2
FRAMEWORK 2.0 January 2017 FRAMEWORK 2.0 GOALS Promote Student Success Support Academic, Research and Outreach Mission Strengthen Access and Connectivity Transform Natural Systems and Open Space For additional information, or to provide comments, please contact: Planning and Real Estate 614-688-3715 pare.osu.edu Additional documentation and supporting materials for Framework 2.0, including a version of this document, the space assessment and presentations are available at: pare.osu.edu/framework Campbell Hall Faculty Innovation Center — The newly constructed Faculty Innovation Center in Campbell Hall is used to teach faculty how to utilize the resources in an active learning classroom. Long-term Mid-West Campus Development Proposed interdisciplinary research hub for the university on Mid-West Campus. Primary Campus Corridors Upgraded internal and external streets to enhance access and connect the campus. Historic Mirror Lake District Conceptual rendering for the restoration of historic Mirror Lake and the surrounding district focusing on safety and sustainability. Existing Roads Proposed Connections

FRAMEWORK 2.0 GOALS - Ohio State University · Systems and Open Space For ... pare.osu.edu Additional documentation and supporting materials for Framework 2.0 ... Campbell Hall Faculty

Embed Size (px)

Citation preview

Page 1: FRAMEWORK 2.0 GOALS - Ohio State University · Systems and Open Space For ... pare.osu.edu Additional documentation and supporting materials for Framework 2.0 ... Campbell Hall Faculty

FRAMEWORK 2.0January 2017

FRAMEWORK 2.0 GOALS

Promote Student Success

Support Academic, Research and Outreach Mission

Strengthen Access and Connectivity

Transform Natural Systems and Open Space

For additional information, or to provide comments, please contact:Planning and Real Estate

614-688-3715

pare.osu.edu

Additional documentation and supporting materials for Framework 2.0, including a version of this document, the space assessment and presentations are available at:

pare.osu.edu/framework

Campbell Hall Faculty Innovation Center — The newly constructed Faculty Innovation Center in Campbell Hall is used to teach faculty how to utilize the resources in an active learning classroom.

Long-term Mid-West Campus Development — Proposed interdisciplinary research hub for the university on Mid-West Campus.

Primary Campus Corridors — Upgraded internal and external streets to enhance access and connect the campus.

Historic Mirror Lake District — Conceptual rendering for the restoration of historic Mirror Lake and the surrounding district focusing on safety and sustainability.

Existing RoadsProposed Connections

Page 2: FRAMEWORK 2.0 GOALS - Ohio State University · Systems and Open Space For ... pare.osu.edu Additional documentation and supporting materials for Framework 2.0 ... Campbell Hall Faculty

13

Lane Ave

Woodruff Ave

Woody Hayes Dr

Annie and John Glenn Ave

Kinnear Rd

Woody Hayes DrVernon Tharp St

Ackerman Rd

Hig

h St

Nor

th S

tar R

d

Kenn

y Rd

Can

non

Dr

Nei

l Ave

King Ave

10th Ave

John Herrick Dr

Ole

ntan

gy R

iver

Rd

12th Ave

11th Ave

Col

lege

Ave

SR 315

11b14b

14a

14d

1

12

5

7

3

8

9

214c

106

13

N

14e

12

11a

11c

11d

10

9

1 St. John Arena site with new recreation fields and facilities to support interdisciplinary problem solving and leadership

Extension of Neil Avenue to Woodruff Avenue for bus, bike and pedestrian traffic

Extension of Annie and John Glenn Avenue from High Street to Cannon Drive creating an additional ‘academic main street’

Co-located Center for the Arts

Mixed use development at 15th Avenue and High Street with an improved campus gateway

Restoration of Historic Mirror Lake District focusing on safety and sustainability

Mixed use development on 11th Avenue to support market driven innovation and student success

Near and long-term development for the Health Sciences and Wexner Medical Center to support their strategic plan and research goals

Realignment of Cannon Drive to connect King Avenue with Lane Avenue creating a greenway along the river

Improved Kinnear Road/John Herrick Drive/Olentangy River Road connection

Mid-West Campus11a. New and replacement

facilities for CFAES teaching and research

11b. New interdisciplinary research facilities focused on life and health sciences

11c. New Veterinary Medicine facilities for research and equine diagnostics

11d. Extension and connection to Annie and John Glenn Avenue to Vernon Tharp Street

11e. Enhancements to the Olentangy River Road corridor

Athletics District• Schumaker Student-Athlete

Development Center• Covelli Multi Sport Arena• Jennings Family Wresting

Practice Facility• New Ice Arena• New Indoor Track• Practice Fields• Irving Schottenstein Drive

Realignment

New Waterman Lab research, teaching, and community outreach facilities

Partnerships, Outreach, Innovation14a. Mixed use development14b. Naturalize landscape for

stormwater management14c. Research and innovation

buildings along Woody Hayes Drive

14d. Facilities for small, medium, large and extra-large industry partnerships

14e. New center and gateway for innovation at Rev-1/Sci-Tech

2

3

5

4

6

7

84

11e

11

14

FRAMEWORK 2.0 PLAN