SULTANATE OF OMAN
MINISTRY OF TRANSPORT AND COMMUNICATIONS DIRECTORATE GENERAL OF ROADS & LAND TRANSPORT
MUSCAT
UPGRADING OF FALAJ AL QABAIL ROUNDABOUT TENDER NO. 51/2012
MONTHLY PROGRESS REPORT NO. 7
JULY 2014
CONSULTANT:
RENARDET S.A. & PARTNERS CONSULTING ENGINEERS LLC. P.O. Box 579, Muscat, P.C. 100, Sultanate of Oman
CONTRACTOR:
CONSOLIDATED CONTRACTORS CO. LLC P.O. Box 614, Muscat, P.C. 100, Sultanate of Oman
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 1
Table of Contents
S. No. Description Page No.
1. Project Particulars 2
2. Scope of Work 3
3. Typical Cross Sections 4
4. Site visits/ Meetings 6
5 Engineers Site Staff 7
6. Progress Review 8
7. Financial Status 22
8. Contractors Resources 23
9. QA/ QC Reports 27
10. Engineers Comments 31
11. Project Correspondence 32
12. Progress Photographs 36
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 2
Project Particulars
Client: Ministry of Transport &
Communications
P.O. Box 684, Muscat, Postal Code 113
Directorate General of Roads
Sultanate of Oman.
Consultant: Renardet S.A & Partners L.L.C. P.O. Box 579, Muscat, Postal Code 100
Sultanate of Oman.
Contractor: Consolidated Contractors Company
L.L.C.
P.O. Box 614, Muscat, Postal Code 100
Sultanate of Oman.
Project Commencement Date: 30.10.2013
Mobilization Period: 60 Days
Construction Period: 548 Days
Completion date: 29.06.2015
Original Contract Value:
(Including Contingencies) R.O. 17,884,403.000
Amount of Contingencies: R.O. 1,402,155.613
Original Contract Value:
(Excluding Contingencies) R.O. 16,482,247.387
Planned physical progress
cumulative up to end of July 2014
42.37%
Achieved physical progress
cumulative up to end of July 2014 22.55%
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 3
Scope of Work
This project is located in Batinah Region on existing Batinah Highway in the Wilayat Sohar and
consists of construction of an interchange in place of existing roundabout along with allied works.
Total length of the project along Batinah highway is about 4.0 km which shall be converted from four
lanes to six lanes with tapering back to 4lanes, all as shown on plans. Also included in the scope of
work is the construction of service roads, pedestrian underpasses.
The work also includes expropriation of properties, relocation/protection of services (sewerage,
telephone, electricity, water, irrigation) road lighting works and traffic signals.
Major items within the scope of work consist of but not limited to the following:
Removal of existing asphalt surface, extension of existing embankment and earthwork to achieve
the designed profile and gradient.
Removal of existing drainage structures and construction of new ones including protection works
as shown on construction drawings and as directed.
Expropriation of open/built up properties and removal of existing structures thereupon.
Construction of interchange ramps, Box Girder Bridge, roundabout, pedestrian underpasses and
service roads.
Provision of new street lighting system/traffic signals and removal/disposal of existing street light
poles including conductors/cables, transformers, feeder pillars, foundations etc., all for the
proper completion of the job.
Construction of earthen embankment/sub grade, sub-base, aggregate base course, bituminous base
course and bituminous wearing course as per details on the construction drawings.
Installation of road side furniture (traffic signs, road marking etc.) and protection works on
embankment slopes.
Relocation/Protection of existing LT, 11KV and 33KV transmission lines and allied items
(transformers etc.) as per the requirements of concerned authority.
Relocation/Protection of existing utilities (sewerage, telephone, electricity, water lines and
irrigation) as per the requirements of concerned authorities.
Provision of ducts for future utilities as per the requirements of utility operator.
Construction of concrete safety barriers, fixing of guard rails and paving tiles.
Provision of traffic diversion in coordination with concerned authorities.
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 4
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 5
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 6
Site visits/ Meetings
S. No. Details of Site Visit Date Final Outcome/ Decisions
1 Meeting with Director of
Maintenance, Sohar Municipality for
the approval of MAS for Street
Lighting Luminaires.
01.07.2014 Director informed that the
Luminaires from M/s Majelite
Industries shall be approved.
2 Meeting with Director of
Maintenance, Sohar Municipality for
the approval of MAS for Street
Lighting Luminaires.
08.07.2014 Director informed that the
Luminaires from M/s Majelite
Industries shall be approved.
3 Meeting with DGRs QS at Muscat
office.
17.07.2014 Invoice No. 5 was reviewed.
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 7
Engineers Site Staff S.
No. Name Designation
Date of
Joining
1. Roberto Benigni Head Supervision Projects
2. Muneer Abdul Resident Engineer 19.03.2014
3. Hussein Shah Material Engineer 04.01.2014
4. Ernesto B. Paredes Bridge Engineer 16.04.2014
5. Sande H Tangaras Civil Engineer 08.06.2014
6. Danilo Quantity Surveyor 19.06.2014
6. Mohamed Safie Land Surveyor 04.01.2014
7. Aseef Iqbal Site Inspector 10.02.2014
8. Alaa Aldin Abdelfatah Site Inspector 30.03.2014
9. Walid Samy Abdoh Mostafa Material Inspector 01.04.2014
10. Haneefa Mohmmed Al Zadjali Secretary 13.04.2014
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 8
2013
De
cJan
Fe
bM
ar
Ap
rM
ay
Ju
nJu
lA
ug
Se
pO
ct
No
vD
ec
Jan
Fe
bM
ar
Ap
rM
ay
Ju
nJu
lA
ug
Se
pO
ct
0.0
1
0.2
5
1.4
2
4.2
3
7.2
5
10.0
6
9.4
2
9.7
3
10.2
1
9.7
9
8.4
9
5.7
2
4.5
5
3.5
6
2.7
9
3.8
3
3.5
5
3.4
7
1.6
7
-
-
-
-
-
0.2
8
0.1
8
1.0
1
2.8
9
5.6
5
5.1
8
7.3
6
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
0.0
10.2
61.6
75.9
113.1
523.2
132.6
442.3
752.5
862.3
770.8
676.5
981.1
384.6
987.4
891.3
194.8
698.3
3100.0
0100.0
0100.0
0100.0
0100.0
0
-
0.2
8
0.4
5
1.4
6
4.3
6
10.0
1
15.1
9
22.5
5
CU
MU
LA
TIV
E P
RO
GR
ES
SC
L14 O
rg P
lan
Cu
mu
lati
ve
%
Actu
al C
um
ula
tive
2014
2015
MO
NT
HL
Y P
RO
GR
ES
SC
L14 O
rg P
lan
pe
r M
on
th %
Actu
al p
er
Mo
nth
0.0
0
20
.00
40
.00
60
.00
80
.00
10
0.0
0
12
0.0
0
- 2 4 6 8
10
12
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
20
13
20
14
20
15
% Cumulative
% MONTHLY
MO
NT
HS
UP
GR
AD
ING
OF
FA
LA
J A
L Q
AB
AIL
RO
UN
DA
BO
UT
PR
OJ
EC
T -
OM
AN
MO
NT
HLY
CL
14
PL
AN
NE
D V
S. A
CT
UA
L M
AN
HO
UR
S
CL
14
Org
Pla
n p
er
Mo
nth
%A
ctu
al p
er
Mo
nth
CL
14
Org
Pla
n C
um
ula
tive %
Actu
al C
um
ula
tiv
e
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 9
REV
.:0
PER
IOD
EN
DIN
G:
Ju
l-14
2013
De
cJan
Fe
bM
ar
Ap
rM
ay
Ju
nJu
lA
ug
Se
pO
ct
No
vD
ec
Jan
Fe
bM
ar
Ap
rM
ay
Ju
nJu
lA
ug
Se
pO
ct
CL
14 P
lan
%0.3
08.6
719.2
326.8
931.7
736.6
441.5
146.3
951.2
656.1
361.0
165.8
870.7
675.6
380.5
085.3
890.2
595.1
3100.0
0100.0
0100.0
0100.0
0100.0
0
Actu
al
-
6.6
2
13.0
3
22.3
6
37.3
1
43.0
0
44.1
1
51.2
1
CL
14 P
lan
%0.0
00.0
00.3
820.3
747.7
048.3
348.3
348.3
348.3
348.3
348.3
348.3
348.3
359.9
177.8
490.2
794.9
3100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0
Actu
al
-
10.0
9
10.0
9
17.5
9
19.5
2
77.4
2
69.9
6
70.1
8
CL
14 P
lan
%0.0
00.0
00.0
00.7
86.5
816.7
629.3
841.3
758.6
466.6
074.1
882.8
584.7
584.7
585.2
492.3
492.3
498.3
6100.0
0100.0
0100.0
0100.0
0100.0
0
Actu
al
-
-
-
-
4.3
5
4.8
9
-
5.2
7
CL
14 P
lan
%0.0
00.0
01.0
19.2
129.3
045.9
156.9
062.2
464.5
967.9
469.0
869.0
875.0
582.8
593.4
898.6
4100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0
Actu
al
-
-
-
5.0
0
5.0
0
53.2
3
62.1
6
74.9
1
CL
14 P
lan
%0.0
00.0
00.0
00.0
00.0
00.0
00.0
00.0
011.0
726.2
741.9
859.9
878.7
379.9
079.9
085.2
089.4
592.6
0100.0
0100.0
0100.0
0100.0
0100.0
0
Actu
al
CL
14 P
lan
%0.0
00.0
00.0
00.0
00.0
00.0
00.0
00.0
00.0
00.0
87.7
719.3
231.2
244.9
451.9
852.1
490.1
490.1
4100.0
0100.0
0100.0
0100.0
0100.0
0
Actu
al
CL
14 P
lan
%0.0
00.0
00.2
31.4
32.9
710.1
723.6
536.5
151.4
763.0
674.2
675.9
777.3
780.0
582.4
088.9
792.1
398.5
5100.0
0100.0
0100.0
0100.0
0100.0
0
Actu
al
-
-
-
0.4
8
1.2
6
5.5
9
14.9
3
27.7
2
CL
14 P
lan
%0.0
00.0
04.0
215.2
134.6
257.8
969.2
681.4
083.3
883.4
684.5
092.8
999.9
6100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0
Actu
al
-
-
-
0.0
1
6.0
5
14.7
3
18.1
4
22.3
3
CL
14 P
lan
%0.0
00.0
00.0
00.0
00.0
00.3
81.2
12.6
33.4
24.2
35.5
06.0
86.0
834.3
599.3
899.7
699.7
6100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0
Actu
al
-
-
-
2.5
0
16.1
9
14.3
9
13.2
4
16.1
9
CL
14 P
lan
%0.0
00.0
00.0
00.0
00.0
00.0
00.0
02.8
017.8
743.8
561.5
972.9
881.1
583.9
484.4
285.3
592.8
696.3
9100.0
0100.0
0100.0
0100.0
0100.0
0
Actu
al
-
-
-
-
-
2.6
1
4.9
8
6.4
2
CL
14 P
lan
%0.0
00.0
00.0
04.4
317.2
333.3
649.1
365.0
780.7
993.8
2100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0
Actu
al
-
-
-
6.1
6
9.8
7
17.6
3
25.6
9
35.9
0
CL
14 P
lan
%0.0
00.0
00.0
00.0
00.0
00.1
70.7
91.4
35.6
513.4
121.8
430.5
632.9
470.9
475.0
494.0
296.4
3100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0
Actu
al
-
-
-
0.1
3
5.5
2
9.2
6
13.3
8
16.8
7
Re
vis
ed
Pla
n0.1
1
0.2
5
0.4
8
0.7
6
2.4
7
5.6
4
12.4
8
21.6
4
30.7
8
39.8
7
48.3
5
56.2
6
64.3
4
71.0
5
77.3
1
81.9
9
85.5
9
88.9
3
93.3
5
96.6
4
98.2
7
99.3
8
100.0
0
Actu
al C
um
-
0.2
8
0.4
5
1.4
6
4.3
6
10.0
1
15.1
9
22.5
5
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
2013
De
cJan
Fe
bM
ar
Ap
rM
ay
Ju
nJu
lA
ug
Se
pO
ct
No
vD
ec
Jan
Fe
bM
ar
Ap
rM
ay
Ju
nJu
lA
ug
Se
pO
ct
0.0
1
0.2
5
1.4
2
4.2
3
7.2
5
10.0
6
9.4
2
9.7
3
10.2
1
9.7
9
8.4
9
5.7
2
4.5
5
3.5
6
2.7
9
3.8
3
3.5
5
3.4
7
1.6
7
-
-
-
-
-
0.2
8
0.1
8
1.0
1
2.8
9
5.6
5
5.1
8
7.3
6
0.0
1
0.2
6
1.6
7
5.9
1
13.1
5
23.2
1
32.6
4
42.3
7
52.5
8
62.3
7
70.8
6
76.5
9
81.1
3
84.6
9
87.4
8
91.3
1
94.8
6
98.3
3
100.0
0
100.0
0
100.0
0
100.0
0
100.0
0
-
0.2
8
0.4
5
1.4
6
4.3
6
10.0
1
15.1
9
22.5
5
UP
GR
AD
ING
OF
FA
LA
J A
L Q
AB
AIL
RO
UN
DA
BO
UT
- O
MA
N
MA
NH
OU
RS
OV
ER
AL
L P
RO
JE
CT
S-C
UR
VE
Ite
mD
es
cri
pti
on
Wtd
.
%
Pla
n/
Actu
al
2014
C
Cle
ari
ng
&
Re
mo
va
l o
f
Ob
str
uc
tio
ns
0.9
5
2015
BR
oa
d D
ive
rsio
ns
2.7
3
Bu
dg
ete
d
Man
-Hrs
56,4
23
1
9,5
58
ES
tru
ctu
ral
Ex
ca
va
tio
n0.7
2
DE
mb
an
km
en
t3.5
974,0
43
1
4,8
21
GB
itu
min
ou
s
Pa
ve
me
nt
3.5
7
FS
ub
ba
se
&
Ag
gre
ga
te B
as
e2.4
250,0
04
7
3,7
24
IC
on
cre
te f
or
Bri
dg
e22.1
2
H
Co
nc
rete
fo
r
Bo
x C
ulv
ert
/Un
de
rpa
s
38.1
9788,1
38
4
56,5
22
LM
SE
wa
lls
6.8
4
JD
rain
ag
e W
ork
s1.5
0
KIn
cid
en
tal
Co
ns
tru
cti
on
13.3
3
30,9
20
275,0
37
1
41,1
90
2014
2015
MO
NT
HL
Y P
RO
GR
ES
SC
L14 O
rg P
lan
pe
r M
on
th %
Actu
al p
er
Mo
nth
CU
MU
LA
TIV
E P
RO
GR
ES
SC
L14 O
rg P
lan
Cu
mu
lati
ve
%
Actu
al C
um
ula
tive
MM
EP
Wo
rks
&
Du
cts
4.0
3
TO
TA
L100.0
00
83,2
64
2,0
63
,64
4
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 10
Progress of Permanent Works
Sl. No.
Description Unit BOQ Qty. Actual Qty.
% This Month
% Last Month
1 Clearing & Grubbing M2 161,752 137,490 85.00% 85.00%
2 Removal of Trees No. 956 656 68.62% 68.62%
3 Removal of Existing Pavement
M3 24,000 13,500 56.25% 56.25%
4 Removal of Reinforced Concrete
M3 1,000 493.5 49.35% 0.32%
5 Removal of Signboards Nr. 60 15 25.00% 25.00%
6 Removal of Floodway Marker posts
Nr. 400 Revised
200 50.00% 50.00%
7 Removal of Drainage Protection Works
M3 6,000 1,902 31.70% 31.70%
8 Expandable Piles No. 4 4 100.0% 100.0%
9 Working Piles No. 110 Revised
95 86.36% 83.63%
10 MSE Panels - Precast M2 13,030
Revised
4,742 36.39% 23.72%
11 RCC Drainage Pipes LM 3,680 Revised
832 22.61% 22.61%
12 Steel Fixing Tons 4,600 Revised
938.4 20.40% 12.22%
13 Concrete Class 30 Box Culverts
M3 17,200 4,139 24.06% 10.76%
14 Concrete Class 15 M3 2,600 2,512 96.61% 81.3%
15 Precast NJB M 6,400 2,209 34.51% 21.1%
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 11
PILE MONTHLY SCHEDULE (CASTING) as of 31 JULY 2014
LOCATION PILE NO. CASTING SETTING OUT BORING,
REBARS, & CONCRETE
INTEGRITY TEST
LOAD TEST (Expendable Piles)
- EP 01 3 26/3/2014 26/3/2014 - 7-8/5/2014
- EP 02 2 25/3/2014 25/3/2014 - 16-17/4/2014
- EP 03 1 25/3/2014 25/3/2014 - 5-6/4/2014
- EP 04 4 26/3/2014 26/3/2014 - 13-14/5/2014
- - - - - - LOAD TEST (Working
Piles)
P3R 85 1 7/4/2014 8/4/2014 23/4/2014 -
P3R 87 2 7/4/2014 8/4/2014 23/4/2014 -
P3R 83 3 8/4/2014 9/4/2014 23/4/2014 -
P3R 81 4 8/4/2014 9/4/2014 23/4/2014 -
P3R 79 5 8/4/2014 9/4/2014 23/4/2014 -
P1R 63 6 9/4/2014 10/4/2014 28/4/2014 -
P1R 65 7 9/4/2014 10/4/2014 28/4/2014 -
P3R 86 8 10/4/2014 12/4/2014 23/4/2014 -
P3R 84 9 10/4/2014 12/4/2014 23/4/2014 -
P3R 82 10 10/4/2014 12/4/2014 23/4/2014 -
P1R 68 11 12/4/2014 13/4/2014 28/4/2014 -
P1R 66 12 12/4/2014 13/4/2014 28/4/2014 -
P1R 61 13 9/4/2014 13/4/2014 28/4/2014 -
P3R 80 14 13/4/2014 14/4/2014 23/4/2014 -
P3L 28 15 13/4/2014 14/4/2014 28/4/2014 -
P1R 62 16 12/4/2014 15/4/2014 28/4/2014 -
P1R 67 17 14/4/2014 15/4/2014 28/4/2014 -
P1R 69 18 14/4/2014 15/4/2014 28/4/2014 -
P3L 26 19 15/4/2014 16/4/2014 28/4/2014 -
P3L 30 20 15/4/2014 16/4/2014 28/4/2014 -
P3L 32 21 15/4/2014 16/4/2014 28/4/2014 -
P1R 64 22 16/4/2014 17/4/2014 28/4/2014 -
P1L 6 WP 23 16/4/2014 17/4/2014 11/5/2014 30/4/2014 to 1/5/2014
P1L 14 24 16/4/2014 17/4/2014 11/5/2014 -
P3L 25 25 17/4/2014 20/4/2014 28/4/2014 -
P3L 27 26 17/4/2014 20/4/2014 28/4/2014 -
P3L 29 27 20/4/2014 28/4/2014 -
P2R 78 28 19/4/2014 21/4/2014 11/5/2014 -
P2R 76 29 19/4/2014 21/4/2014 11/5/2014 -
P2R 74 30 19/4/2014 21/4/2014 11/5/2014 -
P2L 23 WP 31 21/4/2014 22/4/2014 14/6/2014 1 - 2/6/2014
P3L 24 32 21/4/2014 22/4/2014 28/4/2014 -
P3L 31 33 20/4/2014 22/4/2014 28/4/2014 -
P1L 8 34 22/4/2014 23/4/2014 11/5/2014 -
P1L 10 35 22/4/2014 23/4/2014 11/5/2014 -
P1L 12 36 22/4/2014 23/4/2014 11/5/2014 -
P2L 17 37 23/4/2014 24/4/2014 14/6/2014 -
P2L 18 38 23/4/2014 24/4/2014 14/6/2014 -
P2L 22 39 23/4/2014 24/4/2014 14/6/2014 -
P1L 7 40 24/4/2014 26/4/2014 11/5/2014 -
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 12
LOCATION PILE NO. CASTING SETTING
OUT
BORING, REBARS, & CONCRETE
INTEGRITY TEST
LOAD TEST (Working Piles)
P1L 9 41 24/4/2014 26/4/2014 11/5/2014 -
P1L 13 42 24/4/2014 26/4/2014 11/5/2014 -
P1L 11 43 26/4/2014 27/4/2014 11/5/2014 -
P2L 16 44 26/4/2014 27/4/2014 14/6/2014 -
P2L 21 45 26/4/2014 27/4/2014 14/6/2014 -
P2L 19 46 27/4/2014 28/4/2014 14/6/2014 -
P2R 72 47 27/4/2014 28/4/2014 11/5/2014 -
P2R 77 48 27/4/2014 28/4/2014 11/5/2014 -
P2L 15 49 28/4/2014 29/4/2014 14/6/2014 -
P2L 20 50 27/4/2014 29/4/2014 14/6/2014 -
P2R 70 51 28/4/2014 29/4/2014 11/5/2014 -
P2R 71 52 29/4/2014 30/4/2014 11/5/2014 -
P2R 73 53 29/4/2014 30/4/2014 11/5/2014 -
P2R 75 54 29/4/2014 30/4/2014 11/5/2014 -
P5R 105 55 4/5/2014 5/5/2014 18/5/2014 -
P5R 104 56 4/5/2014 5/5/2014 18/5/2014 -
P5R 103 57 4/5/2014 5/5/2014 18/5/2014 -
P5R 102 58 5/5/2014 6/5/2014 18/5/2014 -
P5R 101 59 5/5/2014 6/5/2014 18/5/2014 -
P5R 100 60 5/5/2014 6/5/2014 18/5/2014 -
P5R 97 61 6/5/2014 7/5/2014 18/5/2014 -
P5R 98 62 6/5/2014 7/5/2014 18/5/2014 -
P5R 99 63 6/5/2014 7/5/2014 18/5/2014 -
P5L 48 WP 64 7/5/2014 8/5/2014 3/6/2014 24/5/2014 to 25/5/2014
P5L 49 65 7/5/2014 8/5/2014 3/6/2014 -
P5L 50 66 7/5/2014 8/5/2014 3/6/2014 -
P5L 42 67 10/5/2014 11/5/2014 3/6/2014 -
P5L 44 68 10/5/2014 11/5/2014 3/6/2014 -
P5L 46 69 10/5/2014 11/5/2014 3/6/2014 -
P5L 43 70 10/5/2014 12/5/2014 3/6/2014 -
P5L 45 71 10/5/2014 12/5/2014 3/6/2014 -
P5L 47 72 10/5/2014 12/5/2014 3/6/2014 -
AB1 R 56 73 12/5/2014 13/5/2014 21/5/2014 -
AB1 R 58 74 12/5/2014 13/5/2014 21/5/2014 -
AB1 R 60 75 12/5/2014 13/5/2014 21/5/2014 -
AB1 L 1 76 14/5/2014 15/5/2014 21/5/2014 -
AB1 L 3 77 14/5/2014 15/5/2014 21/5/2014 -
AB1 L 5 78 14/5/2014 15/5/2014 21/5/2014 -
AB1 R 57 79 13/6/2014 14/6/2014 21/5/2014 -
AB1 R 59 80 13/6/2014 14/6/2014 21/5/2014 -
AB1 L 2 81 15/5/2014 17/5/2014 21/5/2014 -
AB1 L 4 82 15/5/2014 17/5/2014 21/5/2014 -
AB2 L 51 83 19/5/2014 20/5/2014 3/6/2014 -
AB2 L 53 84 19/5/2014 20/5/2014 3/6/2014 -
AB2 L 55 85 19/5/2014 20/5/2014 3/6/2014 -
AB2 R 106 86 19/5/2014 20/5/2014 3/6/2014 -
AB2 L 54 87 20/5/2014 21/5/2014 3/6/2014 -
AB2 R 108 88 20/5/2014 21/5/2014 3/6/2014 -
AB2 R 110 89 20/5/2014 21/5/2014 3/6/2014 -
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 13
LOCATION PILE NO. CASTING SETTING OUT BORING,
REBARS, & CONCRETE
INTEGRITY TEST
LOAD TEST (Working Piles)
AB2 L 52 90 21/5/2014 22/5/2014 3/6/2014 -
AB2 R 107 91 21/5/2014 22/5/2014 3/6/2014 -
AB2 R 109 92 21/5/2014 22/5/2014 3/6/2014 -
P4L 33 93 30/7/2014 31/7/2014 - -
P4L 37 94 30/7/2014 31/7/2014 - -
P4L 39 95 30/7/2014 31/7/2014 - -
BRIDGE SUB-STRUCTURE PROGRESS SCHEDULE
As of 31 JULY 2014
SUB-STRUCTURE WORK PROGRESS (LHS)
ACTIVITY AB1 L P1L P2L P3L P4L P5L AB2
L
PEDESTAL - - - - - - -
PIER N/A - - - - - N/A
2nd Lift - on-going - 24-Jul-14 - - -
Height (m) - 6.920 6.920 6.920 6.920 6.920 -
1st Lift - 23-Jul-14 on-going 29-Jun-14 - on-going -
Height (m) - 1.153 1.210 1.440 1.248 1.225 -
BIT. PAINTING - 28-May-
14 26-Jun-14 17-May-14 - 23-Jun-14 -
PILE CAP - 17-May-
14 18-Jun-14 8-May-14 - 11-Jun-14 -
F/P & BLINDING
N/A 11-May-
14 11-Jun-14 1-May-14 - 3-Jun-14 N/A
SUB-STRUCTURE WORK PROGRESS (RHS)
ACTIVITY AB1 R P1R P2R P3R P4R P5R AB2
R
PEDESTAL - - - - - - -
PIER N/A - - - - - N/A
2nd Lift - 9-Jun-14 28-Jun-14 22-Jun-14 - 10-Jul-14 -
Height (m) - 6.920 6.920 6.920 6.920 6.920 -
1st Lift - 20-May-
14 11-Jun-14 26-May-14 - 22-Jun-14 -
Height (m) - 0.366 0.423 0.649 0.461 0.438 -
BIT. PAINTING - 12-May-
14 25-May-
14 8-May-14 -
31-May-14
-
PILE CAP - 4-May-14 13-May-
14 4/30/2014 -
20-May-14
-
F/P & BLINDING
N/A 27-Apr-14 7-May-14 22-Apr-14 - 14-May-
14 N/A
PREVIOUS
PREVIOUS MONTH
THIS MONTH
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 14
Re
bar
sC
on
cre
teR
eb
ars
Co
ncr
ete
Re
bar
sC
on
cre
te
10+
003
- 0+
022
19.0
01.
0 x
2.0
13-J
ul-
1414-Jul-14
14-J
ul-
1415
-Ju
l-14
15-J
ul-
1417
-Ju
l-14
17-J
ul-
1422
-Ju
l-14
20+
022
- 0+
040
18.0
01.
0 x
2.0
28-M
ay-1
44-Jun-14
4-Ju
n-1
412
-Ju
n-1
412
-Ju
n-1
416
-Ju
n-1
416
-Ju
n-1
429
-Ju
n-1
43
0+04
0 -
0+05
212
.00
1.0
x 2.
015
-Ap
r-14
16-A
pr-
1416
-Ap
r-14
19-A
pr-
1419
-Ap
r-14
21-A
pr-
1421
-Ap
r-14
29-A
pr-
14M
H0+
043
--
--
--
--
--
40+
052
- 0+
070
18.0
01.
0 x
2.0
5-M
ar-1
424
-Mar
-14
24-M
ar-1
48-
Ap
r-14
8-A
pr-
1412
-Ap
r-14
12-A
pr-
1419
-Ap
r-14
50+
070
- 0+
100
30.0
01.
0 x
2.0
2-M
ar-1
45-
Mar
-14
5-M
ar-1
46-
Mar
-14
6-M
ar-1
411
-Mar
-14
11-M
ar-1
419
-Mar
-14
60+
100
- 0+
104
4.00
1.0
x 2.
010
-May
-14
8-Ju
n-1
48-
Jun
-14
14-J
un
-14
14-J
un
-14
17-J
un
-14
17-J
un
-14
24-J
un
-14
MH
0+10
4-
--
--
16-J
ul-
1416
-Ju
l-14
--
-7
0+10
4 -
0+12
218
.00
1.0
x 2.
010
-May
-14
17-M
ay-1
417
-May
-14
20-M
ay-1
420
-May
-14
24-M
ay-1
424
-May
-14
29-M
ay-1
48
0+12
2 -
0+13
917
.00
1.0
x 2.
010
-May
-14
14-M
ay-1
414
-May
-14
17-M
ay-1
417
-May
-14
19-M
ay-1
419
-May
-14
29-M
ay-1
49
0+13
9 -
0+15
011
.00
1.0
x 2.
05-
Mar
-14
1-A
pr-
141-
Ap
r-14
5-A
pr-
145-
Ap
r-14
8-A
pr-
148-
Ap
r-14
12-A
pr-
1410
0+15
0 -
0+17
020
.00
1.0
x 2.
02-
Mar
-14
6-M
ar-1
46-
Mar
-14
5-A
pr-
145-
Ap
r-14
12-A
pr-
1412
-Ap
r-14
10-A
pr-
14M
H0+
165
--
--
-2-
Jun
-14
2-Ju
n-1
4-
--
110+
170
- 0+
182
12.0
01.
0 x
2.0
19-M
ay-1
422
-May
-14
22-M
ay-1
42-
Jun
-14
2-Ju
n-1
45-
Jun
-14
5-Ju
n-1
416
-Ju
n-1
412
0+18
2 -
0+20
018
.00
1.0
x 2.
019
-May
-14
21-M
ay-1
421
-May
-14
25-M
ay-1
425
-May
-14
2-Ju
n-1
42-
Jun
-14
16-J
un
-14
130+
200
- 0+
213.
513
.50
1.0
x 2.
024
-Fe
b-1
427
-Fe
b-1
427
-Fe
b-1
41-
Mar
-14
1-M
ar-1
44-
Mar
-14
4-M
ar-1
410
-Mar
-14
140+
213.
5 -
0+22
511
.50
1.0
x 2.
028
-May
-14
3-Ju
n-1
43-
Jun
-14
8-Ju
n-1
48-
Jun
-14
17-J
un
-14
17-J
un
-14
28-J
un
-14
MH
0+22
5-
--
--
5-Ju
l-14
5-Ju
l-14
--
-15
0+22
5 -
0+23
27.
001.
0 x
1.5
28-M
ay-1
43-
Jun
-14
3-Ju
n-1
48-
Jun
-14
8-Ju
n-1
417
-Ju
n-1
417
-Ju
n-1
428
-Ju
n-1
416
0+23
2 -
0+25
018
.00
1.0
x 1.
510
-Ap
r-14
13-A
pr-
1413
-Ap
r-14
15-A
pr-
1415
-Ap
r-14
19-A
pr-
1419
-Ap
r-14
13-M
ay-1
417
0+25
0 -
0+25
88.
001.
0 x
1.5
23-A
pr-
1426
-Ap
r-14
26-A
pr-
1427
-Ap
r-14
27-A
pr-
141-
May
-14
1-M
ay-1
413
-May
-14
180+
258
- 0+
268
10.0
01.
0 x
1.5
13-J
ul-
1414-Jul-14
14-J
ul-
1415
-Ju
l-14
15-J
ul-
1417
-Ju
l-14
17-J
ul-
1422
-Ju
l-14
MH
0+26
8-
--
--
--
--
-26
5.00
0.00
PR
EVIO
US
PR
EV
IOU
S
MO
NT
HTH
IS M
ON
TH
F/P
&
BLI
ND
ING
(Cha
inag
e 23
+411
.400
)
BA
SE S
LAB
WA
LLTO
P S
LAB
BA
LAN
CE
(m)
=TO
TAL
LEN
GTH
(m
) =
Bit
um
ino
us
Pai
nt
(2 C
oat
s)
FALA
J R
CBC
PR
OG
RES
S SC
HED
ULE
As
of
31 J
ULY
201
4
NO
.ST
ATI
ON
TYP
E (1
Ce
ll) &
DIM
ENSI
ON
(m
)
LEN
GTH
(m)
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 15
Re
bar
sC
on
cre
teR
eb
ars
Co
ncr
ete
Re
bar
sC
on
cre
te
121
+260
3 ce
lls
- 2.
0 x
1.5
43.0
390
--
--
--
--
LHS
Blo
ck 1
3 ce
lls
- 2.
0 x
1.5
19.5
260
--
--
--
--
RH
SB
lock
23
cell
s -
2.0
x 1.
523
.493
0-
--
--
--
-2
21+4
851
cell
- 2
.0 x
1.5
49.7
500
--
--
--
--
Blo
ck 1
a1
cell
- 2
.0 x
1.5
3.00
00
--
--
--
--
Blo
ck 1
b1
cell
- 2
.0 x
1.5
17.2
900
1-Ju
l-14
Blo
ck 2
a1
cell
- 2
.0 x
1.5
7.71
00
1-Ju
l-14
--
--
--
-B
lock
2b
1 ce
ll -
2.0
x 1
.521
.730
0-
--
--
--
-3
21+8
382
x 4
cell
s -
2.0
x 1.
557
.210
0-
--
--
--
-B
lock
1a
1 x
4 ce
lls
- 2.
0 x
1.5
5.00
00
21-J
ul-
14-
--
--
--
Blo
ck 1
b1
x 4
cell
s -
2.0
x 1.
522
.590
03-
Jul-
14-
--
--
--
Blo
ck 2
1 x
4 ce
lls
- 2.
0 x
1.5
22.5
800
3-Ju
l-14
--
--
--
-B
lock
31
x 4
cell
s -
2.0
x 1.
57.
000
0-
--
--
--
-B
lock
4a
1 x
4 ce
lls
- 2.
0 x
1.5
5.00
00
21-J
ul-
14-
--
--
--
Blo
ck 4
b1
x 4
cell
s -
2.0
x 1.
522
.590
03-
Jul-
14B
lock
51
x 4
cell
s -
2.0
x 1.
522
.580
03-
Jul-
14-
--
--
--
Blo
ck 6
1 x
4 ce
lls
- 2.
0 x
1.5
7.00
00
--
--
--
--
421
+972
.411
x 4
ce
lls
- 3.
0 x
2.0
57.6
290
--
--
--
--
Blo
ck 1
1 x
4 ce
lls
- 3.
0 x
2.0
28.0
380
24-M
ay-1
45-
Jun
-14
5-Ju
n-1
424
-Ju
n-1
424
-Ju
n-1
415
-Ju
l-14
16-J
ul-
14-
Blo
ck 2
1 x
4 ce
lls
- 3.
0 x
2.0
28.0
310
24-M
ay-1
49-
Jul-
1410
-Ju
l-14
--
--
-B
lock
31
x 4
cell
s -
3.0
x 2.
028
.026
017
-May
-14
25-M
ay-1
425
-May
-14
3-Ju
n-1
43-
Jun
-14
23-J
un
-14
23-J
un
-14
-B
lock
41
x 4
cell
s -
3.0
x 2.
028
.022
018
-May
-14
12-J
ul-
1413
-Ju
l-14
--
--
-B
lock
51
x 4
cell
s -
3.0
x 2.
028
.019
018
-May
-14
29-M
ay-1
429
-May
-14
8-Ju
n-1
48-
Jun
-14
2-Ju
l-14
2-Ju
l-14
-B
lock
61
x 4
cell
s -
3.0
x 2.
028
.018
018
-May
-14
31-J
ul-
1431
-Ju
l-14
--
--
-B
lock
71
x 4
cell
s -
3.0
x 2.
028
.019
018
-May
-14
10-J
un
-14
10-J
un
-14
1-Ju
l-14
1-Ju
l-14
23-J
ul-
1424
-Ju
l-14
-B
lock
81
x 4
cell
s -
3.0
x 2.
028
.022
026
-May
-14
--
--
--
-B
lock
91
x 4
cell
s -
3.0
x 2.
028
.026
026
-May
-14
15-J
un
-14
15-J
un
-14
7-Ju
l-14
8-Ju
l-14
--
-B
lock
10
1 x
4 ce
lls
- 3.
0 x
2.0
28.0
310
28-M
ay-1
4-
--
--
--
Blo
ck 1
11
x 4
cell
s -
3.0
x 2.
028
.038
028
-May
-14
19-J
un
-14
19-J
un
-14
20-J
ul-
1420
-Ju
l-14
--
-B
lock
12
1 x
4 ce
lls
- 3.
0 x
2.0
21.0
150
--
--
--
--
Blo
ck 1
31
x 4
cell
s -
3.0
x 2.
021
.010
027
-Ju
l-14
--
--
--
-B
lock
14
1 x
4 ce
lls
- 3.
0 x
2.0
21.0
060
27-J
ul-
14-
--
--
--
Blo
ck 1
51
x 4
cell
s -
3.0
x 2.
021
.003
024
-Ju
l-14
--
--
--
-B
lock
16
1 x
4 ce
lls
- 3.
0 x
2.0
21.0
010
16-J
un
-14
27-J
ul-
1427
-Ju
l-14
--
--
-B
lock
17
1 x
4 ce
lls
- 3.
0 x
2.0
21.0
000
16-J
un
-14
--
--
--
-B
lock
18
1 x
4 ce
lls
- 3.
0 x
2.0
21.0
010
12-J
un
-14
--
--
--
-B
lock
19
1 x
4 ce
lls
- 3.
0 x
2.0
21.0
030
12-J
un
-14
--
--
--
-B
lock
20
1 x
4 ce
lls
- 3.
0 x
2.0
21.0
060
8-Ju
n-1
4-
--
--
--
Blo
ck 2
11
x 4
cell
s -
3.0
x 2.
021
.010
08-
Jun
-14
--
--
--
-B
lock
22
1 x
4 ce
lls
- 3.
0 x
2.0
21.0
150
8-Ju
n-1
425
-Ju
n-1
425
-Ju
n-1
430
-Ju
l-14
30-J
ul-
14-
--
NO
.TO
P S
LAB
Bit
um
ino
us
Pai
nt
(2 C
oat
s)LE
NG
TH (
m)
SKEW
(
)F/
P &
BLI
ND
ING
LHS
LHS
LHS
RH
S
TYP
E &
DIM
ENSI
ON
STA
TIO
N
RCB
C P
RO
GR
ESS
SCH
EDU
LE (
BA
RR
EL)
As
of
31 J
ULY
201
4
BA
SE S
LAB
WA
LL
RH
S
LHS
RH
S
RH
S
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 16
Re
bar
sC
on
cre
teR
eb
ars
Co
ncr
ete
Re
bar
sC
on
cre
te
421
+972
.411
x 4
ce
lls
- 3.
0 x
2.0
57.6
290
--
--
--
--
Blo
ck 2
31
x 4
cell
s -
3.0
x 2.
06.
635
0-
--
--
--
-B
lock
24
1 x
4 ce
lls
- 3.
0 x
2.0
6.78
20
--
--
--
--
Blo
ck 2
51
x 4
cell
s -
3.0
x 2.
06.
819
0-
--
--
--
-B
lock
26
1 x
4 ce
lls
- 3.
0 x
2.0
7.21
70
--
--
--
--
Blo
ck 2
71
x 4
cell
s -
3.0
x 2.
07.
975
0-
--
--
--
-B
lock
28
1 x
4 ce
lls
- 3.
0 x
2.0
8.57
10
--
--
--
--
Blo
ck 2
91
x 4
cell
s -
3.0
x 2.
09.
267
0-
--
--
--
-B
lock
30
1 x
4 ce
lls
- 3.
0 x
2.0
9.94
90
--
--
--
--
Blo
ck 3
11
x 4
cell
s -
3.0
x 2.
010
.260
0-
--
--
--
-B
lock
32
1 x
4 ce
lls
- 3.
0 x
2.0
10.2
620
--
--
--
--
Blo
ck 3
31
x 4
cell
s -
3.0
x 2.
010
.265
0-
--
--
--
-5
22+6
552
x 4
cell
s -
2.0
x 2.
095
.482
45
R-
--
--
--
-1
cell
- 2
.0 x
2.0
--
--
--
--
Blo
ck 1
1 x
4 ce
lls
- 2.
0 x
2.0
9.67
545
R
--
--
--
--
Blo
ck 2
1 x
4 ce
lls
- 2.
0 x
2.0
32.7
1145
R
30-J
un
-14
--
--
--
-B
lock
31
x 4
cell
s -
2.0
x 2.
032
.711
45
R24
-Ju
n-1
421
-Ju
l-14
21-J
ul-
14-
--
--
Blo
ck 4
1 x
4 ce
lls
- 2.
0 x
2.0
20.3
1545
R
--
--
--
--
Blo
ck 5
1 x
4 ce
lls
- 2.
0 x
2.0
19.0
3545
R
--
--
--
--
Blo
ck 6
1 x
4 ce
lls
- 2.
0 x
2.0
32.7
1145
R
29-J
un
-14
27-J
ul-
1427
-Ju
l-14
--
--
-B
lock
71
x 4
cell
s -
2.0
x 2.
032
.711
45
R24
-Ju
n-1
4-
--
--
--
Blo
ck 8
1 x
4 ce
lls
- 2.
0 x
2.0
10.9
545
R
--
--
--
--
Blo
ck 9
1 ce
ll -
2.0
x 2
.025
.03
45
R-
--
--
--
-B
lock
10
1 ce
ll -
2.0
x 2
.032
.711
45
R28
-Ju
n-1
4-
--
--
--
Blo
ck 1
11
cell
- 2
.0 x
2.0
32.7
1145
R
29-J
un
-14
--
--
--
-B
lock
12
1 ce
ll -
2.0
x 2
.03.
130
45
R-
--
--
--
-6
23+4
921
x 4
cell
s -
3.0
x 2.
079
.065
15
R-
--
--
--
-1
cell
- 3
.0 x
2.0
--
--
--
--
Blo
ck 1
1 x
4 ce
lls
- 3.
0 x
2.0
6.45
715
R
--
--
--
--
Blo
ck 2
1 x
4 ce
lls
- 3.
0 x
2.0
31.5
4615
R
24-J
un
-14
9-Ju
l-14
9-Ju
l-14
30-J
ul-
1430
-Ju
l-14
--
-B
lock
31
x 4
cell
s -
3.0
x 2.
031
.546
15
R24
-Ju
n-1
414
-Ju
l-14
14-J
ul-
14-
--
--
Blo
ck 4
1 x
4 ce
lls
- 3.
0 x
2.0
7.98
215
R
--
--
--
--
Blo
ck 5
1 ce
ll -
3.0
x 2
.07.
039
15
R-
--
--
--
-B
lock
61
cell
- 3
.0 x
2.0
31.5
4615
R
24-J
un
-14
--
--
--
-B
lock
71
cell
- 3
.0 x
2.0
31.5
4615
R
24-J
un
-14
--
--
--
-B
lock
81
cell
- 3
.0 x
2.0
5.52
515
R
--
--
--
--
LHS
RH
S
Bit
um
ino
us
Pai
nt
(2 C
oat
s)
LHS
RH
S
LHS
RH
S
RH
S
LHS
RCB
C P
RO
GR
ESS
SCH
EDU
LE (
BA
RR
EL)
As
of
31 J
ULY
201
4
NO
.ST
ATI
ON
TYP
E &
DIM
ENSI
ON
LEN
GTH
(m
)SK
EW (
)
TOP
SLA
BF/
P &
BLI
ND
ING
BA
SE S
LAB
WA
LL
RH
S
LHS
RH
S
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 17
Re
bar
sC
on
cre
teR
eb
ars
Co
ncr
ete
Re
bar
sC
on
cre
te
723
+756
.51
cell
- 2
.0 x
1.5
67.5
500
--
--
--
--
Blo
ck 1
1 ce
ll -
2.0
x 1
.512
.090
0-
--
--
--
-B
lock
21
cell
- 2
.0 x
1.5
20.1
800
12-J
ul-
1423
-Ju
l-14
23-J
ul-
1423
-Ju
l-14
23-J
ul-
1423
-Ju
l-14
23-J
ul-
1424
-Ju
l-14
Blo
ck 3
a1
cell
- 2
.0 x
1.5
14.4
300
12-J
ul-
1423
-Ju
l-14
23-J
ul-
1423
-Ju
l-14
23-J
ul-
1423
-Ju
l-14
23-J
ul-
1424
-Ju
l-14
Blo
ck 3
b1
cell
- 2
.0 x
1.5
8.70
00
--
--
--
--
Blo
ck 4
1 ce
ll -
2.0
x 1
.512
.090
0-
--
--
--
-8
23+9
971
cell
- 2
.0 x
1.5
70.2
680
--
--
--
--
Blo
ck 1
1 ce
ll -
2.0
x 1
.516
.128
0-
--
--
--
-B
lock
2a
1 ce
ll -
2.0
x 1
.54.
933
0-
--
--
--
-B
lock
2b
1 ce
ll -
2.0
x 1
.513
.860
08-
Jul-
1423
-Ju
l-14
23-J
ul-
1423
-Ju
l-14
23-J
ul-
1423
-Ju
l-14
23-J
ul-
1424
-Ju
l-14
Blo
ck 3
a1
cell
- 2
.0 x
1.5
16.3
000
8-Ju
l-14
23-J
ul-
1423
-Ju
l-14
23-J
ul-
1423
-Ju
l-14
23-J
ul-
1423
-Ju
l-14
24-J
ul-
14B
lock
3b
1 ce
ll -
2.0
x 1
.54.
942
0B
lock
4a
1 ce
ll -
2.0
x 1
.57.
848
0B
lock
4b
1 ce
ll -
2.0
x 1
.56.
197
09
24+2
351
cell
- 2
.0 x
1.5
59.1
060
--
--
--
--
Blo
ck 1
a1
cell
- 2
.0 x
1.5
15.5
660
--
--
--
--
Blo
ck 1
b1
cell
- 2
.0 x
1.5
15.0
000
12-J
ul-
1423
-Ju
l-14
23-J
ul-
1423
-Ju
l-14
23-J
ul-
1423
-Ju
l-14
23-J
ul-
1424
-Ju
l-14
Blo
ck 2
a1
cell
- 2
.0 x
1.5
8.90
00
12-J
ul-
1423
-Ju
l-14
23-J
ul-
1423
-Ju
l-14
23-J
ul-
1423
-Ju
l-14
23-J
ul-
1424
-Ju
l-14
Blo
ck 2
b1
cell
- 2
.0 x
1.5
15.6
000
--
--
--
--
Blo
ck 2
c1
cell
- 2
.0 x
1.5
4.02
00
--
--
--
--
1024
+570
1 ce
ll -
2.0
x 1
.551
.953
0-
--
--
--
-LH
SB
lock
11
cell
- 2
.0 x
1.5
25.8
460
--
--
--
--
Blo
ck 2
a1
cell
- 2
.0 x
1.5
13.5
000
--
--
--
--
Blo
ck 2
b1
cell
- 2
.0 x
1.5
12.5
870
--
--
--
--
Not
e: P
reca
st R
CBC
wer
e us
ed f
or a
ll 1
cell
- 2.
0m x
1.5
m lo
cati
ons.
PR
EVIO
US
PR
EV
IOU
S
MO
NT
HTH
IS M
ON
TH
Bit
um
ino
us
Pai
nt
(2 C
oat
s)
BA
SE S
LAB
WA
LL
LHS
RH
S
TYP
E &
DIM
ENSI
ON
LEN
GTH
(m
)SK
EW (
)
F/P
&
BLI
ND
ING
LHS
RH
S
RCB
C P
RO
GR
ESS
SCH
EDU
LE (
BA
RR
EL)
As
of
31 J
ULY
201
4
NO
.ST
ATI
ON
TOP
SLA
B
LHS
RH
S
RH
S
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 18
Re
bar
sC
on
cre
teB
it. P
ain
tR
eb
ars
Co
ncr
ete
Bit
. Pai
nt
121
+260
3 ce
lls
- 2.
0 x
1.5
--
--
--
-2
21+4
851
cell
- 2
.0 x
1.5
--
--
--
-3
21+8
382
x 4
cell
s -
2.0
x 1.
5-
--
--
--
421
+972
.411
x 4
ce
lls
- 3.
0 x
2.0
--
--
--
-22
+655
2 x
4 ce
lls
- 2.
0 x
2.0
--
--
--
-
1 ce
ll -
2.0
x 2
.0-
--
--
--
23+4
921
x 4
cell
s -
3.0
x 2.
0-
--
--
--
1 ce
ll -
3.0
x 2
.0-
--
--
--
723
+756
.51
cell
- 2
.0 x
1.5
--
--
--
-
823
+997
1 ce
ll -
2.0
x 1
.5-
--
--
--
924
+235
1 ce
ll -
2.0
x 1
.5-
--
--
--
1024
+570
1 ce
ll -
2.0
x 1
.5-
--
--
--
PR
EVIO
US
PR
EV
IOU
S
MO
NT
HTH
IS M
ON
TH
STA
TIO
NTY
PE
5 6
INLE
T
RCB
C P
RO
GR
ESS
SCH
EDU
LE (
INLE
T &
OU
TLET
)
As
of
31 J
ULY
201
4
F/P
&
BLI
ND
ING
OU
TLET
NO
.
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 19
DIA TYPESetting out/
Exc/InstallConcrete Backfill
LEFT STAGE
MIDDLE STAGE
RIGHT STAGE
LEFT STAGE
MIDDLE STAGE
RIGHT STAGE
LEFT STAGE
MIDDLE STAGE
RIGHT STAGE
LEFT STAGE
MIDDLE STAGE
RIGHT STAGE
LEFT STAGE 5/15/2014 5/15/2014 5/18/2014 6/12/2014 UTL-LAY- 81 UTL-CON- 65 UTL-BF- 01
MIDDLE STAGE 6/11/2014 6/11/2014 6/12/2014 7/10/2014 UTL-LAY- 104 UTL-CON- 83 UTL-BF- 20
RIGHT STAGE
LEFT STAGE 5/19/2014 5/19/2014 5/20/2014 6/4/2014 UTL-LAY- 87 UTL-CON- 66 UTL-BF- 03
MIDDLE STAGE 6/14/2014 14/06/014 6/14/2014 6/21/2014 UTL-LAY- 108 UTL-CON- 84 UTL-BF- 21
RIGHT STAGE
LEFT STAGE 5/19/2014 5/19/2014 5/20/2014 5/31/2014 UTL-LAY- 85 UTL-CON- 63 UTL-BF- 02
MIDDLE STAGE 6/15/2014 6/15/2014 6/15/2014 UTL-LAY- 107 UTL-CON- 85 UTL-BF-
RIGHT STAGE
LEFT STAGE 5/20/2014 5/20/2014 5/25/2014 6/4/2014 UTL-LAY- 86 UTL-CON- 64 UTL-BF- 05
MIDDLE STAGE 6/15/2014 6/15/2014 6/15/2014 7/8/2014 UTL-LAY- 109 UTL-CON- 87 UTL-BF- 23
RIGHT STAGE
LEFT STAGE 5/25/2014 5/25/2014 5/25/2014 6/4/2014 UTL-LAY- 90 UTL-CON-68 UTL-BF- 07
MIDDLE STAGE 6/16/2014 6/16/2014 6/17/2014 7/10/2014 UTL-LAY- 111 UTL-CON- 88 UTL-BF- 28
RIGHT STAGE
LEFT STAGE 6/17/2014 6/17/2014 6/18/2014 7/9/2014 UTL-LAY- 112 UTL-CON- 89 UTL-BF- 33
MIDDLE STAGE 7/20/2014 7/20/2014 7/21/2014 7/27/2014 UTL-LAY- 131UTL-CON-
106UTL-BF-44
RIGHT STAGE
LEFT STAGE 6/19/2014 6/19/2014 6/19/2014 7/6/2014 UTL-LAY- 114 UTL-CON- 92 UTL-BF- 31
MIDDLE STAGE 7/20/2014 7/20/2014 7/21/2014 7/17/2014 UTL-LAY- 132UTL-CON-
107UTL-BF-46
RIGHT STAGE
LEFT STAGE 6/19/2014 6/19/2014 6/19/2014 7/5/2014 UTL-LAY- 113 UTL-CON- 91 UTL-BF- 30
MIDDLE STAGE 7/20/2014 7/20/2014 7/21/2014 7/17/2014 UTL-LAY- 133UTL-CON-
108UTL-BF-45
RIGHT STAGE
LEFT STAGE
MIDDLE STAGE
RIGHT STAGE
LEFT STAGE
MIDDLE STAGE
RIGHT STAGE
LEFT STAGE 5/26/2014 5/26/2014 5/26/2014 6/8/2014 UTL-LAY- 88 UTL-CON- 69 UTL-BF- 08
MIDDLE STAGE 6/11/2014 6/11/2014 6/11/2014 7/22/2014 UTL-LAY-106 UTL-CON- 81 UTL-BF-26
RIGHT STAGE
LEFT STAGE
MIDDLE STAGE
RIGHT STAGE
Future Road Crossing Utilities Ducts (As of 31 July 2014)
DRAWING NO.NO. OF
PIPES
300 uPVC
3CCC/FQR/IR/10 SOL-
30+300 200 uPVC
4
BACKFILLIN
G
RFI REF.
S. NO. CHAINAGE
PIPE SETOUT/EX
C/BED
PREP
INSTALLATI
ONCONCRETE
1CCC/FQI/IR/06
SERVICE ROAD-30+030 200 uPVC
2CCC/FQR/IR/11 SOL-
20+150
CCC/FQR/WA/05 SR-
10+600 300 uPVC
5 CCC/FQI/EL/01 21+360 150 uPVC
6 CCC/FQI/IR/01 21+460 300 uPVC
7 CCC/FQI/EL/02 21+660
10
150 uPVC
8 CCC/FQI/IR/02 21+780 300
150
150
12 CCC/FQI/IR/03 22+520
13CCC/FQI/IR/04
JUNCTION CROSSING22+520 LHS
9 CCC/FQI/EL/03 21+880
CCC/FQI/EL/04 22+260
11 CCC/FQI/EL/05 22+510
14CCC/FQI/IR/05
JUNCTION CROSSING22+587 LHS
CCC/FQI/WA/02
JUNCTION16 23+008 LHS
15 CCC/FQI/EL/06 22+760
150
200
200
200
150
300
uPVC
uPVC
uPVC
uPVC
uPVC
uPVC
uPVC
uPVC
uPVC
3
3
3
2
2
2
3
1
Location
2
2
2
2
3
2
3
2
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 20
DIA TYPESetting out/
Exc/InstallConcrete Backfill
LEFT STAGE 6/16/2014 6/16/2014 6/16/2014 7/20/2014 UTL-LAY- 102 UTL-CON- UTL-BF-19
MIDDLE STAGE 7/8/2014 7/8/2014 7/9/2014 7/27/2014 UTL-LAY- 125 UTL-CON-99 UTL-BF-42
RIGHT STAGE
LEFT STAGE 5/25/2014 5/25/2014 5/26/2014 6/14/2014 UTL-LAY- 91 UTL-CON- 71 UTL-BF- 06
MIDDLE STAGE 11/06/201 6/11/2014 6/11/2014 6/23/2014 UTL-LAY- 105 UTL-CON- 82 UTL-BF- 25
RIGHT STAGE
LEFT STAGE 5/27/2014 5/27/2014 5/27/2014 6/17/2014 UTL-LAY- 92 UTL-CON- 72 UTL-BF- 09
MIDDLE STAGE
RIGHT STAGE
LEFT STAGE 5/28/2014 5/28/2014 5/28/2014 6/17/2014 UTL-LAY- 93 UTL-CON- 70 UTL-BF- 10
MIDDLE STAGE
RIGHT STAGE
LEFT STAGE 5/29/2014 5/29/2014 5/29/2014 6/17/2014 UTL-LAY- 94 UTL-CON- 73 UTL-BF- 11
MIDDLE STAGE 7/30/2014
RIGHT STAGE
LEFT STAGE 5/29/2014 6/2/2014 6/2/2014 6/17/2014 UTL-LAY- 95 UTL-CON- 75 UTL-BF- 15
MIDDLE STAGE 7/14/2014 7/14/2014 7/14/2014 UTL-LAY- 124UTL-CON-
102
RIGHT STAGE
LEFT STAGE 5/29/2014 6/2/2014 6/2/2014 6/17/2014 UTL-LAY-97 UTL-CON- 76 UTL-BF- 13
MIDDLE STAGE 7/14/2014 7/14/2014 7/15/2014 UTL-LAY- 127UTL-CON-
101
RIGHT STAGE
LEFT STAGE 5/29/2014 6/2/2014 6/3/2014 6/19/2014 UTL-LAY- 98 UTL-CON- 77 UTL-BF- 14
MIDDLE STAGE
RIGHT STAGE
LEFT STAGE
MIDDLE STAGE
RIGHT STAGE
LEFT STAGE 6/3/2014 6/4/2014 6/4/2014 6/23/2014 UTL-LAY- 99 UTL-CON- 78 UTL-BF- 16
MIDDLE STAGEUTL-LAY-140
R1
UTL-CON-
114
RIGHT STAGE
LEFT STAGE 6/4/2014 6/5/2014 6/10/2014 23/06/201 UTL-LAY- 100 UTL-CON- 79 UTL-BF- 17
MIDDLE STAGE 7/23/2014 7/24/2014 UTL-LAY-139
RIGHT STAGE
LEFT STAGE 6/9/2014 6/9/2014 6/10/2014 6/23/2014 UTL-LAY- 101 UTL-CON- 80 UTL-BF- 18
MIDDLE STAGE
RIGHT STAGE
LEFT STAGE 7/5/2014 7/5/2014 7/5/2014 UTL-LAY- 123 UTL-CON- 94
MIDDLE STAGE
RIGHT STAGE
LEFT STAGE 7/16/2014 7/16/2014 7/17/2014 7/27/2014 UTL-LAY- 130UTL-CON-
105UTL-BF- 43
MIDDLE STAGE
RIGHT STAGE
LEFT STAGE
MIDDLE STAGE
RIGHT STAGE
LEFT STAGE
MIDDLE STAGE
RIGHT STAGE
S. NO. DRAWING NO. Location CHAINAGE
PIPENO. OF
PIPES
SETOUT/EX
C/BED
PREP
INSTALLATI
ONCONCRETE
BACKFILLIN
G
RFI REF.
CCC/FQI/WA/01
CCC/FQI/EL/1022
CCC/FQI/WA/0323
24 CCC/FQI/EL/11
19 CCC/FQI/EL/13
CCC/FQI/EL/0820
CCC/FQI/EL/0921
24+220
24+340
24+520
24+820
24+960
23+820
23+900
23+980
24+000
24+020
24+120
23+060
23+210
23+240
23+560
17
18 CCC/FQI/EL/07
23+020
CCC/FQI/EL/1227
28
29
30
31
32
CCC/FQI/WA/0425
CCC/FQI/IR/0726
CCC/FQI/EL/14
CCC/FQI/IR/08
CCC/FQI/EL/15
CCC/FQI/EL/16
CCC/FQI/IR/09
900
150
300
150
150
150
150
150
600
150
600
300
RC
uPVC
uPVC
uPVC
uPVC
uPVC
RC
uPVC
RC
uPVC
uPVC
uPVC
150
uPVC
uPVC
uPVC
150
150
300
1
3
4
3
4
3
1
3
1
2
3
3
2
3
3
2
uPVC
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 21
DIA TYPESetting out/
Exc/InstallConcrete Backfill
LEFT STAGE
MIDDLE STAGE
RIGHT STAGE
LEFT STAGE 5/21/2014 5/21/2014 5/21/2014 6/4/2014 UTL-LAY- 89 UTL-CON- 67 UTL-BF- 04
MIDDLE STAGE 6/16/2014 6/16/2014 6/18/2014 7/10/2014 UTL-LAY- 110 UTL-CON- 90 UTL-BF- 29
RIGHT STAGE
LEFT STAGE 5/29/2014 5/31/2014 5/31/2014 6/17/2014 UTL-LAY- 96 UTL-CON- 74 UTL-BF- 12
MIDDLE STAGE 7/10/2014 7/10/2014UTL-LAY- 120
R1
RIGHT STAGE
LEFT STAGE
MIDDLE STAGE
RIGHT STAGE
LEFT STAGE
MIDDLE STAGE
RIGHT STAGE
LEFT STAGE
MIDDLE STAGE
RIGHT STAGE
LEFT STAGE 7/9/2014 7/9/2014 UTL-LAY- 116
MIDDLE STAGE
RIGHT STAGE
LEFT STAGE
MIDDLE STAGE 7/10/2014 7/10/2014 7/14/2014 UTL-LAY-126UTL-CON-
103
RIGHT STAGE 7/22/2014 7/22/2014 7/23/2014 UTL-LAY-136UTL-CON-
110
SETOUT/EX
C/BED
PREP
INSTALLATI
ONCONCRETE
BACKFILLIN
G
RFI REF.
4
40 CCC/FQI/SL/04 22+990 150 uPVC 4
39 CCC/FQI/SL/03 22+820 150 uPVC
S. NO. DRAWING NO. Location
CCC/FQI/OMANTEL.2 100 uPVC38 0+140 SOL-3 4
25+160
CHAINAGE
33
34
35
36
CCC/FQI/EL/17
CCC/FQI/NAW.2
CCC/FQI/NAW.3
CCC/FQI/NAW.4
37 CCC/FQI/OMANTEL.1
uPVC
uPVC
uPVC
uPVC
22+810 100 uPVC
100
21+870
23+580
24+720
150
100
100
PIPE
4
NO. OF
PIPES
2
3
2
2
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 22
Sl. N
o.
DES
CR
IPTI
ON
PA
YMEN
T FO
R
THE
MO
NTH
OF
GR
OSS
AM
OU
NT
(R.O
.)
GR
OSS
AM
OU
NT
CLA
IMED
(R
.O.)
NET
AM
OU
NT
CLA
IMED
(R.O
.)
DA
TE
SUB
MIT
TED
AM
OU
NT
CER
TIFI
ED (
R.O
.)D
ATE
CER
TIFI
ED
AM
OU
NT
REC
EIV
ED
(R.O
.)
DA
TE
PA
YMEN
T D
UE
DA
TE
PA
YMEN
T
REC
EIV
ED
1PA
YMEN
T A
PPLI
CA
TIO
N N
o. 1
(AD
VA
NC
E PA
YMEN
T)D
ec-1
3
1,6
48,2
25
1,6
48,2
25
1,64
8,22
5 23
-Nov
-13
1,6
48,2
25
29-J
an-1
41,
648,
225
6-Fe
b-1
4
2PA
YMEN
T A
PPLI
CA
TIO
N N
o. 2
Jan-
14
2,2
91,2
77
643,
052
514,
442
12
-Feb
-14
514,
442
02-A
pr-1
451
3,60
8
10-A
pr-1
4
3PA
YMEN
T A
PPLI
CA
TIO
N N
o. 3
Feb
&M
ar-1
4
2,8
08,6
44
517,
367
504,
147
06
-Apr
-14
434,
917
03-M
ay-1
402
-Jul
-14
4PA
YMEN
T A
PPLI
CA
TIO
N N
o. 4
Apr
-14
3
,315
,692
50
7,04
8
41
7,90
0
08-M
ay-1
440
7,53
8
05
-Jun
-14
04-A
ug-1
4
5PA
YMEN
T A
PPLI
CA
TIO
N N
o. 5
May
-14
4
,109
,460
79
3,76
8
65
0,80
2
05-J
un-1
444
5,70
8
04
-Jul
-14
02-S
ep-1
4
6PA
YMEN
T A
PPLI
CA
TIO
N N
o. 6
Jun-
14
4,2
93,7
64
184,
304
382,
116
15
-Jul
-14
382,
116
16-J
ul-1
414
-Sep
-14
7PA
YMEN
T A
PPLI
CA
TIO
N N
o. 7
Jul-
14
8PA
YMEN
T A
PPLI
CA
TIO
N N
o. 8
Aug
-14
9PA
YMEN
T A
PPLI
CA
TIO
N N
o. 9
Sep
-14
10PA
YMEN
T A
PPLI
CA
TIO
N N
o. 1
0O
ct-1
4
11PA
YMEN
T A
PPLI
CA
TIO
N N
o. 1
1N
ov-1
4
12PA
YMEN
T A
PPLI
CA
TIO
N N
o. 1
2D
ec-1
4
13PA
YMEN
T A
PPLI
CA
TIO
N N
o. 1
3Ja
n-15
14PA
YMEN
T A
PPLI
CA
TIO
N N
o. 1
4Fe
b-1
5
15PA
YMEN
T A
PPLI
CA
TIO
N N
o. 1
5M
ar-1
5
16PA
YMEN
T A
PPLI
CA
TIO
N N
o. 1
6A
pr-1
5
17PA
YMEN
T A
PPLI
CA
TIO
N N
o. 1
7M
ay-1
5
18PA
YMEN
T A
PPLI
CA
TIO
N N
o. 1
8Ju
n-15
4,29
3,76
4
4,
293,
764
4,11
7,63
2
3,
832,
946
2,
161,
833
ST
AT
US
OF
PA
YM
EN
T A
PP
LIC
AT
ION
TOTA
L A
MO
UN
T (R
.O.)
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 23
LIST OF AVAILABLE EQUIPMENTS AT SITE
Sl.
No.CCC HIRED
TOTAL
AVAILABLE
AT SITE
1 COMPRESSOR
2 AIR COMPRESSOR 1 1 2
3 MILLER WELDING MECHINE 2 2
4 GENERATOR 2 2
5 CRANES -
6 CRANES 30 TON / 25 TON / 70 TON 2 1 3
7 VEHICLES H.D. -
8 DIESEL TANKER -
9 FLAT TRAILER 1 1
10 HIAB TRUCK 2 2
11 P/MOVER + TIPPING TRAILER 3 3
12 TIPPER TRUCKS 11 11
13 WATER TANKER 5000 GAL 2 2 4
14 EARTH MOVING PLANT
15 BOBCAT 2 2
16 EXCAVATOR 2 2
17 JCB 4CX / 3CX 1 4 5
18 SHOVEL / WHEEL LOADER 3 3
19 DOZER D9N/D8R 1 1
20 TELEHANDLER -
21 CIVIL ENGINEERING EQUIPMENT
22 CONCRETE MIXER -
23 DYNAPAC S/ROLLER -
24 E/WORK ROLLER 1 1
25 MOTOR GRADER 1 1 2
26 TITAN PAVER MACHINE -
27 TYRE / PTR ROLLER -
28 PAVER MACHINE -
29 L. D. VEHICLES & TRUCKS
30 DYNA TRUCK 1 2 3
31 MAINTENANCE TRUCKS 1 1
32 ASHOK LEYLAND BUS 55 SEAT 5 5
33 TOYOTA COASTER BUS 24 S 1 1
34 TOYOTA COROLLA/CIVIC/YARIS 11 11
35 TOYOTA PICKUP/ISUZU 5 7 12
36 NISSAN PATHFINDER/X-TRAIL 5 5
37 TOYOTA LAND CRUISER/FORTUNER 4 4
38 Total 44 44 88
DESCRIPTION
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 24
Ja
n-1
4Fe
b-1
4M
ar-
14
Ap
r-1
4M
ay
-14
Ju
n-1
4Ju
l-1
4A
ug
-14
Se
p-1
4O
ct-
14
No
v-1
4D
ec-1
4Ja
n-1
5Fe
b-1
5M
ar-
15
Ap
r-1
5M
ay
-15
Ju
n-1
5Ju
l-1
5A
ug
-15
Se
p-1
5O
ct-
15
To
tal
PLA
NN
ED
TO
TA
L P
ER
MO
NTH
47
68
87
95
93
10
71
10
10
81
02
10
09
88
78
27
97
76
65
34
11
50
0
REV
ISED
PLA
NN
ED
TO
TA
L P
ER
MO
NTH
68
87
95
93
10
71
10
10
81
02
10
09
88
78
27
97
76
65
34
1
PLA
NN
ED
CU
MU
LA
TIV
E4
71
15
20
22
97
39
04
97
60
77
15
81
79
17
1,0
15
1,1
02
1,1
84
1,2
63
1,3
40
1,4
06
1,4
59
1,5
00
1,5
00
1,5
00
1,5
00
1,5
00
AC
TU
AL T
OTA
L P
ER
MO
NTH
33
55
66
68
77
86
88
47
3
AC
TU
AL C
UM
ULA
TIV
E3
38
81
54
22
22
99
38
54
73
EQ
UIP
ME
NT
HIS
TO
GR
AM
20
14
20
15
47
68
87
95
93
107
110
108
102
100
98
87
82
79
77
66
53
41
33
55
66
68
77
86
88
68
87
95
93
10
711
01
08
10
21
00
98
87
82
79
77
66
53
41
0
20
40
60
80
10
0
12
0
Jan-14
Feb-14
Mar-14
Apr-14
May-14
Jun-14
Jul-14
Aug-14
Sep-14
Oct-14
Nov-14
Dec-14
Jan-15
Feb-15
Mar-15
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
No. of EQUIPMENT
PR
OJ
EC
T M
ON
TH
S
PL
AN
NE
D T
OT
AL
PE
R M
ON
TH
AC
TU
AL
TO
TA
L P
ER
MO
NT
H
RE
VIS
ED
PL
AN
NE
D T
OT
AL
PE
R M
ON
TH
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 25
CONTRACTORS MANPOWER AVAILABLE AT SITE
BUDGET ACTUAL BUDGET ACTUAL BUDGET ACTUAL
A - MANAGEMENT *** 3 3
B - COMMERCIAL STAFF * 9 1 10
C - ENGINEERS 5 5
D - FOREMAN & C/H 21 1 22
E - ENGINEERING TECHNICIANS ** 22 7 29
F - DAILY RATED EMPLOYEES :
1 - SKILLED CRAFTSMEN 132 71 203
2 - SEMI-SKILLED/UNSKILLED 494 59 553
TOTAL AS OF END OF THE MONTH 0 686 0 139 0 825
G - SUBCONTRACTORS
Number of Personnel employed by Subcontractor on Company Work : 16
STAFF & LABOUR
EXPATRIATES NATIONALS TOTAL
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 26
20
13
De
c-1
3Jan
-14
Fe
b-1
4M
ar-
14
Ap
r-14
May-1
4Ju
n-1
4Ju
l-14
Au
g-1
4S
ep
-14
Oct-
14
No
v-1
4D
ec-1
4Jan
-15
Fe
b-1
5M
ar-
15
Ap
r-15
May-1
5Ju
n-1
5Ju
l-15
Au
g-1
5S
ep
-15
Oct-
15
To
tal
PL
AN
NE
D T
OT
AL
PE
R M
ON
TH
- (
DIR
EC
T )
634
186
375
586
791
792
799
794
793
701
480
381
269
246
307
307
305
149
8301
565
756
754
750
700
652
667
554
516
387
297
276
365
271
135
92
51
7788
PL
AN
NE
D T
OT
AL
PE
R M
ON
TH
- (
IN
DIR
EC
T )
523
36
50
52
57
59
59
60
61
63
61
61
57
51
47
44
35
30
914
RE
VIS
ED
- P
LA
NN
ED
TO
TA
L P
ER
MO
NT
H-(
IND
IRE
CT
)63
84
84
83
78
72
74
61
57
43
33
31
40
30
15
10
6862
PL
AN
NE
D T
OT
AL
PE
R M
ON
TH
- (
DIR
EC
T +
IN
DIR
EC
T )
11
57
222
425
638
848
851
858
854
854
764
541
442
326
297
354
351
340
179
9215
RE
VIS
ED
- P
LA
NN
ED
-
( D
IRE
CT
+ IN
DIR
EC
T )
627
840
838
833
778
725
741
616
573
429
330
306
406
301
150
102
57
8651
PL
AN
NE
D C
UM
UL
AT
IVE
11
68
291
715
1,3
53
2,2
02
3,0
52
3,9
10
4,7
64
5,6
18
6,3
83
6,9
23
7,3
65
7,6
91
7,9
88
8,3
42
8,6
93
9,0
33
9,2
12
9,2
12
AC
TU
AL
TO
TA
L P
ER
MO
NT
H -
( D
IRE
CT
)322
365
550
581
603
691
709
756
4577
AC
TU
AL
TO
TA
L P
ER
MO
NT
H -
( IN
DIR
EC
T )
18
26
46
49
54
57
64
69
383
AC
TU
AL
TO
TA
L P
ER
MO
NT
H -
( D
IRE
CT
+ IN
DIR
EC
T )
340
391
596
630
657
748
773
825
00
00
00
00
00
04960
AC
TU
AL
CU
MU
LA
TIV
E340
731
1,3
27
1,9
57
2,6
14
3,3
62
4,1
35
4,9
60
RE
VIS
ED
- P
LA
NN
ED
TO
TA
L P
ER
MO
NT
H -
( D
IRE
CT
)
MA
NP
OW
ER
HIS
TO
GR
AM
(D
IRE
CT
& IN
DIR
EC
T)
20
14
20
15
11
57
222
425
638
848
851
858
854
854
764
541
442
326
297
354
351
340
179
340
391
596
630
657
748
773
825
0
0
0
0
0
0
0
0
0
0
0
0
10
0
20
0
30
0
40
0
50
0
60
0
70
0
80
0
90
0
Dec-13
Jan-14
Feb-14
Mar-14
Apr-14
May-14
Jun-14
Jul-14
Aug-14
Sep-14
Oct-14
Nov-14
Dec-14
Jan-15
Feb-15
Mar-15
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
No. of Men
PR
OJ
EC
T M
ON
TH
S
PL
AN
NE
D T
OT
AL P
ER
MO
NTH
- ( D
IRE
CT
+ IN
DIR
EC
T )
AC
TU
AL
TO
TA
L P
ER
MO
NT
H -
( D
IRE
CT
+ IN
DIR
EC
T )
RE
VIS
ED
- P
LA
NN
ED
-
( D
IRE
CT
+ IN
DIR
EC
T )
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 27
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 28
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 29
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014
RENARDET S.A. & PARTNERS Page 30
Date
Su
bm
itte
d
CC
C/F
QI/
RE
N/M
AS
/001
MA
S/C
CC
/FQ
I/B
BC
/001
Bit
um
ino
us B
ase C
ou
rse
Tarm
ac Z
aw
aw
i L
LC
Om
an
22/1
2/2
013
Ren
ard
et
AP
PR
OV
ED
01/0
4/2
014
SO
/FQ
I/C
CC
/087
07/0
4/2
014
CC
C/F
QI/
RE
N/M
AS
/002
MA
S/C
CC
/FQ
I/G
TI/
002
Geo
tech
nic
al In
vesti
gati
on
Sw
issb
ori
ng
& C
om
pan
y L
LC
26/1
2/2
013
Ren
ard
et
AP
PR
OV
ED
02/0
2/2
014
SO
/FQ
I/C
CC
/015
12/0
2/2
014
CC
C/F
QI/
RE
N/M
AS
/003
MA
S/C
CC
/FQ
I/M
SE
/003
MS
E W
all S
yste
mF
rey
ssin
et
Ara
bia
n S
ea L
LC
26/1
2/2
013
Ren
ard
et
AP
PR
OV
ED
02/0
2/2
014
SO
/FQ
I/C
CC
/014
12/0
2/2
014
CC
C/F
QI/
RE
N/M
AS
/004
MA
S/C
CC
/FQ
I/P
VC
/004
UP
VC
Pip
es
Am
ian
tit
Om
an
26/1
2/2
013
Ren
ard
et
AP
PR
OV
ED
09/0
2/2
014
SO
/FQ
I/C
CC
/019
18/0
2/2
014
CC
C/F
QI/
RE
N/M
AS
/005
MA
S/C
CC
/FQ
I/H
DP
E/0
05
HD
PE
Pip
es &
Fit
tin
gs
Am
ian
tit
Om
an
26/1
2/2
013
Ren
ard
et
AP
PR
OV
ED
09/0
2/2
014
SO
/FQ
I/C
CC
/020
18/0
2/2
014
CC
C/F
QI/
RE
N/M
AS
/006
MA
S/C
CC
/FQ
I/P
W/0
06
Pilin
g W
ork
sA
PC
C L
LC
26/0
1/2
014
Ren
ard
et
AP
PR
OV
ED
19/0
2/2
014
SO
/FQ
I/C
CC
/026
25/0
2/2
014
CC
C/F
QI/
RE
N/M
AS
/007
MA
S/C
CC
/FQ
I/M
C/0
07
Bit
nu
min
ou
s P
rim
e C
oat
(MC
-70)
Em
irate
s L
ub
e O
il C
o. (M
uscat)
30/0
1/2
014
Ren
ard
et
AP
PR
OV
ED
09/0
3/2
014
SO
/FQ
I/C
CC
/069
27/0
3/2
014
CC
C/F
QI/
RE
N/M
AS
/008
MA
S/C
CC
/FQ
I/R
S/0
08
Rein
forc
ing
Ste
el
Mu
scat
Ste
el In
du
str
ies
02/0
2/2
014
Ren
ard
et
AP
PR
OV
ED
20/0
3/2
014
SO
/FQ
I/C
CC
/063
24/0
3/2
014
CC
C/F
QI/
RE
N/M
AS
/009-1
MA
S/C
CC
/FQ
I/P
T/0
09-1
Po
st
Ten
sio
nin
g W
ork
- A
nch
ora
ge
Fre
yssin
et
Ara
bia
n S
ea L
LC
22/0
2/2
014
Ren
ard
et
AP
PR
OV
ED
27/0
3/2
014
SO
/FQ
I/C
CC
/089
14/0
4/2
014
CC
C/F
QI/
RE
N/M
AS
/009-2
MA
S/C
CC
/FQ
I/P
T/0
09-2
Po
st
Ten
sio
nin
g W
ork
- D
uct
Fre
yssin
et
Ara
bia
n S
ea L
LC
22/0
2/2
014
Ren
ard
et
AP
PR
OV
ED
27/0
3/2
014
SO
/FQ
I/C
CC
/090
14/0
4/2
014
CC
C/F
QI/
RE
N/M
AS
/009-3
MA
S/C
CC
/FQ
I/P
T/0
09-3
Po
st
Ten
sio
nin
g W
ork
- S
tran
dF
rey
ssin
et
Ara
bia
n