10 – 12 March 20112nd SOLAR THERMAL ELECTRICITY INDUSTRY FORUM
Forum: ”Solar Thermal Power: From Legend to Reality”
Integration of renewable sources power capacity in
European and Mediterranean Power Systems
Italian Operations Department - Investment Planning/Grid Planning 1
Siracusa, 11th March 2011
10 – 12 March 20112nd SOLAR THERMAL ELECTRICITY INDUSTRY FORUM
• Terna’s evidences
• Key figures of Italian Network Development Plan 2011
• Italian transmission network: electrical gate of Mediterranean power systems
• Development of European Grid on the North - South axis (ENTSO-E TYNDP)
• Development of EU-MENA interconnection on the South – South axis
Table of contents
Italian Operations Department - Investment Planning/Grid Planning 2
• Development of EU-MENA interconnection on the South – South axis
10 – 12 March 20112nd SOLAR THERMAL ELECTRICITY INDUSTRY FORUM
� 1st independent operator in Europe and 7th in the world
� Primary owner of the National High Voltage Electricity
Transmission Grid
� Terna is responsible for grid planning, development and
maintenance as well for energy transmission and
dispatching
� Over 62.500 km of EHV and HV lines
Terna and the Italian Transmission SystemEvidences
Italian Operations Department - Investment Planning/Grid Planning 3
1.122 km underground cables, 917 km subsea cables, 11.261 km operated to 380 kV
� Over 390 transforming and switching stations
Transforming capacity 122 GVA
� n.18 interconnection lines
with France (4), Switzerland (9), Austria(1), Slovenia (2), Greece (1), Corsica (1)
� 326 TWh the 2010 energy demand (+1,8% vs 2009)
� 56.425 MW the 2010 maximum power demand
(16th July 2010)
10 – 12 March 20112nd SOLAR THERMAL ELECTRICITY INDUSTRY FORUM
Italian Transmission Network Development Plan 2011Forecast of energy and power demand
Development scenarios:
�+2,3% the energy annual growth rate in the next 10y �Trend of energy demand, Gross domestic
product and electrical intensity
85,9
20,4
22,6
25
5,6
5,9
6
Agricolture
Losses
CAGR
2009 - 2020
0,5%
1,9%
2,0%
ITALY
362.1
320.3
410.0 2,3%
1.4
1.6
1.8
2.0
CAGR
1990 -2009
+1,6%
+0,9%
+0,7%
CAGR
2009 -2020
+2,3%
+1,6%
+0,7%
Domanda elettrica
PIL
Intensità elettrica
Energy demand
Gross domestic product
Electrical intensity
[TWh] %
Italian Operations Department - Investment Planning/Grid Planning 4
130,5 142,4 153,4
94,8115,2
139,7
68,9
75,920,4
2009 2015 2020
Losses
Household
Service
Sector
Industry
3,6%
1,5%
�Forecast of power demand
Year Power
2009 51.873 MW
2016 low/high hypothesis 64/66 GW
2020 low/high hypothesis 70/74 GW
0.8
1.0
1.2
1.4
1990 1995 2000 2005 2010 2015 2020
10 – 12 March 20112nd SOLAR THERMAL ELECTRICITY INDUSTRY FORUM
Wind installed capacity from 2001 to 2010 (MW) Photovoltaic installed capacity from 2007 to 2010 (MW)
+260% In the last 5 years
+160% in the last year
Italian Transmission Network Development Plan 2011Wind and Photovoltaic installed capacity
Italian Operations Department - Investment Planning/Grid Planning 5
* Provisional data
10 – 12 March 20112nd SOLAR THERMAL ELECTRICITY INDUSTRY FORUM
2020
Source GW
Hydro 17,8
Geothermal. 0,9
Solar 8,6
Tide,… <0,1
Wind 12,7
•Wind installed and
forecast capacity (MW)
•Photovoltaic installed and
forecast capacity (MW)
•Minimum target
of Energy Action
Plan
Italian Transmission Network Development Plan 2011Wind and Photovoltaic expected capacity increase
13 15
65 85
139260
107 170
266415
120 140
269530
December2010*2.660 MW
Forecast 2013/146.200 MW
179405
72 120
2834603 3 December 2010*
>3000 MW
2013/14 forecast
6.200 MW
23 25
2 5
0 4545 115
16 35
3 5
1 10
Eolico dicembre 2010*5.850 MW
Eolico 2013/149.600 MW
13 15
December 2010*
5.850 MW
2013/14 forecast
9.600 MW
Italian Operations Department - Investment Planning/Grid Planning 6
Wind 12,7
Biomass 3,8
Total 43,8
� Total connection applications at the end of 2010 (wind and solar) over 120.000 MW
of which 110 MW of Solar Thermoelectric Power (1 plant in Sicily and 1 plant in Sardinia)* Provisional data
511
1.637
40 85
73 180
47210
13 135
50 95
127445
208400
75410
1.339
2.100
283470
827
1.390
596
1.370
373610
225 230
1.424
1.950
9 80
671
1.150
of which 600 MW
by concentrated
solar plants
3,7
1,4
1,7
2011-2015 2016-2020 (bn€)
Italian Transmission Network Development Plan 20112011-2015 Strategic Investments Plan
� The New Strategic Plan includes
3,8 bn€ of total investments for
grid development in the short
term period (2011-2015).
� The National Development Plan
(Roll Over of the 10-Year Plan
from 2011 to 2020) contains
investment for about 7,5 bn€.
Italian Operations Department - Investment Planning/Grid Planning 7
3,8
4,4
1,6
0,8
1,2
0,8
PdS 2011-2020 Renewable &
Congestions
Interconnections Others
investment for about 7,5 bn€.
10 – 12 March 20112nd SOLAR THERMAL ELECTRICITY INDUSTRY FORUM
Completati nel 2010
• Projects completed in 2010� SA.PE.I.
� 380 kV Ittiri-Codrongianos
� S/E 380/150 kV Bisaccia, Deliceto, Maida,
� others
…comes to total of ∼∼∼∼900 Mln€1
• Main projects in construction� Sorgente-Rizziconi
� S/E 380/150 kV Troia, Spinazzola,
Castellaneta, Montesano M., Rotello,
Tuscania, Aliano
Italian Transmission Network Development Plan 2011Energy Action Plan: 10y network investment for renewable energy
380/150 kV Foggia
(existing)
380/150 kV
Rotello
380/150 kV Larino
(existing)
HVDC interconnection
380/150 Tuscania
380/150 kV S.Severo
(existing)
Adriatic
backbone
Italian Operations Department - Investment Planning/Grid Planning 8
1 At completion total cost
Intervento per rinnovabile
• Main projets in permitting phase� Montecorv.-Avellino N.
� Paternò-Priolo
� Foggia-Gissi
� Benevento II-Foggia
� S/E Villanova and S/E Foggia (PST)
� others
…comes to total of ∼∼∼∼600 Mln€ 2
Intervento per rinnovabile
Tuscania, Aliano
� Development on existing S/E 380/150 kV
(Maida Deliceto, Scandale, Foggia,
Galatina, Brindisi, Feroleto,…)
� others
…comes to total of ∼∼∼∼900 Mln€
2 Connection projects of new power plant in permitting not included
380/150 kV Galatina
(existing)
380/150 kV Brindisi S.
(existing)
(existing)
380/150 kV
Castellaneta
380 kV Sorgente-Rizziconi
380 kV
Calabria-Basilicata-Campania
380 kV Foggia-
Benevento II
HVDC interconnection
Sardinia-Continent
380 kV Deliceto-Bisaccia
380/150 kV
Spinazzola
380/150 kV
Marcellana
380/150 kV Feroleto
(existing) 380/150 kV
Belcastro
380/150 kV Scandale
(existing)
380/150 kV
Aliano
380/150 kV Mineo
Calabria
Crossbone
Laino-Altomonte
380/150 kV P. del Colle
(existing)
380/150 kV Sorgente 2
380 kV ring of Sicily
Partinico-Fulgatore
10 – 12 March 20112nd SOLAR THERMAL ELECTRICITY INDUSTRY FORUM
'
''
'
'
''
'
'
'
(' '
$
'
$'
''
' '
'
''
''
''
''
'
'
'''
''
'
$
'
'
$
$$
""""
$
""
$
' '
(
'
'
'
'
'
'
'""
""
'
$(
'
$
'
ROSELECTRA
MONFALCONETORVISCOSA
VOGHERA ST
ROSARA SF6
TAVARNUZZE
VILLARODIN
VIGNOLE B.
TURBIGO
PIANCAMUNO
CORDIGNANO
PORTO TOLLE
ALBERTVILLE
UDINE OVEST
SPEZIA C.LE
VADO TERMICA
FERRARA NORD
VENEZIA N.
PORTO CORSINI
RONCOVALGRANDE
BARGI C.LE
RAVENNA CANALA
S.MARTINO IN XX
POGGIO A CAIANO
PARMA VIGH.
PIOMBINO TERMICA
ENIPOWER RAVENNA
FORLI' VIA ORAZIANA
PIAN DELLA SPERANZA
'
'
'
' '
'
'
'
'
'
'
'
'
'
'
'
$
""
$
'
'
'
'
'
'
'
'
$
'
(
(
$
''
''
$
'
$$
'
$
'
$'
' $
'
$
$
'
'$
'
' '
$
NAVE
DOLO
EDOLO
ROSEN
LEYNI
FLERO
CAMIN
VENAUS
CANDIA
ROBBIASOAZZA
LONATO
CAORSO
OSPIATE
DIVACA
DUGALECASSANO
SERMIDE
MANTOVA
LAVORGO
COLUNGA
RUBIERA
GORLAGO
S.ROCCO
PLANAIS
OSTIGLIA
PIACENZA
S.DAMASO
SUVERETO
MAGLIANO
CASANOVA
BULCIAGO
MERCALLO
SANDRIGO
TAVAZZANO
ROSIGNANO
ENTRACQUE
S.FIORANO
FANO E.T.CALENZANOMARGINONE
PIOSSASCO
MUSIGNANO
ADRIA SUD
TRINO C.LE
CHIVAS.TER
Italy: electrical gate of the MediterraneanMain project on the EHV network about the North-South axis
Foggia-Benevento and PST
Mantova-Modena
Link accross Veneto
Voghera-Lacasella
Trino-Lacchiarella
Casanova-Vignole
Udine O.-Redipuglia
Dolo-Camin
Adriatic backbone and PST
Colunga-Calenzano
Italian Operations Department - Investment Planning/Grid Planning 9
PRESENZANO
ROSSANO TE
TERAMO 380
LATINA NUCL.
CEPRANO380
VALMONTONE
VILLAVALLE
ROMA O.
TARANTO N2
ISAB ENERGY
BENEVENTO 2
SET TEVEROLA
SPARANISE
CAGLIARI SUD
CODRONGIANOS
MONTECORVINO
SIMERI CRICHI
BRINDISI NORD
S.GIACOMO
TORREVAL.NORD
MONTALTO C.LE
PATERNO
GARIGLIANO ST
BRINDISI SUD CE
BRINDISI S.
PIOMBINO TERMICA
FIUMESANTO
CHIARAMONTE GULFI
ALTOMONTE
ENERGIA M. TERMOLI
S. TERESA
$
'
''
'
'
'
'
'
'
'
'
'
''
'
'
'
$$
'
'
'
'
'
'
'
'
'
'
''
'
'
$
$
$$
'
'
$
""
""
'
$'
$
$
' $
'
'
$
''
$
'
'$
$
'
$
'
$'
'
$
S.MARIA CAPUA V.
AR
AC
HT
HO
S(G
RE
CIA
)
TORREVAL. SUDGISSI
LAINO
LARINO
SARLUX
BARI O
MATERA
ANDRIA
FOGGIA
PATRIA
CANDELA
S.LUCIAAURELIA
MAGISANO
ASSEMINI
CORRIOLO
ROMA E.
ROMA S.
FEROLETO
SCANDALE
GALATINA
BRINDISI
SELARGIUS
VILLANOVA
ROMA N.
RIZZICONISORGENTE
MISTERBIANCO
MELILLI'
'
Calabria-Campania axis
Link accross Calabria
Sorgente-RizziconiSicily EHV ring
M.Corvino-Benevento
Foggia-Benevento and PSTVoghera-Lacasella
SACOI repowering
Chignolo-Maleo
10 – 12 March 20112nd SOLAR THERMAL ELECTRICITY INDUSTRY FORUM
CURRENT NET TRANSFER
CAPACITY1 :
�7.540 MW NORTH BORDER
by French (4 tie-lines)
by Switzerland (9 tie-lines)
by Austria (1 tie-lines)
by Slovenia (2 tie-lines)
�500 MW GREECE
Italy: electrical gate of the MediterraneanNew capacity by interconnection project and relevant investments
HVDC Grand’Ile-Piossasco
(permitting)
Italia – Austria
(planned)
Udine O.-Okroglo
(planned)
FR 500 MW HVDC Italy-Croatia
(under consideration)
HVDC Italy-Slovenia
(under feasibility study)
HVDC Italia-Austria
(under consideration)Italy-Switzerland
(under feasibility study)
HVDC Italy-French
(under consideration)
Italian Operations Department - Investment Planning/Grid Planning 10
DEVELOPMENTS:
+3.000/5.000 MW ON NORTH
by over 800 Mln€ of investments2
DEVELOPMENTS:
+1.500/4.000 MW ON BALCANS AND
NORTH AFRICA
by over 800 Mln€ of investments2
�500 MW GREECE
HVDC Italy-Albania
(authorized)
Existing submarine cable
Terna’s development plan projects
Projects by private founding (ML and interconnectors)
HVDC Villanova-Tivat/Kotor
(permitting)
HVDC Italy-Tunisia
(permitting)
HVDC Galatina-Arachthos
Sorgente-Rizziconi
HVDC SAPEI
(completed in 2010)
Repowering of SACOI
(planned)
HVDC Italy-Malta
(planned)
Sicily-Mainland AC link
(under construction)
HVDC Italy-Algeria
(under feasibility study)
1 Referred to winter peak NTC value in import
2 At completion total cost
Entso-e systemKey Drivers for Transmission Investments and TYNDP
�Terna is involved as a member of ENTSO-E being the body of transmission system operators of electricity at European level.
�ENTSO-E's mission: to guarantee Security and Adequacy, improve Market competition and promote Sustainability
Italian Operations Department - Investment Planning/Grid Planning 11
�Main European transmission projects are included in the TYNDP
�TYNDP was approved after six weeks of public consultation from 1 March till 11 April 2010
Entso-e system
Key Drivers for Transmission Investments and TYNDP
�over 42.000 km in next 10 years; the main technology
�European transmission investments driven by Security of Supply, Renewable Energy Sources, Market Integration
�TYNDP covers about 23-28 bn€ of about n. 500 transmission projects in next 5 years
�over 10 % in charge of Terna
Italian Operations Department - Investment Planning/Grid Planning 12
�over 42.000 km in next 10 years; the main technology remains 400 kV HVAC OHL,
�other technical solutions are being implemented in specific situations (HVDC links, subsea cables, etc.)
388418 425
455
489
429400
500
600
Entso-e systemFuture scenarios of load and generation
346 411 415 439 453
70%
80%
90%
100%
• Demand Growth [GW]
+ 17 % in next 10 years
•Generation capacity trends
+ 132 % renewable power in next 10 years
Italian Operations Department - Investment Planning/Grid Planning 13
334
362 369398
429
0
100
200
300
400
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
January 19:00 July 11:00
139 151 156 168 171
111110 108 106 107
93 154 167 216 262
0%
10%
20%
30%
40%
50%
60%
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Hydro Power Nuclear Power Renewable Energy Sources Fossil Fuels
10 – 12 March 20112nd SOLAR THERMAL ELECTRICITY INDUSTRY FORUM
ENTSO-E: Ten Year National Development PlanFocus on network needs of North-South axis by Italy (2010-2020)
Roads of priority network corridors
Italian network system fully involved on the
implementation of TYNDP on the axis North - South:
�North Sea ���� Continental Central South
�Central Continent ���� South (Italy)
�Central South Est ���� South (Italy)
Italian Operations Department - Investment Planning/Grid Planning 14
RS
HU
IT
SIRO
BA
HR
BG
GR
MK
CYCONTINENTAL
SOUTH EAST
ME
RS
HU
IT
SIRO
BA
HR
BG
GR
MK
CYCONTINENTAL
SOUTH EAST
ME
0
2
4
6
8
10
12
14
16
bn€
DE
FR
IT
CH AT
CONTINENTAL
CENTRAL SOUTH
SI
DE
FR
IT
CH AT
CONTINENTAL
CENTRAL SOUTH
SI
0
2
4
6
8
10
12
14
16
bn€
10 – 12 March 20112nd SOLAR THERMAL ELECTRICITY INDUSTRY FORUM
Development of EU-MENA transmission systemsDevelopment of new interconnection on South – South axis
DESERTEC as “enabler”
coming before
development and
realization activity
Main transmission target:
� Identify grid requirements
for desert power
Italian Operations Department - Investment Planning/Grid Planning 15
� Assess grid conditions
� Assess relevant
transmission technologies
� Work out optimal
transmission paths to
relax bottlenecks
� Develop transmission cost
model
� Develop scenarios for grid
arrangements
� Examine the impact of
transmission on EU/MENA
10 – 12 March 20112nd SOLAR THERMAL ELECTRICITY INDUSTRY FORUM
• MEDGRID foundation is a unique private industry joint venture aiming at creating a Trans-
Mediterranean grid system for transmission of energy between MENA countries and with Europe.
• Target of Medgrid:
� Design in partnership with
the MENA countries, the
Mediterranean transmission
Development of EU-MENA transmission systemsDevelopment of new interconnection on South – South axis
Italian Operations Department - Investment Planning/Grid Planning 16
grid Master Plan for 2020
� Promote a regulatory and
institutional framework
� Assess the benefits of
investments in grid
infrastructures
� Develop technical and
technological cooperation
with the MENA countries
� Promote HVDC technologies
for power transmission
Growing interconnection around the
Mediterranean Area
�UCTE block expanded to Southeastern
Europe
�Interlinkage to SW-Mediterranean block
and recently also with Turkey on going
Technical challenges for the completion of the Mediterranean ring
Italian Operations Department - Investment Planning/Grid Planning 17
Challenges for completion of Medring
remain
�failed synchronisation attempts with
SE-Mediterranean (Libya-Tunisia)
�Low capability of North African
Countries to react to disturbances
If synchronisation tests continue to fail,
linking the systems through HVDC may
be a possible option
HVDC
MENA-Europe maritime connections: Seabed morphology and depth pose limitations
Further evaluation:
�Assessment of feasible corridors in Mediterranen area
�Analysis of previous feasibility studies (results, status, involved parties)
�Preliminary identification of time line, costs and benefits of planned projects
Italian Operations Department - Investment Planning/Grid Planning 18
Red parts >2000m beyond mid term technical limit