14
FPIC: THE PHILIPPINE FPIC: THE PHILIPPINE EXPERIENCE EXPERIENCE By: Robie Halip Researcher, NTFP 2 nd Regional UNREDD Information Exchange Meeting: FPIC Shared Learning April 19-20, 2012 Bogor, Indonesia

FPIC: THE PHILIPPINE EXPERIENCE

  • Upload
    lacey

  • View
    122

  • Download
    0

Embed Size (px)

DESCRIPTION

FPIC: THE PHILIPPINE EXPERIENCE. By: Robie Halip Researcher, NTFP 2 nd Regional UNREDD Information Exchange Meeting: FPIC Shared Learning April 19-20, 2012 Bogor, Indonesia. REDD+ in the Philippines. Philippines is now in the readiness phase - PowerPoint PPT Presentation

Citation preview

Page 1: FPIC: THE PHILIPPINE EXPERIENCE

FPIC: THE PHILIPPINE FPIC: THE PHILIPPINE EXPERIENCEEXPERIENCE

By: Robie HalipResearcher, NTFP

2nd Regional UNREDD Information Exchange Meeting: FPIC Shared Learning April 19-20, 2012Bogor, Indonesia

Page 2: FPIC: THE PHILIPPINE EXPERIENCE

REDD+ in the Philippines Philippines is now in the readiness phase - focused on capacity building,

consultation, communication, integration and reform among others- implement National REDD Plus Strategies (NRPS) Readiness Strategies

* NRPS has 7 components and is included in the National Climate Change Action Plan of the Climate Change Commission approved last November 22, 2011

Page 3: FPIC: THE PHILIPPINE EXPERIENCE

REDD+ in the Philippines

Related initiatives from the NRPS components are currently being conducted ie policy studies of GIZ and CODE REDD/ NTFP

Policy Study on Review of FPIC Implementation How faithful is FPIC process being followed Is current FPIC process an effective safeguard for

indigenous peoples to assert their right to self determination?

Will FPIC process be an effective safeguard of indigenous rights once REDD PLUS is implemented?

Page 4: FPIC: THE PHILIPPINE EXPERIENCE

Steps in FPIC Process (2006 Guidelines)

I. Project Proponent files application with regulatory agency

II. Regulatory agency refers application to NCIP

III. NCIP endorses application to NCIP Regional Office NCIP Refers to Master List of Ancestral Domains Can result in Certificate of Non-Overlap (CNO)

IV. Pre-FBI (Field Based Investigation) Conference

V. FBI Proper – commences after payment by project proponent of FBI Fee (to NCIP Trust Fund)

VI. Pre-FPIC Conference

VII. FPIC Proper – starts upon payment of FPIC Fee Includes provision for inclusion of NGO Results in Consent/MOA or Non-Consent and issuance of

CP

Page 5: FPIC: THE PHILIPPINE EXPERIENCE

Basic FPIC Process (NCIP AO 1 s. 2006)

REGULATORY AGENCY / APPLICANT

REGIONAL LEVEL

PO/CSC LEVEL

Endorses request for CP with required documents

RD directs the PO/CSC to hold a pre-FBI Conference

& FBI and notifies the applicant

Conduct of Pre-FBI conference(w/in 10 days from receipt

of application)

RD assigns officer to determine overlap based

on AD Master List

PO notifies RD & ADAR of the commencement of FBI

Conduct of FBI, prep & submission of report (w/in 9 days, to commence

after 5 days of deposit of FBI fee

Conduct of Pre-FPIC conference (1 day)

Conduct of FPIC Conference

Regular(55 days)

Special (20 days)

Applicant deposits FBI Fee to the PTA

Receives copyOf the CNO

In case the application covers 2 or moreRegions, the concerned agency shall

Endorse the same to ADO Director whoWill decide which RO shall take the lead.

Overlap?3DAYS RD issues

CNO

NO YES

Page 6: FPIC: THE PHILIPPINE EXPERIENCE

Rationale of the Policy Study on the FPIC Implementation• There have been reports of complaints ranging

from creation of fictitious tribal associations and tribal leaders, collusion with the proponents, to outright corruption.

• Some communities have started questioning the wisdom and legitimacy of the existing FPIC process because of these allegations

• The NCIP has deemed it urgent for an assessment and evaluation of FPIC processes in view of several issues

• The FPIC safeguard has to be strengthened to be able to respond to existing and emerging pressures from development projects in ancestral domains

• REDD PLUS initiatives aimed at utilising/managing forest resources affects and impacts on indigenous rights over such resources

Page 7: FPIC: THE PHILIPPINE EXPERIENCE

Policy Study on the assessment of the implementation of FPIC

OBJECTIVES•To assess the faithful implementation of the Free and Prior Informed Consent (FPIC) provisions as effective safeguard for IPs to assert their right to self-determination•Develop a policy agenda and recommendations for enhancing FPIC process in the Philippines, particular in the context of REDD-plus implementation

Page 8: FPIC: THE PHILIPPINE EXPERIENCE

Common experiences in the implementation of FPIC requirement

Communities Consent were given mainly because of the

economic benefits Phasing of the acquisition of consent No monitoring mechanisms on violations

committed during the conduct of the FPIC and implementation of the MOA

Insufficient IEC to the communities on the FPIC process and available grievance mechanisms

Lack of capacity building on negotiation skills (community and NCIP)

Page 9: FPIC: THE PHILIPPINE EXPERIENCE

Common experiences in the implementation of FPIC requirement

Signing of MOA were done outside the communities leading to mistrust of community members to their leaders/designated signatories

Insufficient IEC on available grievance mechanisms for affected indigenous communities

Phasing of the acquisition of consent Information provided to the communities were

insufficient for them to come up with an informed decision

Page 10: FPIC: THE PHILIPPINE EXPERIENCE

Common experiences in the implementation of FPIC requirement

NCIP Different interpretations of FPIC teams ie affected area and

impact area MOA content not scrutinized well by RRT (Regional Review

Team) NCIP role as facilitator is contradictory to their mandate to

protect the rights of IPS Limited to the documents provided by the regulating

agency/proponent Limited technical expertise Budgetary constraints in the NCIP Insufficient interagency coordination in the implementation

of the FPIC requirement

Page 11: FPIC: THE PHILIPPINE EXPERIENCE

Emerging Policy Options

Time-bound decision making vs. customary decision making system of the community

Role of NCIP in the implementation of the FPIC process – neutral?

Strengthen the role of the RRT especially in ensuring that the FPIC process was implemented accordingly and the MOA reflects the sentiments of the people

Implementation of one FPIC for one process / phase of the project

Page 12: FPIC: THE PHILIPPINE EXPERIENCE

Emerging Policy Options Strengthen feedbacking system with the affected

communities and local NCIP offices Invite independent technical experts especially during

FPIC process Ensure the full participation of indigenous peoples Encourage IPs to adhere to their cultural system of

consent Fixed FBI and FPIC fees – the higher the impact, the

higher the fee (eg. Small scale vs large scale – should be centralized at the NCIP Central Office)

Each AD / community should have own MOA and CP One CP for one application and process of the project

Page 13: FPIC: THE PHILIPPINE EXPERIENCE

Joint Initiatives to Assess/Review the 2006 FPIC Guidelines

I. Filing of House Resolution 887 in the Lower House of the 15th Congress calling for the review of the 2006 FPIC Guidelines that led to the formation of a technical working group on the review of the 2006 FPIC guidelines composed of NCC Committee members, representatives from NCIP and members of various civil society organizations

II. Creation of a Technical Working Group on the Review of FPIC of NCIP

Page 14: FPIC: THE PHILIPPINE EXPERIENCE

THANK YOU… THANK YOU…

HAGGIYOHAGGIYO! !