Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
CASE STUDY:
XT Edge Protection Aveo Bella Vista Retirement VillageStrongbuild Commercial, July 2017
1800 809 809 fortressfencing.com.au
SPECIALISED FENCING AND
SAFETY EQUIPMENT
SPECIALISED FENCING AND SAFETY EQUIPMENT Call Fortress Now. Consider it Done.
1800 809 809fortressfencing.com.au
THE PROJECT
Strongbuild Commercial will deliver a multi-level retirement village located in the Western Sydney suburb of Bella Vista. The project will span 10 levels containing over 400 luxury retirement living apartments and an additional 145 aged care apartments.
Strongbuild Commercial secured the contract to build this innovative and sustainable structure using 4156 panels of cross laminated timber (CLT), resulting in a complex and striking retirement village.
With signifi cant areas of the slab perimeter exposed during the build, the risk of falls from unprotected edges presented a serious hazard that needed addressing.
The project managers required a safety solution that would ensure workers could stay safe on site when working at height.
A temporary edge protection fence was identifi ed as an ideal solution as it was strong and rigid, yet could be easily installed and dismantled as needed. Strongbuild chose 1200 metres of Fortress Fencing XT Edge Protection Fencing for this purpose.
THE SOLUTION
Fortress Fencing supplied Strongbuild Commercial with 1,200 metres of XT Edge Protection.
The XT Edge Barrier system was used as a protective barrier on the multiple levels of the building during construction.
Each galvanised welded mesh panel is made from 4mm steel wire grid with centres not exceeding 50mm x 50mm. This means it complies with Australian Standards for scaff olding.
The panels also feature a rectangular rolled wire top and bottom
Case Study
XT Edge Protection Aveo Bella Vista Retirement Village
Strongbuild Commercial, July 2017
with a galvanised kick plate. This solid kick plate helps prevent objects from falling through the panel bottom, thereby reducing the risk of losing objects near the drop-off .
The system uses two installation methods; either XT Edge Protection posts for installation into concrete as seen here, or steel star posts for soft or sandy ground.
This project was completed in late 2017.
With signifi cant areas of the slab perimeter exposed, the risk of falls from unprotected edges presented a serious hazard.
System Used: XT Edge Protection
Time Period: Installed July 2017
Customer: Strongbuild Commercial
Quantity: 500 XT Edge Protection Panels,
506 XT Edge Protection Posts
Install Length: 1,200m
Key Data
Case Study
XT Edge Protection Aveo Bella Vista Retirement Village
Strongbuild Commercial, July 2017
SPECIALISED FENCING AND SAFETY EQUIPMENT Call Fortress Now. Consider it Done.
1800 809 809fortressfencing.com.au
Site Photos