10 – 12 March 2011 2nd SOLAR THERMAL ELECTRICITY INDUSTRY FORUM Forum: ”Solar Thermal Power: From Legend to Reality” Integration of renewable sources power capacity in European and Mediterranean Power Systems Italian Operations Department - Investment Planning/Grid Planning 1 Siracusa, 11th March 2011

Forum: ”Solar Thermal Power: From Legend to Reality ...orizzontenergia.it/download/Appr/SOLARE/2011_03_11_Integration of... · Forum: ”Solar Thermal Power: From Legend to Reality

  • Upload
    vanthu

  • View
    214

  • Download
    0

Embed Size (px)

Citation preview

10 – 12 March 20112nd SOLAR THERMAL ELECTRICITY INDUSTRY FORUM

Forum: ”Solar Thermal Power: From Legend to Reality”

Integration of renewable sources power capacity in

European and Mediterranean Power Systems

Italian Operations Department - Investment Planning/Grid Planning 1

Siracusa, 11th March 2011

10 – 12 March 20112nd SOLAR THERMAL ELECTRICITY INDUSTRY FORUM

• Terna’s evidences

• Key figures of Italian Network Development Plan 2011

• Italian transmission network: electrical gate of Mediterranean power systems

• Development of European Grid on the North - South axis (ENTSO-E TYNDP)

• Development of EU-MENA interconnection on the South – South axis

Table of contents

Italian Operations Department - Investment Planning/Grid Planning 2

• Development of EU-MENA interconnection on the South – South axis

10 – 12 March 20112nd SOLAR THERMAL ELECTRICITY INDUSTRY FORUM

� 1st independent operator in Europe and 7th in the world

� Primary owner of the National High Voltage Electricity

Transmission Grid

� Terna is responsible for grid planning, development and

maintenance as well for energy transmission and

dispatching

� Over 62.500 km of EHV and HV lines

Terna and the Italian Transmission SystemEvidences

Italian Operations Department - Investment Planning/Grid Planning 3

1.122 km underground cables, 917 km subsea cables, 11.261 km operated to 380 kV

� Over 390 transforming and switching stations

Transforming capacity 122 GVA

� n.18 interconnection lines

with France (4), Switzerland (9), Austria(1), Slovenia (2), Greece (1), Corsica (1)

� 326 TWh the 2010 energy demand (+1,8% vs 2009)

� 56.425 MW the 2010 maximum power demand

(16th July 2010)

10 – 12 March 20112nd SOLAR THERMAL ELECTRICITY INDUSTRY FORUM

Italian Transmission Network Development Plan 2011Forecast of energy and power demand

Development scenarios:

�+2,3% the energy annual growth rate in the next 10y �Trend of energy demand, Gross domestic

product and electrical intensity

85,9

20,4

22,6

25

5,6

5,9

6

Agricolture

Losses

CAGR

2009 - 2020

0,5%

1,9%

2,0%

ITALY

362.1

320.3

410.0 2,3%

1.4

1.6

1.8

2.0

CAGR

1990 -2009

+1,6%

+0,9%

+0,7%

CAGR

2009 -2020

+2,3%

+1,6%

+0,7%

Domanda elettrica

PIL

Intensità elettrica

Energy demand

Gross domestic product

Electrical intensity

[TWh] %

Italian Operations Department - Investment Planning/Grid Planning 4

130,5 142,4 153,4

94,8115,2

139,7

68,9

75,920,4

2009 2015 2020

Losses

Household

Service

Sector

Industry

3,6%

1,5%

�Forecast of power demand

Year Power

2009 51.873 MW

2016 low/high hypothesis 64/66 GW

2020 low/high hypothesis 70/74 GW

0.8

1.0

1.2

1.4

1990 1995 2000 2005 2010 2015 2020

10 – 12 March 20112nd SOLAR THERMAL ELECTRICITY INDUSTRY FORUM

Wind installed capacity from 2001 to 2010 (MW) Photovoltaic installed capacity from 2007 to 2010 (MW)

+260% In the last 5 years

+160% in the last year

Italian Transmission Network Development Plan 2011Wind and Photovoltaic installed capacity

Italian Operations Department - Investment Planning/Grid Planning 5

* Provisional data

10 – 12 March 20112nd SOLAR THERMAL ELECTRICITY INDUSTRY FORUM

2020

Source GW

Hydro 17,8

Geothermal. 0,9

Solar 8,6

Tide,… <0,1

Wind 12,7

•Wind installed and

forecast capacity (MW)

•Photovoltaic installed and

forecast capacity (MW)

•Minimum target

of Energy Action

Plan

Italian Transmission Network Development Plan 2011Wind and Photovoltaic expected capacity increase

13 15

65 85

139260

107 170

266415

120 140

269530

December2010*2.660 MW

Forecast 2013/146.200 MW

179405

72 120

2834603 3 December 2010*

>3000 MW

2013/14 forecast

6.200 MW

23 25

2 5

0 4545 115

16 35

3 5

1 10

Eolico dicembre 2010*5.850 MW

Eolico 2013/149.600 MW

13 15

December 2010*

5.850 MW

2013/14 forecast

9.600 MW

Italian Operations Department - Investment Planning/Grid Planning 6

Wind 12,7

Biomass 3,8

Total 43,8

� Total connection applications at the end of 2010 (wind and solar) over 120.000 MW

of which 110 MW of Solar Thermoelectric Power (1 plant in Sicily and 1 plant in Sardinia)* Provisional data

511

1.637

40 85

73 180

47210

13 135

50 95

127445

208400

75410

1.339

2.100

283470

827

1.390

596

1.370

373610

225 230

1.424

1.950

9 80

671

1.150

of which 600 MW

by concentrated

solar plants

3,7

1,4

1,7

2011-2015 2016-2020 (bn€)

Italian Transmission Network Development Plan 20112011-2015 Strategic Investments Plan

� The New Strategic Plan includes

3,8 bn€ of total investments for

grid development in the short

term period (2011-2015).

� The National Development Plan

(Roll Over of the 10-Year Plan

from 2011 to 2020) contains

investment for about 7,5 bn€.

Italian Operations Department - Investment Planning/Grid Planning 7

3,8

4,4

1,6

0,8

1,2

0,8

PdS 2011-2020 Renewable &

Congestions

Interconnections Others

investment for about 7,5 bn€.

10 – 12 March 20112nd SOLAR THERMAL ELECTRICITY INDUSTRY FORUM

Completati nel 2010

• Projects completed in 2010� SA.PE.I.

� 380 kV Ittiri-Codrongianos

� S/E 380/150 kV Bisaccia, Deliceto, Maida,

� others

…comes to total of ∼∼∼∼900 Mln€1

• Main projects in construction� Sorgente-Rizziconi

� S/E 380/150 kV Troia, Spinazzola,

Castellaneta, Montesano M., Rotello,

Tuscania, Aliano

Italian Transmission Network Development Plan 2011Energy Action Plan: 10y network investment for renewable energy

380/150 kV Foggia

(existing)

380/150 kV

Rotello

380/150 kV Larino

(existing)

HVDC interconnection

380/150 Tuscania

380/150 kV S.Severo

(existing)

Adriatic

backbone

Italian Operations Department - Investment Planning/Grid Planning 8

1 At completion total cost

Intervento per rinnovabile

• Main projets in permitting phase� Montecorv.-Avellino N.

� Paternò-Priolo

� Foggia-Gissi

� Benevento II-Foggia

� S/E Villanova and S/E Foggia (PST)

� others

…comes to total of ∼∼∼∼600 Mln€ 2

Intervento per rinnovabile

Tuscania, Aliano

� Development on existing S/E 380/150 kV

(Maida Deliceto, Scandale, Foggia,

Galatina, Brindisi, Feroleto,…)

� others

…comes to total of ∼∼∼∼900 Mln€

2 Connection projects of new power plant in permitting not included

380/150 kV Galatina

(existing)

380/150 kV Brindisi S.

(existing)

(existing)

380/150 kV

Castellaneta

380 kV Sorgente-Rizziconi

380 kV

Calabria-Basilicata-Campania

380 kV Foggia-

Benevento II

HVDC interconnection

Sardinia-Continent

380 kV Deliceto-Bisaccia

380/150 kV

Spinazzola

380/150 kV

Marcellana

380/150 kV Feroleto

(existing) 380/150 kV

Belcastro

380/150 kV Scandale

(existing)

380/150 kV

Aliano

380/150 kV Mineo

Calabria

Crossbone

Laino-Altomonte

380/150 kV P. del Colle

(existing)

380/150 kV Sorgente 2

380 kV ring of Sicily

Partinico-Fulgatore

10 – 12 March 20112nd SOLAR THERMAL ELECTRICITY INDUSTRY FORUM

'

''

'

'

''

'

'

'

(' '

$

'

$'

''

' '

'

''

''

''

''

'

'

'''

''

'

$

'

'

$

$$

""""

$

""

$

' '

(

'

'

'

'

'

'

'""

""

'

$(

'

$

'

ROSELECTRA

MONFALCONETORVISCOSA

VOGHERA ST

ROSARA SF6

TAVARNUZZE

VILLARODIN

VIGNOLE B.

TURBIGO

PIANCAMUNO

CORDIGNANO

PORTO TOLLE

ALBERTVILLE

UDINE OVEST

SPEZIA C.LE

VADO TERMICA

FERRARA NORD

VENEZIA N.

PORTO CORSINI

RONCOVALGRANDE

BARGI C.LE

RAVENNA CANALA

S.MARTINO IN XX

POGGIO A CAIANO

PARMA VIGH.

PIOMBINO TERMICA

ENIPOWER RAVENNA

FORLI' VIA ORAZIANA

PIAN DELLA SPERANZA

'

'

'

' '

'

'

'

'

'

'

'

'

'

'

'

$

""

$

'

'

'

'

'

'

'

'

$

'

(

(

$

''

''

$

'

$$

'

$

'

$'

' $

'

$

$

'

'$

'

' '

$

NAVE

DOLO

EDOLO

ROSEN

LEYNI

FLERO

CAMIN

VENAUS

CANDIA

ROBBIASOAZZA

LONATO

CAORSO

OSPIATE

DIVACA

DUGALECASSANO

SERMIDE

MANTOVA

LAVORGO

COLUNGA

RUBIERA

GORLAGO

S.ROCCO

PLANAIS

OSTIGLIA

PIACENZA

S.DAMASO

SUVERETO

MAGLIANO

CASANOVA

BULCIAGO

MERCALLO

SANDRIGO

TAVAZZANO

ROSIGNANO

ENTRACQUE

S.FIORANO

FANO E.T.CALENZANOMARGINONE

PIOSSASCO

MUSIGNANO

ADRIA SUD

TRINO C.LE

CHIVAS.TER

Italy: electrical gate of the MediterraneanMain project on the EHV network about the North-South axis

Foggia-Benevento and PST

Mantova-Modena

Link accross Veneto

Voghera-Lacasella

Trino-Lacchiarella

Casanova-Vignole

Udine O.-Redipuglia

Dolo-Camin

Adriatic backbone and PST

Colunga-Calenzano

Italian Operations Department - Investment Planning/Grid Planning 9

PRESENZANO

ROSSANO TE

TERAMO 380

LATINA NUCL.

CEPRANO380

VALMONTONE

VILLAVALLE

ROMA O.

TARANTO N2

ISAB ENERGY

BENEVENTO 2

SET TEVEROLA

SPARANISE

CAGLIARI SUD

CODRONGIANOS

MONTECORVINO

SIMERI CRICHI

BRINDISI NORD

S.GIACOMO

TORREVAL.NORD

MONTALTO C.LE

PATERNO

GARIGLIANO ST

BRINDISI SUD CE

BRINDISI S.

PIOMBINO TERMICA

FIUMESANTO

CHIARAMONTE GULFI

ALTOMONTE

ENERGIA M. TERMOLI

S. TERESA

$

'

''

'

'

'

'

'

'

'

'

'

''

'

'

'

$$

'

'

'

'

'

'

'

'

'

'

''

'

'

$

$

$$

'

'

$

""

""

'

$'

$

$

' $

'

'

$

''

$

'

'$

$

'

$

'

$'

'

$

S.MARIA CAPUA V.

AR

AC

HT

HO

S(G

RE

CIA

)

TORREVAL. SUDGISSI

LAINO

LARINO

SARLUX

BARI O

MATERA

ANDRIA

FOGGIA

PATRIA

CANDELA

S.LUCIAAURELIA

MAGISANO

ASSEMINI

CORRIOLO

ROMA E.

ROMA S.

FEROLETO

SCANDALE

GALATINA

BRINDISI

SELARGIUS

VILLANOVA

ROMA N.

RIZZICONISORGENTE

MISTERBIANCO

MELILLI'

'

Calabria-Campania axis

Link accross Calabria

Sorgente-RizziconiSicily EHV ring

M.Corvino-Benevento

Foggia-Benevento and PSTVoghera-Lacasella

SACOI repowering

Chignolo-Maleo

10 – 12 March 20112nd SOLAR THERMAL ELECTRICITY INDUSTRY FORUM

CURRENT NET TRANSFER

CAPACITY1 :

�7.540 MW NORTH BORDER

by French (4 tie-lines)

by Switzerland (9 tie-lines)

by Austria (1 tie-lines)

by Slovenia (2 tie-lines)

�500 MW GREECE

Italy: electrical gate of the MediterraneanNew capacity by interconnection project and relevant investments

HVDC Grand’Ile-Piossasco

(permitting)

Italia – Austria

(planned)

Udine O.-Okroglo

(planned)

FR 500 MW HVDC Italy-Croatia

(under consideration)

HVDC Italy-Slovenia

(under feasibility study)

HVDC Italia-Austria

(under consideration)Italy-Switzerland

(under feasibility study)

HVDC Italy-French

(under consideration)

Italian Operations Department - Investment Planning/Grid Planning 10

DEVELOPMENTS:

+3.000/5.000 MW ON NORTH

by over 800 Mln€ of investments2

DEVELOPMENTS:

+1.500/4.000 MW ON BALCANS AND

NORTH AFRICA

by over 800 Mln€ of investments2

�500 MW GREECE

HVDC Italy-Albania

(authorized)

Existing submarine cable

Terna’s development plan projects

Projects by private founding (ML and interconnectors)

HVDC Villanova-Tivat/Kotor

(permitting)

HVDC Italy-Tunisia

(permitting)

HVDC Galatina-Arachthos

Sorgente-Rizziconi

HVDC SAPEI

(completed in 2010)

Repowering of SACOI

(planned)

HVDC Italy-Malta

(planned)

Sicily-Mainland AC link

(under construction)

HVDC Italy-Algeria

(under feasibility study)

1 Referred to winter peak NTC value in import

2 At completion total cost

Entso-e systemKey Drivers for Transmission Investments and TYNDP

�Terna is involved as a member of ENTSO-E being the body of transmission system operators of electricity at European level.

�ENTSO-E's mission: to guarantee Security and Adequacy, improve Market competition and promote Sustainability

Italian Operations Department - Investment Planning/Grid Planning 11

�Main European transmission projects are included in the TYNDP

�TYNDP was approved after six weeks of public consultation from 1 March till 11 April 2010

Entso-e system

Key Drivers for Transmission Investments and TYNDP

�over 42.000 km in next 10 years; the main technology

�European transmission investments driven by Security of Supply, Renewable Energy Sources, Market Integration

�TYNDP covers about 23-28 bn€ of about n. 500 transmission projects in next 5 years

�over 10 % in charge of Terna

Italian Operations Department - Investment Planning/Grid Planning 12

�over 42.000 km in next 10 years; the main technology remains 400 kV HVAC OHL,

�other technical solutions are being implemented in specific situations (HVDC links, subsea cables, etc.)

388418 425

455

489

429400

500

600

Entso-e systemFuture scenarios of load and generation

346 411 415 439 453

70%

80%

90%

100%

• Demand Growth [GW]

+ 17 % in next 10 years

•Generation capacity trends

+ 132 % renewable power in next 10 years

Italian Operations Department - Investment Planning/Grid Planning 13

334

362 369398

429

0

100

200

300

400

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

January 19:00 July 11:00

139 151 156 168 171

111110 108 106 107

93 154 167 216 262

0%

10%

20%

30%

40%

50%

60%

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

Hydro Power Nuclear Power Renewable Energy Sources Fossil Fuels

10 – 12 March 20112nd SOLAR THERMAL ELECTRICITY INDUSTRY FORUM

ENTSO-E: Ten Year National Development PlanFocus on network needs of North-South axis by Italy (2010-2020)

Roads of priority network corridors

Italian network system fully involved on the

implementation of TYNDP on the axis North - South:

�North Sea ���� Continental Central South

�Central Continent ���� South (Italy)

�Central South Est ���� South (Italy)

Italian Operations Department - Investment Planning/Grid Planning 14

RS

HU

IT

SIRO

BA

HR

BG

GR

MK

CYCONTINENTAL

SOUTH EAST

ME

RS

HU

IT

SIRO

BA

HR

BG

GR

MK

CYCONTINENTAL

SOUTH EAST

ME

0

2

4

6

8

10

12

14

16

bn€

DE

FR

IT

CH AT

CONTINENTAL

CENTRAL SOUTH

SI

DE

FR

IT

CH AT

CONTINENTAL

CENTRAL SOUTH

SI

0

2

4

6

8

10

12

14

16

bn€

10 – 12 March 20112nd SOLAR THERMAL ELECTRICITY INDUSTRY FORUM

Development of EU-MENA transmission systemsDevelopment of new interconnection on South – South axis

DESERTEC as “enabler”

coming before

development and

realization activity

Main transmission target:

� Identify grid requirements

for desert power

Italian Operations Department - Investment Planning/Grid Planning 15

� Assess grid conditions

� Assess relevant

transmission technologies

� Work out optimal

transmission paths to

relax bottlenecks

� Develop transmission cost

model

� Develop scenarios for grid

arrangements

� Examine the impact of

transmission on EU/MENA

10 – 12 March 20112nd SOLAR THERMAL ELECTRICITY INDUSTRY FORUM

• MEDGRID foundation is a unique private industry joint venture aiming at creating a Trans-

Mediterranean grid system for transmission of energy between MENA countries and with Europe.

• Target of Medgrid:

� Design in partnership with

the MENA countries, the

Mediterranean transmission

Development of EU-MENA transmission systemsDevelopment of new interconnection on South – South axis

Italian Operations Department - Investment Planning/Grid Planning 16

grid Master Plan for 2020

� Promote a regulatory and

institutional framework

� Assess the benefits of

investments in grid

infrastructures

� Develop technical and

technological cooperation

with the MENA countries

� Promote HVDC technologies

for power transmission

Growing interconnection around the

Mediterranean Area

�UCTE block expanded to Southeastern

Europe

�Interlinkage to SW-Mediterranean block

and recently also with Turkey on going

Technical challenges for the completion of the Mediterranean ring

Italian Operations Department - Investment Planning/Grid Planning 17

Challenges for completion of Medring

remain

�failed synchronisation attempts with

SE-Mediterranean (Libya-Tunisia)

�Low capability of North African

Countries to react to disturbances

If synchronisation tests continue to fail,

linking the systems through HVDC may

be a possible option

HVDC

MENA-Europe maritime connections: Seabed morphology and depth pose limitations

Further evaluation:

�Assessment of feasible corridors in Mediterranen area

�Analysis of previous feasibility studies (results, status, involved parties)

�Preliminary identification of time line, costs and benefits of planned projects

Italian Operations Department - Investment Planning/Grid Planning 18

Red parts >2000m beyond mid term technical limit