporting requirements across departments and programmes and develop an integrated M&E framework
PS, DPR, TDs, DA, district offices, institutions
X
5.1.1.2 Vet the M&E framework with MoGCSW staff and partners/ stakeholders
PS, DPR, TDs, district offices, institutions
X
5.1.1.3 Develop data collection and reporting processes
PS, DPR, TDs, DA, district offices, institutions
X
5.1.1.4 Review and update the the M&E framework on an annual basis
PS, DPR, TDs, district offices, institutions
X X X X
5.1.2 Establish a functional MoGCSW management information system
5.1.2.1 Design an information system for the M&E framework (software development)
DPR, DA, TDs, district offices, and institutions
X X
5.1.2.2 Assess infrastructure/hardware needs to implement the system at headquarters, districts, institutions, and training centres; procure equipment and supplies
DPR, DA, TDs, district offices, and institutions
X X
A2-15
Strategy Activity Implementers Year
2014 2015 2016 2017 2018
5.1.2.3 Test and roll out implementation of the system
DPR, TDs, district offices, and institutions
X
5.1.2.4 Review system needs annually in line with the M&E framework; maintain infrastructure
DPR, TDs, district offices, and institutions
X X X
5.1.3 Develop and manage a research agenda for the ministry
5.1.3.1 Identify knowledge gaps and research needs DPR, TDs X
5.1.3.2 Hold a stakeholder consultation meeting to prioritise research topics and draft a research agenda
DPR, Malawi National Research Council; research partners; programme partners
X
5.1.3.3 Finalise the agenda and develop a research implementation plan
DPR, Malawi National Research Council; research partners; programme partners
X
5.1.3.4 Monitor and report on progress of the research implementation plan
DPR, TDs X X X
Objective 5.2: To ensure information is shared and used by ministry staff and stakeholders at national and district levels
5.2.1 Establish functional information sharing platforms for
5.2.1.1 Develop and institutionalise reporting and dissemination processes for the M&E framework
PS, DPR, TDs, districts offices, institutions
X X X X X
A2-16
Strategy Activity Implementers Year
2014 2015 2016 2017 2018
the ministry 5.2.1.2 Develop and implement a dissemination plan for the research agenda/programme
DPR, TDs, research partners
X X X X
5.2.1.3 Routinely update the ministry’s website DPR, PRO X X X X X
5.2.1.4 Establish and maintain a central electronic depository and archives for key ministry documents
DPR, DA, TDs X X X X X
5.2.2 Enhance MoGCSW capacity for information management and use
5.2.2.1 Establish an M&E unit within the DPR PS, DPR X
5.2.2.2 Develop and implement a training plan on M&E and the management information system for ministry staff at all levels (linked to 3.2.1)
M&E Unit, CHRMO X X X X X
5.2.2.3 Strengthen the information communication
technology (ICT) unit within the DPR PS, DPR
X X X X X
5.2.2.4 Develop and implement a procurement plan for ICT hardware and software for all levels of the ministry
ICT Unit, DA X X X X X
5.2.2.5 Develop and implement an ICT training plan and user support services for the ministry (linked to 3.2.1)
ICT Unit, CHRMO X X X X X
A3-1
ANNEX 3: MONITORING AND EVALUATION PLAN &
COSTINGS
A3-2
Priority Area 1: Leadership and Governance
Outcome: Strong leadership and governance
Objective Output Performance Indicator
Target Baseline Source of Verification
Assumptions/ Risks
1.1 To realign ministry structure and functions from headquarters to districts in line with the Decentralisation Policy
a. Review of the ministry structure is completed
Ministry organogram from headquarters to districts
Ministry organogram is updated, finalised, and disseminated
Existing organogram
Ministry progress reports
Availability of resources
Proposed structure is accepted by local government
b. Process for developing devolution guidelines is completed
Devolution guidelines
Devolution guidelines that align with the Decentralisation Policy are finalised and disseminated
Existing guidelines
Ministry progress reports
1.2 To ensure that all programmatic policies, guidelines, and standards are developed and disseminated
c. Departments develop and implement plans for completing draft policies, guidelines, and standards and developing new ones
Number of programmatic policies, guidelines, and standards finalised and disseminated
5 2
Ministry progress reports
Timely approvals
Availability of resources
d. Process for mainstreaming
Number of policies,
5 0 Ministry
reports Ministry’s
policies are due
A3-3
Priority Area 1: Leadership and Governance
Outcome: Strong leadership and governance
Objective Output Performance Indicator
Target Baseline Source of Verification
Assumptions/ Risks
gender into ministry policies, guidelines, and standards is implemented
guidelines, and standards that explicitly address gender
Ministry policies
for review
Acceptance of gender mainstreaming
1.3 To strengthen advocacy and communication for all the ministry’s programmes
e. Ministry advocacy and communication strategy is developed and implemented
Percentage of the strategy that is implemented according to schedule
80% 0
Ministry reports Availability of resources
Appointment of ministry PRO
f. The Public Relations Unit actively engages with the media fraternity
Positive news coverage in both print and electronic media
50% increase To Be Determined (TBD)
Ministry reports
Newspaper articles
Radio/TV news and documentaries
Availability of resources
PRO appointed
1.4 To provide leadership for effective and efficient coordination and implementation of the JSSP
g. Resource mobilisation strategy is developed
Percentage of proposals that are funded
80% TBD
SWG and TWG reports
Availability of resources
h. SWG and TWGs actively guide JSSP implementation
Number of SWGs and TWGS meetings held per year
4 SWGs/TWGs
0
SWG and TWG reports
Availability of resources
Members participation
A3-4
Priority Area 2: Coordination
Outcome: Well-coordinated delivery of services
Objective Output Performance Indicator
Target Baseline Source of Verification
Assumptions/ Risks
2.1 To strengthen coordination of programmes and departments within the MoGCSW
a. An internal communications strategy is developed and implemented
Percentage of the strategy that is implemented according to schedule
80% 0
Ministry reports
Management meetings convened as planned
b. Joint planning and review meetings are institutionalised
Number of planning and review meetings conducted per year
4 0
Meeting reports
Meetings convened as planned
2.2 To strengthen partnerships for delivery of programmes and services
c. Effective structures for partner coordination are developed at national and district levels
Mapping of partners and guidelines for partner coordination
Updated annually
TBD
Ministry reports
SWG reports
JSSP is funded and implemented
d. Joint planning and review forums with partners are institutionalised
Number of partner planning and review forums conducted per year
4 TBD
Meeting reports
Meetings convened as planned
Availability of resources
A3-5
Priority Area 3: Workforce
Outcome: Vibrant and productive workforce
Objective Output Performance Indicator
Target Baseline Source of Verification
Assumptions/ Risks
3.1 To strengthen MoGCSW human resource systems
a. Vacant positions within the ministry`s establishment are filled
Staff vacancy rate for the ministry`s establishment 20% 53%
HRMS No freezing on recruitment to fill the vacancy
b. Human resource procedures and practices are reviewed
Percentage compliance with national human resource policies
100% TBD
Annual review reports
3.2 To strengthen performance of ministry staff at all levels
c. Training and capacity development plan developed and implemented
Percentage of plan activities completed according to schedule
80%
TBD
HRMS
Training reports
Availability of financial resources
d. Performance appraisal system is developed and implemented
Percentage of MoGCSW staff for whom a performance appraisal is conducted annually
100% TBD
HRMS reports Availability of resources
3.3 To strengthen the performance of all volunteer cadres in the
e. Compensation guidelines for volunteers are
Percentage of volunteers who receive
100% TBD Ministry reports
Availability of financial resources
A3-6
Priority Area 3: Workforce
Outcome: Vibrant and productive workforce
Objective Output Performance Indicator
Target Baseline Source of Verification
Assumptions/ Risks
ministry updated and implemented
compensation according to the guidelines
f. A training plan for volunteers is developed and implemented
Percentage of volunteers who have been trained according to the plan
50% (half male, half
female) 0
Ministry reports
3.4 To strengthen MoGCSW institutions
g. Improvement plans are developed and implemented for all training institutions
Percentage of planned activities that are completed according to schedule
80% TBD
Ministry reports
Availability of resources
h. Renovation plans for reformatory and social rehabilitation centres are developed and implemented
Percentage of planned activities that are completed according to schedule
80% TBD
Ministry reports
Availability of resources
A3-7
Priority Area 4: Financing
Outcome: Adequate resources to implement the ministry’s mandate
Objective Output Performance Indicator
Target Baseline Source of Verification
Assumptions/ Risks
4.1 To mobilise adequate resources for the ministry and rationally allocate them across ministry programmes at all levels
a. Resource allocation guidelines are developed and implemented
A resource mobilisation strategy document in place
An approved mobilisation strategy in place
NA
Resource mobilisation strategy document
Timely allocation of financial resources
Timely liquidation of resources spent per activity
≤1 week after the activity
>2 weeks after the activity
Accounts reports
Delays in submission of reports
b. Resource mobilisation strategy is developed and implemented
Percentage increase in the annual resource inflow to the ministry from Treasury
≥20% TBD
Budget documents
An increase in the government resource basket
Number of funding partners supporting the ministry
TBD TBD TBD
4.2 To ensure cost efficiency, transparency, and accountability of MoGCSW finances
c. Administrative costs of programme implementation are reduced
Ratio of administrative costs to programme delivery costs
1:4 TBD
Activity expenditure reports
Number of activity 2 per year 0 Ministry
A3-8
Priority Area 4: Financing
Outcome: Adequate resources to implement the ministry’s mandate
Objective Output Performance Indicator
Target Baseline Source of Verification
Assumptions/ Risks
expenditures reports produced
reports
d. An electronic financial management system is implemented
Percentage of officers trained in electronic financial management
100% by 2017
Less than 20%
Training reports
Availability of financial resources
Number of dedicated computers for financial management
10 1
Stores inventory
Availability of financial resources
Priority Area 5: Information
Outcome: Quality, timely, and harmonised information collected, shared, and used
Objective Output Performance Indicator
Target Baseline Source of Verification
Assumptions/ Risks
5.1 To generate and manage information for evidence-based decision making at national and district levels
a. An integrated M&E framework is developed and implemented
Percentage of indicators with complete data reporting
80% TBD
M&E reports Availability of resources
b. Management information system is established and functional
Percentage of MoGCSW M&E reporting that is generated by the system
80% 0
Management reports
Availability of resources
A3-9
Priority Area 4: Financing
Outcome: Adequate resources to implement the ministry’s mandate
Objective Output Performance Indicator
Target Baseline Source of Verification
Assumptions/ Risks
5.2 To ensure information is shared and used by ministry staff and stakeholders at national and district levels
c. Information sharing platforms are strengthened
Number of information exchange forums held
2 per year TBD
Meeting minutes
Number of documents archived in a central electronic depository
TBD TBD
Ministry reports
d. M&E and ICT capacity building plans are developed and implemented
Percentage of designated staff trained in M&E
100% (half female, half
male) TBD
Training records
Availability of resources
Percentage of ICT equipment in place according to the plan
100% TBD
ICT Unit records
Availability of resources
A3-10
ANNEX 4
IMPLEMENTATION COST OF THE INSTITUTIONAL FRAMEWORK
A3-11
COST SUMMARY BY OBJECTIVE
Exchange Rate ($1=MK416)
Projection
Year 1 Year 2 Year 3 Year 4 Year 5 Total
5 Years
%
TOTAL COSTS
TOTAL ESTIMATED COST 203,816,293 187,502,788 86,449,621 80,309,082 76,246,314 634,324,098
PRIORITY AREA 1 90,458,663 80,328,970 37,780,455 31,639,916 27,577,149 267,785,154 42.2%
Objective 1.1 14,879,820 13,085,509 0 0 0 27,965,329 4.4%
Objective 1.2 54,486,767 36,430,609 15,083,306 8,942,767 4,880,000 119,823,449 18.9%
Objective 1.3 1,913,155 8,849,847 734,144 734,144 734,144 12,965,436 2.0%
Objective 1.4 19,178,921 21,963,005 21,963,005 21,963,005 21,963,005 107,030,941 16.9%
PRIORITY AREA 2 17,779,540 16,125,654 16,125,654 16,125,654 16,125,654 82,282,154 13.0%
Objective 2.1 16,125,654 16,125,654 16,125,654 16,125,654 16,125,654 80,628,268 12.7%
Objective 2.2 1,653,886 0 0 0 0 1,653,886 0.3%
A3-12
Objective Year 1 Year 2 Year 3 Year 4 Year 5 Total
5 Years
%
TOTAL COSTS
PRIORITY AREA 3 64,334,176 52,314,052 31,488,705 31,488,705 31,488,705 211,114,342 33.3%
Objective 3.1 1,025,858 0 0 0 0 1,025,858 0.2%
Objective 3.2 4,390,430 8,242,300 0 0 0 12,632,731 2.0%
Objective 3.3 45,469,183 31,488,705 31,488,705 31,488,705 31,488,705 171,424,003 27.0%
Objective 3.4 13,448,704 12,583,046 0 0 0 26,031,750 4.1%
PRIORITY AREA 4 5,300,040 18,584,222 1,054,807 1,054,807 1,054,807 27,048,682 4.3%
Objective 4.1 5,300,040 8,646,752 1,054,807 1,054,807 1,054,807 17,111,212 2.7%
Objective 4.2 0 9,937,470 0 0 0 9,937,470 1.6%
PRIORITY AREA 5 25,943,875 20,149,890 0 0 0 46,093,765 7.3%
Objective 5.1 18,923,875 20,149,890 0 0 0 39,073,765 6.2%
Objective 5.2 7,020,000 0 0 0 0 7,020,000 1.1%
A3-13
SUMMARY BY ACTIVITY
Projection
Activity Costs Year 1 Costs Year 2 Costs Year 3 Costs Year
4
Costs Year
5
Total
5 Years
% of
Total
TOTAL ESTIMATED COST 203,816,293 187,502,788 86,449,621 80,309,082 76,246,314 634,324,098 0
PRIORITY AREA 1: Leadership and Governance 90,458,663 80,328,970 37,780,455 31,639,916 27,577,149 267,785,154 0
Objective 1.1: To realign ministry structure and functions from
headquarters to districts in line with the Decentralisation Policy
14,879,820 13,085,509 0 0 0 27,965,329 0
Strategy 1.1.1: Devolve all ministry functions currently implemented
at the central level
13,510,723 13,085,509 0 0 0 26,596,232
1.1.1.1 Identify functions to be devolved 3,575,118 0 0 0 0 3,575,118 0.6%
1.1.1.2 Conduct meetings with local governments (LGs), district councils
(DCs), and Local Government Finance Committee (LGFC) on devolved
functions
9,935,605 13,085,509 0 0 0 23,021,114 3.6%
Strategy 1.1.2: Streamline the structure at the district level and
harmonise the responsibilities of staff at all levels
1,369,097 0 0 0 0 1,369,097
1.1.2.1 Review district level structures, systems, and functions 1,369,097 0 0 0 0 1,369,097 0.2%
1.1.2.2 Develop appropriate structure for approval 0 0 0 0 0 0 0.0%
1.1.2.3 Develop clear job descriptions 0 0 0 0 0 0 0.0%
1.1.2.4 Sensitise district personnel on structure, systems, and functions 0 0 0 0.0%
A3-14
Objective 1.2: To ensure that all programmatic policies, guidelines,
and standards are developed and disseminated
54,486,767 36,430,609 15,083,306 8,942,767 4,880,000 119,823,449
Strategy 1.2.1: Finalise all draft policies, guidelines, and standards 2,890,847 0 0 0 0 2,890,847
1.2.1.1 Review draft policies in line with OPC guidelines (National Gender
Policy, Community Development Policy, and Adult Literacy Policy);
review draft guidelines and standards
2,363,403 0 0 0 0 2,363,403 0.4%
1.2.1.2 Conduct PS’s review meeting for policies 527,443 0 0 0 0 527,443 0.1%
1.2.1.3 Finalise draft policies, standards, and guidelines 0 0 0 0 0 0 0.0%
Strategy 1.2.2: Develop relevant policies, guidelines ,and standards
not yet in place
15,406,237 565,460 0 0 0 15,971,697
1.2.2.1 Identify and prioritise gaps in relevant policies, guidelines, and
standards
0 0 0 0 0 0 0.0%
1.2.2.2 Develop issue papers 0 0 0 0 0 0 0.0%
1.2.2.3 Conduct consultative meetings 8,957,619 0 0 0 0 8,957,619 1.4%
1.2.2.4 Draft policies, guidelines, and standards 5,897,683 0 0 0 0 5,897,683 0.9%
1.2.2.5 Validate and finalise draft policies, guidelines, and standards 550,935 565,460 0 0 0 1,116,395 0.2%
Strategy 1.2.3: Disseminate the available policies, guidelines, and
standards
8,942,767 8,942,767 8,942,767 8,942,767 4,880,000 40,651,068
1.2.3.1 Develop a dissemination plan 0 0 0 0 0 0 0.0%
1.2.3.2 Translate policies, guidelines, and standards to local languages 4,062,767 4,062,767 4,062,767 4,062,767 0 16,251,068 2.6%
1.2.3.3 Manage and implement the dissemination plan for policies,
guidelines, and standards
4,880,000 4,880,000 4,880,000 4,880,000 4,880,000 24,400,000 3.8%
A3-15
1.2.3.4 Evaluate the dissemination of policies, guidelines, and standards 0 0 0 0 0 0 0.0%
Strategy 1.2.4: Mainstream gender and other crosscutting issues of
HIV and AIDS, age, and disability in all ministry policies, guidelines,
standards, and programmes
27,246,916 26,922,382 6,140,539 0 0 60,309,837
1.2.4.1 Develop guidelines for gender mainstreaming 0 0 0 0 0 0 0.0%
1.2.4.2 Conduct sensitisation meetings for mainstreaming gender with all
heads of departments, institutions, and districts
8,825,299 8,500,765 17,326,064 2.7%
1.2.4.3 Institutionalise “gender focal points” in all departments, institutions,
training centres, and districts
0 0 0 0 0 0 0.0%
1.2.4.4 Train all gender focal points 18,421,617 18,421,617 6,140,539 0 0 42,983,773 6.8%
1.2.4.5 Engender all ministry policies and programmes 0 0 0 0 0 0 0.0%
Objective 1.3: To strengthen advocacy and communication for all
ministry programmes
1,913,155 8,849,847 734,144 734,144 734,144 12,965,436
Strategy 1.3.1: Institutionalise a public relations function within the
MoGCSW
0 852,344 0 0 0 852,344
1.3.1.1 Develop terms of reference (TOR) for the Public Relations Officer
(PRO); recruit for and appoint the position
0 0 0 0 0 0 0.0%
1.3.1.2 Establish and equip the Public Relations Unit (PR Unit) 852,344 0 0 0 852,344 0.1%
Strategy 1.3.2: Develop and implement an integrated
communications strategy
1,913,155 7,263,360 0 0 0 9,176,515
1.3.2.1 Conduct consultative meetings and surveys to get input for the
communications strategy for MoGCSW programmes
1,913,155 0 0 0 0 1,913,155 0.3%
A3-16
1.3.2.2 Draft the communication strategy 0 0 0 0 0 0 0.0%
1.3.2.3 Vet and finalise the communications strategy 0 1,259,122 0 0 0 1,259,122 0.2%
1.3.2.4 Orient ministry personnel in the communications strategy 0 6,004,237 0 0 0 6,004,237 0.9%
1.3.2.5 Implement the communications strategy 0 0 0 0 0 0 0.0%
Strategy 1.3.3: Increase interface with the media fraternity 0 734,144 734,144 734,144 734,144 2,936,577
1.3.3.1 Identify media houses and journalists to work with 0 0 0 0 0 0 0.0%
1.3.3.2 Conduct consultative meetings to get input for a publicity plan (linked
to the communications strategy, 1.3.2)
0 0 0 0 0 0 0.0%
1.3.3.3 Develop the ministry's publicity plan 0 0 0 0 0 0 0.0%
1.3.3.4 Sensitise/train journalists on MoGCSW programmes, issues, and
functions
0 734,144 734,144 734,144 734,144 2,936,577 0.5%
1.3.3.5 Implement the ministry's publicity plan 0 0 0 0 0 0 0.0%
Objective 1.4: To provide leadership for effective and efficient
coordination and implementation of the JSSP
19,178,921 21,963,005 21,963,005 21,963,005 21,963,005 107,030,941
Strategy 1.4.1: Mobilise financial and technical resources for the
JSSP
0 0 0 0 0 0
1.4.1.1 Develop a resource mobilisation strategy 0 0 0 0 0 0 0.0%
1.4.1.2 Meet potential donors/partners 0 0 0 0 0 0 0.0%
1.4.1.3 Develop funding proposals 0 0 0 0 0 0 0.0%
Strategy 1.4.2: Launch and disseminate the JSSP 0 0 0 0 0 0
A3-17
1.4.2.1 Conduct the launch of the JSSP 0 0 0 0 0 0 0.0%
1.4.2.2 Develop a dissemination and reporting plan 0 0 0.0%
1.4.2.3 Implement the dissemination and reporting plan 0 0 0 0 0 0 0.0%
Strategy 1.4.3: Ensure that the sector working group (SWG) and
technical working groups (TWGs) are active and productive
19,178,921 21,963,005 21,963,005 21,963,005 21,963,005 107,030,941
1.4.3.1 Develop schedules of meetings 0 0 0 0 0 0 0.0%
1.4.3.2 Conduct quarterly TWG meetings 13,073,037 15,857,121 15,857,121 15,857,121 15,857,121 76,501,521 12.1%
1.4.3.3 Develop joint TWG programmes 0 0 0 0 0 0 0.0%
1.4.3.4 Conduct joint TWG planning and review meetings 0 0 0 0 0 0 0.0%
1.4.3.5 Conduct joint sector reviews (JSRs) 6,105,884 6,105,884 6,105,884 6,105,884 6,105,884 30,529,420 4.8%
PRIORITY AREA 2: Coordination 17,779,540 16,125,654 16,125,654 16,125,654 16,125,654 82,282,154
Objective 2.1: To strengthen coordination of programmes and
departments within the MoGCSW
16,125,654 16,125,654 16,125,654 16,125,654 16,125,654 80,628,268
Strategy 2.1.1: Clarify mandates and TOR for each department in the
ministry
0 0 0 0 0 0
2.1.1.1 Communicate mandates and TOR of all departments as outlined in
the functional review, linked to the MoGCSW communications
strategy (1.3.2) and the internal communication strategy (2.1.2)
0 0 0 0 0 0 0.0%
2.1.1.2 Conduct periodic reviews of the mandates and TOR of all departments
and communicate outcomes
0 0 0 0 0 0 0.0%
A3-18
Strategy 2.1.2: Develop and operationalise an internal
communication strategy for the ministry
0 0 0 0 0 0
2.1.2.1 Gather input from managers and staff for developing an internal
communication strategy
0 0 0 0 0 0 0.0%
2.1.2.2 Develop the internal communication strategy 0 0 0 0 0 0 0.0%
2.1.2.3 Implement the internal communication strategy 0 0 0 0 0 0 0.0%
2.1.2.4 Periodically review the ministry's internal communication strategy 0 0 0 0 0 0 0.0%
Strategy 2.1.3: Rationalise the frequency and business of
management
0 0 0 0 0 0
2.1.3.1 Review gaps and redundancies in frequency and business of
management meetings
0 0 0 0 0 0 0.0%
2.1.3.2 Develop an improved management meeting schedule and guidelines 0 0 0 0 0 0 0.0%
2.1.3.3 Implement the schedule and guidelines; conduct periodic assessments 0 0 0 0 0 0 0.0%
2.1.3.4 Disseminate management decisions in line with the internal
communication strategy (2.1.2)
0 0 0 0 0 0 0.0%
Strategy 2.1.4: Institutionalise intradepartmental meetings 0 0 0 0 0 0
2.1.4.1 Review the current schedule of departmental meetings; identify
areas of common interest/business across departments
0 0 0 0 0 0 0.0%
2.1.4.2 Develop revised schedule of meetings and meeting guidelines for the
priority areas
0 0 0 0 0 0 0.0%
A3-19
2.1.4.3 Implement the revised schedule and conduct periodic assessments 0 0 0 0 0 0 0.0%
Strategy 2.1.5: Institutionalise joint planning and review forums
among the ministry’s departments and units
16,125,654 16,125,654 16,125,654 16,125,654 16,125,654 80,628,268
2.1.5.1 Develop TORs for the planning and review forums 0 0 0 0 0 0 0.0%
2.1.5.2 Conduct annual meetings 16,125,654 16,125,654 16,125,654 16,125,654 16,125,654 80,628,268 12.7%
2.1.5.3 Disseminate information in line with the internal communication
strategy (2.1.2)
0 0 0 0 0 0 0.0%
Objective 2.2: To strengthen partnerships for delivery of
programmes and services
1,653,886 0 0 0 0 1,653,886
Strategy 2.2.1: Establish effective national- and district-level
coordination structures
1,653,886 0 0 0 0 1,653,886
2.2.1.1 Review current coordination structures- strengths, weaknesses, gaps,
and opportunities for improvement
916,288
0 0 0 0 916,288 0.1%
2.2.1.2 Develop effective structures for stakeholder coordination at both
national and district levels
737,598
0 0 0 0 737,598 0.1%
2.2.1.3 Monitor coordination structures for effective coordination 0 0 0 0 0 0 0.0%
Strategy 2.2.2: Institutionalise joint planning and review forums
between the ministry and its partners/stakeholders
0 0 0 0 0 0
2.2.2.1 Develop TOR for the joint planning and review forums 0 0 0 0 0 0 0.0%
2.2.2.2 Develop a schedule of forums 0 0 0 0 0 0 0.0%
2.2.2.3 Conduct joint planning and review forums 0 0 0 0 0 0 0.0%
2.2.2.4 Disseminate information in line with internal communication strategy 0 0 0 0 0 0 0.0%
A3-20
(2.1.2)
PRIORITY AREA 3: Workforce 64,334,176 52,314,052 31,488,705 31,488,705 31,488,705 211,114,342
Objective 3.1: To strengthen MoGCSW human resource systems 1,025,858 0 0 0 0 1,025,858
Strategy 3.1.1: Complete and implement the 2013 functional review 0 0 0 0 0 0
3.1.1.1 Obtain authorised establishment warrant for all positions in the
functional review report (new, upgraded, and retitled positions)
0 0 0 0 0 0 0.0%
3.1.1.2 Appoint implementation committee to monitor the implementation
process
0 0 0 0 0 0 0.0%
3.1.1.3 Seek authority from DHRMD to fill vacant positions (new, upgraded,
and retitled positions)
0 0 0 0 0 0 0.0%
Strategy 3.1.2: Reduce the ministry’s job vacancy rate 1,025,858 0 0 0 0 1,025,858
3.1.2.1 Identify vacant positions 1,025,858 0 0 0 0 1,025,858 0.2%
3.1.2.2 Obtain authority to fill vacant positions from DHRMD 0 0 0 0 0 0 0.0%
3.1.2.3 Submit recommendations to CSC/Appointment and Disciplinary
Committee to fill vacant positions
0 0 0 0 0 0 0.0%
3.1.2.4 Conduct interviews and placement 0 0 0 0 0 0 0.0%
Strategy 3.1.3: Review practices/procedures and implement them in
line with current human resource policies including crosscutting
issues of gender, disability, and HIV and AIDS
0 0 0 0 0 0
3.1.3.1 Identify practices and procedures to be reviewed and propose
options
0 0 0 0 0 0 0.0%
3.1.3.2 Implement proposed options 0 0 0 0 0 0 0.0%
A3-21
3.1.3.3 Monitor the implementation of human resource policies and report
outcomes
0 0 0 0 0 0 0.0%
Objective 3.2: To strengthen the performance of ministry staff 4,390,430 8,242,300 0 0 0 12,632,731
Strategy 3.2.1: Develop and implement a capacity-building
programme for ministry personnel
0 3,027,672 0 0 0 3,027,672
3.2.1.1 Appoint a capacity development/training committee 0 0 0 0 0 0 0.0%
3.2.1.2 Conduct a capacity needs assessment for all staff 0 3,027,672 0 0 0 3,027,672 0.5%
3.2.1.3 Prepare a capacity development plan 0 0 0 0 0 0 0.0%
3.2.1.4 Implement the ministry's training and development plan 0 0 0 0 0 0 0.0%
3.2.1.5 Evaluate the capacity development programme 0 0 0 0 0 0 0.0%
Strategy 3.2.2: Implement a staff performance appraisal 4,390,430 5,214,629 0 0 0 9,605,059
3.2.2.1 Develop/refine the staff performance appraisal system 0 0 0 0 0 0 0.0%
3.2.2.2 Sensitise and train staff on the system 4,390,430 5,214,629 0 0 0 9,605,059 1.5%
3.2.2.3 Implement the staff performance appraisal system 0 0 0 0 0 0 0.0%
3.2.2.4 Monitor the implementation process and outcomes and report
findings
0 0 0 0 0 0 0.0%
Objective 3.3: To strengthen the performance of all volunteer cadres
in the ministry
45,469,183 31,488,705 31,488,705 31,488,705 31,488,705 171,424,003
Strategy 3.3.1: Review and update the incentives and compensations
for all volunteers working for the ministry
2,760,452 0 0 0 0 2,760,452
A3-22
3.3.1.1 Conduct a review of volunteer services and compensations; develop
recommendations for revision (increase in honorarium) and
standardization
2,760,452 0 0 0 0 2,760,452 0.4%
3.3.1.2 Develop and finalise a plan to revise honoraria and other
compensation
0 0 0 0 0 0 0.0%
3.3.1.3 Develop a volunteer charter 0 0 0 0 0 0 0.0%
3.3.1.4 Conduct a training needs assessment among volunteers 0 0 0 0 0 0 0.0%
3.3.1.5 Implement the plan to revise honoraria and other compensation and
the volunteer charter (e.g., procure bicycles, protective wear, etc.)
0 0 0 0 0 0 0.0%
Strategy 3.3.2: Build the capacity of all volunteers working with the
ministry
2,995,842 0 0 0 0 2,995,842
3.3.2.1 Conduct a training needs assessment among volunteers 2,995,842 0 0 0 0 2,995,842 0.5%
3.3.2.2 Develop a training plan 0 0 0 0 0 0 0.0%
3.3.2.3 Implement the training plan for volunteers 0 0 0 0 0 0 0.0%
3.3.2.4 Evaluate the impact of changes in volunteer incentives/compensation,
training, and community support
0 0 0 0 0 0 0.0%
Strategy 3.3.3: Enhance the community support system for the
volunteers
39,712,890 31,488,705 31,488,705 31,488,705 31,488,705 165,667,710
3.3.3.1 Conduct community sensitization meetings 8,224,185 0 0 0 0 8,224,185 1.3%
3.3.3.2 Conduct community mobilisation through training programmes for
community and influential leaders
31,488,705 31,488,705 31,488,705 31,488,705 31,488,705 157,443,525 24.8%
A3-23
Objective 3.4: To strengthen MoGCSW institutions 13,448,704 12,583,046 0 0 0 26,031,750
Strategy 3.4.1: Upgrade Magomero College and other training
centres
13,448,704 7,266,951 0 0 0 20,715,655
3.4.1.1 Develop a plan to obtain accreditation of Magomero College to offer
diplomas in community development and early childhood
development
4,200,737 0 0 0 0 4,200,737 0.7%
3.4.1.2 Develop/review standards, capacity, and performance of the training
centres at Liwonde, Ntchisi, Mzuzu, and Kwacha
9,247,967 0 0 0 0 9,247,967 1.5%
3.4.1.3 Assess needs for infrastructure refurbishment/ construction,
equipment, materials/supplies, human resources, training, and
technical assistance at Liwonde, Ntchisi, Mzuzu, and Kwacha training
centres
0 7,266,951 0 0 0 7,266,951 1.1%
3.4.1.4 Develop costed plans to make necessary improvements at each
training centre
0 0 0 0 0 0 0.0%
3.4.1.5 Implement the plans 0 0 0 0 0 0 0.0%
Strategy 3.4.2: Renovate existing reformatory and social
rehabilitation centres
0 5,316,095 0 0 0 5,316,095
3.4.2.1 Review/develop guidelines and standards for reformatory and social
rehabilitation centres
0 5,316,095 0 0 0 5,316,095 0.8%
3.4.2.2 Conduct a needs assessments to bring centres up to standards 0 0 0 0 0 0 0.0%
3.4.2.3 Develop a costed plan to renovate the centres 0 0 0 0 0 0 0.0%
3.4.2.4 Implement the plan to renovate the ministry's training centres 0 0 0 0 0 0 0.0%
A3-24
PRIORITY AREA 4: Financing 5,300,040 18,584,222 1,054,807 1,054,807 1,054,807 27,048,682
Objective 4.1: To mobilise adequate resources for the ministry and
rationally allocate them across ministry programmes at all levels
5,300,040 8,646,752 1,054,807 1,054,807 1,054,807 17,111,212
Strategy 4.1.1: Develop and implement a resource mobilisation
strategy for the ministry’s programmes
3,507,373 1,054,807 1,054,807 1,054,807 1,054,807 7,726,600
4.1.1.1 Develop an issues paper (well-researched) articulating the
socioeconomic cost of dwindling resource allocation to the ministry,
the resource history, gaps, and opportunities
2,452,567 0 0 0 0 2,452,567 0.4%
4.1.1.2 Develop a resource mobilisation strategy based on the issues paper 0 0 0 0 0 0 0.0%
4.1.1.3 Hold initial roundtable advocacy meetings on the strategy with
government funding decision makers and funding partners
1,054,807 1,054,807 1,054,807 1,054,807 1,054,807 5,274,033 0.8%
4.1.1.4 Implement the strategy 0 0 0 0 0 0 0.0%
4.1.1.5 Continuously monitor and report on resource mobilisation
performance
0 0 0 0 0 0 0.0%
Strategy 4.1.2: Develop and implement a resource allocation system
for the ministry’s programmes
1,792,667 7,591,945 0 0 0 9,384,612
4.1.2.1 Conduct a rapid assessment of the key resource requirements of the
ministry’s programmes
1,792,667 0 0 0 0 1,792,667 0.3%
4.1.2.2 Hold internal consultative meetings on the resource allocation system 0 0 0 0 0 0 0.0%
4.1.2.3 Develop ministry resource allocation guidelines 0 0 0 0 0 0 0.0%
4.1.2.4 Disseminate the ministry's resource allocation guidelines to the
ministry staff and conduct orientation
0 7,591,945 0 0 0 7,591,945 1.2%
A3-25
4.1.2.5 Continuously monitor and report on compliance with the ministry's
resource allocation guidelines
0 0 0 0 0 0 0.0%
Objective 4.2: To ensure cost efficiency, transparency, and
accountability of MoGCSW finances
0 9,937,470 0 0 0 9,937,470
Strategy 4.2.1: Reduce administrative costs in the implementation of
programmes
0 0 0 0 0 0
4.2.1.1. Develop an expenditure tracking system 0 0 0 0 0 0 0.0%
4.2.1.2. Conduct a workshop for all key staff on cost-saving strategies 0 0 0 0 0 0 0.0%
Strategy 4.2.2: Ensure that effective financial management systems
and practices, including close financial monitoring, are in place
0 0 0 0 0 0
4.2.2.1 Orient staff in the Public Finance Management Act and Public
Procurement Act
0 0 0 0 0 0 0.0%
4.2.2.2 Develop and implement monthly activity and expenditure reports 0 0 0 0 0 0 0.0%
4.2.2.3 Conduct biannual expenditure review meetings 0 0 0 0 0 0 0.0%
Strategy 4.2.3: Enhance the capacity of auditors, accounts personnel,
and programme officers (especially for electronic financial records
and management)
0 9,937,470 0 0 0 9,937,470
4.2.3.1 Procure and provide computers for financial records and management 0 2,035,490 0 0 0 2,035,490 0.3%
4.2.3.2 Conduct trainings of internal auditors, accountants, administrators,
and programme officers on electronic financial management (linked
to 3.2.1)
0
6,106,653
0 0 0 6,106,653 1.0%
4.2.3.3 Conduct orientation sessions on the specific financial reporting
requirements of particular donors
0 1,795,328 0 0 0 1,795,328 0.3%
A3-26
PRIORITY AREA 5: Information 25,943,875 20,149,890 0 0 0 46,093,765
Objective 5.1: To generate and manage information for evidence-
based decision making at national and district levels
8,923,875 20,149,890 0 0 0 39,073,765
Strategy 5.1.1: Develop and operationalise an integrated M&E
framework for MoGCSW programmes
5,382,709
0 0 0 5,382,709
5.1.1.1 Compile and review reporting requirements across departments and
programmes and develop an integrated M&E framework
2,452,567
0 0 0 0 2,452,567 0.4%
5.1.1.2 Vet the framework with MoGCSW staff and partners/ stakeholders
2,930,143
0 0 0 0 2,930,143 0.5%
5.1.1.3 Develop data collection and reporting processes 0 0 0 0 0 0 0.0%
5.1.1.4 Review and update the M&E framework on an annual basis 0 0 0 0 0 0 0.0%
Strategy 5.1.2: Establish a functional MoGCSW management
information system
12,034,389 20,149,890 0 0 0 32,184,279
5.1.2.1 Design an information system for the M&E framework (software
development)
8,100,000
0 0 0 0 8,100,000 1.3%
5.1.2.1b Validate the information system
2,930,143
0 0 0 0 2,930,143 0.5%
5.1.2.2 Assess infrastructure/hardware needs to implement the system at
headquarters, districts, institutions, and training centres; procure
equipment and supplies
1,004,246 20,149,890.00 0 0 0 21,154,136 3.3%
5.1.2.3 Test and roll out implementation of the system 0 0 0 0 0 0 0.0%
A3-27
5.1.2.4 Review system needs annually in line with the M&E framework;
maintain infrastructure
0 0 0 0 0 0 0.0%
Strategy 5.1.3: Develop and manage a research agenda for the
ministry
1,506,777 0 0 0 0 1,506,777
5.1.3.1 Identify knowledge gaps and research needs 0 0 0 0 0 0 0.0%
5.1.3.2 Hold a stakeholder consultation meeting to prioritise research topics
and draft a research agenda
1,506,777 0 0 0 0 1,506,777 0.2%
5.1.3.3 Finalise the agenda and develop a research implementation plan 0 0 0 0 0 0 0.0%
5.1.3.4 Monitor and report on progress of the research implementation plan 0 0 0 0 0 0 0.0%
Objective 5.2: To ensure information is shared and used by ministry
staff and stakeholders at national and district levels
7,020,000 0 0 0 0 7,020,000
Strategy 5.2.1: Establish functional information-sharing platforms for
the ministry
0 0 0 0 0 0
5.2.1.1 Develop and institutionalise reporting and dissemination processes
for the M&E framework
0 0 0 0 0 0 0.0%
5.2.1.2 Develop and implement a dissemination plan for the research
agenda/programme
0 0 0 0 0 0 0.0%
5.2.1.3 Routinely update the ministry’s website 0 0 0 0 0 0 0.0%
5.2.1.4 Establish and maintain a central electronic depository and archives for
key ministry documents
0 0 0 0 0 0 0.0%
Strategy 5.2.2: Enhance MoGCSW capacity for information
management and use
7,020,000 0 0 0 0 7,020,000
A3-28
5.2.2.1 Establish an M&E Unit within the Directorate of Planning &Research 0 0 0 0 0 0 0.0%
5.2.2.2 Develop and implement a training plan on M&E and the management
information system for ministry staff at all levels (linked to 3.2.1)
0 0 0 0 0 0 0.0%
5.2.2.3 Strengthen the information communication technology (ICT) unit
within the DPR
7,020,000 0 0 0 0 7,020,000 1.1%
5.2.2.4 Develop and implement a procurement plan for ICT hardware and
software for all levels of the ministry
0 0 0 0 0 0 0.0%
5.2.2.5 Develop and implement an ICT training plan and user support services
for the ministry (linked to 3.2.1)
0 0 0 0 0 0 0.0%
A3-29
SUMMARY BY PRIORITY AREA FOR THE FRAMEWORK
Projection Total
5 Years
POLICY AREA Year 1 Year 2 Year 3 Year 4 Year 5 Kwacha US$
TOTAL ESTIMATED COST 203,816,293 187,502,788 86,449,621 80,309,082 76,246,314 634,324,098 1,524,818
Leadership and Governance 90,458,663 80,328,970 37,780,455 31,639,916 27,577,149 267,785,154 643,714
Coordination 17,779,540 16,125,654 16,125,654 16,125,654 16,125,654 82,282,154 197,794
Workforce 64,334,176 52,314,052 31,488,705 31,488,705 31,488,705 211,114,342 507,486
Financing 5,300,040 18,584,222 1,054,807 1,054,807 1,054,807 27,048,682 65,021
Information 25,943,875 20,149,890 0 0 0 46,093,765 110,802
Exchange Rate ($1=MK416)
A3-30
SUMMARY BY COST ITEM
Cost Item Year 1 Year 2 Year 3 Year 4 Year 5 Total 5 Years %age
Per diem 71,778,600 62,033,900 28,485,100 25,182,700 25,029,100 212,509,400 33.50%
Stationery 13,133,715 10,516,160 7,550,907 7,393,688 7,256,670 45,851,141 7.23%
Printing costs 3,600,000 3,600,000 3,600,000 3,600,000 3,600,000 18,000,000 2.84%
Hotel charges 47,560,000 38,198,500 23,809,000 22,161,500 21,929,500 153,658,500 24.22%
Transport costs (fuel) 29,941,478 26,433,879 16,405,614 15,820,193 15,655,044 104,256,208 16.44%
Consultancy 35,922,500 21,802,625 4,719,000 4,271,000 896,000 67,611,125 10.66%
Purchase of plant and office
equipment
0 23,037,724 0 0 0 23,037,724 3.63%
Adverts 1,880,000 1,880,000 1,880,000 1,880,000 1,880,000 9,400,000 1.48%
TOTAL 203,816,293 187,502,788 86,449,621 80,309,082 76,246,314 634,324,098 100.00%