Think
SCADA
SCADA Roadmap May 2013 Rev 2013.5.1
Think Foxboro
INVENSYS has prepared this document for sole use with Opsmanage13 only.
Legal Disclaimer
Invensys Proprietary & Confidential
Date Company Contact Email Tel
5-8 May Opsmanage13 ANZ Chris J Smith [email protected] --
Copyright © INVENSYS 2013.
The information contained herein is the property of INVENSYS and any other use or
disclosure of such information is prohibited.
This report shall not be reproduced, copied or used in whole or in part without prior
written approval of INVENSYS.
All rights reserved.
The names, logos, and taglines identifying the products and services of Invensys are
proprietary marks of Invensys or its subsidiaries.
All third party trademarks and service marks are the proprietary marks of their respective
owners.
Not for distribution.
All dates are currently scheduled dates and are subject to change.
CONFIDENTIAL
Holistic SCADA Layered Terminology
APPS • ASSET, PIPELINE, POWER, Load Control
MTU
• SUPERVISORY CONTROL - OPERATIONS INTEGRATION / COMMUNICATIONS – BACKUP Control Centres
Comms • Wireless, Networks [Vendor, User, 3rd Party Providers]
RTU • Remote Controller, Data Aquisition, Remote Gateway
Instrumen-tation
• Metering, Protection, IO Subsystems, Safety Systems
Recent Releases…
Recent Major Updates
- SCD5200 Firmware and Tools
Slide 7 Invensys Proprietary & Confidential
FEATURES - New F/W Release 2013
This release significantly enhances the overall IEC61850 capability of the SCD5200 as well as expanding the overall port capacity and instances of protocol stack. This is in line with the modern practice of redundant data concentration for many 3rd Party IEDs within the architecture.
FIRMWARE VERSION SY-1101190_P
Release Date : April 2013
Slide 8 Invensys Proprietary & Confidential
IEC61850 Architectures Simplified
• Co-Resident IEC61850 Client and IEC61850 Server operation within a single SCD5200 Node
– Optonet is NOT required to allow data transfers between client and server
– Architectures can be simplified
• KEMA IEC61850 Certification of both IEC61850 Client and Server Operation
– Avoids the need for further end-user qualification and testing of IEC61850 operation
• Updated IEC61850 Schema
– IEC61850 is a maturing standard and this brings the older firmware up to date in support of the IEC61850 SCL language and Schema
• Other Enhancements
• The maximum number of increased to 150 within a single node
• A 50 per cent increase in port capacity
• More than double the number of DNP protocol stacks allowed
• Slide 9 Invensys Proprietary & Confidential
IEC 61850 RELATED SERVER UPDATE
• Server Time activated Operate for Controls
• Server CILO and RSYN LNs
• Control Interlock and Synchro Check
• Server On, Off and Blocked Modes
• Server Status Check before Execute
• Server String Types now visible over Optonet
• Server ENUM and CODED types now available to other protocols and applications in SALL User Language
Slide 10 Invensys Proprietary & Confidential
Photo : Leshanes123 Flickr
© 2012 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks of Invensys or its subsidiaries. All third party trademarks and service marks are the proprietary marks of their respective owners. All dates herein subject to change.
Slide 11
Intelligent
SCADA
Automate Intelligence
SCADA Roadmap May 2013 Rev 2013.5.1
Roadmap Business Drivers
Invensys Proprietary & Confidential
End of Life Components – New OS Versions
- Memory
- CPUs
- Oscillators
Migration / New Functionality
Installed Base Products and Capability
IEC61850
Web based Technologies
RoHS and REACH
EU Directives coming into force in 2017
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
SCD5200/SCD6000 Roadmap 2013
Invensys Proprietary & Confidential
Ap
plic
atio
ns
So
ftw
are
C
on
tro
ller
Devic
e &
Sys
Int.
I/
O s
ub
syste
m.
Main Processor 64MB
Configuration and Diagnostic
Tools
Data Concentration and Communications
Open Standard Protocols, User defined Communications, SALL, IDF,
Rationalize IO configurations and Range
Optimize Total Cost of Ownership
Database, IDF, User Level SALL and IEC 61131 Programming
Main Processor 512MB
Configuration and Diagnostic
Tools
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
SCD5200/6000 Roadmap 2013
Invensys Proprietary & Confidential
Ap
plic
atio
ns
So
ftw
are
C
on
tro
ller
Devic
e &
Sys
Int.
I/
O s
ub
syste
m.
Main Processor
Manage Larger Distributed Databases and Faster Response Times
Configuration and Diagnostic Tools
Simplify configuration, maintenance and change management
Data Concentration and Communications
Open Standard Protocols, User defined Communications, SALL, IDF,
Rationalize IO configurations and Range
Optimize Total Cost of Ownership
Secure Authorization
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
SCD5200/6000 Roadmap = Values
Invensys Proprietary & Confidential
Ap
plic
atio
ns
So
ftw
are
C
on
tro
ller
Devic
e &
Sys
Int.
I/
O s
ub
syste
m.
• Extend Performance
• Assist higher level use of Object Oriented Structures
• Include Secure Serial and Network Connectivity
• Maintain latest OS, Security, and Patches
• Utilize greater applications flexibility
• Improve Performance
• Better Port Diagnostics and Capture
• Higher Density of Intelligent IEDs
• Modernize to increase IO density and rationalize for Spare Parts
• RoHs [Reduction of Hazardous Substances] Directives
• Preserve Engineering, Programs, and Artifacts
• SALL, .IDF, .CFG
2012 2013 2014 2015 2016
SCD5200/6000 Roadmap 2012-2016 Applications &
Soft
ware
Netw
ork
/
Securi
ty
Contr
lrs
Devic
e &
Syste
m I
nt.
I/
O
subsyste
m.
Invensys Proprietary & Confidential
SCD6000 – Electrobus IO and Comms. Modules
SCD6000 CPU
ArchestrA SCADA 2014
IEC 61850 SCD5200 Client/Server Update
IEC 61850 Runtime Integration
Secure Collaboration [MTU/RTU]
SCD6000 ELECTROBUS Comms
SCD6000 ELECTROBUS IO
LEGEND: BLUE under development; YELLOW planned
SCD5200 Upgrade
with SCD6000
Controller
SCD6000 Engineering Security Diagnostics
SY-1101190_P
SCD5200
Upgrade with
SCD6000
Series RoHS
I/O
SCD2200 Mercury
IASCADA Migration
IEC 61850 TEST and SIMULATION ANALYSIS
SCD6000 IEC 61850 TEST and SIMULATION MODULE
SCD5200 RITTAL CARD FILE
SCD5200 DEEP ADI Terminations
Work in Progress .. Stage III and above
• ADI Module - Deeper Terminal Block
• New Cardfile - Rittal
• Proposal 167 – SCD6000
Slide 17 Invensys Proprietary & Confidential
Work in Progress .. Deeper ADI Block
Slide 18 Invensys Proprietary & Confidential
• Funding allocated
• Prototype
Constructed
• Feedback ?
• Moulding [12wk]
• RTP October Likely
Proposal 167
Slide 19
SCD5200
RTU50
SCD6000
ELECTROBUS RTU
RTU50
[1993 – 2013]
SCD5200
[2002 – 2016]
SCD6000
Gateway Data
Concentrator
SCD6000
Translator
Data
Concentrator
Increasing Functional Replacement of SCD5200
Maintains Bus Compatibility
• Electrobus
• Optonet
Proposal 167
Deliverables
The objective deliverables of this proposal are all variants of SCD6000 CPU which would enable any variant of the SCD5200 and RTU50 COPE, COE, P30E to be functionally upgraded.
These variants would appear to the market as:
• SCD6000 Gateway Data Concentrator
• SCD6000 Translator Data Concentrator
• SCD6000 ELECTROBUS RTU
Slide 20 Do not delete any slides or content. Mark as ‘Not Applicable’.
The SCD6000 Processor Upgrade Developments
SCD6000 Processor
Replaces…
• SY-0399143 SCD5200 COPE [16MB]
• SY-0399144 SCD5200 COE [16MB]
• SY-0399145 RTU50 P3E [16MB]
• SY-0399152 SCD5200 COPE [64MB
• SY-0399153 SCD5200 COE [64MB]
• SY-0399154 RTU50 P3OE [64MB]
Slide 21 Invensys Proprietary & Confidential
Lifecycle and Migration [Session 2]
Slide 22 Invensys Proprietary & Confidential
New
R
ele
ases
Lifecycle Phase
MTU
SCD2200
SCD2100
2010++
SCD5200 {2003 – 2016}
C50/RTU50 1993++
RTU20
1999++
InFusion SCADA
2.1
{2010++}
IASCADA
1997++ P6009
MATURE PREFERRED
SCADA-A2
RTU
SCD6200
ArchestrA
SCADA
2014
Substation
Automation
System
NEW PRODUCTS AVAILABLE LIFETIME
Substation
Automation
Configurator
SCD2200 SCD2100
P6008
1980++
C2020
C2025
1970++
LN2068
1988++
Upgrade / Migration Planning
Global Customer Support – Customer First Service
Foxboro RTU Product Migration Plan
Manufacturer : Shanghai Foxboro Company Limited
Life Cycle Phase
RTU50 SCD5200 SCD6000
Preferred 1993-2005 2002-2015 2016++
Available 2006-2013 2016-2017
Mature 2014-2016 2017++
Lifetime 2017++
Technology Advance
RTU50 – SCD5200 Migration Strategy Function Feature RTU50 SCD5200 SCD6000
Euro/China RoHs Directive Lead Free Modules NO NO YES
CPU Electrobus/Optonet P30E [64MB] COPE/COE[64MB] COPE/COE
BUS Hardware Electrobus 1 to 4 files 1 File 1 File
Optobus 1 – 8 files Not Supported Not Supported
Optonet 1 – 50 files 1 – 50 files 1 – 50 Nodes
Engineering SALL / IDF Yes Yes Yes
Protocols Wisp+ Yes Yes No
Conitel Yes Yes Yes
LN57 Yes No No
DNP Yes Yes Yes
DNP Secure IEC62351-5
No No Yes
IEC 60870-5-101/103/104
Yes Yes Yes
Intelligent Bus IEC 61850 Client Yes Yes Yes
Intelligent Bus IEC 61850 Server Yes Yes Yes
RTU50 – SCD5200 Migration Strategy Main Use Feature RTU50 SCD5200 SCD6000
T/D Wide Range [24-164] YES YES Ultra Wide PS
T/D P30E COPE/COE COPE/COE
T/D Use Optonet Optonet Optonet
Electrobus Extn. Use Optonet Optonet Optonet
8-12 Ch Serial Module 12 Channel 8 Channel 8 Channel
Dual V11 YES YES TBA
Dual V28 YES YES YES
Legacy 1200 Baud Dual V23 YES NO NO
Distribution Dual Glass Optical YES YES YES
Transmission 32DI/4AI YES YES YES [32 DI ONLY]
Transmission 20AI YES YES YES
Transmission AGC 4 AO [Setpoint] YES YES YES
Distribution 11/33kV IO [24DI/6AI/8DO] NO YES YES
General DO 12 CH [1A] 12CH[1A] 12CH[1A]
{Distribution} CTVT MODULE[PQ] 3CT/4VT / 2DO 3CT/4VT / 2DO 3CT/4VT / 2DO
Slide 27 Invensys Proprietary & Confidential
Slide 28
Responsibility to each other
And we want your help....... Invensys Proprietary & Confidential
For an “overview” audience, the roadmap
presentation could end here. However there will be
opportunities to present to internal & external
customers where greater detail is required for a
specific product, for a grouping of products (some of
which may be on roadmaps outside of this portfolio),
or for other reasons. The following slides illustrate
ways of tying the “overview” map into details slides.